Load Forecasting Enhancement Act
A BILL
To require the Federal Energy Regulatory Commission to establish regional joint boards to study electric load forecasting, and for other purposes.
Sec. 2 Regional joint boards to study electric load forecasting
Sec. 3 PURPA standard on electric load forecasting
“(22) Electric load forecasting—The procedures used to forecast electric loads shall incorporate the recommendations published in the report of the Federal Energy Regulatory Commission pursuant to the Load Forecasting Enhancement Act.”
“(e) Consideration and determination by nonregulated electric utilities—The requirement for consideration and determination referred to in the first sentence of subsection (a) shall not apply to a nonregulated electric utility with respect to the standard established by paragraph (22) of subsection (d).”
“(9)
“(A) Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) shall commence consideration under section 111, or set a hearing date for consideration, with respect to the standard established by paragraph (22) of section 111(d).
“(B) Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) shall complete the consideration and make the determination under section 111 with respect to the standard established by paragraph (22) of section 111(d).”
“(i) Other prior State actions—Subsections (b) and (c) shall not apply to the standard established by paragraph (22) of section 111(d) in the case of any electric utility in a State if, before the date of enactment of this subsection—
“(1) the State has implemented for the electric utility the standard (or a comparable standard);
“(2) the State regulatory authority for the State has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or
“(3) the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility during the 3-year period ending on that date of enactment.”
Sec. 4 State energy conservation plans
“(8) procedures and programs to improve the accuracy, oversight, and transparency to stakeholders of the forecasting of electric loads by electric utilities (as such term is defined in section 3 of the Federal Power Act (16 U.S.C. 796)).”