(6)
Covered efficiency project— The term covered efficiency project means, with respect to action taken by an eligible entity—
(A)
the purchase or upgrading of equipment or technology, including an electrical or thermal monitoring system, that is demonstrated to increase the energy efficiency of communications infrastructure;
(B)
the installation or upgrading of permanent solar panels, wind turbines, combined heat and power technology, or other renewable energy generators that are used in communications infrastructure, or at a data center, provided, operated, or owned by the eligible entity;
(C)
entering into a partnership with an energy utility company to purchase land for renewable energy infrastructure, or to construct renewable energy infrastructure, that will be used to power a data center, an internet exchange point, or communications infrastructure provided, operated, or owned by the eligible entity;
(D)
the reduction of water consumption for cooling a data center, or operating other communications infrastructure, provided, operated, or owned by the eligible entity, in an area that is likely to experience drought;
(E)
the study of ways to make a communications network provided, operated, or owned by the eligible entity, or communications infrastructure provided, operated, or owned by the eligible entity, more energy and resource efficient;
(F)
the study, including through pilot projects, of green technologies to make a communications network provided, operated, or owned by the eligible entity more energy and resource efficient; or
(G)
any other type of project carried out by the eligible entity that the Assistant Secretary determines will promote the adoption of energy efficient, renewable energy, and carbon-neutral technologies and practices with respect to communications networks, or communications infrastructure, provided, operated, or owned by the eligible entity.
(7)
Covered resiliency project— The term covered resiliency project means, with respect to action taken by an eligible entity—
(A)
the construction of communications infrastructure to be provided, operated, or owned by the eligible entity in a location that is not vulnerable to projected severe effects with respect to extreme weather, natural disasters, or climate change-related events, including sea-level rise, flooding, and increased risk of wildfire;
(B)
the relocation of communications infrastructure provided, operated, or owned by the eligible entity to a location that is less vulnerable to projected severe effects with respect to extreme weather, natural disasters, or climate change-related events, including sea-level rise, flooding, and increased risk of wildfire;
(C)
the reinforcement, hardening, or replacement of communications infrastructure provided, operated, or owned by the eligible entity in a location that is increasingly vulnerable to projected severe effects with respect to extreme weather, natural disasters, or climate change-related events, including sea-level rise, flooding, and increased risk of wildfire;
(D)
the construction of a fortification, such as a sea wall or embankment, or the development of green infrastructure solutions, such as wetlands or drainage ponds, to protect communications infrastructure provided, operated, or owned by the eligible entity from projected severe effects with respect to extreme weather, natural disasters, or climate change-related events, including sea-level rise, flooding, and increased risk of wildfire;
(E)
the undertaking of research with respect to communications infrastructure provided, operated, or owned by the eligible entity to identify vulnerabilities of that infrastructure to climate change based on the best available data, analysis, and projections regarding that change, including sea-level rise projections, 100-year floodplain maps, and heat and temperature projections;
(F)
the undertaking of research (using the best available data, analysis and projections regarding tectonic science and structural engineering) with respect to communications infrastructure provided, operated, or owned by the eligible entity to identify vulnerabilities, or the susceptibility, of that communications infrastructure to damage caused by natural disasters;
(G)
the purchase of renewable energy or low-emission backup generators, fuel cells, or batteries to maximize the likelihood that communications infrastructure provided, operated, or owned by the eligible entity can continue operating in the event of an electrical system outage, without regard to whether the eligible entity is required to provide such backup power with respect to that communications infrastructure;
(H)
the purchase of cooling equipment or insulation, or the development of green infrastructure, to protect communications infrastructure provided, operated, or owned by the eligible entity from extreme heat events;
(I)
the piloting of technologies to make a communications network provided, operated, or owned by the eligible entity more resilient through energy efficient and low carbon emission measures;
(J)
in order to facilitate faster detection of, or response to, a communications network outage with respect to a communications network provided, operated, or owned by the eligible entity—
(i)
the training of employees of the eligible entity relating to such a detection or response;
(ii)
the conducting of communications network outage tests or simulations;
(iii)
the participation in communications network outage tests or simulations, including those administered by local, State, or Federal governmental entities; or
(iv)
the purchase of equipment or technology relating to such a detection or response, including communications infrastructure (including deployable communications infrastructure) that can expedite the restoration of communications or telecommunications services after such a communications network outage;
(K)
the undertaking of research to develop technologies that can expedite the restoration of communications or telecommunications services after an outage with respect to communications infrastructure provided, operated, or owned by the eligible entity;
(L)
the construction, purchase, relocation, reinforcement, or replacement of communications infrastructure provided, operated, or owned by the eligible entity in order to minimize the risk of a communications network outage caused by an affirmative power shut-off by a utility; or
(M)
any other type of project carried out by the eligible entity that the Assistant Secretary determines will increase the resiliency of a communications network or communications infrastructure provided, operated, or owned by the eligible entity with respect to—
(ii)
natural disasters; and
(iii)
climate change-related events, including extreme weather events, droughts, coastal and inland flooding, sea level rise, increased storm surge, wildfires, mudslides, and extreme temperatures.