Section 1 Short title; definitions
Short title— This Act may be cited as the “Efficient Grid Interconnection Act of 2023”.
Definitions— In this Act:
Commission— The term Commission means the Federal Energy Regulatory Commission.
Energy storage project— The term energy storage project means equipment which receives, stores, and delivers energy using batteries, compressed air, pumped hydropower, hydrogen storage (including hydrolysis), thermal energy storage, regenerative fuel cells, flywheels, capacitors, superconducting magnets, or other technologies identified by the Secretary of Energy, and which has a capacity of not less than 5 kilowatt hours.
Generation project— The term generation project means any facility—
that generates electricity; and
the interconnection request of which is subject to the jurisdiction of the Commission.
Generator tie line— The term generator tie line means a dedicated transmission line that is used to transmit power from a generation project or an energy storage project to a transmission facility or a transmission system.
Grid enhancing technology— The term grid enhancing technology means any technology or equipment that increases the capacity, efficiency, or reliability of a transmission facility or transmission system, including—
power flow control and transmission switching equipment;
energy storage technology;
topology optimization technology;
dynamic line rating technology; and
other advanced transmission technologies, such as composite reinforced aluminum conductors or high temperature superconductors.
Interconnection customer— The term interconnection customer means a person or entity that has submitted a request to interconnect a generation project or an energy storage project that is subject to the jurisdiction of the Commission to the owner or operator of a transmission facility or a transmission system.
Network upgrade— The term network upgrade means—
any modification of, addition to, or expansion of any transmission facility or transmission system;
the construction of a new facility that will become part of a transmission system;
the addition of an energy storage project to a transmission facility or a transmission system; and
any construction, deployment, or addition of grid enhancing technology to a transmission facility or a transmission system that eliminates or reduces the need to carry out any of the activities described in subparagraphs (A) through (C).
Participant funding— The term participant funding means any cost allocation method under which an interconnection customer is required to pay, without reimbursement, all or a disproportionate amount of the costs of a network upgrade that is determined to be necessary to ensure the reliable interconnection of the interconnection customer’s generation project or energy storage project.
Public utility— The term public utility has the meaning given such term in section 201(e) of the Federal Power Act (16 U.S.C. 824(e)).
Renewable generation project— The term renewable generation project means a generation project that generates electricity from a renewable energy resource, including wind, solar, geothermal, and hydropower.
Regional Transmission Organization; Independent System Operator— The terms Regional Transmission Organization and Independent System Operator have the meanings given such terms in section 3 of the Federal Power Act (16 U.S.C. 796).
Transmission system— The term transmission system means a network of transmission facilities used for the transmission of electric energy in interstate commerce.