All-of-the-Above Federal Building Energy Conservation Act of 2018
A BILL
To improve energy performance in Federal buildings, and for other purposes.
Sec. 2 Energy performance requirement for Federal buildings
“(2) Exclusion for buildings with energy intensive activities
“(A) In general—An agency may exclude from the requirements of paragraph (1) any building (including the associated energy consumption and gross square footage of the building) in which energy intensive activities are carried out.
“(B) Reports—Each agency shall identify and include in each report under section 548(a) each building designated by the agency for exclusion under subparagraph (A) during the period covered by the report.”
“(E) Ongoing commissioning—The term ongoing commissioning means an ongoing process of commissioning using monitored data, the primary goal of which is to ensure continuous optimum performance of a facility, in accordance with design or operating needs, over the useful life of the facility, while meeting facility occupancy requirements.”
“(C) Energy management system—An energy manager designated for a facility under subparagraph (A) shall take into consideration—
“(i) the use of a system to manage energy use at the facility; and
“(ii) the applicability of certification of the facility in accordance with the International Organization for Standardization standard numbered 50001 and entitled “Energy Management Systems”.”
“(3) Energy and water evaluations and commissioning
“(A) Evaluations—Except as provided in subparagraph (B), not later than the date that is 180 days after the date of enactment of the All-of-the-Above Federal Building Energy Conservation Act of 2018, and annually thereafter, each energy manager shall complete, for the preceding calendar year, a comprehensive energy and water evaluation and recommissioning or retrocommissioning for approximately 25 percent of the facilities of the applicable agency that meet the criteria under paragraph (2)(B) in a manner that ensures that an evaluation of each such facility is completed not less frequently than once every 4 years.
“(B) Exceptions—An evaluation and recommissioning or retrocommissioning shall not be required under subparagraph (A) with respect to a facility that, as of the date on which the evaluation and recommissioning or retrocommissioning would otherwise occur—
“(i) has had a comprehensive energy and water evaluation during the preceding 8-year period;
“(ii)
“(I) has been commissioned, recommissioned, or retrocommissioned during the preceding 10-year period; or
“(II) is under ongoing commissioning;
“(iii) has not had a major change in function or use since the previous evaluation and recommissioning;
“(iv) has been benchmarked with public disclosure under paragraph (8) during the preceding calendar year; and
“(v)
“(I) based on the benchmarking described in clause (iv), has achieved at a facility level the most-recent cumulative energy savings target under subsection (a), as compared to the earlier of—
“(aa) the date of the most recent evaluation; and
“(bb) the date—
“(AA) of the most recent commissioning, recommissioning, or retrocommissioning; or
“(BB) on which ongoing commissioning began; or
“(II) has a long-term contract in place guaranteeing energy savings at least as great as the energy savings target under subclause (I).
“(4) Implementation of identified energy and water efficiency measures—Not later than 2 years after the completion of each evaluation under paragraph (3), each energy manager shall—
“(A) implement any energy- or water-saving measure that the Federal agency identified in the evaluation conducted that is life cycle cost-effective; and
“(B) bundle individual measures of varying paybacks together into combined projects.”
Sec. 3 Federal building energy efficiency performance standards; certification system and level for green buildings
“(11) Major renovation—The term major renovation means a modification of the energy systems of a building that is sufficiently extensive to ensure that the entire building can achieve compliance with applicable energy standards for new buildings, based on such criteria as the Secretary shall establish, by regulation.”
“(3) Revised Federal building energy efficiency performance standards; certification for green buildings
“(A) Revised Federal building energy efficiency performance standards
“(i) In general—Not later than 1 year after the date of enactment of the All-of-the-Above Federal Building Energy Conservation Act of 2018, the Secretary shall establish, by regulation, revised Federal building energy efficiency performance standards that require that—
“(I) unless demonstrated not to be life-cycle cost-effective for new Federal buildings and Federal buildings with major renovations—
“(aa) the buildings shall be designed to achieve energy consumption levels that are not less than 30 percent below the levels established in the version of the ASHRAE Standard or the International Energy Conservation Code, as appropriate, in effect on the date of enactment of the All-of-the-Above Federal Building Energy Conservation Act of 2018, unless the Secretary determines, pursuant to subparagraph (B), that a subsequent version of such a standard or code shall apply; and
“(bb) sustainable design principles are applied to the location, siting, design, and construction of all new Federal buildings and replacement Federal buildings;
“(II) if water is used to achieve energy efficiency, water conservation technologies shall be applied to the extent that the technologies are life-cycle cost-effective; and
“(III) if life-cycle cost-effective, as compared to other reasonably available technologies, not less than 30 percent of the hot water demand for each new Federal building or Federal building undergoing a major renovation shall be met through the installation and use of solar hot water heaters.
“(B) Updates—Not later than 1 year after the date of approval of each subsequent revision of the ASHRAE Standard or the International Energy Conservation Code, as appropriate, the Secretary shall determine whether the revised standards established under subparagraph (A) should be updated to reflect the revisions, based on the energy savings and life-cycle cost-effectiveness of the revisions.”
“(C) Budget request—In the budget request”
“(1) In general—The head”
“(B) Procedures—The Architect of the Capitol shall adopt procedures necessary to ensure that the buildings referred to in subparagraph (A) meet or exceed the standards described in that subparagraph.”
“(2) Applicability
“(A) In general—The Federal”
“(b) Expenditures—The head of a Federal agency may expend Federal funds for the construction of a new Federal building or a Federal building with major renovations”