Water Design-Build Improvement Act of 2022
A BILL
To amend the Water Infrastructure Finance and Innovation Act of 2014 to authorize the selection of eligible projects to be carried out using collaborative project delivery methods, and for other purposes.
Sec. 2 Collaborative project delivery methods
“(c) Collaborative project delivery methods
“(1) Authorization—The Secretary or the Administrator, as applicable, may select, in accordance with this section, a project to be carried out using a collaborative project delivery method (consistent with any applicable State or local law), including a construction management at-risk method and a design-build method.
“(2) Definitions—In this subsection:
“(A) Collaborative project delivery method—The term collaborative project delivery method means a method for carrying out a capital project that involves close collaboration among the eligible entity, the owner of the project (if different from the eligible entity), the designer of the project, and the contractor for the project, from design through completion of construction.
“(B) Construction management at-risk method—The term construction management at-risk method means a collaborative project delivery method in which an engineering firm and a construction management at-risk firm are retained under 2 separate contracts for design and construction, respectively.
“(C) Design-build method—The term design-build method means a collaborative project delivery method under which a single lead contract is entered into with a design-builder for design and construction.”