(1)
Advanced energy technology— The term advanced energy technology means any energy generation, modifying transmission loading, or storage technology with zero or minimal greenhouse gas emissions that is connected—
(A)
to the distribution system;
(B)
to the transmission system; or
(2)
Advisory Committee— The term Advisory Committee means the advisory committee established under section 3(a)(2)(A).
(3)
Commission— The term Commission means the Federal Energy Regulatory Commission.
(4)
Electric utility— The term electric utility has the meaning given the term in section 3 of the Federal Power Act (
16 U.S.C. 796).
(5)
Grid operator— The term grid operator means—
(A)
a Transmission Organization, including—
(i)
an Independent System Operator; and
(ii)
a Regional Transmission Organization;
(B)
a public utility; and
(6)
Independent System Operator— The term Independent System Operator has the meaning given the term in section 3 of the Federal Power Act (
16 U.S.C. 796).
(7)
Initiative— The term Initiative means the Advanced Energy Technology Research Initiative established under section 3(a)(1).
(8)
Public utility— The term public utility has the meaning given the term in section 201(e) of the Federal Power Act (
16 U.S.C. 824(e)).
(9)
Regional Transmission Organization— The term Regional Transmission Organization has the meaning given the term in section 3 of the Federal Power Act (
16 U.S.C. 796).
(10)
Secretary— The term Secretary means the Secretary of Energy.
(11)
Transmission Organization— The term Transmission Organization has the meaning given the term in section 3 of the Federal Power Act (
16 U.S.C. 796).