Sec. 103
Factoring increased real-time monitoring and updated science into Delta smelt management
(a)
In general— The Director shall use the best scientific and commercial data available to implement, continuously evaluate, and refine or amend, as appropriate, the reasonable and prudent alternative described in the smelt biological opinion, and any successor opinions or court order. The Secretary shall make all significant decisions under the smelt biological opinion, or any successor opinions that affect Central Valley Project and State Water Project operations, in writing, and shall document the significant facts upon which such decisions are made, consistent with section 706 of title 5, United States Code.
(b)
Increased Monitoring To Inform Real-Time Operations— The Secretary shall conduct additional surveys, on an annual basis at the appropriate time of the year based on environmental conditions, in collaboration with other Delta science interests.
(1)
In implementing this section, the Secretary shall—
(A)
use the most accurate survey methods available for the detection of Delta smelt to determine the extent that adult Delta smelt are distributed in relation to certain levels of turbidity, or other environmental factors that may influence salvage rate; and
(B)
use results from appropriate survey methods for the detection of Delta smelt to determine how the Central Valley Project and State Water Project may be operated more efficiently to minimize salvage while maximizing export pumping rates without causing a significant negative impact on the long-term survival of the Delta smelt.
(2)
During the period beginning on December 1, 2015, and ending March 31, 2016, and in each successive December through March period, if suspended sediment loads enter the Delta from the Sacramento River and the suspended sediment loads appear likely to raise turbidity levels in the Old River north of the export pumps from values below 12 Nephelometric Turbidity Units (NTU) to values above 12 NTU, the Secretary shall—
(A)
conduct daily monitoring using appropriate survey methods at locations including, but not limited to, the vicinity of Station 902 to determine the extent that adult Delta smelt are moving with turbidity toward the export pumps; and
(B)
use results from the monitoring surveys referenced in paragraph (A) to determine how increased trawling can inform daily real-time Central Valley Project and State Water Project operations to minimize salvage while maximizing export pumping rates without causing a significant negative impact on the long-term survival of the Delta smelt.
(c)
Periodic review of monitoring— Within 12 months of the date of enactment of this title, and at least once every 5 years thereafter, the Secretary shall—
(1)
evaluate whether the monitoring program under subsection (b), combined with other monitoring programs for the Delta, is providing sufficient data to inform Central Valley Project and State Water Project operations to minimize salvage while maximizing export pumping rates without causing a significant negative impact on the long-term survival of the Delta smelt; and
(2)
determine whether the monitoring efforts should be changed in the short or long term to provide more useful data.
(d)
Delta smelt distribution study—
(1)
In general— No later than January 1, 2016, and at least every five years thereafter, the Secretary, in collaboration with the California Department of Fish and Wildlife, the California Department of Water Resources, public water agencies, and other interested entities, shall implement new targeted sampling and monitoring specifically designed to understand Delta smelt abundance, distribution, and the types of habitat occupied by Delta smelt during all life stages.
(2)
Sampling— The Delta smelt distribution study shall, at a minimum—
(A)
include recording water quality and tidal data;
(B)
be designed to understand Delta smelt abundance, distribution, habitat use, and movement throughout the Delta, Suisun Marsh, and other areas occupied by the Delta smelt during all seasons;
(C)
consider areas not routinely sampled by existing monitoring programs, including wetland channels, near-shore water, depths below 35 feet, and shallow water; and
(D)
use survey methods, including sampling gear, best suited to collect the most accurate data for the type of sampling or monitoring.
(e)
changed
Scientifically supported implementation of old and middle river OMR flow requirements— In implementing the provisions of the smelt biological opinion, or any successor biological opinion or court order, pertaining to management of reverse flow in the Old and Middle River, Rivers, the Secretary shall—
(1)
consider the relevant provisions of the biological opinion or any successor biological opinion;
(2)
changed
to maximize Central Valley project and State Water Project water supplies, manage export pumping rates to achieve a reverse OMR flow rate in Old and Middle River of −5,000 cubic feet per second unless information developed by the Secretary under paragraphs (3) and (4) leads the Secretary to reasonably conclude that a less negative OMR flow rate is necessary to avoid a negative impact on the long-term survival of the Delta smelt. If information available to the Secretary indicates that a reverse OMR flow rate in Old and Middle River more negative than −5,000 cubic feet per second can be established without an imminent negative impact on the long-term survival of the Delta smelt, the Secretary shall manage export pumping rates to achieve that more negative OMR flow rate;
(3)
document in writing any significant facts about real-time conditions relevant to the determinations of OMR reverse flow rates, including—
(A)
whether targeted real-time fish monitoring in the Old River pursuant to this section, including monitoring in the vicinity of Station 902, indicates that a significant negative impact on the long-term survival of the Delta smelt is imminent; and
(B)
whether near-term forecasts with available salvage models show under prevailing conditions that OMR flow of −5,000 cubic feet per second or higher will cause a significant negative impact on the long-term survival of the Delta smelt;
(4)
show in writing that any determination to manage OMR reverse flow at rates less negative than −5,000 cubic feet per second is necessary to avoid a significant negative impact on the long-term survival of the Delta smelt, including an explanation of the data examined and the connection between those data and the choice made, after considering—
(A)
the distribution of Delta smelt throughout the Delta;
(B)
the potential effects of documented, quantified entrainment on subsequent Delta smelt abundance;
(C)
the water temperature;
(D)
other significant factors relevant to the determination; and
(E)
whether any alternative measures could have a substantially lesser water supply impact; and
(5)
for any subsequent biological opinion, make the showing required in paragraph (4) for any determination to manage OMR reverse flow at rates less negative than the most negative limit in the biological opinion if the most negative limit in the biological opinion is more negative than −5,000 cubic feet per second.
(f)
Memorandum of Understanding— No later than December 1, 2015, the Commissioner and the Director will execute a Memorandum of Understanding (MOU) to ensure that the smelt biological opinion is implemented in a manner that maximizes water supply while complying with applicable laws and regulations. If that MOU alters any procedures set out in the biological opinion, there will be no need to reinitiate consultation if those changes will not have a significant negative impact on the long-term survival on listed species and the implementation of the MOU would not be a major change to implementation of the biological opinion. Any change to procedures that does not create a significant negative impact on the long-term survival to listed species will not alter application of the take permitted by the incidental take statement in the biological opinion under section 7(o)(2) of the Endangered Species Act of 1973.
(g)
changed
Calculation of reverse flow in OMR— Within 90 days of the enactment of this title, the Secretary is directed, in consultation with the California Department of Water Resources to revise the method used to calculate reverse flow in Old and Middle River Rivers for implementation of the reasonable and prudent alternatives in the smelt biological opinion and the salmonid biological opinion, and any succeeding biological opinions, for the purpose of increasing Central Valley Project and State Water Project water supplies. The method of calculating reverse flow in Old and Middle River Rivers shall be reevaluated not less than every five years thereafter to achieve maximum export pumping rates within limits established by the smelt biological opinion, the salmonid biological opinion, and any succeeding biological opinions.
Sec. 202
Process for ensuring salmonid management is responsive to new science
(a)
General directive— The reasonable and prudent alternative described in the salmonid biological opinion allows for and anticipates adjustments in Central Valley Project and State Water Project operation parameters to reflect the best scientific and commercial data currently available, and authorizes efforts to test and evaluate improvements in operations that will meet applicable regulatory requirements and maximize Central Valley Project and State Water Project water supplies and reliability. Implementation of the reasonable and prudent alternative described in the salmonid biological opinion shall be adjusted accordingly as new scientific and commercial data are developed. The Commissioner and the Assistant Administrator shall fully utilize these authorities as described below.
(b)
Annual reviews of certain Central Valley Project and State Water Project operations— No later than December 31, 2016, and at least annually thereafter:
(1)
The Commissioner, with the assistance of the Assistant Administrator, shall examine and identify adjustments to the initiation of Action IV.2.3 as set forth in the Biological Opinion and Conference Opinion on the Long-Term Operations of the Central Valley Project and State Water Project, Endangered Species Act Section 7 Consultation, issued by the National Marine Fisheries Service on June 4, 2009, pertaining to negative OMR flows, subject to paragraph (5).
(2)
The Commissioner, with the assistance of the Assistant Administrator, shall examine and identify adjustments in the timing, triggers or other operational details relating to the implementation of pumping restrictions in Action IV.2.1 pertaining to the inflow to export ratio, subject to paragraph (5).
(3)
changed
Pursuant to the consultation and assessments carried out under paragraphs (1) and (2) of this subsection, the Commissioner and the Assistant Administrator shall jointly make recommendations to the Secretary of the Interior and to the Secretary of Commerce on adjustments to project operations that, in the exercise of the adaptive management provisions of the salmonid biological opinion, will reduce water supply impacts of the salmonid biological opinion on the Central Valley Project and the California State Water Project and are consistent with the requirements of applicable law and as further described in subsection (c).
(4)
changed
The Secretary of Commerce and the Secretary of the Interior shall direct the Commissioner and Assistant Administrator to implement recommended adjustments to Central Valley Project and State Water Project operations for which the conditions under subsection (c) are met.
(5)
The Assistant Administrator and the Commissioner shall review and identify adjustments to Central Valley Project and State Water Project operations with water supply restrictions in any successor biological opinion to the salmonid biological opinion, applying the provisions of this section to those water supply restrictions where there are references to Actions IV.2.1 and IV.2.3.
(c)
changed
Implementation of operational adjustments— After reviewing the recommendations under subsection (b), the Secretary of the Interior and the Secretary of Commerce shall direct the Commissioner and the Assistant Administrator to implement those operational adjustments, or any combination, for which, in aggregate—
(1)
the net effect on listed species is equivalent to those of the underlying project operational parameters in the salmonid biological opinion, taking into account both—
(A)
efforts to minimize the adverse effects of the adjustment to project operations; and
(B)
whatever additional actions or measures may be implemented in conjunction with the adjustments to operations to offset the adverse effects to listed species, consistent with (d), that are in excess of the adverse effects of the underlying operational parameters, if any; and
(2)
the effects of the adjustment can be reasonably expected to fall within the incidental take authorizations.
(d)
Evaluation of offsetting measures— When examining and identifying opportunities to offset the potential adverse effect of adjustments to operations under subsection (c)(1)(B), the Commissioner and the Assistant Administrator shall take into account the potential species survival improvements that are likely to result from other measures which, if implemented in conjunction with such adjustments, would offset adverse effects, if any, of the adjustments. When evaluating offsetting measures, the Commissioner and the Assistant Administrator shall consider the type, timing and nature of the adverse effects, if any, to specific species and ensure that the measures likely provide equivalent overall benefits to the listed species in the aggregate, as long as the change will not cause a significant negative impact on the long-term survival of a listed salmonid species.
(e)
Framework for examining opportunities To minimize or offset the potential adverse effect of adjustments to operations— Not later than December 31, 2015, and every five years thereafter, the Assistant Administrator shall, in collaboration with the Director of the California Department of Fish and Wildlife, based on the best scientific and commercial data available and for each listed salmonid species, issue estimates of the increase in through-Delta survival the Secretary expects to be achieved—
(1)
through restrictions on export pumping rates as specified by Action IV.2.3 as compared to limiting OMR flow to a fixed rate of −5,000 cubic feet per second within the time period Action IV.2.3 is applicable, based on a given rate of San Joaquin River inflow to the Delta and holding other relevant factors constant;
(2)
through San Joaquin River inflow to export restrictions on export pumping rates specified within Action IV.2.1 as compared to the restrictions in the April/May period imposed by the State Water Resources Control Board decision D–1641, based on a given rate of San Joaquin River inflow to the Delta and holding other relevant factors constant;
(3)
through physical habitat restoration improvements;
(4)
through predation control programs;
(5)
through the installation of temporary barriers, the management of Cross Channel Gates operations, and other projects affecting flow in the Delta;
(6)
through salvaging fish that have been entrained near the entrance to Clifton Court Forebay;
(7)
through any other management measures that may provide equivalent or better protections for listed species while maximizing export pumping rates without causing a significant negative impact on the long-term survival of a listed salmonid species; and
(8)
through development and implementation of conservation hatchery programs for salmon and steelhead to aid in the recovery of listed salmon and steelhead species.
(1)
To the maximum extent practicable, the Assistant Administrator shall make quantitative estimates of survival such as a range of percentage increases in through-Delta survival that could result from the management measures, and if the scientific information is lacking for quantitative estimates, shall do so on qualitative terms based upon the best available science.
(2)
If the Assistant Administrator provides qualitative survival estimates for a species resulting from one or more management measures, the Secretary shall, to the maximum extent feasible, rank the management measures described in subsection (e) in terms of their most likely expected contribution to increased through-Delta survival relative to the other measures.
(3)
If at the time the Assistant Administrator conducts the reviews under subsection (b), the Secretary has not issued an estimate of increased through-Delta survival from different management measures pursuant to subsection (e), the Secretary shall compare the protections to the species from different management measures based on the best scientific and commercial data available at the time.
(g)
Comparison of adverse consequences for alternative management measures of equivalent protection for a species—
(1)
For the purposes of this subsection and subsection (c)—
(A)
the alternative management measure or combination of alternative management measures identified in paragraph (2) shall be known as the “equivalent alternative measure”;
(B)
the existing measure or measures identified in subparagraphs (2) (A), (B), (C), or (D) shall be known as the “equivalent existing measure”; and
(C)
an “equivalent increase in through-Delta survival rates for listed salmonid species” shall mean an increase in through-Delta survival rates that is equivalent when considering the change in through-Delta survival rates for the listed salmonid species in the aggregate, and not the same change for each individual species, as long as the change in survival rates will not cause a significant negative impact on the long-term survival of a listed salmonid species.
(2)
As part of the reviews of project operations pursuant to subsection (b), the Assistant Administrator shall determine whether any alternative management measures or combination of alternative management measures listed in subsection (e) (3) through (8) would provide an increase in through-Delta survival rates for listed salmonid species that is equivalent to the increase in through-Delta survival rates for listed salmonid species from the following:
(A)
Through restrictions on export pumping rates as specified by Action IV.2.3, as compared to limiting OMR flow to a fixed rate of −5,000 cubic feet per second within the time period Action IV.2.3 is applicable.
(B)
Through restrictions on export pumping rates as specified by Action IV.2.3, as compared to a modification of Action IV.2.3 that would provide additional water supplies, other than that described in subparagraph (A).
(C)
Through San Joaquin River inflow to export restrictions on export pumping rates specified within Action IV.2.1, as compared to the restrictions in the April/May period imposed by the State Water Resources Control Board decision D–1641.
(D)
Through San Joaquin River inflow to export restrictions on export pumping rates specified within Action IV.2.1, as compared to a modification of Action IV.2.1 that would reduce water supply impacts of the salmonid biological opinion on the Central Valley Project and the California State Water Project, other than that described in subparagraph (C).
(3)
If the Assistant Administrator identifies an equivalent alternative measure pursuant to paragraph (2), the Assistant Administrator shall determine whether—
(A)
it is technically feasible and within Federal jurisdiction to implement the equivalent alternative measure;
(B)
the State of California, or subdivision thereof, or local agency with jurisdiction has certified in writing within 10 calendar days to the Assistant Administrator that it has the authority and capability to implement the pertinent equivalent alternative measure; or
(C)
the adverse consequences of doing so are less than the adverse consequences of the equivalent existing measure, including a concise evaluation of the adverse consequences to other affected interests.
(4)
If the Assistant Administrator makes the determinations in subparagraph (3)(A) or (3)(B), the Commissioner shall adjust project operations to implement the equivalent alternative measure in place of the equivalent existing measure in order to increase export rates of pumping to the greatest extent possible while maintaining a net combined effect of equivalent through-Delta survival rates for the listed salmonid species.
(h)
Tracking Adverse Effects Beyond the Range of Effects Accounted for in the Salmonid Biological Opinion and Coordinated Operation with the Delta Smelt Biological Opinion—
(1)
Among the adjustments to the project operations considered through the adaptive management process under this section, the Assistant Administrator and the Commissioner shall—
(A)
evaluate the effects on listed salmonid species and water supply of the potential adjustment to operational criteria described in subparagraph (B); and
(B)
consider requiring that before some or all of the provisions of Actions IV.2.1. or IV.2.3 are imposed in any specific instance, the Assistant Administrator show that the implementation of these provisions in that specific instance is necessary to avoid a significant negative impact on the long-term survival of a listed salmonid species.
(2)
The Assistant Administrator, the Director, and the Commissioner, in coordination with State officials as appropriate, shall establish operational criteria to coordinate management of OMR flows under the smelt and salmonid biological opinions, in order to take advantage of opportunities to provide additional water supplies from the coordinated implementation of the biological opinions.
(3)
The Assistant Administrator and the Commissioner shall document the effects of any adaptive management decisions related to the coordinated operation of the smelt and salmonid biological opinions that prioritizes the maintenance of one species at the expense of the other.
(i)
Real-Time Monitoring and Management— Notwithstanding the calendar based triggers described in the salmonid biological opinion Reasonable and Prudent Alternative (RPA), the Assistant Administrator and the Commissioner shall not limit OMR reverse flow to −5,000 cubic feet per second unless current monitoring data indicate that this OMR flow limitation is reasonably required to avoid a significant negative impact on the long-term survival of a listed salmonid species.
(j)
Evaluation and implementation of management measures— If the quantitative estimates of through-Delta survival established by the Secretary for the adjustments in subsection (b)(2) exceed the through-Delta survival established for the RPAs, the Secretary shall evaluate and implement the management measures in subsection (b)(2) as a prerequisite to implementing the RPAs contained in the Salmonid Biological Opinion.
(k)
Accordance with other law— Consistent with section 706 of title 5, United States Code, decisions of the Assistant Administrator and the Commissioner described in subsections (b) through (j) shall be made in writing, on the basis of best scientific and commercial data currently available, and shall include an explanation of the data examined at the connection between those data and the decisions made.
Sec. 602
Oversight board for Restoration Fund
(a)
Plan; advisory board— Section 3407 of the Central Valley Project Improvement Act (Public Law 102–575; 106 Stat. 4726) is amended by adding at the end the following:
“(g) Plan on expenditure of funds
“(1) In general—For each fiscal year, the Secretary, in consultation with the Advisory Board, shall submit to Congress a plan for the expenditure of all of the funds deposited into the Restoration Fund during the preceding fiscal year.
“(2) Contents—The plan shall include an analysis of the cost-effectiveness of each expenditure.
“(h) Advisory board
“(1) Establishment—There is established the Restoration Fund Advisory Board (referred to in this section as the “Advisory Board”), which shall be composed of 11 members appointed by the Secretary.
“(2) Membership
“(A) In general—The Secretary shall appoint members to the Advisory Board that represent the various Central Valley Project stakeholders, of whom—
“(i) 4 members shall be agricultural users of the Central Valley Project, including at least one agricultural user from north-of-the-Delta and one agricultural user from south-of-the-Delta;
“(ii) 2 members shall be municipal and industrial users of the Central Valley Project, including one municipal and industrial user from north-of-the-Delta and one municipal and industrial user from south-of-the-Delta;
changed
“(iii) 3 2 members shall be power contractors of the Central Valley Project, including at least one power contractor from north-of-the-Delta and from south-of-the-Delta;
changed
“(iv) 1 member shall be a representative of a Federal national wildlife refuge that contracts for Central Valley Project water supplies with the Bureau of Reclamation; andReclamation;
changed
“(v) 1 member shall have expertise in the economic impacts of the changes to water operations.operations; and
added
“(vi) 1 member shall be a representative of a wildlife entity that primarily focuses on waterfowl.
“(B) Observer—The Secretary and the Secretary of Commerce may each designate a representative to act as an observer of the Advisory Board.
added
“(C) Chair—The Secretary shall appoint 1 of the members described in subparagraph (A) to serve as Chair of the Advisory Board.
removed
“(C) Chairman—The Secretary shall appoint 1 of the members described in subparagraph (A) to serve as Chairman of the Advisory Board.
“(3) Terms—The term of each member of the Advisory Board shall be 4 years.
“(4) Date of appointments—The appointment of a member of the Panel shall be made not later than—
“(A) the date that is 120 days after the date of enactment of this Act; or
“(B) in the case of a vacancy on the Panel described in subsection (c)(2), the date that is 120 days after the date on which the vacancy occurs.
“(5) Vacancies
“(A) In general—A vacancy on the Panel shall be filled in the manner in which the original appointment was made and shall be subject to any conditions that applied with respect to the original appointment.
“(B) Filling unexpired term—An individual chosen to fill a vacancy shall be appointed for the unexpired term of the member replaced.
“(C) Expiration of terms—The term of any member shall not expire before the date on which the successor of the member takes office.
“(6) Removal—A member of the Panel may be removed from office by the Secretary of the Interior.
“(7) Federal advisory committee act—The Panel shall not be subject to the requirements of the Federal Advisory Committee Act.
“(8) Duties—The duties of the Advisory Board are—
“(A) to meet not less frequently than semiannually to develop and make recommendations to the Secretary regarding priorities and spending levels on projects and programs carried out under this title;
“(B) to ensure that any advice given or recommendation made by the Advisory Board reflects the independent judgment of the Advisory Board;
“(C) not later than December 31, 2015, and annually thereafter, to submit to the Secretary and Congress the recommendations under subparagraph (A); and
“(D) not later than December 31, 2015, and biennially thereafter, to submit to Congress details of the progress made in achieving the actions required under section 3406.
“(9) Administration—With the consent of the appropriate agency head, the Advisory Board may use the facilities and services of any Federal agency.
“(10) Cooperation and assistance
“(A) Provision of information—Upon request of the Panel Chair for information or assistance to facilitate carrying out this section, the Secretary of the Interior shall promptly provide such information, unless otherwise prohibited by law.
“(B) Space and assistance—The Secretary of the Interior shall provide the Panel with appropriate and adequate office space, together with such equipment, office supplies, and communications facilities and services as may be necessary for the operation of the Panel, and shall provide necessary maintenance services for such offices and the equipment and facilities located therein.”
Sec. 805
Project acceleration
(1)
In general— This section shall apply to—
(A)
each project study that is initiated after the date of enactment of this Act and for which an environmental impact statement is prepared under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
(B)
the extent determined appropriate by the Secretary, to other project studies initiated before the date of enactment of this Act and for which an environmental review process document is prepared under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
(C)
any project study for the development of a non-federally owned and operated surface water storage project for which the Secretary determines there is a demonstrable Federal interest and the project—
(i)
is located in a river basin where other Bureau of Reclamation water projects are located;
(ii)
will create additional water supplies that support Bureau of Reclamation water projects; or
(iii)
will become integrated into the operation of Bureau of Reclamation water projects.
(2)
Flexibility— Any authority granted under this section may be exercised, and any requirement established under this section may be satisfied, for the conduct of an environmental review process for a project study, a class of project studies, or a program of project studies.
(3)
List of project studies—
(A)
In general— The Secretary shall annually prepare, and make publicly available, a list of all project studies that the Secretary has determined—
(i)
meets the standards described in paragraph (1); and
(ii)
does not have adequate funding to make substantial progress toward the completion of the project study.
(B)
Inclusions— The Secretary shall include for each project study on the list under subparagraph (A) a description of the estimated amounts necessary to make substantial progress on the project study.
(b)
Project review process—
(1)
In general— The Secretary shall develop and implement a coordinated environmental review process for the development of project studies.
(2)
Coordinated review— The coordinated environmental review process described in paragraph (1) shall require that any review, analysis, opinion, statement, permit, license, or other approval or decision issued or made by a Federal, State, or local governmental agency or an Indian tribe for a project study described in subsection (b) be conducted, to the maximum extent practicable, concurrently with any other applicable governmental agency or Indian tribe.
(3)
Timing— The coordinated environmental review process under this subsection shall be completed not later than the date on which the Secretary, in consultation and concurrence with the agencies identified under section 805(d), establishes with respect to the project study.
(A)
In general— Subject to the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and the requirements of section 1506.8 of title 40, Code of Federal Regulations (or successor regulations), including the concurrence of the proposed joint lead agency, a project sponsor may serve as the joint lead agency.
(B)
Project sponsor as joint lead agency— A project sponsor that is a State or local governmental entity may—
(i)
with the concurrence of the Secretary, serve as a joint lead agency with the Federal lead agency for purposes of preparing any environmental document under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
(ii)
prepare any environmental review process document under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) required in support of any action or approval by the Secretary if—
(I)
the Secretary provides guidance in the preparation process and independently evaluates that document;
(II)
the project sponsor complies with all requirements applicable to the Secretary under—
(aa)
the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
(bb)
any regulation implementing that Act; and
(cc)
any other applicable Federal law; and
(III)
the Secretary approves and adopts the document before the Secretary takes any subsequent action or makes any approval based on that document, regardless of whether the action or approval of the Secretary results in Federal funding.
(2)
Duties— The Secretary shall ensure that—
(A)
the project sponsor complies with all design and mitigation commitments made jointly by the Secretary and the project sponsor in any environmental document prepared by the project sponsor in accordance with this subsection; and
(B)
any environmental document prepared by the project sponsor is appropriately supplemented to address any changes to the project the Secretary determines are necessary.
(3)
Adoption and use of documents— Any environmental document prepared in accordance with this subsection shall be adopted and used by any Federal agency making any determination related to the project study to the same extent that the Federal agency could adopt or use a document prepared by another Federal agency under—
(A)
the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
(B)
parts 1500 through 1508 of title 40, Code of Federal Regulations (or successor regulations).
(4)
Roles and responsibility of lead agency— With respect to the environmental review process for any project study, the Federal lead agency shall have authority and responsibility—
(A)
to take such actions as are necessary and proper and within the authority of the Federal lead agency to facilitate the expeditious resolution of the environmental review process for the project study; and
(B)
to prepare or ensure that any required environmental impact statement or other environmental review document for a project study required to be completed under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) is completed in accordance with this section and applicable Federal law.
(d)
Participating and cooperating agencies—
(1)
Identification of jurisdictional agencies— With respect to carrying out the environmental review process for a project study, the Secretary shall identify, as early as practicable in the environmental review process, all Federal, State, and local government agencies and Indian tribes that may—
(A)
have jurisdiction over the project;
(B)
be required by law to conduct or issue a review, analysis, opinion, or statement for the project study; or
(C)
be required to make a determination on issuing a permit, license, or other approval or decision for the project study.
(2)
State authority— If the environmental review process is being implemented by the Secretary for a project study within the boundaries of a State, the State, consistent with State law, may choose to participate in the process and to make subject to the process all State agencies that—
(A)
have jurisdiction over the project;
(B)
are required to conduct or issue a review, analysis, opinion, or statement for the project study; or
(C)
are required to make a determination on issuing a permit, license, or other approval or decision for the project study.
(A)
In general— The Federal lead agency shall invite, as early as practicable in the environmental review process, any agency identified under paragraph (1) to become a participating or cooperating agency, as applicable, in the environmental review process for the project study.
(B)
Deadline— An invitation to participate issued under subparagraph (A) shall set a deadline by which a response to the invitation shall be submitted, which may be extended by the Federal lead agency for good cause.
(4)
changed
Procedures— Section 1501.6 of title 40, Code of Federal Regulations (as in effect on the date of enactment of the Bureau of Reclamation Surface Water Storage Project Streamlining Act) shall govern the identification and the participation of a cooperating agency.
(5)
Federal cooperating agencies— Any Federal agency that is invited by the Federal lead agency to participate in the environmental review process for a project study shall be designated as a cooperating agency by the Federal lead agency unless the invited agency informs the Federal lead agency, in writing, by the deadline specified in the invitation that the invited agency—
(i)
has no jurisdiction or authority with respect to the project;
(ii)
has no expertise or information relevant to the project; or
(iii)
does not have adequate funds to participate in the project; and
(B)
does not intend to submit comments on the project.
(6)
Administration— A participating or cooperating agency shall comply with this section and any schedule established under this section.
(7)
Effect of designation— Designation as a participating or cooperating agency under this subsection shall not imply that the participating or cooperating agency—
(A)
supports a proposed project; or
(B)
has any jurisdiction over, or special expertise with respect to evaluation of, the project.
(8)
Concurrent reviews— Each participating or cooperating agency shall—
(A)
carry out the obligations of that agency under other applicable law concurrently and in conjunction with the required environmental review process, unless doing so would prevent the participating or cooperating agency from conducting needed analysis or otherwise carrying out those obligations; and
(B)
formulate and implement administrative, policy, and procedural mechanisms to enable the agency to ensure completion of the environmental review process in a timely, coordinated, and environmentally responsible manner.
(e)
Non-Federal projects integrated into reclamation systems— The Federal lead agency shall serve in that capacity for the entirety of all non-Federal projects that will be integrated into a larger system owned, operated or administered in whole or in part by the Bureau of Reclamation.
(f)
Non-Federal project— If the Secretary determines that a project can be expedited by a non-Federal sponsor and that there is a demonstrable Federal interest in expediting that project, the Secretary shall take such actions as are necessary to advance such a project as a non-Federal project, including, but not limited to, entering into agreements with the non-Federal sponsor of such project to support the planning, design and permitting of such project as a non-Federal project.
(g)
Programmatic compliance—
(1)
In general— The Secretary shall issue guidance regarding the use of programmatic approaches to carry out the environmental review process that—
(A)
eliminates repetitive discussions of the same issues;
(B)
focuses on the actual issues ripe for analyses at each level of review;
(C)
establishes a formal process for coordinating with participating and cooperating agencies, including the creation of a list of all data that are needed to carry out an environmental review process; and
(i)
the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
(ii)
all other applicable laws.
(2)
Requirements— In carrying out paragraph (1), the Secretary shall—
(A)
as the first step in drafting guidance under that paragraph, consult with relevant Federal, State, and local governmental agencies, Indian tribes, and the public on the appropriate use and scope of the programmatic approaches;
(B)
emphasize the importance of collaboration among relevant Federal, State, and local governmental agencies, and Indian tribes in undertaking programmatic reviews, especially with respect to including reviews with a broad geographical scope;
(C)
ensure that the programmatic reviews—
(i)
promote transparency, including of the analyses and data used in the environmental review process, the treatment of any deferred issues raised by Federal, State, and local governmental agencies, Indian tribes, or the public, and the temporal and special scales to be used to analyze those issues;
(ii)
use accurate and timely information in the environmental review process, including—
(I)
criteria for determining the general duration of the usefulness of the review; and
(II)
the timeline for updating any out-of-date review;
(I)
the relationship between programmatic analysis and future tiered analysis; and
(II)
the role of the public in the creation of future tiered analysis; and
(iv)
are available to other relevant Federal, State, and local governmental agencies, Indian tribes, and the public;
(D)
allow not fewer than 60 days of public notice and comment on any proposed guidance; and
(E)
address any comments received under subparagraph (D).
(A)
Establishment— The Federal lead agency shall, after consultation with and with the concurrence of each participating and cooperating agency and the project sponsor or joint lead agency, as applicable, establish a plan for coordinating public and agency participation in, and comment on, the environmental review process for a project study or a category of project studies.
(i)
In general— As soon as practicable but not later than 45 days after the close of the public comment period on a draft environmental impact statement, the Federal lead agency, after consultation with and the concurrence of each participating and cooperating agency and the project sponsor or joint lead agency, as applicable, shall establish, as part of the coordination plan established in subparagraph (A), a schedule for completion of the environmental review process for the project study.
(ii)
Factors for consideration— In establishing a schedule, the Secretary shall consider factors such as—
(I)
the responsibilities of participating and cooperating agencies under applicable laws;
(II)
the resources available to the project sponsor, joint lead agency, and other relevant Federal and State agencies, as applicable;
(III)
the overall size and complexity of the project;
(IV)
the overall schedule for and cost of the project; and
(V)
the sensitivity of the natural and historical resources that could be affected by the project.
(iii)
Modifications— The Secretary may—
(I)
lengthen a schedule established under clause (i) for good cause; and
(II)
shorten a schedule only with concurrence of the affected participating and cooperating agencies and the project sponsor or joint lead agency, as applicable.
(iv)
Dissemination— A copy of a schedule established under clause (i) shall be—
(I)
provided to each participating and cooperating agency and the project sponsor or joint lead agency, as applicable; and
(II)
made available to the public.
(2)
Comment deadlines— The Federal lead agency shall establish the following deadlines for comment during the environmental review process for a project study:
(A)
Draft environmental impact statements— For comments by Federal and State agencies and the public on a draft environmental impact statement, a period of not more than 60 days after publication in the Federal Register of notice of the date of public availability of the draft environmental impact statement, unless—
(i)
a different deadline is established by agreement of the Federal lead agency, the project sponsor or joint lead agency, as applicable, and all participating and cooperating agencies; or
(ii)
the deadline is extended by the Federal lead agency for good cause.
(B)
Other environmental review processes— For all other comment periods established by the Federal lead agency for agency or public comments in the environmental review process, a period of not more than 30 days after the date on which the materials on which comment is requested are made available, unless—
(i)
a different deadline is established by agreement of the Federal lead agency, the project sponsor, or joint lead agency, as applicable, and all participating and cooperating agencies; or
(ii)
the deadline is extended by the Federal lead agency for good cause.
(3)
Deadlines for decisions under other laws— In any case in which a decision under any Federal law relating to a project study, including the issuance or denial of a permit or license, is required to be made by the date described in subsection (i)(5)(B), the Secretary shall submit to the Committee on Natural Resources of the House of Representatives and the Committee on Energy and Natural Resources of the Senate—
(A)
as soon as practicable after the 180-day period described in subsection (i)(5)(B), an initial notice of the failure of the Federal agency to make the decision; and
(B)
every 60 days thereafter until such date as all decisions of the Federal agency relating to the project study have been made by the Federal agency, an additional notice that describes the number of decisions of the Federal agency that remain outstanding as of the date of the additional notice.
(4)
Involvement of the public— Nothing in this subsection reduces any time period provided for public comment in the environmental review process under applicable Federal law (including regulations).
(5)
Transparency reporting—
(A)
Reporting requirements— Not later than 1 year after the date of enactment of this Act, the Secretary shall establish and maintain an electronic database and, in coordination with other Federal and State agencies, issue reporting requirements to make publicly available the status and progress with respect to compliance with applicable requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and any other Federal, State, or local approval or action required for a project study for which this section is applicable.
(B)
Project study transparency— Consistent with the requirements established under subparagraph (A), the Secretary shall make publicly available the status and progress of any Federal, State, or local decision, action, or approval required under applicable laws for each project study for which this section is applicable.
(i)
Issue identification and resolution—
(1)
Cooperation— The Federal lead agency, the cooperating agencies, and any participating agencies shall work cooperatively in accordance with this section to identify and resolve issues that could delay completion of the environmental review process or result in the denial of any approval required for the project study under applicable laws.
(2)
Federal lead agency responsibilities—
(A)
In general— The Federal lead agency shall make information available to the cooperating agencies and participating agencies as early as practicable in the environmental review process regarding the environmental and socioeconomic resources located within the project area and the general locations of the alternatives under consideration.
(B)
Data sources— The information under subparagraph (A) may be based on existing data sources, including geographic information systems mapping.
(3)
Cooperating and participating agency responsibilities— Based on information received from the Federal lead agency, cooperating and participating agencies shall identify, as early as practicable, any issues of concern regarding the potential environmental or socioeconomic impacts of the project, including any issues that could substantially delay or prevent an agency from granting a permit or other approval that is needed for the project study.
(4)
Accelerated issue resolution and elevation—
(A)
In general— On the request of a participating or cooperating agency or project sponsor, the Secretary shall convene an issue resolution meeting with the relevant participating and cooperating agencies and the project sponsor or joint lead agency, as applicable, to resolve issues that may—
(i)
delay completion of the environmental review process; or
(ii)
result in denial of any approval required for the project study under applicable laws.
(B)
Meeting date— A meeting requested under this paragraph shall be held not later than 21 days after the date on which the Secretary receives the request for the meeting, unless the Secretary determines that there is good cause to extend that deadline.
(C)
Notification— On receipt of a request for a meeting under this paragraph, the Secretary shall notify all relevant participating and cooperating agencies of the request, including the issue to be resolved and the date for the meeting.
(D)
Elevation of issue resolution— If a resolution cannot be achieved within the 30-day period beginning on the date of a meeting under this paragraph and a determination is made by the Secretary that all information necessary to resolve the issue has been obtained, the Secretary shall forward the dispute to the heads of the relevant agencies for resolution.
(E)
Convention by secretary— The Secretary may convene an issue resolution meeting under this paragraph at any time, at the discretion of the Secretary, regardless of whether a meeting is requested under subparagraph (A).
(5)
Financial penalty provisions—
(A)
In general— A Federal jurisdictional agency shall complete any required approval or decision for the environmental review process on an expeditious basis using the shortest existing applicable process.
(I)
Transfer of funds— If a Federal jurisdictional agency fails to render a decision required under any Federal law relating to a project study that requires the preparation of an environmental impact statement or environmental assessment, including the issuance or denial of a permit, license, statement, opinion, or other approval by the date described in clause (ii), the amount of funds made available to support the office of the head of the Federal jurisdictional agency shall be reduced by an amount of funding equal to the amount specified in item (aa) or (bb) of subclause (II), and those funds shall be made available to the division of the Federal jurisdictional agency charged with rendering the decision by not later than 1 day after the applicable date under clause (ii), and once each week thereafter until a final decision is rendered, subject to subparagraph (C).
(II)
Amount to be transferred— The amount referred to in subclause (I) is—
(aa)
$20,000 for any project study requiring the preparation of an environmental assessment or environmental impact statement; or
(bb)
$10,000 for any project study requiring any type of review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) other than an environmental assessment or environmental impact statement.
(ii)
Description of date— The date referred to in clause (i) is the later of—
(I)
the date that is 180 days after the date on which an application for the permit, license, or approval is complete; and
(II)
the date that is 180 days after the date on which the Federal lead agency issues a decision on the project under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
(i)
In general— No transfer of funds under subparagraph (B) relating to an individual project study shall exceed, in any fiscal year, an amount equal to 1 percent of the funds made available for the applicable agency office.
(ii)
Failure to decide— The total amount transferred in a fiscal year as a result of a failure by an agency to make a decision by an applicable deadline shall not exceed an amount equal to 5 percent of the funds made available for the applicable agency office for that fiscal year.
(iii)
Aggregate— Notwithstanding any other provision of law, for each fiscal year, the aggregate amount of financial penalties assessed against each applicable agency office under this Act and any other Federal law as a result of a failure of the agency to make a decision by an applicable deadline for environmental review, including the total amount transferred under this paragraph, shall not exceed an amount equal to 9.5 percent of the funds made available for the agency office for that fiscal year.
(D)
added
Notification of transfers— Not later than 10 days after the last date in a fiscal year on which funds of the Federal jurisdictional agency may be transferred under subparagraph (B)(5) with respect to an individual decision, the agency shall submit to the appropriate committees of the House of Representatives and the Senate written notification that includes a description of—
(ii)
added
the project study involved;
(iii)
added
the amount of each transfer under subparagraph (B) in that fiscal year relating to the decision;
(iv)
added
the total amount of all transfers under subparagraph (B) in that fiscal year relating to the decision; and
(v)
added
the total amount of all transfers of the agency under subparagraph (B) in that fiscal year.
(E)
added
No fault of agency—
(D)
removed
No fault of agency—
(i)
renumbered
was (10)(6)(5)(2)
In general— A transfer of funds under this paragraph shall not be made if the applicable agency described in subparagraph (A) notifies, with a supporting explanation, the Federal lead agency, cooperating agencies, and project sponsor, as applicable, that—
(I)
renumbered
was (10)(6)(5)(2)(3)
the agency has not received necessary information or approvals from another entity in a manner that affects the ability of the agency to meet any requirements under Federal, State, or local law;
(II)
renumbered
was (10)(6)(5)(2)(4)
significant new information, including from public comments, or circumstances, including a major modification to an aspect of the project, requires additional analysis for the agency to make a decision on the project application; or
(III)
renumbered
was (10)(6)(5)(2)(5)
the agency lacks the financial resources to complete the review under the scheduled timeframe, including a description of the number of full-time employees required to complete the review, the amount of funding required to complete the review, and a justification as to why not enough funding is available to complete the review by the deadline.
(ii)
renumbered
was (10)(6)(5)(3)
Lack of financial resources— If the agency provides notice under clause (i)(III), the Inspector General of the agency shall—
(I)
renumbered
was (10)(6)(5)(3)(3)
conduct a financial audit to review the notice; and
(II)
added
not later than 90 days after the date on which the review described in subclause (I) is completed, submit to the Committee on Natural Resources of the House of Representatives and the Committee on Energy and Natural Resources of the Senate the results of the audit conducted under subclause (I).
(II)
removed
not later than 90 days after the date on which the review described in subclause (I) is completed, submit to the Committee on Natural Resources of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a notification on the notice.
(F)
renumbered
was (10)(6)(6)
Limitation— The Federal agency from which funds are transferred pursuant to this paragraph shall not reprogram funds to the office of the head of the agency, or equivalent office, to reimburse that office for the loss of the funds.
(G)
renumbered
was (10)(6)(7)
Effect of paragraph— Nothing in this paragraph affects or limits the application of, or obligation to comply with, any Federal, State, local, or tribal law.
(j)
Memorandum of agreements for early coordination—
(1)
Sense of congress— It is the sense of Congress that—
(A)
the Secretary and other Federal agencies with relevant jurisdiction in the environmental review process should cooperate with each other, State and local agencies, and Indian tribes on environmental review and Bureau of Reclamation project delivery activities at the earliest practicable time to avoid delays and duplication of effort later in the process, prevent potential conflicts, and ensure that planning and project development decisions reflect environmental values; and
(B)
the cooperation referred to in subparagraph (A) should include the development of policies and the designation of staff that advise planning agencies and project sponsors of studies or other information foreseeably required for later Federal action and early consultation with appropriate State and local agencies and Indian tribes.
(2)
Technical assistance— If requested at any time by a State or project sponsor, the Secretary and other Federal agencies with relevant jurisdiction in the environmental review process, shall, to the maximum extent practicable and appropriate, as determined by the agencies, provide technical assistance to the State or project sponsor in carrying out early coordination activities.
(3)
Memorandum of agency agreement— If requested at any time by a State or project sponsor, the Federal lead agency, in consultation with other Federal agencies with relevant jurisdiction in the environmental review process, may establish memoranda of agreement with the project sponsor, Indian tribes, State and local governments, and other appropriate entities to carry out the early coordination activities, including providing technical assistance in identifying potential impacts and mitigation issues in an integrated fashion.
(k)
Limitations— Nothing in this section preempts or interferes with—
(1)
any obligation to comply with the provisions of any Federal law, including—
(A)
the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
(B)
any other Federal environmental law;
(2)
the reviewability of any final Federal agency action in a court of the United States or in the court of any State;
(3)
any requirement for seeking, considering, or responding to public comment; or
(4)
any power, jurisdiction, responsibility, duty, or authority that a Federal, State, or local governmental agency, Indian tribe, or project sponsor has with respect to carrying out a project or any other provision of law applicable to projects.
(A)
In general— Notwithstanding any other provision of law, a claim arising under Federal law seeking judicial review of a permit, license, or other approval issued by a Federal agency for a project study shall be barred unless the claim is filed not later than 3 years after publication of a notice in the Federal Register announcing that the permit, license, or other approval is final pursuant to the law under which the agency action is taken, unless a shorter time is specified in the Federal law that allows judicial review.
(B)
Applicability— Nothing in this subsection creates a right to judicial review or places any limit on filing a claim that a person has violated the terms of a permit, license, or other approval.
(A)
In general— The Secretary shall consider new information received after the close of a comment period if the information satisfies the requirements for a supplemental environmental impact statement under title 40, Code of Federal Regulations (including successor regulations).
(B)
Separate action— The preparation of a supplemental environmental impact statement or other environmental document, if required under this section, shall be considered a separate final agency action and the deadline for filing a claim for judicial review of the action shall be 3 years after the date of publication of a notice in the Federal Register announcing the action relating to such supplemental environmental impact statement or other environmental document.
(m)
Categorical exclusions—
(1)
In general— Not later than 180 days after the date of enactment of this Act, the Secretary shall—
(A)
survey the use by the Bureau of Reclamation of categorical exclusions in projects since 2005;
(B)
publish a review of the survey that includes a description of—
(i)
the types of actions that were categorically excluded or could be the basis for developing a new categorical exclusion; and
(ii)
any requests previously received by the Secretary for new categorical exclusions; and
(C)
solicit requests from other Federal agencies and project sponsors for new categorical exclusions.
(2)
New categorical exclusions— Not later than 1 year after the date of enactment of this Act, if the Secretary has identified a category of activities that merit establishing a categorical exclusion that did not exist on the day before the date of enactment this Act based on the review under paragraph (1), the Secretary shall publish a notice of proposed rulemaking to propose that new categorical exclusion, to the extent that the categorical exclusion meets the criteria for a categorical exclusion under section 1508.4 of title 40, Code of Federal Regulations (or successor regulation).
(n)
Review of project acceleration reforms—
(1)
In general— The Comptroller General of the United States shall—
(A)
assess the reforms carried out under this section; and
(B)
not later than 5 years and not later than 10 years after the date of enactment of this Act, submit to the Committee on Natural Resources of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that describes the results of the assessment.
(2)
Contents— The reports under paragraph (1) shall include an evaluation of impacts of the reforms carried out under this section on—
(B)
compliance with environmental laws; and
(C)
the environmental impact of projects.
(o)
Performance measurement— The Secretary shall establish a program to measure and report on progress made toward improving and expediting the planning and environmental review process.
(p)
Categorical exclusions in emergencies— For the repair, reconstruction, or rehabilitation of a Bureau of Reclamation surface water storage project that is in operation or under construction when damaged by an event or incident that results in a declaration by the President of a major disaster or emergency pursuant to the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5121 et seq.), the Secretary shall treat such repair, reconstruction, or rehabilitation activity as a class of action categorically excluded from the requirements relating to environmental assessments or environmental impact statements under section 1508.4 of title 40, Code of Federal Regulations (or successor regulations), if the repair or reconstruction activity is—
(1)
in the same location with the same capacity, dimensions, and design as the original Bureau of Reclamation surface water storage project as before the declaration described in this section; and
(2)
commenced within a 2-year period beginning on the date of a declaration described in this subsection.
Sec. 902
Prepayment of certain repayment contracts between the United States and contractors of federally developed water supplies
(a)
Conversion and prepayment of contracts—
(1)
Conversion— Upon request of the contractor, the Secretary of the Interior shall convert any water service contract in effect on the date of enactment of this Act and between the United States and a water users’ association to allow for prepayment of the repayment contract pursuant to paragraph (2) under mutually agreeable terms and conditions. The manner of conversion under this paragraph shall be as follows:
(A)
Water service contracts that were entered into under section 9(e) of the Act of August 4, 1939 (53 Stat. 1196), to be converted under this section shall be converted to repayment contracts under section 9(d) of that Act (53 Stat. 1195).
(B)
Water service contracts that were entered under subsection (c)(2) of section 9 of the Act of August 4, 1939 (53 Stat. 1194), to be converted under this section shall be converted to a contract under subsection (c)(1) of section 9 of that Act (53 Stat. 1195).
(2)
changed
Prepayment— All Except for those repayment contracts under which the contractor has previously negotiated for prepayment, all repayment contracts under section 9(d) of that Act (53 Stat. 1195) in effect on the date of enactment of this Act at the request of the contractor, and all contracts converted pursuant to paragraph (1)(A) shall—
(A)
changed
upon request of the contractor, provide for the repayment, either in lump sum or by accelerated prepayment, of the remaining construction costs identified in water project specific irrigation rate repayment schedules, as adjusted to reflect payment not reflected in such schedule, and properly assignable for ultimate return by the contractor, or if made in approximately equal installments, no later than 3 years after the effective date of the repayment contract; contract, such amount to be discounted by ½ the Treasury rate. An estimate of the remaining construction costs, as adjusted, shall be provided by the Secretary to the contractor no later than 90 days following receipt of request of the contractor;
(B)
require that construction costs or other capitalized costs incurred after the effective date of the contract or not reflected in the rate schedule referenced in subparagraph (A), and properly assignable to such contractor shall be repaid in not more than 5 years after notification of the allocation if such amount is a result of a collective annual allocation of capital costs to the contractors exercising contract conversation under this subsection of less than $5,000,000. If such amount is $5,000,000 or greater, such cost shall be repaid as provided by applicable reclamation law;
(C)
provide that power revenues will not be available to aid in repayment of construction costs allocated to irrigation under the contract; and
(D)
continue so long as the contractor pays applicable charges, consistent with section 9(d) of the Act of August 4, 1939 (53 Stat. 1195), and applicable law.
(3)
changed
Contract requirements— The Except for those repayment contracts under which the contractor has previously negotiated for prepayment, the following shall apply with regard to all repayment contracts under subsection (c)(1) of section 9 of that Act (53 Stat. 1195) in effect on the date of enactment of this Act at the request of the contractor, and all contracts converted pursuant to paragraph (1)(B):
(A)
changed
Upon request of the contractor, provide Provide for the repayment in lump sum of the remaining construction costs identified in water project specific municipal and industrial rate repayment schedules, as adjusted to reflect payments not reflected in such schedule, and properly assignable for ultimate return by the contractor. An estimate of the remaining construction costs, as adjusted, shall be provided by the Secretary to the contractor no later than 90 days after receipt of request of contractor.
(B)
The contract shall require that construction costs or other capitalized costs incurred after the effective date of the contract or not reflected in the rate schedule referenced in subparagraph (A), and properly assignable to such contractor, shall be repaid in not more than 5 years after notification of the allocation if such amount is a result of a collective annual allocation of capital costs to the contractors exercising contract conversation under this subsection of less than $5,000,000. If such amount is $5,000,000 or greater, such cost shall be repaid as provided by applicable reclamation law.
(C)
Continue so long as the contractor pays applicable charges, consistent with section 9(c)(1) of the Act of August 4, 1939 (53 Stat. 1195), and applicable law.
(4)
Conditions— All contracts entered into pursuant to paragraphs (1), (2), and (3) shall—
(A)
not be adjusted on the basis of the type of prepayment financing used by the water users’ association;
(B)
conform to any other agreements, such as applicable settlement agreements and new constructed appurtenant facilities; and
(C)
not modify other water service, repayment, exchange and transfer contractual rights between the water users’ association, and the Bureau of Reclamation, or any rights, obligations, or relationships of the water users’ association and their landowners as provided under State law.
(b)
Accounting— The amounts paid pursuant to subsection (a) shall be subject to adjustment following a final cost allocation by the Secretary of the Interior. In the event that the final cost allocation indicates that the costs properly assignable to the contractor are greater than what has been paid by the contractor, the contractor shall be obligated to pay the remaining allocated costs. The term of such additional repayment contract shall be not less than one year and not more than 10 years, however, mutually agreeable provisions regarding the rate of repayment of such amount may be developed by the parties. In the event that the final cost allocation indicates that the costs properly assignable to the contractor are less than what the contractor has paid, the Secretary shall credit such overpayment as an offset against any outstanding or future obligation of the contractor.
(c)
Applicability of certain provisions—
(1)
Effect of existing law— Upon a contractor’s compliance with and discharge of the obligation of repayment of the construction costs pursuant to a contract entered into pursuant to subsection (a)(2)(A), subsections (a) and (b) of section 213 of the Reclamation Reform Act of 1982 (96 Stat. 1269) shall apply to affected lands.
(2)
Effect of other obligations— The obligation of a contractor to repay construction costs or other capitalized costs described in subsection (a)(2)(B), (a)(3)(B), or (b) shall not affect a contractor’s status as having repaid all of the construction costs assignable to the contractor or the applicability of subsections (a) and (b) of section 213 of the Reclamation Reform Act of 1982 (96 Stat. 1269) once the amount required to be paid by the contractor under the repayment contract entered into pursuant to subsection (a)(2)(A) have been paid.
(d)
Effect on existing law not altered— Implementation of the provisions of this title shall not alter—
(1)
the repayment obligation of any water service or repayment contractor receiving water from the same water project, or shift any costs that would otherwise have been properly assignable to the water users’ association identified in subsections (a)(1), (a)(2), and (a)(3) absent this section, including operation and maintenance costs, construction costs, or other capitalized costs incurred after the date of the enactment of this Act, or to other contractors; and
(2)
specific requirements for the disposition of amounts received as repayments by the Secretary under the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act (43 U.S.C. 371 et seq.).
(e)
Surface water storage enhancement program—
(1)
changed
In general— Except as provided in subsection (d)(2), three years following the date of enactment of this Act, no less than __ 50 percent of receipts generated from prepayment of contracts under this section beyond amounts necessary to cover the amount of receipts forgone from scheduled payments under current law for the 10-year period following the date of enactment of this Act shall be directed to the Reclamation Surface Water Storage Account under paragraph (2).
(2)
Surface storage account— The Secretary shall allocate amounts collected under paragraph (1) into the “Reclamation Surface Storage Account” to fund the construction of surface water storage. The Secretary may also enter into cooperative agreements with water users’ associations for the construction of surface water storage and amounts within the Surface Storage Account may be used to fund such construction. Surface water storage projects that are otherwise not federally authorized shall not be considered Federal facilities as a result of any amounts allocated from the Surface Storage Account for part or all of such facilities.
(3)
changed
Repayment— Amounts used for surface water storage construction from the Account shall be fully reimbursed to the Account consistent with the requirements under Federal reclamation law (the law (the Act of June 17, 1902 (32 Stat. 388, chapter 1093))), and Acts supplemental to and amendatory of that Act (43 U.S.C. 371 et seq.) except that all funds reimbursed shall be deposited in the Account established under paragraph (1).(2).
(4)
Availability of amounts— Amounts deposited in the Account under this subsection shall—
(A)
be made available in accordance with this section, subject to appropriation; and
(B)
be in addition to amounts appropriated for such purposes under any other provision of law.
(5)
Purposes of surface water storage— Construction of surface water storage under this section shall be made for the following purposes:
(A)
Increased municipal and industrial water supply.
(B)
Agricultural floodwater, erosion, and sedimentation reduction.
(C)
Agricultural drainage improvements.
(D)
Agricultural irrigation.
(E)
Increased recreation opportunities.
(F)
Reduced adverse impacts to fish and wildlife from water storage or diversion projects within watersheds associated with water storage projects funded under this section.
(G)
Any other purposes consistent with reclamation laws or other Federal law.
(f)
Definitions— For the purposes of this title, the following definitions apply:
(1)
Account— The term Account means the Reclamation Surface Water Storage Account established under subsection (e)(2).
(2)
Construction— The term construction means the designing, materials engineering and testing, surveying, and building of surface water storage including additions to existing surface water storage and construction of new surface water storage facilities, exclusive of any Federal statutory or regulatory obligations relating to any permit, review, approval, or other such requirement.
(3)
Surface water storage— The term surface water storage means any federally owned facility under the jurisdiction of the Bureau of Reclamation or any non-Federal facility used for the surface storage and supply of water resources.
(4)
Treasury rate— The term Treasury rate means the 20-year Constant Maturity Treasury (CMT) rate published by the United States Department of the Treasury existing on the effective date of the contract.
(5)
Water users’ association— The term water users’ association means—
(A)
an entity organized and recognized under State laws that is eligible to enter into contracts with reclamation to receive contract water for delivery to and users of the water and to pay applicable charges; and
(B)
includes a variety of entities with different names and differing functions, such as associations, conservatory district, irrigation district, municipality, and water project contract unit.