(1)
Bureau— The term Bureau means the Bureau of Reclamation.
(2)
Commissioner— The term Commissioner means the Commissioner of the Bureau.
(3)
Eligible land— The term eligible land, with respect to a Reclamation project, means land that—
(A)
is authorized to receive water under State law; and
(B)
shares a groundwater source with land located in the service area of the Reclamation project.
(4)
In-lieu recharge— The term in-lieu recharge means the use of surface water instead of pumped groundwater if that use of surface water will cause the direct reduction or elimination of groundwater withdrawals.
(5)
Net water storage benefit— The term net water storage benefit means an increase in the volume of water that is—
(A)
stored in 1 or more aquifers; and
(B)
(i)
available for use within the area served by a Reclamation project; or
(ii)
stored on a long term basis to avoid or reduce groundwater overdraft.
(6)
Reclamation facility— The term Reclamation facility means each of the infrastructure assets that are owned by the Bureau at a Reclamation project.
(7)
Reclamation project— The term Reclamation project means any reclamation or irrigation project, including incidental features thereof, authorized by Federal reclamation law, or constructed by the United States pursuant to such law, or in connection with which there is a repayment or water service contract executed by the United States pursuant to such law, or any project constructed by the Secretary through the Bureau of Reclamation for the reclamation of land.
(8)
Secretary— The term Secretary means the Secretary of the Interior.