Interim Consolidated Storage Act of 2016
A BILL
To amend the Nuclear Waste Policy Act of 1982 to authorize the Secretary of Energy to enter into contracts for the storage of certain high-level radioactive waste and spent nuclear fuel and take title to certain high-level radioactive waste and spent nuclear fuel.
Sec. 2 Definition of interim consolidated storage facility
“(35) The term “interim consolidated storage facility” means a facility that possesses a specific license issued by the Commission that authorizes storage of high-level radioactive waste or spent nuclear fuel received from the Secretary or from two or more persons that generate or hold title to high-level radioactive waste or spent nuclear fuel generated at a civilian nuclear power reactor.”
Sec. 3 Interim consolidated storage of high-level radioactive waste and spent nuclear fuel
“I Interim Consolidated Storage
“190. Interim consolidated storage
“(a) In general—The Secretary may enter into contracts for the storage of high-level radioactive waste or spent nuclear fuel with any person that holds a license for an interim consolidated storage facility.
“(b) Definition of High-Level Radioactive Waste—For purposes of this subtitle and section 302, the term “high-level radioactive waste” includes Greater than Class C waste as defined in section 72.3 of title 10, Code of Federal Regulations. Nothing in this section or section 191 shall be interpreted to affect existing judicial interpretation of the term high-level radioactive waste or to require the disposal of Greater than Class C waste in a repository.
“191. Contracts
“(a) In general—The Secretary may enter into new contracts or modify existing contracts with any person who generates or holds title to high-level radioactive waste or spent nuclear fuel of domestic origin for the acceptance of title and subsequent storage of such waste or fuel at an interim consolidated storage facility, with priority for storage given to high-level radioactive waste and spent nuclear fuel located on sites without an operating nuclear reactor.
“(b) Contract terms—A contract entered into or modified under this section shall provide that acceptance by the Secretary, and transfer of title under subsection (d), of any high-level radioactive waste or spent nuclear fuel for an interim consolidated storage facility satisfies the Secretary’s responsibility under a contract entered into under section 302(a) to accept title to such waste or fuel for disposal, with respect to such accepted waste or fuel.
“(c) Limitation—The Secretary shall not require a person to settle claims against the United States for the breach of a contract entered into under section 302(a) for the disposal of high-level radioactive waste or spent nuclear fuel as a condition precedent of entering into or modifying a contract under this section.
“(d) Title to material—Delivery, and acceptance by the Secretary, of any high-level radioactive waste or spent nuclear fuel for an interim consolidated storage facility shall constitute a transfer to the Secretary of title to such waste or fuel.”
“(6) the fees and costs in connection with the storage of high-level radioactive waste or spent nuclear fuel in an interim consolidated storage facility; and”