(a)
In general— The Secretary of Energy shall provide for a Long-Baseline Neutrino Facility to facilitate the international Deep Underground Neutrino Experiment to enable a program in neutrino physics to measure the fundamental properties of neutrinos, explore physics beyond the Standard Model, and better clarify the nature of matter and antimatter.
(b)
Facility capabilities— The Secretary shall ensure that the facility described in subsection (a) will provide, at a minimum, the following capabilities:
(1)
A broad-band neutrino beam capable of 1.2 megawatts (MW) of beam power and upgradable to 2.4 MW of beam power.
(2)
Four caverns excavated for a 40 kiloton fiducial detector mass and supporting surface buildings and utilities.
(3)
Neutrino detector facilities at both the Far Site in South Dakota and the Near Site in Illinois to categorize and study neutrinos on their 800-mile journey between the two sites.
(4)
Cryogenic systems to support neutrino detectors.
(c)
Start of operations— The Secretary shall, to the maximum extent practicable, ensure that the start of full operations of the facility under this section occurs before December 31, 2026.
(d)
Funding— There are authorized to be appropriated to the Secretary for the Office of Science to carry out to completion the construction of the facility under this section—
(1)
$95,000,000 for fiscal year 2018;
(2)
$160,000,000 for fiscal year 2019;
(3)
$195,000,000 for fiscal year 2020;
(4)
$195,000,000 for fiscal year 2021;
(5)
$200,000,000 for fiscal year 2022;
(6)
$200,000,000 for fiscal year 2023;
(7)
$195,000,000 for fiscal year 2024;
(8)
$150,000,000 for fiscal year 2025; and
(9)
$50,000,000 for fiscal year 2026.