Section 1 Eligible high hazard potential dam
Section 2(4)(B)(i) of the National Dam Safety Program Act (33 U.S.C. 467(4)(B)(i)) is amended by inserting “with an authorized installed capacity of greater than 1500 kilowatts” after “hydroelectric dam”.
A BILL