Drought Resilient Infrastructure Act of 2024
A BILL
To provide for water conservation, drought operations, and drought resilience at water resources development projects, and for other purposes.
Sec. 2 Definition of Secretary
Sec. 3 Declaration of policy
Sec. 4 Forecast-informed reservoir operations
Sec. 5 Updates to certain water control manuals
Sec. 6 Emergency drought operations pilot program
Sec. 7 Leveraging Federal infrastructure for increased water supply
“(2) Contributed funds for other Federal reservoir projects
“(A) In general—The Secretary is authorized to receive and expend funds from a non-Federal interest or a Federal agency that owns a Federal reservoir project described in subparagraph (B) to formulate, review, or revise operational documents pursuant to a proposal submitted in accordance with subsection (a) for such a Federal reservoir project.
“(B) Federal reservoir projects described—A Federal reservoir project referred to in subparagraph (A) is a reservoir for which the Secretary is authorized to prescribe regulations for the use of storage allocated for flood control or navigation pursuant to section 7 of the Act of December 22, 1944 (commonly known as the “Flood Control Act of 1944”) (58 Stat. 890, chapter 665; 33 U.S.C. 709).”
Sec. 8 Studies for modification of project purposes in the Colorado River Basin in Arizona
Sec. 9 Invasive species that exacerbate drought
“(4) Drought resilience—A project under this section may include measures that enhance drought resilience through the restoration of wetlands or the removal of invasive species.”
“(3) Anadromous fish—Notwithstanding paragraph (1), for projects carried out under subsection (a)(3), the non-Federal interest shall provide 15 percent of the cost of construction, including provision of all lands, easements, rights-of-way, and necessary relocations.”
Sec. 10 Project modifications for improvement of environment or drought resiliency
“(1) improving”
“(2) providing drought resiliency.”
“(j) Drought resilience—Drought resilience measures carried out under this section may include—
“(1) water conservation measures to mitigate and address drought conditions;
“(2) removal of sediment captured behind a dam for the purpose of restoring or increasing the authorized storage capacity of the project concerned;
“(3) the planting of native plant species that will reduce the risk of drought and the incidence of nonnative species; and
“(4) other actions that increase drought resilience, water conservation, or water availability.”