H.R. 23 — what changed

Gaining Responsibility on Water Act of 2017

From Introduced in House to Engrossed in House. 14 sections amended, 7 added, and 7 removed between Introduced in House and Engrossed in House.

Sec. 101 Amendment to purposes

Section 3402 of the Central Valley Project Improvement Act (106 Stat. 4706) is amended—

(1)
in subsection (f), by striking the period at the end; and
(2)
by adding at the end the following:

changed “(g) to ensure that water dedicated to fish and wildlife purposes by this title part is replaced and provided to Central Valley Project water contractors by December 31, 2018, at the lowest cost reasonably achievable; and

“(h) to facilitate and expedite water transfers in accordance with this Act.”

Sec. 110 Regulatory streamlining

(a)
Applicability of certain laws— Filing of a Notice of Determination or a Notice of Exemption for any project, including the issuance of a permit under State law, related to any project of the CVP or the delivery of water therefrom in accordance with the California Environmental Quality Act shall be deemed to meet the requirements of section 102(2)(C) of the National Environmental Protection Act of 1969 (42 U.S.C. 4332(2)(C)) for that project or permit.
(b)
changed Continuation of project— The Bureau of Reclamation shall not be required to cease or modify any major Federal action or other activity related to any project of the CVP or the delivery of water there from therefrom pending completion of judicial review of any determination made under the National Environmental Protection Act of 1969 (42 U.S.C. 4332(2)(C)).
(c)
Project defined— For the purposes of this section:
(1)
CVP— The term CVP means the Central Valley Project.
(2)
Project— The term project—
(A)
means an activity that—
(i)
is undertaken by a public agency, funded by a public agency, or that requires an issuance of a permit by a public agency;
(ii)
has a potential to result in physical change to the environment; and
(iii)
may be subject to several discretionary approvals by governmental agencies;
(B)
may include construction activities, clearing or grading of land, improvements to existing structures, and activities or equipment involving the issuance of a permit; or
(C)
as defined under the California Environmental Quality Act in section 21065 of the California Public Resource Code.

Sec. 112 Applicants

changed The Secretary of In the Interior, in collaboration event that the Bureau of Reclamation or another Federal agency initiates or reinitiates consultation with the Sacramento Water Forum, shall expedite evaluation, completion U.S. Fish and implementation Wildlife Service or the National Marine Fisheries Service under section 7(a)(2) of the Modified Lower American River Flow Management Standard developed by Endangered Species Act of 1973 (16 U.S.C. 1536(a)(2)), with respect to construction or operation of the Central Valley Project and State Water Forum in 2015 to improve water supply reliability for Project, or any part thereof, the State Water Project contractors and the Central Valley Project American River water contractors will be accorded all the rights and resource protection responsibilities extended to applicants in the lower American River during consecutive dry years under current and future demand and climate change conditions.consultation process.

Sec. 113 San Joaquin River settlement

(a)
added Purpose and findings—
(1)
added Purpose and findings— Section 10002 of the San Joaquin River Restoration Settlement Act (Public Law 111–11) is amended to read as follows:

added “10002. Purpose and findings

added “(a) Purpose—The purpose of this part is to authorize implementation of the Settlement.

added “(b) Findings—Congress finds that since the date of the enactment of this Act, the following conditions now persist with regard to implementation of the Settlement:

added “(1) Millions of dollars of economic damages have occurred due to seepage from rivers flows and other impacts to third parties affected by the Settlement and San Joaquin River Restoration Program and such impacts will continue for the duration of the Settlement and Restoration Program implementation.

added “(2) Estimated costs of implementing the Settlement have more than doubled from the initial estimates for implementing the Settlement, from a high-end estimate of $800,000,000 to more than $1,700,000,000, due to unrealistic initial cost estimates, additional, unanticipated cost increases related to damages to land from seepage and to infrastructure from subsidence, and from increased construction costs to complete channel improvements, and other improvements not originally identified, but anticipated in the Settlement as necessary to implement the Restoration Goal.

added “(3) Achievement of the Settlement’s Water Management Goal, to reduce or avoid water supply impacts to Friant Division long-term contractors, including the Friant-Kern Canal and Madera Canal capacity restoration projects have not progressed and are likely impossible given available and likely future funding and regulatory constraints.

added “(4) Implementation of the Settlement’s Restoration Goal has already fallen short of the schedule agreed to by the Settling Parties and Congress, which required the reintroduction of Spring-run and Fall-run Chinook salmon in the river by December 31, 2012, and the majority of Paragraph 11 improvements construction to be complete by December 31, 2013, with the remainder of the paragraph (11) improvements to be completed by December 31, 2016, neither of which deadlines have been met and the Secretary has now made findings that such improvements will not be completed until 2030 at the earliest and likely beyond that timeframe, which schedule assumes full funding of the Restoration Program, which has not occurred.

added “(5) Catastrophic species declines in the Sacramento-San Joaquin Delta and other changed conditions have affected the Friant Division’s water supply in ways unimagined during the time of the Settlement’s signing, resulting in additional reductions in water supply for the Friant Division beyond what was agreed to in the Settlement.

added “(6) Recent scientific assessments of likely future climate change suggest that no amount of additional flow in the San Joaquin River will sustain Spring-run Chinook salmon, one of the target species for maintaining a self-sustaining population below Friant Dam.

added “(7) In consideration of existing conditions, it is not reasonable, prudent and feasible to implement the Settlement as originally authorized.”

(2)
added Definitions— Section 10003 of the San Joaquin River Restoration Settlement Act (Public Law 111–11) is amended by adding at the end the following:

added “(4) The term Exchange Contractors means San Joaquin River Exchange Contractors Water Authority, whose members are the Central California Irrigation District, Columbia Canal Company, the Firebaugh Canal Water District, and the San Luis Canal Company.

added “(5) The term Governor means the Governor of the State of California.

added “(6) The term Gravelly Ford means the Gravelly Ford gaging station in the San Joaquin River located at approximately River Mile 230.

added “(7) The term Restoration Area means the San Joaquin River between Friant Dam and the Merced River confluence, and generally within 1,500 feet of the centerline of the river.

added “(8) The term Restoration Flow means the hydrograph flows (as provided in paragraph 18 and exhibit B of the Settlement), buffer flows of up to 10 percent of the applicable hydrograph flows, and any additional water acquired by the Secretary of the Interior from willing sellers to meet the Restoration Goal of the Settlement.

added “(9) The term Restoration Fund means that fund established by this part.

added “(10) The term Sack Dam means a low-head earth and concrete structure with wooden flap gates that diverts San Joaquin River flows into the Arroyo Canal at approximately River Mile 182.1.

added “(11) The term Warm Water Fishery means a water system that has an environment suitable for species of fish other than salmon (including any subspecies) and trout (including all subspecies).

added “(12) The term third party means the Exchange Contractors or any member thereof, current or former members of the San Joaquin Tributaries Authority, and current or former members of the San Luis and Delta Mendota Water Authority.”

(3)
added Implementation of settlement— Section 10004 of the San Joaquin River Restoration Settlement Act (Public Law 111–11) is amended—
(A)
added in subsection (f), by striking “pursuant to the Settlement and section 10011” and inserting “or other species for any reason”;
(B)
added in subsection (g), by inserting “or the implementation of the Settlement and the reintroduction of California Central Valley Spring Run Chinook salmon or any other species,” after “nothing in this part”;
(C)
added in subsection (h)—
(i)
added in the header by striking “Interim”;
(ii)
added in paragraph (1)—
(I)
added by striking “Interim Flows” and inserting “Flows” each place it appears;
(II)
added in subparagraph (C)(ii), by inserting “which shall be implemented” after “significant”; and
(III)
added in subparagraph (E), by striking “as a result of the Interim Flows” and inserting “or State laws as a result of Flows.”; and
(iii)
added by striking paragraphs (2), (3), and (4) and inserting the following:

added “(2) Conditions for release—The Secretary is authorized to release Flows—

added “(A) if all improvements and mitigation measures are completed or implemented, including all actions necessary to mitigate impacts on landowners, water agencies, and water users; and

added “(B) if such Flows will not exceed existing downstream channel capacities.

added “(3) Seepage impacts

added “(A) The Secretary, in implementing this Act, shall not cause material adverse impacts to third parties. The Secretary shall reduce Flows to the extent necessary to address any material adverse impacts to third parties from groundwater seepage or levee instability caused by such flows identified based on the monitoring program of the Secretary. Notwithstanding the foregoing, the Secretary shall not directly or indirectly cause groundwater to rise above 10 feet below ground surface and shall provide at least 10 feet below ground surface as a minimum threshold elevation for groundwater beneath any fields where permanent or other deep rooted crops are grown, and at least 6 feet below ground surface as a minimum threshold elevation for groundwater beneath any fields where annual or shallow rooted crops are grown. These minimum thresholds shall be adjusted yearly based upon information provided by individual landowners regarding the minimum threshold that they will need in order to grow their crop(s) that year. If during the course of the year the landowner informs the Secretary that detrimental seepage is being experienced or is reasonably likely to occur despite the adherence to the minimum threshold, the Secretary shall reduce Restoration Flows to a volume sufficient to reduce seepage impacts by reducing the occurrence of groundwater to a non-damaging level below ground surface.

added “(B) If Flow reduction alone is not sufficient to mitigate for seepage impacts the Secretary shall mitigate by real estate transaction or installation of physical measures, whichever option is requested by the landowner.

added “(C) Any water that seeps onto private property shall thereupon become the property of that landowner if the landowner takes control of the water including by re-diverting it to the San Joaquin River. If seepage water is returned to the San Joaquin River it shall meet applicable water quality requirements.

added “(4) Temporary fish barrier program—Using funds otherwise available from the San Joaquin River Restoration Fund if necessary, the Secretary is authorized to make improvements to the Hills Ferry Barrier or any replacement thereof in order to prevent upstream migration of any protected species to the restoration area. The Secretary is further authorized to work with the California Department of Fish and Wildlife for the improvement or replacement of the Hills Ferry Barrier in order to prevent the upstream migration of any protected species. If third parties south of the confluence with the Merced River are required to install their screens or fish bypass facilities in order to comply with the Endangered Species Act of 1973, the Secretary shall bear the costs of such screens or facilities, except to the extent that such costs are already or are further willingly borne by the State of California or by the third parties. Expenditures by Reclamation are non-reimbursable. Any protected species recovered at the Hills Ferry Barrier or in the Restoration Area or any river or false pathways thereto that is to be relocated outside of the Restoration Area shall only be relocated to an area where there is an established self-sustaining population of that same genotype or phenotype.”

(D)
added by amending subsection (j) to read as follows:

added “(j) San Joaquin river exchange contract and related—Subject to section 10006(b), nothing in this part shall modify or amend the rights and obligations under the Purchase Contract between Miller and Lux and the United States including without exclusion of others, any right to enforce the power contracts identified in the Purchase Contract, the Second Amended Exchange Contract between the United States, Department of the Interior Bureau of Reclamation and Central California Irrigation District, San Luis Canal Company, Firebaugh Canal Water District, and Columbia Canal Company. Prior to releasing any restoration flow, the Secretary shall determine that such release will not affect its contractual obligations to the Exchange Contractors.”

(4)
added Acquisition of property— Section 10005 of the San Joaquin River Restoration Settlement Act (Public Law 111–11) is amended by striking subsections (b) and (c) and inserting the following:

added “(b) Acquisition of property—The Secretary is authorized to acquire property solely through purchase from willing sellers any property, interests in property, or options to acquire real property needed to implement the Settlement authorized by this part. The Secretary shall not acquire property through the exercise of eminent domain unless the owner of said property does not object to an eminent domain action.

added “(c) Disposal of property—Any property or interests therein acquired by the Secretary and for which the Secretary determines that the property or interest therein is no longer needed to be held by the United States for the furtherance of the Settlement, shall be first offered for repurchase to the prior owner of the property from whom the United States acquired the property and at the same price for which the United States acquired the property unless it is demonstrated that the property has decreased in value in which case the Secretary shall sell the property back to the prior owner at the decreased price. If the prior owner does not want the property, the Secretary shall sell the property on the open market.”

(5)
added Compliance with applicable law— Section 10006 of the San Joaquin River Restoration Settlement Act (Public Law 111–11) is amended—
(A)
added in subsection (a)—
(i)
added in paragraph (1), by striking “as necessary” and inserting “as necessary, as provided for in this part and in a manner that does not conflict with the intent of Congress as expressed in this title which intent shall be afforded the greatest deference and any difference or ambiguity shall be resolved in favor of said intent” before the period at the end; and
(ii)
added in paragraph (2), by adding at the end the following: “Any statutory exemptions from conducting environmental review or consultation are not applicable.”;
(B)
added in subsection (b)—
(i)
added by striking “Nothing” and inserting “Except as provided in subsection (e) below, nothing”; and
(ii)
added by striking “State law.” and inserting “State law, except as otherwise provided for herein or would conflict with achieving the purposes or intent of this title.”; and
(C)
added by adding at the end the following:

added “(e) In general—Sections 5930 through 5948 of the California Fish and Game Code and all applicable Federal laws, including this part, as amended by the Gaining Responsibility on Water Act of 2017, and the Stipulation of Settlement (Natural Resources Defense Council, et al. v. Kirk Rodgers, et al., Eastern District of California, No. Civ. S–88–1658—LKK/GGH), shall be satisfied by implementation of the Settlement as provided in section 10014(b) or the plan provided in section 10014(a) of the Gaining Responsibility on Water Act of 2017.

added “(f) Compliance with existing friant division contracts—Congress hereby finds and declares that compliance with the provisions of this Act by Friant Division Contractors shall fulfill all requirements for compliance with this part, contained in contracts between the Secretary and Friant Division Contractors.”

(6)
added No private right of action— Section 10008(a) of the San Joaquin River Restoration Settlement Act (Public Law 111–11) is amended by striking “the Settlement” and inserting “the Settlement or a third party”.
(7)
added Settlement fund— Section 10009 of the San Joaquin River Restoration Settlement Act (Public Law 111–11) is amended—
(A)
added in subsection (a), by amending paragraph (3) to read as follows:

added “(3) Limitation—Except as provided in the Settlement, to the extent that costs incurred solely to implement this Settlement would not otherwise have been incurred by any entity or public or local agency or subdivision of the State of California, such costs shall not be borne by any such entity, agency, or subdivision of the State of California, unless such costs are incurred on a voluntary basis. Any appropriations by Congress to implement this part shall be on the basis of line item authorizations and appropriations and shall not be part of the programmatic funding for the Secretary or the Bureau of Reclamation.”

(B)
added by striking subsection (f) and inserting the following:

added “(f) Reach 4B—No Restoration Flows released shall be routed through section 4B of the San Joaquin River. The Secretary shall seek to make use of modified and/or existing conveyance facilities such as flood control channels in order to provide conveyance for the restoration flows. Congress finds that such use of multi-use facilities is more economical and cost-effective than seeking to restore certain sections of the San Joaquin River. The Secretary shall provide non-reimbursable funding for the incremental increase in maintenance costs for use of the flood control channels.

added “(g) No impact on water supplies—Re-introduction or migration of species to the San Joaquin River upstream of the confluence with the Merced River made possible by or aided by the existence of restoration flows or any improvements to the river made hereunder shall not result in water supply reductions, additional storage releases, or bypass flows on unwilling third parties due to such re-introduction.

added “(h) No transference of liability—Congress finds that the Federal interest in the restoration of the San Joaquin River upstream of the confluence with the Merced River has been satisfied with regard to the development of the Friant Division, Delta Mendota canal, the continued performance of and compliance with the terms of agreements of the United States to purchase water rights and for exchange of water, its Agreements with the entities that comprise the Exchange Contractors to deliver their water rights in the San Joaquin River pursuant to the terms of the agreements. The enactment of the San Joaquin River Restoration Settlement Act, together with findings in this legislation including the Settling Parties and agencies of the State of California tried to implement the Restoration Program for ten years and the Bureau of Reclamation has stated it will take at least another 15 years to implement assuming full funding is provided, even though that full funding has never been provided since the Settlement was executed or the Restoration Act enacted, and that absent implementation of that funding, there is no possibility of establishing a viable self-sustaining salmonid population and the restoration of the upper San Joaquin River has proven infeasible on terms originally conceived by the parties to the Settlement and Congress in the Restoration Act. Therefore, notwithstanding that the United States and water users and agencies within the Friant Division are released of any existing or future obligations with regard to the Restoration Program, or any similar program, no responsibility for achieving the goals of the Restoration Program, including the provision of flows and the re-introduction of salmon, or other fish species to the San Joaquin River, shall be imposed on the United States, upon the Exchange Contractors or any of its members nor shall the rights to delivery of water reserved to the Exchange Contractors by any agency of the United States or the State of California be abridged or impaired.

added “(i) Absence of agreement—In the absence of an agreement with Friant Division long-term contractors, in the event the State of California, acting through the State Water Resources Control Board or otherwise, or any other party requires the flow of the San Joaquin River below Friant Dam to exceed the amounts stated in Exhibit B of the Settlement, then the authorization to implement the Settlement as provided in this Act shall terminate and the Secretary of the Interior shall cease any action to implement this part and the Stipulation of Settlement (Natural Resources Defense Council, et al. v. Kirk Rodgers, et al., Eastern District of California, No. Civ-S–88–1658 LLK/GGH); provided, further, the Secretary shall also cease to collect or expend any funds from the San Joaquin River Restoration Fund.”

(b)
added Review and determination— San Joaquin River Restoration Settlement Act (Public Law 111–11 et seq.) is amended by adding at the end the following:

added “10012. Review and determination

added “(a) Determination required—The Governor and the Secretary, shall determine, in consideration of the overall public interest of both the State of California and the Nation, if it is reasonable, prudent, and feasible to implement the Settlement as provided in section 10014(b) and shall submit a joint report to Congress not later than 1 year after the date of the enactment of this Act, stating their findings and recommended action, including—

added “(1) financial considerations;

added “(2) available scientific evidence;

added “(3) water temperature in the lower reaches of the upper San Joaquin River; and

added “(4) alternative uses for the funds required to implement the Settlement.

added “(b) Absence of timely determination—If the Governor and the Secretary, do not provide a joint recommendation within the time specified in subsection (a), then it shall be deemed that implementing the Settlement consistent with section 10014(b) is not reasonable, prudent, and feasible, and the Secretary shall proceed to implement the Settlement consistent with section 10014(a).

added “10013. Interim operations

added “Beginning on the date of the enactment of the Gaining Responsibility on Water Act of 2017 and continuing until a determination and final plan has been developed and approved by the Secretary and Governor as provided under section 10014(b), and if applicable, the warm water fishery plan developed under section 10014(a), the Secretary shall only take the following actions to implement the Settlement according to the this Act:

added “(1) Implementation of the Restoration Goal and the Water Management Goal of the Settlement only to the extent consistent with section 10014(b).

added “(2) No Restoration Flow releases shall be permitted on the San Joaquin River downstream of Sack Dam to the confluence with the Merced River.

added “(3) No salmonids shall be placed into or allowed to migrate to the Restoration Area. If any salmonids are caught at the Hills Ferry Barrier, they shall be salvaged to the extent feasible and returned to an area where there is a viable sustainable salmonid population of substantially the same genotype or phenotype.

added “(4) Implementation of a plan to recirculate, recapture, reuse, exchange and transfer Restoration Flows for the purpose of reducing or avoiding impacts to water deliveries to all Friant Division long-term contractors caused by the Restoration Flows , to the greatest extent feasible.

added “10014. Alternate long-term actions

added “(a) Gravelly Ford–Warm Water Fishery

added “(1) If it is determined under section 10012(a) that the Settlement should not be implemented as provided in subsection (b), then not later than 1 year after such determination, the Secretary and the Governor shall develop and approve a reasonable, prudent, and feasible plan for maintaining a warm water fishery on the San Joaquin River below Friant Dam, but upstream of Gravelly Ford, consistent with the following:

added “(A) No water shall be released into the San Joaquin River for fishery purposes downstream of Gravelly Ford.

added “(B) Existing and future contributions to the Restoration Fund shall be expended for the purposes of—

added “(i) warm water fishery improvements within the San Joaquin River channel upstream of Gravelly Ford; and

added “(ii) water and fishery improvements in the San Joaquin River channel downstream of the confluence with the Merced River and other areas for benefit of fall run salmon.

added “(C) The Secretary shall establish a fund to be jointly administered by the Friant Water Authority, Exchange Contractors, San Joaquin Tributaries Authority, and San Luis Delta Mendota Water Authority to fund restoration actions along the San Joaquin River and its tributaries that achieve water quality objectives for the protection of fish and wildlife. The Secretary shall transfer the following into the fund:

added “(i) All funds in the San Joaquin River Restoration Fund authorized by this part.

added “(ii) All future payments by Friant Division long-term contractors pursuant to section 3406(c)(1) of the Reclamation Projects, Authorization and Adjustment Act of 1992 (Public Law 102–575; 106 Stat. 4721) as provided in the Settlement.

added “(D) In the absence of an agreement with Friant Division long-term contractors, in the event the State of California, acting through the State Water Resources Control Board or otherwise, or any other party requires the flow of the San Joaquin River to continue below Gravelly Ford for fish and wildlife purposes then—

added “(i) all funding specified for transfer under this subsection shall cease, and any funds remaining in the San Joaquin River Basin Restoration Fund shall be transferred to the Friant Water Authority for implementing conveyance improvements on the Friant Kern Canal and Madera Canal to mitigate for subsidence impacts since their original construction; and

added “(ii) the authorization to implement the Settlement as provided in this part, as amended by the Gaining Responsibility on Water Act of 2017, shall terminate and the Secretary shall cease any action to implement this part and the Stipulation of Settlement (Natural Resources Defense Council, et al. v. Kirk Rodgers, et al., Eastern District of California, No. Civ-S–88–1658 LLK/GGH); provided, further, the Secretary shall also cease to collect or expend any funds from the San Joaquin River Restoration Fund.

added “(b) Continued implementation—If, in the decision required by section 10012(a), it is determined that the Settlement should continue to be implemented as provided in section 10014(b), then the following terms are required for Continued Implementation of Settlement and no funds shall be expended to implement the Settlement other than as provided for herein:

added “(1) Improvements—The improvements described in paragraph (11) of the Settlement and any additional improvements identified in the Framework for Implementation published in 2015 and any successors thereto shall be completed before any Restoration Flows are released to the San Joaquin River.

added “(2) Priority projects—The improvements shall be constructed in the following order:

added “(A) Mendota Pool bypass and fish screen.

added “(B) Arroyo Canal fish screen and Sack Dam fish passage facilities.

added “(C) Seepage mitigation actions to allow Restoration Flows of up to 4500 CFS such that there will be no involuntarily incurred damage to private property and no damage to levees.

added “(3) Other improvements—The remainder of the Improvements shall be constructed in an order deemed appropriate by the Secretary after the foregoing projects are completed.

added “(4) Construction assistance—If agreed to by the Exchange Contractors or any of its members, the Secretary shall enter into an agreement with the Exchange Contractors or any of its members to assume construction responsibility from initial design through completion of such improvements as the Exchange Contractors or any of its members may agree to, provided that the Secretary shall retain financial responsibility for such improvements and shall reimburse the Exchange Contractors or any of its members for costs incurred by them and their contractors, if any, expended in the construction of the improvements. The Secretary shall enter into a construction agreement with the Exchange Contractors or its members, as applicable, and subject to their approval, consistent with the terms of this title.

added “(5) Technical advisory committee and restoration administrator—The Secretary shall add to the Technical Advisory Committee (TAC), established pursuant to the Settlement, one representative from the Exchange Contractors and one representative from the San Luis & Delta-Mendota Water Authority. Any decisions and/or recommendations made by the Restoration Administrator shall be first discussed with the TAC and made on the basis of consensus to maximum extent possible. Any recommendations made by the Restoration Administrator are advisory only, shall be in writing, shall include references to the science relied on and specify the benefits to fish in the river, and include the level of consensus reached by the TAC. The Secretary’s final decision on any action, including flows, can deviate from the Restoration Administrator’s recommendation provided that the Secretary’s final decision is based upon sound and objective science, and is otherwise consistent with this title.

added “(6) Restoration flows—The appropriate level of Restoration Flows under any circumstance shall be no greater than that set forth in the hydrographs attached as exhibit B to the Settlement, and shall be no greater than the real-time fishery needs required to meet the Restoration Goal. The Secretary shall make the final decision as to the appropriate level of Restoration Flows and other actions regarding implementation of the Restoration Program. The appropriate level of Restoration Flows shall at a minimum not exceed channel capacity, cause seepage damage, or be inconsistent with any other requirements in this section. The Secretary’s decisions and those of the Secretary of Commerce shall be fully supported by the best commercial and scientific information available, shall be made in an open and transparent manner, and shall be based on objective information capable of replication.

added “(7) Fish reintroduction—No fishery shall be introduced or placed for any reason in to the San Joaquin River upstream of the Merced River, until Reclamation has released Restoration Flows down the San Joaquin River in each hydrologic year type: wet, above normal, below normal, dry, and critically dry and determined that the improvements are fully functional and that seepage impacts have been fully mitigated. At least 180 days before the introduction of spring run Chinook salmon the Bureau of Reclamation shall submit a report to Congress that provides a critical examination of the impact of Restoration Flows on seepage and the improvements, and the likelihood of success in restoring a salmon fishery that is viable, sustainable and capable of volitional passage.

added “(8) Protected species—Any protected species migrating into the Restoration Area shall be deemed to be a nonessential experimental population. Congress finds that due to human–caused physical changes to the pathways of the San Joaquin River upstream of the confluence of the Merced River the San Joaquin River is deemed a distinct and separate geographic area and no agency shall take any action pursuant to any authority or requirement of the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.) or any other Federal or State species protection law that will have an adverse impact on landowners or water agencies within the Restoration Area unless such impacts are incurred on a voluntary basis.

added “(9) Subsidence—Prior to implementing any other actions, the Secretary shall work with local water districts and landowners to ensure the actions include appropriate solutions to past and likely future subsidence. Without resolution to the subsidence issue, the improvements described in the Settlement and the San Joaquin River and/or the flood control system will continue to be irreparability damaged. Any costs incurred by the Secretary, including but not limited to acquisition of property from willing sellers shall be non-reimbursable.

added “(10) Full funding—Prior to commencing construction of any Improvement, the Secretary shall approve a funding plan that demonstrates that the United States has obtained all authorizations for appropriations combined with other authorized and reasonably foreseeable funding sources necessary for the orderly completion of all improvements described in paragraph (11) of the Settlement and any additional improvements identified in the Framework for Implementation published in 2015, including any amendments thereto.

added “(11) Mitigation of impacts—Prior to the implementation of decisions or agreements to construct, improve, operate, or maintain Improvements. or facilities that the Secretary determines are needed to implement the Settlement, the Secretary shall—

added “(A) identify the impacts associated with such actions;

added “(B) identify the actions that the Secretary must implement to mitigate any impacts on water users and landowners in the Restoration Area; and

added “(C) shall implement all of the mitigation actions so as to eliminate or reduce to an immaterial effect any adverse impacts on water users and landowners.”

removed In the event that the Bureau of Reclamation or another Federal agency initiates or reinitiates consultation with the U.S. Fish and Wildlife Service or the National Marine Fisheries Service under section 7(a)(2) of the Endangered Species Act of 1973 (16 U.S.C. 1536(a)(2)), with respect to construction or operation of the Central Valley Project and State Water Project, or any part thereof, the State Water Project contractors and the Central Valley Project contractors will be accorded all the rights and responsibilities extended to applicants in the consultation process.

Sec. 114 San Joaquin River settlement

removed
(a)
removed California State law satisfied by warm water fishery—
(1)
removed In general— Sections 5930 through 5948 of the California Fish and Game Code, and all applicable Federal laws, including the San Joaquin River Restoration Settlement Act (Public Law 111–11) and the Stipulation of Settlement (Natural Resources Defense Council, et al. v. Kirk Rodgers, et al., Eastern District of California, No. Civ. S–88–1658–LKK/GGH), shall be satisfied by the existence of a warm water fishery in the San Joaquin River below Friant Dam, but upstream of Gravelly Ford.
(2)
removed Definition of warm water fishery— For the purposes of this section, the term warm water fishery means a water system that has an environment suitable for species of fish other than salmon (including all subspecies) and trout (including all subspecies).
(b)
removed Repeal of the San Joaquin River settlement— As of the date of enactment of this section, the Secretary of the Interior shall cease any action to implement the San Joaquin River Restoration Settlement Act (subtitle A of title X of Public Law 111–11) and the Stipulation of Settlement (Natural Resources Defense Council, et al. v. Kirk Rodgers, et al., Eastern District of California, No. Civ. S–88–1658 LKK/GGH).

Sec. 201 Studies

The Secretary of the Interior, through the Commissioner of Reclamation, shall—

(1)
changed complete the feasibility studies described in clauses (i)(I) and (ii)(II) of section 103(d)(1)(A) of Public Law 108–361 (118 Stat. 1684) and submit such studies to the appropriate committees of the House of Representatives and the Senate not later than December 31, 2017;November 30, 2018;
(2)
complete the feasibility study described in clause (i)(II) of section 103(d)(1)(A) of Public Law 108–361 and submit such study to the appropriate committees of the House of Representatives and the Senate not later than November 30, 2018;
(3)
complete a publicly available draft of the feasibility study described in clause (ii)(I) of section 103(d)(1)(A) of Public Law 108–361 and submit such study to the appropriate committees of the House of Representatives and the Senate not later than November 30, 2018;
(4)
complete the feasibility study described in clause (ii)(I) of section 103(d)(1)(A) of Public Law 108–361 and submit such study to the appropriate committees of the House of Representatives and the Senate not later than November 30, 2019;
(5)
complete the feasibility study described in section 103(f)(1)(A) of Public Law 108–361 (118 Stat. 1694) and submit such study to the appropriate committees of the House of Representatives and the Senate not later than December 31, 2019;
(6)
removed provide a progress report on the status of the feasibility studies referred to in paragraphs (1) through (3) to the appropriate committees of the House of Representatives and the Senate not later than 90 days after the date of the enactment of this Act and each 180 days thereafter until December 31, 2019, as applicable. The report shall include timelines for study completion, draft environmental impact statements, final environmental impact statements, and Records of Decision;
(6)
renumbered was (9) in conducting any feasibility study under this Act, the reclamation laws, the Central Valley Project Improvement Act (title XXXIV of Public Law 102–575; 106 Stat. 4706), the Fish and Wildlife Coordination Act (16 U.S.C. 661 et seq.), the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.), and other applicable law, for the purposes of determining feasibility the Secretary shall document, delineate, and publish costs directly relating to the engineering and construction of a water storage project separately from the costs resulting from regulatory compliance or the construction of auxiliary facilities necessary to achieve regulatory compliance; and
(7)
renumbered was (10) communicate, coordinate and cooperate with public water agencies that contract with the United States for Central Valley Project water and that are expected to participate in the cost pools that will be created for the projects proposed in the feasibility studies under this section.

Sec. 203 Water storage project construction

changed If the The Secretary of the Interior fails to provide Interior, acting through the feasibility studies described in section 201 to Commissioner of the appropriate committees Bureau of Reclamation, may partner or enter into an agreement on the House water storage projects identified in section 103(d)(1) of Representatives the Water Supply Reliability and Environmental Improvement Act (Public Law 108–361) (and Acts supplemental and amendatory to the Senate Act) with local joint powers authorities formed pursuant to State law by the times prescribed, the Secretary shall notify each committee chair individually in person on the status of each project once a month until irrigation districts and other local water districts and local governments within the feasibility study for that project is provided applicable hydrologic region, to Congress.advance those projects.

Sec. 204 Geophysical survey

added The Bureau of Reclamation, in cooperation with the United States Geological Survey, the State of California, and local and State water agencies, may conduct detailed geophysical characterization activities of subsurface aquifer systems and groundwater vulnerability in California, which has experienced a critical, multi-year drought that resulted in severe groundwater overdraft in some areas, followed by less than optimal recharge from the heavy rainstorms and flooding during the 2016–2017 winter season. This geophysical survey should include data pertaining to the following:

(a)
removed Partnership and agreements— The Secretary of the Interior, acting through the Commissioner of the Bureau of Reclamation, may partner or enter into an agreement on the water storage projects identified in section 103(d)(1) of the Water Supply Reliability and Environmental Improvement Act (Public Law 108–361) (and Acts supplemental and amendatory to the Act) with local joint powers authorities formed pursuant to State law by irrigation districts and other local water districts and local governments within the applicable hydrologic region, to advance those projects.
(1)
changed Authorization for project— If the Secretary determines a project described in section 202(a)(1) Subsurface system framework: occurrence and (2) is feasible, the Secretary is authorized to carry out the project in a manner that is substantially in accordance with the recommended plan, geometry of aquifer and subject to the conditions described in the feasibility study, provided that no Federal funding shall be used to construct the project.non-aquifer zones.
(2)
added Aquifer storage and transmission characteristics.
(3)
added Areas of greatest recharge potential.

Sec. 205 Headwater-Restoration Scoping Study

added

added The Bureau of Reclamation may partner with academia, specifically the University of California, and State and local water agencies, to develop a study to enhance mountain runoff to Central Valley Project reservoirs from headwater restoration with the following aims:

(1)
added Estimate forest biomass density and annual evapotranspiration (ET) across the Shasta Lake watershed for the past decade using satellite and other available spatial data.
(2)
added Identify areas on public and private land that have high biomass densities and ET, and assess potential changes in ET that would ensue from forest restoration.
(3)
added Assess role of subsurface storage in providing drought resilience of forests, based on long-term historical estimates of precipitation, drought severity and stream discharge.
(4)
added Assess role of snowpack in annual water balance across the watersheds.

Sec. 304 Allocations for Sacramento Valley contractors

(a)
Allocations—
(1)
In general— Subject to paragraph (2) and subsection (b), the Secretary of the Interior is directed, in the operation of the Central Valley Project, to allocate water provided for irrigation purposes to existing Central Valley Project agricultural water service contractors within the Sacramento River Watershed in compliance with the following:
(A)
Not less than 100 percent of their contract quantities in a “Wet” year.
(B)
Not less than 100 percent of their contract quantities in an “Above Normal” year.
(C)
Not less than 100 percent of their contract quantities in a “Below Normal” year that is preceded by an “Above Normal” or a “Wet” year.
(D)
Not less than 50 percent of their contract quantities in a “Dry” year that is preceded by a “Below Normal”, an “Above Normal”, or a “Wet” year.
(E)
In all other years not identified herein, the allocation percentage for existing Central Valley Project agricultural water service contractors within the Sacramento River Watershed shall not be less than twice the allocation percentage to south-of-Delta Central Valley Project agricultural water service contractors, up to 100 percent; provided, that nothing herein shall preclude an allocation to existing Central Valley Project agricultural water service contractors within the Sacramento River Watershed that is greater than twice the allocation percentage to south-of-Delta Central Valley Project agricultural water service contractors.
(2)
changed Conditions— The Secretary’s actions under paragraph (a) (1) shall be subject to—
(A)
the priority of individuals or entities with Sacramento River water rights, including those with Sacramento River Settlement Contracts, that have priority to the diversion and use of Sacramento River water over water rights held by the United States for operations of the Central Valley Project;
(B)
the United States obligation to make a substitute supply of water available to the San Joaquin River Exchange Contractors; and
(C)
the Secretary’s obligation to make water available to managed wetlands pursuant to section 3406(d) of the Central Valley Project Improvement Act (Public Law 102–575).
(b)
Protection of municipal and industrial supplies— Nothing in subsection (a) shall be deemed to—
(1)
modify any provision of a water service contract that addresses municipal and industrial water shortage policies of the Secretary;
(2)
affect or limit the authority of the Secretary to adopt or modify municipal and industrial water shortage policies;
(3)
affect or limit the authority of the Secretary to implement municipal and industrial water shortage policies; or
(4)
affect allocations to Central Valley Project municipal and industrial contractors pursuant to such policies.
(c)
No effect on allocations— This section shall not—
(1)
affect the allocation of water to Friant Division contractors; or
(2)
result in the involuntary reduction in contract water allocations to individuals or entities with contracts to receive water from the Friant Division.
(d)
changed Program for water rescheduling— The Secretary of the Interior shall develop and implement a program, not later than 1 year after the date of the enactment of this Act, to provide for the opportunity for existing individuals or districts that receive Central Valley Project agricultural Water under water service contractors or repayment contracts or water rights settlement contracts within the American River, Sacramento River, Shasta and Trinity River Watershed Divisions to reschedule water, provided for under their Central Valley Project water service service, repayment or settlement contracts, within the same year or from one year to the next.
(e)
changed Definitions—Definition— In this section:section, the year type terms used in subsection (a) have the meaning given those year types in the Sacramento Valley Water Year Type (40–30–30) Index.
(1)
removed The term existing Central Valley Project agricultural water service contractors within the Sacramento River Watershed means water service contractors within the Shasta, Trinity, and Sacramento River Divisions of the Central Valley Project, that have a water service contract in effect, on the date of the enactment of this section, that provides water for irrigation.
(2)
removed The year type terms used in subsection (a) have the meaning given those year types in the Sacramento Valley Water Year Type (40–30–30) Index.

Sec. 405 CA State Water Resources Control Board

(a)
changed Marinas, recreational facilities, other businesses—In general— If in constructing any new or modified water storage project included in section 103(d)(1)(A) of Public Law 108–361 (118 Stat. 1684), the Bureau of Reclamation destroys or otherwise adversely affects any existing marina, recreational facility, or other water-dependent business when constructing or operating a new or modified water storage project, In carrying out this Act, the Secretaries of the Interior and Agriculture, acting through the Bureau and the Forest Service shall—
(1)
changed provide compensation otherwise required recognize Congressional opposition to the violation of private property rights by law; the California State Water Resources Control Board in their proposal to require a minimum percentage of unimpaired flows in the main tributaries of the San Joaquin River; and
(2)
changed provide the owner of the affected marina, recreational facility, or other water-dependent business under mutually agreeable terms and conditions with recognize the right of first refusal need to construct provide reliable water supplies to municipal, industrial, and operate a replacement marina, recreational facility, or other water-dependent business, as the case may be, on United States land associated with agricultural users across the new or modified water storage project.State.
(b)
removed Hydroelectric projects— If in constructing any new or modified water storage project included in section 103(d)(1)(A) of Public Law 108–361 (118 Stat. 1684), the Bureau of Reclamation reduces or eliminates the capacity or generation of any existing non-Federal hydroelectric project by inundation or otherwise, the Secretary of the Interior shall—
(1)
removed provide compensation otherwise required by law;
(2)
removed provide the owner of the affected hydroelectric project under mutually agreeable terms and conditions with a right of first refusal to construct, operate, and maintain replacement hydroelectric generating facilities at such new or modified water storage project, on federal land associated with the new or modified water storage project or on private land owned by the affected hydroelectric project owner;
(3)
removed provide compensation for the construction of any water conveyance facilities as are necessary to convey water to any new powerhouse constructed by such owner in association with such new hydroelectric generating facilities; and
(4)
removed provide for subsections (b)(1), (b)(2), and (b)(3) at a cost not to exceed the estimated value of the actual impacts to any existing non-Federal hydroelectric project and as estimated for the associated feasibility study, including additional planning, environmental, design, construction, and operations and maintenance costs for existing and replacement facilities.
(c)
removed Cost allocation— Any compensation under this section shall be a project cost and allocated to project beneficiaries.
(d)
removed Applicability— This section shall only apply to federally owned water storage projects, whether authorized under this Act or some other authority.
(e)
removed Limitation— Nothing in this section affects the ability of landowners or tribes to seek compensation or any other remedy otherwise required by law.

Sec. 406 New melones reservoir

added The authority under section 4006 of the WIIN Act shall expire 7 years after the date of the enactment of this Act.

(a)
removed In general— In carrying out this Act, the Secretaries shall—
(1)
removed recognize Congressional opposition to the violation of private property rights by the California State Water Resources Control Board in their proposal to require a minimum percentage of unimpaired flows in the main tributaries of the San Joaquin River; and
(2)
removed recognize the need to provide reliable water supplies to municipal, industrial, and agricultural users across the State.

Sec. 407 Actions to benefit threatened and endangered species and other wildlife

added

added None of the funds made available under section 4010(b) of the WIIN Act may be used for the acquisition or leasing of land, water for in-stream purposes if the water is already committed to in-stream purposes, or interests in land or water from willing sellers if the land, water, or interests are already designated for environmental purposes by a court adopted decree or order or cooperative agreement.

Sec. 408 Non-federal program to protect native anadromous fish in stanislaus river

added

added The program established under section 4010(d) of the WIIN Act shall not sunset before January 1, 2023.

Sec. 502 Definitions

In this title:

(1)
Secretary— The term Secretary means the Secretary of the Interior.
(2)
Bureau— The term Bureau means the Bureau of Reclamation.
(3)
changed Qualifying projects— The term qualifying projects means new surface water storage projects in the States covered under the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act (43 U.S.C. 371 et seq.) constructed on lands administered by the Department of the Interior or the Department of Agriculture, exclusive of any easement, right-of-way, lease, or any private holding.projects—
(A)
added means new surface water storage projects in the States covered under the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act (43 U.S.C. 371 et seq.) constructed on lands administered by the Department of the Interior or the Department of Agriculture, exclusive of any easement, right-of-way, lease, or any private holding, unless the project applicant elects not to participate in the process authorized by this Act; and
(B)
added includes State-led storage projects (as defined in section 4007(a)(2) of the WIIN Act) for new surface water storage projects in the States covered under the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act (43 U.S.C. 371 et seq.) constructed on lands administered by the Department of the Interior or the Department of Agriculture, exclusive of any easement, right-of-way, lease, or any private holding, unless the project applicant elects not to participate in the process authorized by this Act.
(4)
Cooperating agencies— The term cooperating agency means a Federal agency with jurisdiction over a review, analysis, opinion, statement, permit, license, or other approval or decision required for a qualifying project under applicable Federal laws and regulations, or a State agency subject to section 503(c).

Sec. 506 Funding to process permits

(a)
changed In general—General— The Secretary, after public notice in accordance with subchapter II of chapter 5, and chapter 7, of title 5, United States Code (commonly known as the Administrative Procedures Act (5 U.S.C. 553), “Administrative Procedure Act”), may accept and expend funds contributed by a non-Federal public entity to expedite the evaluation of a permit of that entity related to a qualifying project.
(b)
Effect on permitting—
(1)
In general— In carrying out this section, the Secretary shall ensure that the use of funds accepted under subsection (a) will not impact impartial decisionmaking with respect to permits, either substantively or procedurally.
(2)
Evaluation of permits— In carrying out this section, the Secretary shall ensure that the evaluation of permits carried out using funds accepted under this section shall—
(A)
be reviewed by the Regional Director of the Bureau, or the Regional Director’s designee, of the region in which the qualifying project or activity is located; and
(B)
use the same procedures for decisions that would otherwise be required for the evaluation of permits for similar projects or activities not carried out using funds authorized under this section.
(3)
Impartial decisionmaking— In carrying out this section, the Secretary and the cooperating agencies receiving funds under this section for qualifying projects shall ensure that the use of the funds accepted under this section for such projects shall not—
(A)
impact impartial decisionmaking with respect to the issuance of permits, either substantively or procedurally; or
(B)
diminish, modify, or otherwise affect the statutory or regulatory authorities of such agencies.
(c)
changed Limitation on use of funds— None of the funds accepted under this section shall be used to carry out a review of the evaluation of permits required under subsection (b)(2)(A).(a)(2)(A).
(d)
Public availability— The Secretary shall ensure that all final permit decisions carried out using funds authorized under this section are made available to the public, including on the Internet.

Sec. 607 Applicability of WIIN Act

added

added Sections 4007 and 4009 of the WIIN Act (Public Law 114–322) shall not apply to any project (as defined in section 602 of this Act).

Sec. 701 Short title

changed This title may be cited as the “Accelerated Revenue, Repayment, and Surface Water Storage Enhancement Act”.“Water Rights Protection Act of 2017”.

Sec. 702 Definitions

added In this title:

(a)
removed Conversion and prepayment of contracts—
(1)
removed Conversion— Upon request of the contractor, the Secretary of the Interior shall convert any water service contract in effect on the date of enactment of this Act and between the United States and a water users’ association to allow for prepayment of the repayment contract pursuant to paragraph (2) under mutually agreeable terms and conditions. The manner of conversion under this paragraph shall be as follows:
(A)
removed Water service contracts that were entered into under section 9(e) of the Act of August 4, 1939 (53 Stat. 1196), to be converted under this section shall be converted to repayment contracts under section 9(d) of that Act (53 Stat. 1195).
(B)
removed Water service contracts that were entered under subsection (c)(2) of section 9 of the Act of August 4, 1939 (53 Stat. 1194), to be converted under this section shall be converted to a contract under subsection (c)(1) of section 9 of that Act (53 Stat. 1195).
(2)
removed Prepayment— Except for those repayment contracts under which the contractor has previously negotiated for prepayment, all repayment contracts under section 9(d) of that Act (53 Stat. 1195) in effect on the date of enactment of this Act at the request of the contractor, and all contracts converted pursuant to paragraph (1)(A) shall—
(A)
removed provide for the repayment, either in lump sum or by accelerated prepayment, of the remaining construction costs identified in water project specific irrigation rate repayment schedules, as adjusted to reflect payment not reflected in such schedule, and properly assignable for ultimate return by the contractor, or if made in approximately equal installments, no later than 3 years after the effective date of the repayment contract, such amount to be discounted by ½ the Treasury rate. An estimate of the remaining construction costs, as adjusted, shall be provided by the Secretary to the contractor no later than 90 days following receipt of request of the contractor;
(B)
removed require that construction costs or other capitalized costs incurred after the effective date of the contract or not reflected in the rate schedule referenced in subparagraph (A), and properly assignable to such contractor shall be repaid in not more than 5 years after notification of the allocation if such amount is a result of a collective annual allocation of capital costs to the contractors exercising contract conversation under this subsection of less than $5,000,000. If such amount is $5,000,000 or greater, such cost shall be repaid as provided by applicable reclamation law;
(C)
removed provide that power revenues will not be available to aid in repayment of construction costs allocated to irrigation under the contract; and
(D)
removed continue so long as the contractor pays applicable charges, consistent with section 9(d) of the Act of August 4, 1939 (53 Stat. 1195), and applicable law.
(3)
removed Contract requirements— Except for those repayment contracts under which the contractor has previously negotiated for prepayment, the following shall apply with regard to all repayment contracts under subsection (c)(1) of section 9 of that Act (53 Stat. 1195) in effect on the date of enactment of this Act at the request of the contractor, and all contracts converted pursuant to paragraph (1)(B):
(A)
removed Provide for the repayment in lump sum of the remaining construction costs identified in water project specific municipal and industrial rate repayment schedules, as adjusted to reflect payments not reflected in such schedule, and properly assignable for ultimate return by the contractor. An estimate of the remaining construction costs, as adjusted, shall be provided by the Secretary to the contractor no later than 90 days after receipt of request of contractor.
(B)
removed The contract shall require that construction costs or other capitalized costs incurred after the effective date of the contract or not reflected in the rate schedule referenced in subparagraph (A), and properly assignable to such contractor, shall be repaid in not more than 5 years after notification of the allocation if such amount is a result of a collective annual allocation of capital costs to the contractors exercising contract conversation under this subsection of less than $5,000,000. If such amount is $5,000,000 or greater, such cost shall be repaid as provided by applicable reclamation law.
(C)
removed Continue so long as the contractor pays applicable charges, consistent with section 9(c)(1) of the Act of August 4, 1939 (53 Stat. 1195), and applicable law.
(4)
removed Conditions— All contracts entered into pursuant to paragraphs (1), (2), and (3) shall—
(A)
removed not be adjusted on the basis of the type of prepayment financing used by the water users’ association;
(B)
removed conform to any other agreements, such as applicable settlement agreements and new constructed appurtenant facilities; and
(C)
removed not modify other water service, repayment, exchange and transfer contractual rights between the water users’ association, and the Bureau of Reclamation, or any rights, obligations, or relationships of the water users’ association and their landowners as provided under State law.
(1)
changed Accounting—Secretary— The amounts paid pursuant to subsection (a) shall be subject to adjustment following a final cost allocation by the Secretary of the Interior. In the event that the final cost allocation indicates that the costs properly assignable to the contractor are greater than what has been paid by the contractor, the contractor shall be obligated to pay the remaining allocated costs. The term of such additional repayment contract shall be not less than one year and not more than 10 years, however, mutually agreeable provisions regarding the rate of repayment of such amount may be developed by the parties. In the event that the final cost allocation indicates that the costs properly assignable to the contractor are less than what the contractor has paid, the Secretary shall credit such overpayment means, as an offset against any outstanding or future obligation of the contractor.applicable—
(A)
added the Secretary of Agriculture; or
(B)
added the Secretary of the Interior.
(2)
added Water right— The term water right means any surface, groundwater, or storage use filed, permitted, certificated, confirmed, decreed, adjudicated, or otherwise recognized by a judicial proceeding or by the State in which the user acquires possession of the water or puts it to beneficial use.
(c)
removed Applicability of certain provisions—
(1)
removed Effect of existing law— Upon a contractor’s compliance with and discharge of the obligation of repayment of the construction costs pursuant to a contract entered into pursuant to subsection (a)(2)(A), subsections (a) and (b) of section 213 of the Reclamation Reform Act of 1982 (96 Stat. 1269) shall apply to affected lands.
(2)
removed Effect of other obligations— The obligation of a contractor to repay construction costs or other capitalized costs described in subsection (a)(2)(B), (a)(3)(B), or (b) shall not affect a contractor’s status as having repaid all of the construction costs assignable to the contractor or the applicability of subsections (a) and (b) of section 213 of the Reclamation Reform Act of 1982 (96 Stat. 1269) once the amount required to be paid by the contractor under the repayment contract entered into pursuant to subsection (a)(2)(A) have been paid.
(d)
removed Effect on existing law not altered— Implementation of the provisions of this title shall not alter—
(1)
removed the repayment obligation of any water service or repayment contractor receiving water from the same water project, or shift any costs that would otherwise have been properly assignable to the water users’ association identified in subsections (a)(1), (a)(2), and (a)(3) absent this section, including operation and maintenance costs, construction costs, or other capitalized costs incurred after the date of the enactment of this Act, or to other contractors; and
(2)
removed specific requirements for the disposition of amounts received as repayments by the Secretary under the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act (43 U.S.C. 371 et seq.).
(e)
removed Surface water storage enhancement program—
(1)
removed In general— Except as provided in subsection (d)(2), three years following the date of enactment of this Act, 50 percent of receipts generated from prepayment of contracts under this section beyond amounts necessary to cover the amount of receipts forgone from scheduled payments under current law for the 10-year period following the date of enactment of this Act shall be directed to the Reclamation Surface Water Storage Account under paragraph (2).
(2)
removed Surface storage account— The Secretary shall allocate amounts collected under paragraph (1) into the “Reclamation Surface Storage Account” to fund the construction of surface water storage. The Secretary may also enter into cooperative agreements with water users’ associations for the construction of surface water storage and amounts within the Surface Storage Account may be used to fund such construction. Surface water storage projects that are otherwise not federally authorized shall not be considered Federal facilities as a result of any amounts allocated from the Surface Storage Account for part or all of such facilities.
(3)
removed Repayment— Amounts used for surface water storage construction from the Account shall be fully reimbursed to the Account consistent with the requirements under Federal reclamation law (the law (the Act of June 17, 1902 (32 Stat. 388, chapter 1093))) and Acts supplemental to and amendatory of that Act (43 U.S.C. 371 et seq.) except that all funds reimbursed shall be deposited in the Account established under paragraph (2).
(4)
removed Availability of amounts— Amounts deposited in the Account under this subsection shall—
(A)
removed be made available in accordance with this section, subject to appropriation; and
(B)
removed be in addition to amounts appropriated for such purposes under any other provision of law.
(5)
removed Purposes of surface water storage— Construction of surface water storage under this section shall be made for the following purposes:
(A)
removed Increased municipal and industrial water supply.
(B)
removed Agricultural floodwater, erosion, and sedimentation reduction.
(C)
removed Agricultural drainage improvements.
(D)
removed Agricultural irrigation.
(E)
removed Increased recreation opportunities.
(F)
removed Reduced adverse impacts to fish and wildlife from water storage or diversion projects within watersheds associated with water storage projects funded under this section.
(G)
removed Any other purposes consistent with reclamation laws or other Federal law.
(f)
removed Definitions— For the purposes of this title, the following definitions apply:
(1)
removed Account— The term Account means the Reclamation Surface Water Storage Account established under subsection (e)(2).
(2)
removed Construction— The term construction means the designing, materials engineering and testing, surveying, and building of surface water storage including additions to existing surface water storage and construction of new surface water storage facilities, exclusive of any Federal statutory or regulatory obligations relating to any permit, review, approval, or other such requirement.
(3)
removed Surface water storage— The term surface water storage means any federally owned facility under the jurisdiction of the Bureau of Reclamation or any non-Federal facility used for the surface storage and supply of water resources.
(4)
removed Treasury rate— The term Treasury rate means the 20-year Constant Maturity Treasury (CMT) rate published by the United States Department of the Treasury existing on the effective date of the contract.
(5)
removed Water users’ association— The term water users’ association means—
(A)
removed an entity organized and recognized under State laws that is eligible to enter into contracts with reclamation to receive contract water for delivery to and users of the water and to pay applicable charges; and
(B)
removed includes a variety of entities with different names and differing functions, such as associations, conservatory district, irrigation district, municipality, and water project contract unit.

Sec. 801 Authorization of additional project benefits

removed

removed The Reclamation Safety of Dams Act of 1978 is amended—

(1)
removed in section 3, by striking “Construction” and inserting “Except as provided in section 5B, construction”; and
(2)
removed by inserting after section 5A (43 U.S.C. 509) the following:

removed “5B. Authorization of additional project benefits

removed “Notwithstanding section 3, if the Secretary determines that additional project benefits, including but not limited to additional conservation storage capacity, are feasible and not inconsistent with the purposes of this Act, the Secretary is authorized to develop additional project benefits through the construction of new or supplementary works on a project in conjunction with the Secretary’s activities under section 2 and subject to the conditions described in the feasibility study, provided—

removed “(1) the Secretary determines that developing additional project benefits through the construction of new or supplementary works on a project will promote more efficient management of water and water-related facilities;

removed “(2) the feasibility study pertaining to additional project benefits has been authorized pursuant to section 8 of the Federal Water Project Recreation Act of 1965 (16 U.S.C. 4601–18); and

removed “(3) the costs associated with developing the additional project benefits are agreed to in writing between the Secretary and project proponents and shall be allocated to the authorized purposes of the structure and repaid consistent with all provisions of Federal Reclamation law (the Act of June 17, 1902, 43 U.S.C. 371 et seq.) and Acts supplemental to and amendatory of that Act.”

Sec. 901 Short title

removed

removed This title may be cited as the “Water Rights Protection Act”.

Sec. 902 Definition of water right

removed

removed In this title, the term water right means any surface or groundwater right filed, permitted, certified, confirmed, decreed, adjudicated, or otherwise recognized by a judicial proceeding or by the State in which the user acquires possession of the water or puts the water to beneficial use, including water rights for federally recognized Indian tribes.

Sec. 903 Treatment of water rights

removed

removed The Secretary of the Interior and the Secretary of Agriculture shall not—

(1)
removed condition or withhold, in whole or in part, the issuance, renewal, amendment, or extension of any permit, approval, license, lease, allotment, easement, right-of-way, or other land use or occupancy agreement on—
(A)
removed limitation or encumbrance of any water right, or the transfer of any water right (including joint and sole ownership), directly or indirectly to the United States or any other designee; or
(B)
removed any other impairment of any water right, in whole or in part, granted or otherwise recognized under State law, by Federal or State adjudication, decree, or other judgment, or pursuant to any interstate water compact;
(2)
removed require any water user (including any federally recognized Indian tribe) to apply for or acquire a water right in the name of the United States under State law as a condition of the issuance, renewal, amendment, or extension of any permit, approval, license, lease, allotment, easement, right-of-way, or other land use or occupancy agreement;
(3)
removed assert jurisdiction over groundwater withdrawals or impacts on groundwater resources, unless jurisdiction is asserted, and any regulatory or policy actions taken pursuant to such assertion are, consistent with, and impose no greater restrictions or regulatory requirements than, applicable State laws (including regulations) and policies governing the protection and use of groundwater resources; or
(4)
removed infringe on the rights and obligations of a State in evaluating, allocating, and adjudicating the waters of the State originating on or under, or flowing from, land owned or managed by the Federal Government.

Sec. 904 Recognition of State authority

removed
(a)
removed In general— In carrying out section 903, the Secretary of the Interior and the Secretary of Agriculture shall—
(1)
removed recognize the longstanding authority of the States relating to evaluating, protecting, allocating, regulating, and adjudicating groundwater by any means, including a rulemaking, permitting, directive, water court adjudication, resource management planning, regional authority, or other policy; and
(2)
removed coordinate with the States in the adoption and implementation by the Secretary of the Interior or the Secretary of Agriculture of any rulemaking, policy, directive, management plan, or other similar Federal action so as to ensure that such actions are consistent with, and impose no greater restrictions or regulatory requirements than, State groundwater laws and programs.
(b)
removed Effect on state water rights— In carrying out this title, the Secretary of the Interior and the Secretary of Agriculture shall not take any action that adversely affects—
(1)
removed any water rights granted by a State;
(2)
removed the authority of a State in adjudicating water rights;
(3)
removed definitions established by a State with respect to the term beneficial use, priority of water rights, or terms of use;
(4)
removed terms and conditions of groundwater withdrawal, guidance and reporting procedures, and conservation and source protection measures established by a State;
(5)
removed the use of groundwater in accordance with State law; or
(6)
removed any other rights and obligations of a State established under State law.

Sec. 905 Effect of title

removed
(a)
removed Effect on existing authority— Nothing in this title limits or expands any existing legally recognized authority of the Secretary of the Interior or the Secretary of Agriculture to issue, grant, or condition any permit, approval, license, lease, allotment, easement, right-of-way, or other land use or occupancy agreement on Federal land subject to the jurisdiction of the Secretary of the Interior or the Secretary of Agriculture, respectively.
(b)
removed Effect on reclamation contracts— Nothing in this title interferes with Bureau of Reclamation contracts entered into pursuant to the reclamation laws.
(c)
removed Effect on endangered species act— Nothing in this title affects the implementation of the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.).
(d)
removed Effect on federal reserved water rights— Nothing in this title limits or expands any existing or claimed reserved water rights of the Federal Government on land administered by the Secretary of the Interior or the Secretary of Agriculture.
(e)
removed Effect on federal power act— Nothing in this title limits or expands authorities under sections 4(e), 10(j), or 18 of the Federal Power Act (16 U.S.C. 797(e), 803(j), 811).
(f)
removed Effect on Indian water rights— Nothing in this title limits or expands any water right or treaty right of any federally recognized Indian tribe.

Sec. 703 Treatment of water rights

added

added The Secretary shall not—

(1)
added condition the issuance, renewal, amendment, or extension of any permit, approval, license, lease, allotment, easement, right-of-way, or other land use or occupancy agreement on the transfer of any water right (including joint and sole ownership) directly or indirectly to the United States, or on any impairment of title or interest, in whole or in part, granted or otherwise recognized under State law, by Federal or State adjudication, decree, or other judgment, or pursuant to any interstate water compact; or
(2)
added require any water user to apply for or acquire a water right in the name of the United States under State law as a condition of the issuance, renewal, amendment, or extension of any permit, approval, license, lease, allotment, easement, right-of-way, or other land use or occupancy agreement.

Sec. 704 Policy development

added

added In developing any rule, policy, directive, management plan, or similar Federal action relating to the issuance, renewal, amendment, or extension of any permit, approval, license, lease, allotment, easement, right-of-way, or other land use or occupancy agreement, the Secretary—

(1)
added shall—
(A)
added recognize the longstanding authority of the States relating to evaluating, protecting, allocating, regulating, permitting, and adjudicating water use; and
(B)
added coordinate with the States to ensure that any rule, policy, directive, management plan, or similar Federal action is consistent with, and imposes no greater restriction or regulatory requirement, than applicable State water law; and
(2)
added shall not—
(A)
added adversely affect—
(i)
added the authority of a State in—
(I)
added permitting the beneficial use of water; or
(II)
added adjudicating water rights;
(ii)
added any definition established by a State with respect to the term beneficial use, priority of water rights, or terms of use; or
(iii)
added any other right or obligation of a State established under State law; or
(B)
added assert any connection between surface and groundwater that is inconsistent with such a connection recognized by State water laws.

Sec. 705 Effect

added
(a)
added Existing authority— Nothing in this title limits or expands any existing legally recognized authority of the Secretary to issue, grant, or condition any permit, approval, license, lease, allotment, easement, right-of-way, or other land use or occupancy agreement on Federal land that is subject to the jurisdiction of the Secretary.
(b)
added Reclamation contracts— Nothing in this title in any way interferes with any existing or future Bureau of Reclamation contract entered into pursuant to Federal reclamation law (the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act).
(c)
added Endangered Species Act— Nothing in this title affects the implementation of the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.).
(d)
added Federal reserved water rights— Nothing in this title limits or expands any existing reserved water rights of the Federal Government on land administered by the Secretary.
(e)
added Federal Power Act— Nothing in this title limits or expands authorities pursuant to sections 4(e), 10(j), or 18 of the Federal Power Act (16 U.S.C. 797(e), 803(j), 811).
(f)
added Indian water rights— Nothing in this title shall have any effect on tribal water rights or their adjudication, or the protection, settlement, or enforcement and/or administration of such rights by either Indian tribes or the United States as trustee for Indian tribes.
(g)
added Federally held State water rights— Nothing in this title limits the ability of the Secretary, through applicable State procedures, to acquire, use, enforce, or protect a State water right owned by the United States.