US Codex
Bill
Notes

H.R. 2898 — what changed

Western Water and American Food Security Act of 2015

From Introduced in House to Engrossed in House. 24 sections amended and 3 added between Introduced in House and Engrossed in House.

Sec. 103 Factoring increased real-time monitoring and updated science into Delta smelt management

(a)
In general— The Director shall use the best scientific and commercial data available to implement, continuously evaluate, and refine or amend, as appropriate, the reasonable and prudent alternative described in the smelt biological opinion, and any successor opinions or court order. The Secretary shall make all significant decisions under the smelt biological opinion, or any successor opinions that affect Central Valley Project and State Water Project operations, in writing, and shall document the significant facts upon which such decisions are made, consistent with section 706 of title 5, United States Code.
(b)
Increased Monitoring To Inform Real-Time Operations— The Secretary shall conduct additional surveys, on an annual basis at the appropriate time of the year based on environmental conditions, in collaboration with other Delta science interests.
(1)
In implementing this section, the Secretary shall—
(A)
use the most accurate survey methods available for the detection of Delta smelt to determine the extent that adult Delta smelt are distributed in relation to certain levels of turbidity, or other environmental factors that may influence salvage rate; and
(B)
use results from appropriate survey methods for the detection of Delta smelt to determine how the Central Valley Project and State Water Project may be operated more efficiently to minimize salvage while maximizing export pumping rates without causing a significant negative impact on the long-term survival of the Delta smelt.
(2)
During the period beginning on December 1, 2015, and ending March 31, 2016, and in each successive December through March period, if suspended sediment loads enter the Delta from the Sacramento River and the suspended sediment loads appear likely to raise turbidity levels in the Old River north of the export pumps from values below 12 Nephelometric Turbidity Units (NTU) to values above 12 NTU, the Secretary shall—
(A)
conduct daily monitoring using appropriate survey methods at locations including, but not limited to, the vicinity of Station 902 to determine the extent that adult Delta smelt are moving with turbidity toward the export pumps; and
(B)
use results from the monitoring surveys referenced in paragraph (A) to determine how increased trawling can inform daily real-time Central Valley Project and State Water Project operations to minimize salvage while maximizing export pumping rates without causing a significant negative impact on the long-term survival of the Delta smelt.
(c)
Periodic review of monitoring— Within 12 months of the date of enactment of this title, and at least once every 5 years thereafter, the Secretary shall—
(1)
evaluate whether the monitoring program under subsection (b), combined with other monitoring programs for the Delta, is providing sufficient data to inform Central Valley Project and State Water Project operations to minimize salvage while maximizing export pumping rates without causing a significant negative impact on the long-term survival of the Delta smelt; and
(2)
determine whether the monitoring efforts should be changed in the short or long term to provide more useful data.
(d)
Delta smelt distribution study—
(1)
In general— No later than January 1, 2016, and at least every five years thereafter, the Secretary, in collaboration with the California Department of Fish and Wildlife, the California Department of Water Resources, public water agencies, and other interested entities, shall implement new targeted sampling and monitoring specifically designed to understand Delta smelt abundance, distribution, and the types of habitat occupied by Delta smelt during all life stages.
(2)
Sampling— The Delta smelt distribution study shall, at a minimum—
(A)
include recording water quality and tidal data;
(B)
be designed to understand Delta smelt abundance, distribution, habitat use, and movement throughout the Delta, Suisun Marsh, and other areas occupied by the Delta smelt during all seasons;
(C)
consider areas not routinely sampled by existing monitoring programs, including wetland channels, near-shore water, depths below 35 feet, and shallow water; and
(D)
use survey methods, including sampling gear, best suited to collect the most accurate data for the type of sampling or monitoring.
(e)
changed Scientifically supported implementation of old and middle river OMR flow requirements— In implementing the provisions of the smelt biological opinion, or any successor biological opinion or court order, pertaining to management of reverse flow in the Old and Middle River, Rivers, the Secretary shall—
(1)
consider the relevant provisions of the biological opinion or any successor biological opinion;
(2)
changed to maximize Central Valley project and State Water Project water supplies, manage export pumping rates to achieve a reverse OMR flow rate in Old and Middle River of −5,000 cubic feet per second unless information developed by the Secretary under paragraphs (3) and (4) leads the Secretary to reasonably conclude that a less negative OMR flow rate is necessary to avoid a negative impact on the long-term survival of the Delta smelt. If information available to the Secretary indicates that a reverse OMR flow rate in Old and Middle River more negative than −5,000 cubic feet per second can be established without an imminent negative impact on the long-term survival of the Delta smelt, the Secretary shall manage export pumping rates to achieve that more negative OMR flow rate;
(3)
document in writing any significant facts about real-time conditions relevant to the determinations of OMR reverse flow rates, including—
(A)
whether targeted real-time fish monitoring in the Old River pursuant to this section, including monitoring in the vicinity of Station 902, indicates that a significant negative impact on the long-term survival of the Delta smelt is imminent; and
(B)
whether near-term forecasts with available salvage models show under prevailing conditions that OMR flow of −5,000 cubic feet per second or higher will cause a significant negative impact on the long-term survival of the Delta smelt;
(4)
show in writing that any determination to manage OMR reverse flow at rates less negative than −5,000 cubic feet per second is necessary to avoid a significant negative impact on the long-term survival of the Delta smelt, including an explanation of the data examined and the connection between those data and the choice made, after considering—
(A)
the distribution of Delta smelt throughout the Delta;
(B)
the potential effects of documented, quantified entrainment on subsequent Delta smelt abundance;
(C)
the water temperature;
(D)
other significant factors relevant to the determination; and
(E)
whether any alternative measures could have a substantially lesser water supply impact; and
(5)
for any subsequent biological opinion, make the showing required in paragraph (4) for any determination to manage OMR reverse flow at rates less negative than the most negative limit in the biological opinion if the most negative limit in the biological opinion is more negative than −5,000 cubic feet per second.
(f)
Memorandum of Understanding— No later than December 1, 2015, the Commissioner and the Director will execute a Memorandum of Understanding (MOU) to ensure that the smelt biological opinion is implemented in a manner that maximizes water supply while complying with applicable laws and regulations. If that MOU alters any procedures set out in the biological opinion, there will be no need to reinitiate consultation if those changes will not have a significant negative impact on the long-term survival on listed species and the implementation of the MOU would not be a major change to implementation of the biological opinion. Any change to procedures that does not create a significant negative impact on the long-term survival to listed species will not alter application of the take permitted by the incidental take statement in the biological opinion under section 7(o)(2) of the Endangered Species Act of 1973.
(g)
changed Calculation of reverse flow in OMR— Within 90 days of the enactment of this title, the Secretary is directed, in consultation with the California Department of Water Resources to revise the method used to calculate reverse flow in Old and Middle River Rivers for implementation of the reasonable and prudent alternatives in the smelt biological opinion and the salmonid biological opinion, and any succeeding biological opinions, for the purpose of increasing Central Valley Project and State Water Project water supplies. The method of calculating reverse flow in Old and Middle River Rivers shall be reevaluated not less than every five years thereafter to achieve maximum export pumping rates within limits established by the smelt biological opinion, the salmonid biological opinion, and any succeeding biological opinions.

Sec. 201 Definitions

In this title:

(1)
changed Assistant administrator— The term Assistant Administrator means the Assistant Administrator of the National Oceanic and Atmospheric Administration for Fisheries.
(2)
Secretary— The term Secretary means the Secretary of Commerce.
(3)
Other affected interests— The term other affected interests means the State of California, Indian tribes, subdivisions of the State of California, public water agencies and those who benefit directly and indirectly from the operations of the Central Valley Project and the State Water Project.
(4)
Commissioner— The term Commissioner means the Commissioner of the Bureau of Reclamation.
(5)
Director— The term Director means the Director of the United States Fish and Wildlife Service.

Sec. 202 Process for ensuring salmonid management is responsive to new science

(a)
General directive— The reasonable and prudent alternative described in the salmonid biological opinion allows for and anticipates adjustments in Central Valley Project and State Water Project operation parameters to reflect the best scientific and commercial data currently available, and authorizes efforts to test and evaluate improvements in operations that will meet applicable regulatory requirements and maximize Central Valley Project and State Water Project water supplies and reliability. Implementation of the reasonable and prudent alternative described in the salmonid biological opinion shall be adjusted accordingly as new scientific and commercial data are developed. The Commissioner and the Assistant Administrator shall fully utilize these authorities as described below.
(b)
Annual reviews of certain Central Valley Project and State Water Project operations— No later than December 31, 2016, and at least annually thereafter:
(1)
The Commissioner, with the assistance of the Assistant Administrator, shall examine and identify adjustments to the initiation of Action IV.2.3 as set forth in the Biological Opinion and Conference Opinion on the Long-Term Operations of the Central Valley Project and State Water Project, Endangered Species Act Section 7 Consultation, issued by the National Marine Fisheries Service on June 4, 2009, pertaining to negative OMR flows, subject to paragraph (5).
(2)
The Commissioner, with the assistance of the Assistant Administrator, shall examine and identify adjustments in the timing, triggers or other operational details relating to the implementation of pumping restrictions in Action IV.2.1 pertaining to the inflow to export ratio, subject to paragraph (5).
(3)
changed Pursuant to the consultation and assessments carried out under paragraphs (1) and (2) of this subsection, the Commissioner and the Assistant Administrator shall jointly make recommendations to the Secretary of the Interior and to the Secretary of Commerce on adjustments to project operations that, in the exercise of the adaptive management provisions of the salmonid biological opinion, will reduce water supply impacts of the salmonid biological opinion on the Central Valley Project and the California State Water Project and are consistent with the requirements of applicable law and as further described in subsection (c).
(4)
changed The Secretary of Commerce and the Secretary of the Interior shall direct the Commissioner and Assistant Administrator to implement recommended adjustments to Central Valley Project and State Water Project operations for which the conditions under subsection (c) are met.
(5)
The Assistant Administrator and the Commissioner shall review and identify adjustments to Central Valley Project and State Water Project operations with water supply restrictions in any successor biological opinion to the salmonid biological opinion, applying the provisions of this section to those water supply restrictions where there are references to Actions IV.2.1 and IV.2.3.
(c)
changed Implementation of operational adjustments— After reviewing the recommendations under subsection (b), the Secretary of the Interior and the Secretary of Commerce shall direct the Commissioner and the Assistant Administrator to implement those operational adjustments, or any combination, for which, in aggregate—
(1)
the net effect on listed species is equivalent to those of the underlying project operational parameters in the salmonid biological opinion, taking into account both—
(A)
efforts to minimize the adverse effects of the adjustment to project operations; and
(B)
whatever additional actions or measures may be implemented in conjunction with the adjustments to operations to offset the adverse effects to listed species, consistent with (d), that are in excess of the adverse effects of the underlying operational parameters, if any; and
(2)
the effects of the adjustment can be reasonably expected to fall within the incidental take authorizations.
(d)
Evaluation of offsetting measures— When examining and identifying opportunities to offset the potential adverse effect of adjustments to operations under subsection (c)(1)(B), the Commissioner and the Assistant Administrator shall take into account the potential species survival improvements that are likely to result from other measures which, if implemented in conjunction with such adjustments, would offset adverse effects, if any, of the adjustments. When evaluating offsetting measures, the Commissioner and the Assistant Administrator shall consider the type, timing and nature of the adverse effects, if any, to specific species and ensure that the measures likely provide equivalent overall benefits to the listed species in the aggregate, as long as the change will not cause a significant negative impact on the long-term survival of a listed salmonid species.
(e)
Framework for examining opportunities To minimize or offset the potential adverse effect of adjustments to operations— Not later than December 31, 2015, and every five years thereafter, the Assistant Administrator shall, in collaboration with the Director of the California Department of Fish and Wildlife, based on the best scientific and commercial data available and for each listed salmonid species, issue estimates of the increase in through-Delta survival the Secretary expects to be achieved—
(1)
through restrictions on export pumping rates as specified by Action IV.2.3 as compared to limiting OMR flow to a fixed rate of −5,000 cubic feet per second within the time period Action IV.2.3 is applicable, based on a given rate of San Joaquin River inflow to the Delta and holding other relevant factors constant;
(2)
through San Joaquin River inflow to export restrictions on export pumping rates specified within Action IV.2.1 as compared to the restrictions in the April/May period imposed by the State Water Resources Control Board decision D–1641, based on a given rate of San Joaquin River inflow to the Delta and holding other relevant factors constant;
(3)
through physical habitat restoration improvements;
(4)
through predation control programs;
(5)
through the installation of temporary barriers, the management of Cross Channel Gates operations, and other projects affecting flow in the Delta;
(6)
through salvaging fish that have been entrained near the entrance to Clifton Court Forebay;
(7)
through any other management measures that may provide equivalent or better protections for listed species while maximizing export pumping rates without causing a significant negative impact on the long-term survival of a listed salmonid species; and
(8)
through development and implementation of conservation hatchery programs for salmon and steelhead to aid in the recovery of listed salmon and steelhead species.
(f)
Survival estimates—
(1)
To the maximum extent practicable, the Assistant Administrator shall make quantitative estimates of survival such as a range of percentage increases in through-Delta survival that could result from the management measures, and if the scientific information is lacking for quantitative estimates, shall do so on qualitative terms based upon the best available science.
(2)
If the Assistant Administrator provides qualitative survival estimates for a species resulting from one or more management measures, the Secretary shall, to the maximum extent feasible, rank the management measures described in subsection (e) in terms of their most likely expected contribution to increased through-Delta survival relative to the other measures.
(3)
If at the time the Assistant Administrator conducts the reviews under subsection (b), the Secretary has not issued an estimate of increased through-Delta survival from different management measures pursuant to subsection (e), the Secretary shall compare the protections to the species from different management measures based on the best scientific and commercial data available at the time.
(g)
Comparison of adverse consequences for alternative management measures of equivalent protection for a species—
(1)
For the purposes of this subsection and subsection (c)—
(A)
the alternative management measure or combination of alternative management measures identified in paragraph (2) shall be known as the “equivalent alternative measure”;
(B)
the existing measure or measures identified in subparagraphs (2) (A), (B), (C), or (D) shall be known as the “equivalent existing measure”; and
(C)
an “equivalent increase in through-Delta survival rates for listed salmonid species” shall mean an increase in through-Delta survival rates that is equivalent when considering the change in through-Delta survival rates for the listed salmonid species in the aggregate, and not the same change for each individual species, as long as the change in survival rates will not cause a significant negative impact on the long-term survival of a listed salmonid species.
(2)
As part of the reviews of project operations pursuant to subsection (b), the Assistant Administrator shall determine whether any alternative management measures or combination of alternative management measures listed in subsection (e) (3) through (8) would provide an increase in through-Delta survival rates for listed salmonid species that is equivalent to the increase in through-Delta survival rates for listed salmonid species from the following:
(A)
Through restrictions on export pumping rates as specified by Action IV.2.3, as compared to limiting OMR flow to a fixed rate of −5,000 cubic feet per second within the time period Action IV.2.3 is applicable.
(B)
Through restrictions on export pumping rates as specified by Action IV.2.3, as compared to a modification of Action IV.2.3 that would provide additional water supplies, other than that described in subparagraph (A).
(C)
Through San Joaquin River inflow to export restrictions on export pumping rates specified within Action IV.2.1, as compared to the restrictions in the April/May period imposed by the State Water Resources Control Board decision D–1641.
(D)
Through San Joaquin River inflow to export restrictions on export pumping rates specified within Action IV.2.1, as compared to a modification of Action IV.2.1 that would reduce water supply impacts of the salmonid biological opinion on the Central Valley Project and the California State Water Project, other than that described in subparagraph (C).
(3)
If the Assistant Administrator identifies an equivalent alternative measure pursuant to paragraph (2), the Assistant Administrator shall determine whether—
(A)
it is technically feasible and within Federal jurisdiction to implement the equivalent alternative measure;
(B)
the State of California, or subdivision thereof, or local agency with jurisdiction has certified in writing within 10 calendar days to the Assistant Administrator that it has the authority and capability to implement the pertinent equivalent alternative measure; or
(C)
the adverse consequences of doing so are less than the adverse consequences of the equivalent existing measure, including a concise evaluation of the adverse consequences to other affected interests.
(4)
If the Assistant Administrator makes the determinations in subparagraph (3)(A) or (3)(B), the Commissioner shall adjust project operations to implement the equivalent alternative measure in place of the equivalent existing measure in order to increase export rates of pumping to the greatest extent possible while maintaining a net combined effect of equivalent through-Delta survival rates for the listed salmonid species.
(h)
Tracking Adverse Effects Beyond the Range of Effects Accounted for in the Salmonid Biological Opinion and Coordinated Operation with the Delta Smelt Biological Opinion—
(1)
Among the adjustments to the project operations considered through the adaptive management process under this section, the Assistant Administrator and the Commissioner shall—
(A)
evaluate the effects on listed salmonid species and water supply of the potential adjustment to operational criteria described in subparagraph (B); and
(B)
consider requiring that before some or all of the provisions of Actions IV.2.1. or IV.2.3 are imposed in any specific instance, the Assistant Administrator show that the implementation of these provisions in that specific instance is necessary to avoid a significant negative impact on the long-term survival of a listed salmonid species.
(2)
The Assistant Administrator, the Director, and the Commissioner, in coordination with State officials as appropriate, shall establish operational criteria to coordinate management of OMR flows under the smelt and salmonid biological opinions, in order to take advantage of opportunities to provide additional water supplies from the coordinated implementation of the biological opinions.
(3)
The Assistant Administrator and the Commissioner shall document the effects of any adaptive management decisions related to the coordinated operation of the smelt and salmonid biological opinions that prioritizes the maintenance of one species at the expense of the other.
(i)
Real-Time Monitoring and Management— Notwithstanding the calendar based triggers described in the salmonid biological opinion Reasonable and Prudent Alternative (RPA), the Assistant Administrator and the Commissioner shall not limit OMR reverse flow to −5,000 cubic feet per second unless current monitoring data indicate that this OMR flow limitation is reasonably required to avoid a significant negative impact on the long-term survival of a listed salmonid species.
(j)
Evaluation and implementation of management measures— If the quantitative estimates of through-Delta survival established by the Secretary for the adjustments in subsection (b)(2) exceed the through-Delta survival established for the RPAs, the Secretary shall evaluate and implement the management measures in subsection (b)(2) as a prerequisite to implementing the RPAs contained in the Salmonid Biological Opinion.
(k)
Accordance with other law— Consistent with section 706 of title 5, United States Code, decisions of the Assistant Administrator and the Commissioner described in subsections (b) through (j) shall be made in writing, on the basis of best scientific and commercial data currently available, and shall include an explanation of the data examined at the connection between those data and the decisions made.

Sec. 204 Pilot projects to implement CALFED invasive species program

added
(a)
added In general— Not later than January 1, 2017, the Secretary of the Interior, in collaboration with the Secretary of Commerce, the Director of the California Department of Fish and Wildlife, and other relevant agencies and interested parties, shall begin pilot projects to implement the invasive species control program authorized pursuant to section 103(d)(6)(A)(iv) of Public Law 108–361 (118 Stat. 1690).
(b)
added Requirements— The pilot projects shall—
(1)
added seek to reduce invasive aquatic vegetation, predators, and other competitors which contribute to the decline of native listed pelagic and anadromous species that occupy the Sacramento and San Joaquin Rivers and their tributaries and the Sacramento-San Joaquin Bay-Delta; and
(2)
added remove, reduce, or control the effects of species, including Asiatic clams, silversides, gobies, Brazilian water weed, water hyacinth, largemouth bass, smallmouth bass, striped bass, crappie, bluegill, white and channel catfish, and brown bullheads.
(c)
added Sunset— The authorities provided under this subsection shall expire seven years after the Secretaries commence implementation of the pilot projects pursuant to subsection (a).
(d)
added Emergency environmental reviews— To expedite the environmentally beneficial programs for the conservation of threatened and endangered species, the Secretaries shall consult with the Council on Environmental Quality in accordance with section 1506.11 of title 40, Code of Federal Regulations (or successor regulations), to develop alternative arrangements to comply with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) for the projects pursuant to subsection (a).

Sec. 306 Increased flexibility for regular project operations

The Secretaries shall, consistent with applicable laws (including regulations)—

(1)
removed help meet the contract water supply needs of Central Valley Project refuges through the improvement or installation of water conservation measures, water conveyance facilities, and wells to use groundwater resources, on the condition that those activities may only be accomplished by using funding made available under Reclamation programs of the Department of the Interior;
(2)
removed make available to individuals or districts who receive water from the United States under water rights settlement contracts, exchange contracts, water service or repayment contracts the additional water obtained from the activities carried out under subparagraph (1);
(1)
renumbered was (5) in coordination with the California Department of Water Resources and the California Department of Fish and Wildlife, implement offsite upstream projects in the Delta and upstream of the Sacramento River and San Joaquin basins that offset the effects on species listed as threatened or endangered under the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.) due to activities carried out pursuant this Act, as determined by the Secretaries;
(2)
renumbered was (6) manage reverse flow in the Old and Middle Rivers at −6,100 cubic feet per second if real-time monitoring indicates that flows of −6,100 cubic feet per second or more negative can be established for specific periods without causing a significant negative impact on the long-term survival of the Delta smelt, or if real-time monitoring does not support flows of −6,100 cubic feet per second than manage OMR flows at −5,000 cubic feet per second subject to section 103(e) (3) and (4); and
(3)
renumbered was (7) use all available scientific tools to identify any changes to real-time operations of the Bureau of Reclamation, State, and local water projects that could result in the availability of additional water supplies.

Sec. 307 Temporary operational flexibility for first few storms of the water year

(a)
In general— Consistent with avoiding a significant negative impact on the long-term survival in the short term upon listed fish species beyond the range of those authorized under the Endangered Species Act of 1973 and other environmental protections under subsection (e), the Secretaries shall authorize the Central Valley Project and the State Water Project, combined, to operate at levels that result in negative OMR flows at −7,500 cubic feet per second (based on United States Geological Survey gauges on Old and Middle Rivers) daily average for 56 cumulative days after October 1 as described in subsection (c).
(b)
Days of temporary operational flexibility— The temporary operational flexibility described in subsection (a) shall be authorized on days that the California Department of Water Resources determines the daily average river flow of the Sacramento River is at, or above, 17,000 cubic feet per second as measured at the Sacramento River at Freeport gauge maintained by the United States Geologic Survey.
(c)
Compliance with Endangered Species Act authorizations— In carrying out this section, the Secretaries may continue to impose any requirements under the smelt and salmonid biological opinions during any period of temporary operational flexibility as they determine are reasonably necessary to avoid an additional significant negative impacts on the long-term survival of a listed fish species beyond the range of those authorized under the Endangered Species Act of 1973, provided that the requirements imposed do not reduce water supplies available for the Central Valley Project and the State Water Project.
(d)
Other environmental protections—
(1)
State law— The Secretaries’ actions under this section shall be consistent with applicable regulatory requirements under State law.
(2)
First sediment flush— During the first flush of sediment out of the Delta in each water year, and provided that such determination is based upon objective evidence, OMR flow may be managed at rates less negative than −5,000 cubic feet per second for a minimum duration to avoid movement of adult Delta smelt (Hypomesus transpacificus) to areas in the southern Delta that would be likely to increase entrainment at Central Valley Project and State Water Project pumping plants.
(3)
Applicability of opinion— This section shall not affect the application of the salmonid biological opinion from April 1 to May 31, unless the Secretary of Commerce finds that some or all of such applicable requirements may be adjusted during this time period to provide emergency water supply relief without resulting in additional adverse effects beyond those authorized under the Endangered Species Act of 1973. In addition to any other actions to benefit water supply, the Secretary of the Interior and the Secretary of Commerce shall consider allowing through-Delta water transfers to occur during this period if they can be accomplished consistent with section 3405(a)(1)(H) of the Central Valley Project Improvement Act. Water transfers solely or exclusively through the State Water Project are not required to be consistent with section 3405(a)(1)(H) of the Central Valley Project Improvement Act.
(4)
changed Monitoring— During operations under this section, the Commissioner of Reclamation, in coordination with the Fish and Wildlife Service, National Marine Fisheries Service, and California Department of Fish and Wildlife, shall undertake a monitoring program and other data gathering to ensure incidental take levels are not exceeded, and to identify potential negative impacts and actions, if any, necessary to mitigate impacts of the temporary operational flexibility to species listed under the Endangered Species Act of 1973 (16 U.S.C. 1531–1544).1531 et seq.).
(e)
Technical adjustments to target period— If, before temporary operational flexibility has been implemented on 56 cumulative days, the Secretaries operate the Central Valley Project and the State Water Project combined at levels that result in OMR flows less negative than −7,500 cubic feet per second during days of temporary operational flexibility as defined in subsection (c), the duration of such operation shall not be counted toward the 56 cumulative days specified in subsection (a).
(f)
Emergency consultation; effect on running averages—
(1)
If necessary to implement the provisions of this section, the Commissioner is authorized to take any action necessary to implement this section for up to 56 cumulative days. If during the 56 cumulative days the Commissioner determines that actions necessary to implement this section will exceed 56 days, the Commissioner shall use the emergency consultation procedures under the Endangered Species Act of 1973 and its implementing regulation at section 402.05 of title 50, Code of Federal Regulations, to temporarily adjust the operating criteria under the biological opinions—
(A)
solely for extending beyond the 56 cumulative days for additional days of temporary operational flexibility—
(i)
no more than necessary to achieve the purposes of this section consistent with the environmental protections in subsections (d) and (e); and
(ii)
including, as appropriate, adjustments to ensure that the actual flow rates during the periods of temporary operational flexibility do not count toward the 5-day and 14-day running averages of tidally filtered daily OMR flow requirements under the biological opinions, or
(B)
for other adjustments to operating criteria or to take other urgent actions to address water supply shortages for the least amount of time or volume of diversion necessary as determined by the Commissioner.
(2)
Following the conclusion of the 56 cumulative days of temporary operational flexibility, or the extended number of days covered by the emergency consultation procedures, the Commissioner shall not reinitiate consultation on these adjusted operations, and no mitigation shall be required, if the effects on listed fish species of these operations under this section remain within the range of those authorized under the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.). If the Commissioner reinitiates consultation, no mitigation measures shall be required.
(g)
Level of detail required for analysis— In articulating the determinations required under this section, the Secretaries shall fully satisfy the requirements herein but shall not be expected to provide a greater level of supporting detail for the analysis than feasible to provide within the short timeframe permitted for timely decisionmaking in response to changing conditions in the Delta.

Sec. 309 Additional emergency consultation

changed For adjustments to operating criteria other than under section 308 of this Act or to take urgent actions to address water supply shortages for the least amount of time or volume of diversion necessary as determined by the Commissioner, Commissioner of Reclamation, no mitigation measures shall be required during any year that the Sacramento Valley index is 6.5 or lower, or at the request of the State of California, and until two succeeding years following either of those events have been completed where the final Sacramento Valley Index is 7.8 or greater, and any mitigation measures imposed must be based on quantitative data and required only to the extent that such data demonstrates actual harm to species.

Sec. 310 Additional storage at New Melones

changed The Commissioner of Reclamation is directed to work with local water and irrigation districts in the Stanislaus River Basin to ascertain the water storage made available by the Draft Plan of Operations in New Melones Reservoir (DRPO) for water conservation programs, conjunctive use projects, water transfers, rescheduled project water and other projects to maximize water storage and ensure the beneficial use of the water resources in the Stanislaus River Basin. All such programs and projects shall be implemented according to all applicable laws and regulations. The source of water for any such storage program at New Melones Reservoir shall be made available under a valid water right, consistent with the State of California water transfer guidelines and any other applicable State water law. The Commissioner shall inform the Congress within 18 months setting forth the amount of storage made available by the DRPO that has been put to use under this program, including proposals received by Reclamation the Commissioner from interested parties for the purpose of this section.

Sec. 401 Studies

The Secretary of the Interior, through the Commissioner of Reclamation, shall—

(1)
complete the feasibility studies described in clauses (i)(I) and (ii)(II) of section 103(d)(1)(A) of Public Law 108–361 (118 Stat. 1684) and submit such studies to the appropriate committees of the House of Representatives and the Senate not later than December 31, 2015;
(2)
changed complete the feasibility studies study described in clauses clause (i)(II) and (ii)(I) of section 103(d)(1)(A) of Public Law 108–361 and submit such studies study to the appropriate committees of the House of Representatives and the Senate not later than November 30, 2016;
(3)
added complete a publicly available draft of the feasibility study described in clause (ii)(I) of section 103(d)(1)(A) of Public Law 108–361 and submit such study to the appropriate committees of the House of Representatives and the Senate not later than November 30, 2016;
(4)
added complete the feasibility study described in clause (ii)(I) of section 103(d)(1)(A) of Public Law 108–361 and submit such study to the appropriate committees of the House of Representatives and the Senate not later than November 30, 2017;
(5)
renumbered was (5) complete the feasibility study described in section 103(f)(1)(A) of Public Law 108–361 (118 Stat. 1694) and submit such study to the appropriate Committees of the House of Representatives and the Senate not later than December 31, 2017;
(6)
added provide a progress report on the status of the feasibility studies referred to in paragraphs (1) through (3) to the appropriate committees of the House of Representatives and the Senate not later than 90 days after the date of the enactment of this Act and each 180 days thereafter until December 31, 2017, as applicable. The report shall include timelines for study completion, draft environmental impact statements, final environmental impact statements, and Records of Decision;
(7)
added in conducting any feasibility study under this Act, the reclamation laws, the Central Valley Project Improvement Act (title XXXIV of Public Law 102–575; 106 Stat. 4706), the Fish and Wildlife Coordination Act (16 U.S.C. 661 et seq.), the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.), and other applicable law, for the purposes of determining feasibility the Secretary shall document, delineate, and publish costs directly relating to the engineering and construction of a water storage project separately from the costs resulting from regulatory compliance or the construction of auxiliary facilities necessary to achieve regulatory compliance; and
(8)
added communicate, coordinate and cooperate with public water agencies that contract with the United States for Central Valley Project water and that are expected to participate in the cost pools that will be created for the projects proposed in the feasibility studies under this section.
(4)
removed provide a progress report on the status of the feasibility studies referred to in paragraphs (1) through (3) to the appropriate committees of the House of Representatives and the Senate not later than 90 days after the date of the enactment of this Act and each 180 days thereafter until December 31, 2017, as applicable. The report shall include timelines for study completion, draft environmental impact statements, final environmental impact statements, and Records of Decision; and
(5)
removed in conducting any feasibility study under this Act, the reclamation laws, the Central Valley Project Improvement Act (title XXXIV of Public Law 102–575; 106 Stat. 4706), the Fish and Wildlife Coordination Act (16 U.S.C. 661 et seq.), the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.), and other applicable law, for the purposes any determining feasibility the Secretary shall document, delineate, and publish costs directly relating to the engineering and construction of a water storage project separately from the costs resulting from regulatory compliance or the construction of auxiliary facilities necessary to achieve regulatory compliance.

Sec. 403 CALFED storage accountability

changed If the Secretary of the Interior fails to provide the feasibility studies described in section 401 to the appropriate committees of the House of Representatives and the Senate by the times prescribed, the amount made available to the Policy and Administration Account of the Bureau of Reclamation for the operation of the Washington, DC, office Secretary shall be reduced by an amount of $20,000 per day and transferred to notify each committee chair individually in person on the Treasury for deficit reduction status of each project once a month until the feasibility reports are study for that project is provided to Congress.

Sec. 404 Water storage project construction

(a)
changed Partnership and agreements— The Secretary, Secretary of the Interior, acting through the Commissioner of the Bureau of Reclamation, may partner or enter into an agreement on the water storage projects identified in section 103(d)(1) of the Water Supply Reliability and Environmental Improvement Act (Public Law 108–361) (and Acts supplemental and amendatory to the Act) with local joint powers authorities formed pursuant to State law by irrigation districts and other local water districts and local governments within the applicable hydrologic region, to advance those projects.
(b)
Authorization for project— If the Secretary determines a project described in section 402(a)(1) and (2) is feasible, the Secretary is authorized to carry out the project in a manner that is substantially in accordance with the recommended plan, and subject to the conditions described in the feasibility study, provided that no Federal funding shall be used to construct the project.

Sec. 501 Offset for State Water Project

(a)
Implementation impacts— The Secretary of the Interior shall confer with the California Department of Fish and Wildlife in connection with the implementation of this Act on potential impacts to any consistency determination for operations of the State Water Project issued pursuant to California Fish and Game Code section 2080.1.
(b)
Additional yield— If, as a result of the application of this Act, the California Department of Fish and Wildlife—
(1)
revokes the consistency determinations pursuant to California Fish and Game Code section 2080.1 that are applicable to the State Water Project;
(2)
amends or issues one or more new consistency determinations pursuant to California Fish and Game Code section 2080.1 in a manner that directly or indirectly results in reduced water supply to the State Water Project as compared with the water supply available under the smelt biological opinion and the salmonid biological opinion; or
(3)
changed requires take authorization under California Fish and Game Code section 2081 for operation of the State Water Project in a manner that directly or indirectly results in reduced water supply to the State Water Project as compared with the water supply available under the smelt biological opinion and the salmonid biological opinion, and as a consequence of the Department’s action, Central Valley Project yield is greater than it would have been absent the Department’s actions, then that additional yield shall be made available to the State Water Project for delivery to State Water Project contractors to offset losses resulting from the Department’s action.
(c)
Notification related to environmental protections— The Secretary of the Interior shall immediately notify the Director of the California Department of Fish and Wildlife in writing if the Secretary of the Interior determines that implementation of the smelt biological opinion and the salmonid biological opinion consistent with this Act reduces environmental protections for any species covered by the opinions.

Sec. 502 Area of origin protections

(a)
In general— The Secretary of the Interior is directed, in the operation of the Central Valley Project, to adhere to California’s water rights laws governing water rights priorities and to honor water rights senior to those held by the United States for operation of the Central Valley Project, regardless of the source of priority, including any appropriative water rights initiated prior to December 19, 1914, as well as water rights and other priorities perfected or to be perfected pursuant to California Water Code Part 2 of Division 2. Article 1.7 (commencing with section 1215 of chapter 1 of part 2 of division 2, sections 10505, 10505.5, 11128, 11460, 11461, 11462, and 11463, and sections 12200 to 12220, inclusive).
(b)
changed Diversions— Any action undertaken by the Secretaries Secretary of the Interior and the Secretary of Commerce pursuant to both this Act and section 7 of the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.) that requires that diversions from the Sacramento River or the San Joaquin River watersheds upstream of the Delta be bypassed shall not be undertaken in a manner that alters the water rights priorities established by California law.
(c)
Endangered species act— Nothing in this title alters the existing authorities provided to and obligations placed upon the Federal Government under the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.), as amended.
(d)
changed Contracts— With respect to individuals and entities with water rights on the Sacramento River, the mandates of this section may be met, in whole or in part, through a contract with the Secretary of the Interior executed pursuant to section 14 of Public Law 76–260; 53 Stat. 1187 (43 U.S.C. 389) that is in conformance with the Sacramento River Settlement Contracts renewed by the Secretary of the Interior in 2005.

Sec. 504 Allocations for Sacramento Valley contractors

(a)
Allocations—
(1)
In general— Subject to paragraph (2) and subsection (b), the Secretary of the Interior is directed, in the operation of the Central Valley Project, to allocate water provided for irrigation purposes to existing Central Valley Project agricultural water service contractors within the Sacramento River Watershed in compliance with the following:
(A)
Not less than 100 percent of their contract quantities in a “Wet” year.
(B)
Not less than 100 percent of their contract quantities in an “Above Normal” year.
(C)
Not less than 100 percent of their contract quantities in a “Below Normal” year that is preceded by an “Above Normal” or a “Wet” year.
(D)
Not less than 50 percent of their contract quantities in a “Dry” year that is preceded by a “Below Normal,” an “Above Normal,” or a “Wet” year.
(E)
In all other years not identified herein, the allocation percentage for existing Central Valley Project agricultural water service contractors within the Sacramento River Watershed shall not be less than twice the allocation percentage to south-of-Delta Central Valley Project agricultural water service contractors, up to 100 percent; provided, that nothing herein shall preclude an allocation to existing Central Valley Project agricultural water service contractors within the Sacramento River Watershed that is greater than twice the allocation percentage to south-of-Delta Central Valley Project agricultural water service contractors.
(2)
Conditions— The Secretary’s actions under paragraph (a) shall be subject to—
(A)
the priority of individuals or entities with Sacramento River water rights, including those with Sacramento River Settlement Contracts, that have priority to the diversion and use of Sacramento River water over water rights held by the United States for operations of the Central Valley Project;
(B)
the United States obligation to make a substitute supply of water available to the San Joaquin River Exchange Contractors; and
(C)
the Secretary’s obligation to make water available to managed wetlands pursuant to section 3406(d) of the Central Valley Project Improvement Act (Public Law 102–575).
(b)
Protection of municipal and industrial supplies— Nothing in subsection (a) shall be deemed to—
(1)
modify any provision of a water service contract that addresses municipal and industrial water shortage policies of the Secretary;
(2)
affect or limit the authority of the Secretary to adopt or modify municipal and industrial water shortage policies;
(3)
affect or limit the authority of the Secretary to implement municipal and industrial water shortage policies; or
(4)
changed affect allocations to Central Valley Project municipal and industrial contractors pursuant to such policies, including the utilization of such allocations as primary water sources for these contractors for purposes of calculating municipal and industrial water shortages.policies.
(c)
changed No effect on allocations— This section shall not result in the involuntary reduction in contract water allocations to individuals or entities with contracts to receive water from the Friant Division.not—
(1)
added affect the allocation of water to Friant Division contractors; or
(2)
added result in the involuntary reduction in contract water allocations to individuals or entities with contracts to receive water from the Friant Division.
(d)
Program for water rescheduling— The Secretary of the Interior shall develop and implement a program, not later than 1 year after the date of the enactment of this Act, to provide for the opportunity for existing Central Valley Project agricultural water service contractors within the Sacramento River Watershed to reschedule water, provided for under their Central Valley Project water service contracts, from one year to the next.
(e)
Definitions— In this section:
(1)
The term existing Central Valley Project agricultural water service contractors within the Sacramento River Watershed means water service contractors within the Shasta, Trinity, and Sacramento River Divisions of the Central Valley Project, that have a water service contract in effect, on the date of the enactment of this section, that provides water for irrigation.
(2)
The year type terms used in subsection (a) have the meaning given those year types in the Sacramento Valley Water Year Type (40–30–30) Index.

Sec. 602 Oversight board for Restoration Fund

(a)
Plan; advisory board— Section 3407 of the Central Valley Project Improvement Act (Public Law 102–575; 106 Stat. 4726) is amended by adding at the end the following:

“(g) Plan on expenditure of funds

“(1) In general—For each fiscal year, the Secretary, in consultation with the Advisory Board, shall submit to Congress a plan for the expenditure of all of the funds deposited into the Restoration Fund during the preceding fiscal year.

“(2) Contents—The plan shall include an analysis of the cost-effectiveness of each expenditure.

“(h) Advisory board

“(1) Establishment—There is established the Restoration Fund Advisory Board (referred to in this section as the “Advisory Board”), which shall be composed of 11 members appointed by the Secretary.

“(2) Membership

“(A) In general—The Secretary shall appoint members to the Advisory Board that represent the various Central Valley Project stakeholders, of whom—

“(i) 4 members shall be agricultural users of the Central Valley Project, including at least one agricultural user from north-of-the-Delta and one agricultural user from south-of-the-Delta;

“(ii) 2 members shall be municipal and industrial users of the Central Valley Project, including one municipal and industrial user from north-of-the-Delta and one municipal and industrial user from south-of-the-Delta;

changed “(iii) 3 2 members shall be power contractors of the Central Valley Project, including at least one power contractor from north-of-the-Delta and from south-of-the-Delta;

changed “(iv) 1 member shall be a representative of a Federal national wildlife refuge that contracts for Central Valley Project water supplies with the Bureau of Reclamation; andReclamation;

changed “(v) 1 member shall have expertise in the economic impacts of the changes to water operations.operations; and

added “(vi) 1 member shall be a representative of a wildlife entity that primarily focuses on waterfowl.

“(B) Observer—The Secretary and the Secretary of Commerce may each designate a representative to act as an observer of the Advisory Board.

added “(C) Chair—The Secretary shall appoint 1 of the members described in subparagraph (A) to serve as Chair of the Advisory Board.

removed “(C) Chairman—The Secretary shall appoint 1 of the members described in subparagraph (A) to serve as Chairman of the Advisory Board.

“(3) Terms—The term of each member of the Advisory Board shall be 4 years.

“(4) Date of appointments—The appointment of a member of the Panel shall be made not later than—

“(A) the date that is 120 days after the date of enactment of this Act; or

“(B) in the case of a vacancy on the Panel described in subsection (c)(2), the date that is 120 days after the date on which the vacancy occurs.

“(5) Vacancies

“(A) In general—A vacancy on the Panel shall be filled in the manner in which the original appointment was made and shall be subject to any conditions that applied with respect to the original appointment.

“(B) Filling unexpired term—An individual chosen to fill a vacancy shall be appointed for the unexpired term of the member replaced.

“(C) Expiration of terms—The term of any member shall not expire before the date on which the successor of the member takes office.

“(6) Removal—A member of the Panel may be removed from office by the Secretary of the Interior.

“(7) Federal advisory committee act—The Panel shall not be subject to the requirements of the Federal Advisory Committee Act.

“(8) Duties—The duties of the Advisory Board are—

“(A) to meet not less frequently than semiannually to develop and make recommendations to the Secretary regarding priorities and spending levels on projects and programs carried out under this title;

“(B) to ensure that any advice given or recommendation made by the Advisory Board reflects the independent judgment of the Advisory Board;

“(C) not later than December 31, 2015, and annually thereafter, to submit to the Secretary and Congress the recommendations under subparagraph (A); and

“(D) not later than December 31, 2015, and biennially thereafter, to submit to Congress details of the progress made in achieving the actions required under section 3406.

“(9) Administration—With the consent of the appropriate agency head, the Advisory Board may use the facilities and services of any Federal agency.

“(10) Cooperation and assistance

“(A) Provision of information—Upon request of the Panel Chair for information or assistance to facilitate carrying out this section, the Secretary of the Interior shall promptly provide such information, unless otherwise prohibited by law.

“(B) Space and assistance—The Secretary of the Interior shall provide the Panel with appropriate and adequate office space, together with such equipment, office supplies, and communications facilities and services as may be necessary for the operation of the Panel, and shall provide necessary maintenance services for such offices and the equipment and facilities located therein.”

Sec. 603 Water supply accounting

(a)
changed In general— All Central Valley Project water, except Central Valley Project water released pursuant to U.S. Department of the Interior Record of Decision, Trinity River Mainstem Fishery Restoration Final Environmental Impact Statement/Environmental Impact Report dated the December 2000 used to implement an action undertaken for a fishery beneficial purpose that was not imposed by terms and conditions existing in licenses, permits, and other agreements pertaining to the Central Valley Project under applicable State or Federal law existing on October 30, 1992, shall be credited to the quantity of Central Valley Project yield dedicated and managed under this section; provided, that nothing herein shall affect the Secretary of the Interior’s duty to comply with any otherwise lawful requirement imposed on operations of the Central Valley Project under any provision of Federal or State law.
(b)
Reclamation policies and allocations— Reclamation policies and allocations shall not be based upon any premise or assumption that Central Valley Project contract supplies are supplemental or secondary to any other contractor source of supply.

Sec. 604 Implementation of water replacement plan

(a)
changed In general— Not later than October 1, 2016, the Secretary of the Interior shall update and implement the plan required by section 3408(j) of title XXXIV of Public Law 102–575. The Secretary shall provide reports to notify the Congress annually describing the progress of implementing the plan required by section 3408(j) of title XXXIV of Public Law 102–575.
(b)
removed Failure To update and implement plan— If the Secretary fails to update and implement the plan required in subsection (a) within 180 days of enactment of this Act, the amount made available to the Policy and Administration Account of the Bureau of Reclamation for the operation of the Washington, DC, office shall be reduced by an amount of $20,000 per day and transferred to the Treasury for deficit reduction until the feasibility reports are provided to Congress.
(b)
renumbered was (4) Potential amendment— If the plan required in subsection (a) has not increased the Central Valley Project yield by 800,000 acre-feet within 5 years after the enactment of this Act, then section 3406 of the Central Valley Project Improvement Act (title XXXIV of Public Law 102–575) is amended as follows:
(1)
renumbered was (4)(3) In subsection (b)—
(A)
renumbered was (4)(3)(2) by amending paragraph (2)(C) to read:

added “(C) If by March 15, 2021, and any year thereafter the quantity of Central Valley Project water forecasted to be made available to all water service or repayment contractors of the Central Valley Project is below 50 percent of the total quantity of water to be made available under said contracts, the quantity of Central Valley Project yield dedicated and managed for that year under this paragraph shall be reduced by 25 percent.”

removed “(C) If by March 15, 2018, and any year thereafter the quantity of Central Valley Project water forecasted to be made available to all water service or repayment contractors of the Central Valley Project is below 50 percent of the total quantity of water to be made available under said contracts, the quantity of Central Valley Project yield dedicated and managed for that year under this paragraph shall be reduced by 25 percent.”

Sec. 606 Transfer the New Melones Unit, Central Valley Project to interested providers

(a)
changed Definitions— For the purposes of this Act, section, the following terms apply:
(1)
Interested local water and power providers— The term interested local water and power providers includes the Calaveras County Water District, Calaveras Public Power Agency, Central San Joaquin Water Conservation District, Oakdale Irrigation District, Stockton East Water District, South San Joaquin Irrigation District, Tuolumne Utilities District, Tuolumne Public Power Agency, and Union Public Utilities District.
(2)
New melones unit, central valley project— The term New Melones Unit, Central Valley Project means all Federal reclamation projects located within or diverting water from or to the watershed of the Stanislaus and San Joaquin rivers and their tributaries as authorized by the Act of August 26, 1937 (50 Stat. 850), and all Acts amendatory or supplemental thereto, including the Act of October 23, 1962 (76 Stat. 1173).
(3)
Secretary— The term Secretary means the Secretary of the Interior.
(b)
Negotiations— Notwithstanding any other provision of law, not later than 180 days after the date of the enactment of this Act, the Secretary shall enter into negotiations with interested local water and power providers for the transfer ownership, control, and operation of the New Melones Unit, Central Valley Project to interested local water and power providers within the State of California.
(c)
Transfer— The Secretary shall transfer the New Melones Unit, Central Valley Project in accordance with an agreement reached pursuant to negotiations conducted under subsection (b).
(d)
Notification— Not later than 360 days after the date of the enactment of this Act, and every 6 months thereafter, the Secretary shall notify the appropriate committees of the House of Representatives and the Senate—
(1)
changed if an agreement is reached pursuant to negotiations conducted under section 1(b), subsection (b), the terms of that agreement;
(2)
of the status of formal discussions with interested local water and power providers for the transfer of ownership, control, and operation of the New Melones Unit, Central Valley Project to interested local water and power providers;
(3)
of all unresolved issues that are preventing execution of an agreement for the transfer of ownership, control, and operation of the New Melones Unit, Central Valley Project to interested local water and power providers;
(4)
on analysis and review of studies, reports, discussions, hearing transcripts, negotiations, and other information about past and present formal discussions that—
(A)
have a serious impact on the progress of the formal discussions;
(B)
explain or provide information about the issues that prevent progress or finalization of formal discussions; or
(C)
are, in whole or in part, preventing execution of an agreement for the transfer; and
(5)
of any actions the Secretary recommends that the United States should take to finalize an agreement for that transfer.

Sec. 607 Basin studies

(a)
changed Authorized studies— The Secretary of the Interior is authorized and directed to expand opportunities and expedite completion of assessments under section 9503(b) of the SECURE Water Act, Act (42 U.S.C. 10363(b)), with non-Federal partners, of individual sub-basins and watersheds within major Reclamation river basins; and shall ensure timely decision and expedited implementation of adaptation and mitigation strategies developed through the special study process.
(b)
Funding—
(1)
In general— The non-Federal partners shall be responsible for 100 percent of the cost of the special studies.
(2)
Contributed Funds— The Secretary may accept and use contributions of funds from the non-Federal partners to carry out activities under the special studies.

Sec. 608 Operations of the Trinity River Division

The Secretary of the Interior, in the operation of the Trinity River Division of the Central Valley Project, shall not make releases from Lewiston Dam in excess of the volume for each water-year type required by the U.S. Department of the Interior Record of Decision, Trinity River Mainstem Fishery Restoration Final Environmental Impact Statement/Environmental Impact Report dated December 2000.

(1)
changed A maximum of 369,000 acre-feet in a “critically dry” “Critically Dry” year.
(2)
changed A maximum of 453,000 acre-feet in a “dry” “Dry” year.
(3)
changed A maximum of 647,000 acre-feet in a “normal” “Normal” year.
(4)
changed A maximum of 701,000 acre-feet in a “wet” “Wet” year.
(5)
changed A maximum of 815,000 acre-feet in an “extremely wet” “Extremely Wet” year.

Sec. 611 Report on results of water usage

added

added The Secretary of the Interior, in consultation with the Secretary of Commerce and the Secretary of Natural Resources of the State of California, shall publish an annual report detailing instream flow releases from the Central Valley Project and California State Water Project, their explicit purpose and authority, and all measured environmental benefit as a result of the releases.

Sec. 612 Klamath project consultation applicants

added

added If the Bureau of Reclamation initiates or reinitiates consultation with the U.S. Fish and Wildlife Service or the National Marine Fisheries Service under section 7(a)(2) of the Endangered Species Act of 1973 (16 U.S.C. 1536(a)(2)), with respect to construction or operation of the Klamath Project (or any part thereof), Klamath Project contractors shall be accorded all the rights and responsibilities extended to applicants in the consultation process. Upon request of the Klamath Project contractors, they may be represented through an association or organization.

Sec. 706 Funding to process permits

(a)
In general— The Secretary, after public notice in accordance with the Administrative Procedures Act (5 U.S.C. 553), may accept and expend funds contributed by a non-Federal public entity to expedite the evaluation of a permit of that entity related to a qualifying project.
(b)
Effect on permitting—
(1)
In general— In carrying out this section, the Secretary shall ensure that the use of funds accepted under subsection (a) will not impact impartial decisionmaking with respect to permits, either substantively or procedurally.
(2)
Evaluation of permits— In carrying out this section, the Secretary shall ensure that the evaluation of permits carried out using funds accepted under this section shall—
(A)
changed be reviewed by the Regional Director of the Bureau of Reclamation, Bureau, or the Regional Director’s designee, of the region in which the qualifying project or activity is located; and
(B)
use the same procedures for decisions that would otherwise be required for the evaluation of permits for similar projects or activities not carried out using funds authorized under this section.
(3)
Impartial decisionmaking— In carrying out this section, the Secretary and the cooperating agencies receiving funds under this section for qualifying projects shall ensure that the use of the funds accepted under this section for such projects shall not—
(A)
impact impartial decisionmaking with respect to the issuance of permits, either substantively or procedurally; or
(B)
diminish, modify, or otherwise affect the statutory or regulatory authorities of such agencies.
(c)
Limitation on use of funds— None of the funds accepted under this section shall be used to carry out a review of the evaluation of permits required under subsection (b)(2)(A).
(d)
Public availability— The Secretary shall ensure that all final permit decisions carried out using funds authorized under this section are made available to the public, including on the Internet.

Sec. 805 Project acceleration

(a)
Applicability—
(1)
In general— This section shall apply to—
(A)
each project study that is initiated after the date of enactment of this Act and for which an environmental impact statement is prepared under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
(B)
the extent determined appropriate by the Secretary, to other project studies initiated before the date of enactment of this Act and for which an environmental review process document is prepared under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
(C)
any project study for the development of a non-federally owned and operated surface water storage project for which the Secretary determines there is a demonstrable Federal interest and the project—
(i)
is located in a river basin where other Bureau of Reclamation water projects are located;
(ii)
will create additional water supplies that support Bureau of Reclamation water projects; or
(iii)
will become integrated into the operation of Bureau of Reclamation water projects.
(2)
Flexibility— Any authority granted under this section may be exercised, and any requirement established under this section may be satisfied, for the conduct of an environmental review process for a project study, a class of project studies, or a program of project studies.
(3)
List of project studies—
(A)
In general— The Secretary shall annually prepare, and make publicly available, a list of all project studies that the Secretary has determined—
(i)
meets the standards described in paragraph (1); and
(ii)
does not have adequate funding to make substantial progress toward the completion of the project study.
(B)
Inclusions— The Secretary shall include for each project study on the list under subparagraph (A) a description of the estimated amounts necessary to make substantial progress on the project study.
(b)
Project review process—
(1)
In general— The Secretary shall develop and implement a coordinated environmental review process for the development of project studies.
(2)
Coordinated review— The coordinated environmental review process described in paragraph (1) shall require that any review, analysis, opinion, statement, permit, license, or other approval or decision issued or made by a Federal, State, or local governmental agency or an Indian tribe for a project study described in subsection (b) be conducted, to the maximum extent practicable, concurrently with any other applicable governmental agency or Indian tribe.
(3)
Timing— The coordinated environmental review process under this subsection shall be completed not later than the date on which the Secretary, in consultation and concurrence with the agencies identified under section 805(d), establishes with respect to the project study.
(c)
Lead agencies—
(1)
Joint lead agencies—
(A)
In general— Subject to the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and the requirements of section 1506.8 of title 40, Code of Federal Regulations (or successor regulations), including the concurrence of the proposed joint lead agency, a project sponsor may serve as the joint lead agency.
(B)
Project sponsor as joint lead agency— A project sponsor that is a State or local governmental entity may—
(i)
with the concurrence of the Secretary, serve as a joint lead agency with the Federal lead agency for purposes of preparing any environmental document under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
(ii)
prepare any environmental review process document under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) required in support of any action or approval by the Secretary if—
(I)
the Secretary provides guidance in the preparation process and independently evaluates that document;
(II)
the project sponsor complies with all requirements applicable to the Secretary under—
(aa)
the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
(bb)
any regulation implementing that Act; and
(cc)
any other applicable Federal law; and
(III)
the Secretary approves and adopts the document before the Secretary takes any subsequent action or makes any approval based on that document, regardless of whether the action or approval of the Secretary results in Federal funding.
(2)
Duties— The Secretary shall ensure that—
(A)
the project sponsor complies with all design and mitigation commitments made jointly by the Secretary and the project sponsor in any environmental document prepared by the project sponsor in accordance with this subsection; and
(B)
any environmental document prepared by the project sponsor is appropriately supplemented to address any changes to the project the Secretary determines are necessary.
(3)
Adoption and use of documents— Any environmental document prepared in accordance with this subsection shall be adopted and used by any Federal agency making any determination related to the project study to the same extent that the Federal agency could adopt or use a document prepared by another Federal agency under—
(A)
the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
(B)
parts 1500 through 1508 of title 40, Code of Federal Regulations (or successor regulations).
(4)
Roles and responsibility of lead agency— With respect to the environmental review process for any project study, the Federal lead agency shall have authority and responsibility—
(A)
to take such actions as are necessary and proper and within the authority of the Federal lead agency to facilitate the expeditious resolution of the environmental review process for the project study; and
(B)
to prepare or ensure that any required environmental impact statement or other environmental review document for a project study required to be completed under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) is completed in accordance with this section and applicable Federal law.
(d)
Participating and cooperating agencies—
(1)
Identification of jurisdictional agencies— With respect to carrying out the environmental review process for a project study, the Secretary shall identify, as early as practicable in the environmental review process, all Federal, State, and local government agencies and Indian tribes that may—
(A)
have jurisdiction over the project;
(B)
be required by law to conduct or issue a review, analysis, opinion, or statement for the project study; or
(C)
be required to make a determination on issuing a permit, license, or other approval or decision for the project study.
(2)
State authority— If the environmental review process is being implemented by the Secretary for a project study within the boundaries of a State, the State, consistent with State law, may choose to participate in the process and to make subject to the process all State agencies that—
(A)
have jurisdiction over the project;
(B)
are required to conduct or issue a review, analysis, opinion, or statement for the project study; or
(C)
are required to make a determination on issuing a permit, license, or other approval or decision for the project study.
(3)
Invitation—
(A)
In general— The Federal lead agency shall invite, as early as practicable in the environmental review process, any agency identified under paragraph (1) to become a participating or cooperating agency, as applicable, in the environmental review process for the project study.
(B)
Deadline— An invitation to participate issued under subparagraph (A) shall set a deadline by which a response to the invitation shall be submitted, which may be extended by the Federal lead agency for good cause.
(4)
changed Procedures— Section 1501.6 of title 40, Code of Federal Regulations (as in effect on the date of enactment of the Bureau of Reclamation Surface Water Storage Project Streamlining Act) shall govern the identification and the participation of a cooperating agency.
(5)
Federal cooperating agencies— Any Federal agency that is invited by the Federal lead agency to participate in the environmental review process for a project study shall be designated as a cooperating agency by the Federal lead agency unless the invited agency informs the Federal lead agency, in writing, by the deadline specified in the invitation that the invited agency—
(A)
(i)
has no jurisdiction or authority with respect to the project;
(ii)
has no expertise or information relevant to the project; or
(iii)
does not have adequate funds to participate in the project; and
(B)
does not intend to submit comments on the project.
(6)
Administration— A participating or cooperating agency shall comply with this section and any schedule established under this section.
(7)
Effect of designation— Designation as a participating or cooperating agency under this subsection shall not imply that the participating or cooperating agency—
(A)
supports a proposed project; or
(B)
has any jurisdiction over, or special expertise with respect to evaluation of, the project.
(8)
Concurrent reviews— Each participating or cooperating agency shall—
(A)
carry out the obligations of that agency under other applicable law concurrently and in conjunction with the required environmental review process, unless doing so would prevent the participating or cooperating agency from conducting needed analysis or otherwise carrying out those obligations; and
(B)
formulate and implement administrative, policy, and procedural mechanisms to enable the agency to ensure completion of the environmental review process in a timely, coordinated, and environmentally responsible manner.
(e)
Non-Federal projects integrated into reclamation systems— The Federal lead agency shall serve in that capacity for the entirety of all non-Federal projects that will be integrated into a larger system owned, operated or administered in whole or in part by the Bureau of Reclamation.
(f)
Non-Federal project— If the Secretary determines that a project can be expedited by a non-Federal sponsor and that there is a demonstrable Federal interest in expediting that project, the Secretary shall take such actions as are necessary to advance such a project as a non-Federal project, including, but not limited to, entering into agreements with the non-Federal sponsor of such project to support the planning, design and permitting of such project as a non-Federal project.
(g)
Programmatic compliance—
(1)
In general— The Secretary shall issue guidance regarding the use of programmatic approaches to carry out the environmental review process that—
(A)
eliminates repetitive discussions of the same issues;
(B)
focuses on the actual issues ripe for analyses at each level of review;
(C)
establishes a formal process for coordinating with participating and cooperating agencies, including the creation of a list of all data that are needed to carry out an environmental review process; and
(D)
complies with—
(i)
the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
(ii)
all other applicable laws.
(2)
Requirements— In carrying out paragraph (1), the Secretary shall—
(A)
as the first step in drafting guidance under that paragraph, consult with relevant Federal, State, and local governmental agencies, Indian tribes, and the public on the appropriate use and scope of the programmatic approaches;
(B)
emphasize the importance of collaboration among relevant Federal, State, and local governmental agencies, and Indian tribes in undertaking programmatic reviews, especially with respect to including reviews with a broad geographical scope;
(C)
ensure that the programmatic reviews—
(i)
promote transparency, including of the analyses and data used in the environmental review process, the treatment of any deferred issues raised by Federal, State, and local governmental agencies, Indian tribes, or the public, and the temporal and special scales to be used to analyze those issues;
(ii)
use accurate and timely information in the environmental review process, including—
(I)
criteria for determining the general duration of the usefulness of the review; and
(II)
the timeline for updating any out-of-date review;
(iii)
describe—
(I)
the relationship between programmatic analysis and future tiered analysis; and
(II)
the role of the public in the creation of future tiered analysis; and
(iv)
are available to other relevant Federal, State, and local governmental agencies, Indian tribes, and the public;
(D)
allow not fewer than 60 days of public notice and comment on any proposed guidance; and
(E)
address any comments received under subparagraph (D).
(h)
Coordinated reviews—
(1)
Coordination plan—
(A)
Establishment— The Federal lead agency shall, after consultation with and with the concurrence of each participating and cooperating agency and the project sponsor or joint lead agency, as applicable, establish a plan for coordinating public and agency participation in, and comment on, the environmental review process for a project study or a category of project studies.
(B)
Schedule—
(i)
In general— As soon as practicable but not later than 45 days after the close of the public comment period on a draft environmental impact statement, the Federal lead agency, after consultation with and the concurrence of each participating and cooperating agency and the project sponsor or joint lead agency, as applicable, shall establish, as part of the coordination plan established in subparagraph (A), a schedule for completion of the environmental review process for the project study.
(ii)
Factors for consideration— In establishing a schedule, the Secretary shall consider factors such as—
(I)
the responsibilities of participating and cooperating agencies under applicable laws;
(II)
the resources available to the project sponsor, joint lead agency, and other relevant Federal and State agencies, as applicable;
(III)
the overall size and complexity of the project;
(IV)
the overall schedule for and cost of the project; and
(V)
the sensitivity of the natural and historical resources that could be affected by the project.
(iii)
Modifications— The Secretary may—
(I)
lengthen a schedule established under clause (i) for good cause; and
(II)
shorten a schedule only with concurrence of the affected participating and cooperating agencies and the project sponsor or joint lead agency, as applicable.
(iv)
Dissemination— A copy of a schedule established under clause (i) shall be—
(I)
provided to each participating and cooperating agency and the project sponsor or joint lead agency, as applicable; and
(II)
made available to the public.
(2)
Comment deadlines— The Federal lead agency shall establish the following deadlines for comment during the environmental review process for a project study:
(A)
Draft environmental impact statements— For comments by Federal and State agencies and the public on a draft environmental impact statement, a period of not more than 60 days after publication in the Federal Register of notice of the date of public availability of the draft environmental impact statement, unless—
(i)
a different deadline is established by agreement of the Federal lead agency, the project sponsor or joint lead agency, as applicable, and all participating and cooperating agencies; or
(ii)
the deadline is extended by the Federal lead agency for good cause.
(B)
Other environmental review processes— For all other comment periods established by the Federal lead agency for agency or public comments in the environmental review process, a period of not more than 30 days after the date on which the materials on which comment is requested are made available, unless—
(i)
a different deadline is established by agreement of the Federal lead agency, the project sponsor, or joint lead agency, as applicable, and all participating and cooperating agencies; or
(ii)
the deadline is extended by the Federal lead agency for good cause.
(3)
Deadlines for decisions under other laws— In any case in which a decision under any Federal law relating to a project study, including the issuance or denial of a permit or license, is required to be made by the date described in subsection (i)(5)(B), the Secretary shall submit to the Committee on Natural Resources of the House of Representatives and the Committee on Energy and Natural Resources of the Senate—
(A)
as soon as practicable after the 180-day period described in subsection (i)(5)(B), an initial notice of the failure of the Federal agency to make the decision; and
(B)
every 60 days thereafter until such date as all decisions of the Federal agency relating to the project study have been made by the Federal agency, an additional notice that describes the number of decisions of the Federal agency that remain outstanding as of the date of the additional notice.
(4)
Involvement of the public— Nothing in this subsection reduces any time period provided for public comment in the environmental review process under applicable Federal law (including regulations).
(5)
Transparency reporting—
(A)
Reporting requirements— Not later than 1 year after the date of enactment of this Act, the Secretary shall establish and maintain an electronic database and, in coordination with other Federal and State agencies, issue reporting requirements to make publicly available the status and progress with respect to compliance with applicable requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and any other Federal, State, or local approval or action required for a project study for which this section is applicable.
(B)
Project study transparency— Consistent with the requirements established under subparagraph (A), the Secretary shall make publicly available the status and progress of any Federal, State, or local decision, action, or approval required under applicable laws for each project study for which this section is applicable.
(i)
Issue identification and resolution—
(1)
Cooperation— The Federal lead agency, the cooperating agencies, and any participating agencies shall work cooperatively in accordance with this section to identify and resolve issues that could delay completion of the environmental review process or result in the denial of any approval required for the project study under applicable laws.
(2)
Federal lead agency responsibilities—
(A)
In general— The Federal lead agency shall make information available to the cooperating agencies and participating agencies as early as practicable in the environmental review process regarding the environmental and socioeconomic resources located within the project area and the general locations of the alternatives under consideration.
(B)
Data sources— The information under subparagraph (A) may be based on existing data sources, including geographic information systems mapping.
(3)
Cooperating and participating agency responsibilities— Based on information received from the Federal lead agency, cooperating and participating agencies shall identify, as early as practicable, any issues of concern regarding the potential environmental or socioeconomic impacts of the project, including any issues that could substantially delay or prevent an agency from granting a permit or other approval that is needed for the project study.
(4)
Accelerated issue resolution and elevation—
(A)
In general— On the request of a participating or cooperating agency or project sponsor, the Secretary shall convene an issue resolution meeting with the relevant participating and cooperating agencies and the project sponsor or joint lead agency, as applicable, to resolve issues that may—
(i)
delay completion of the environmental review process; or
(ii)
result in denial of any approval required for the project study under applicable laws.
(B)
Meeting date— A meeting requested under this paragraph shall be held not later than 21 days after the date on which the Secretary receives the request for the meeting, unless the Secretary determines that there is good cause to extend that deadline.
(C)
Notification— On receipt of a request for a meeting under this paragraph, the Secretary shall notify all relevant participating and cooperating agencies of the request, including the issue to be resolved and the date for the meeting.
(D)
Elevation of issue resolution— If a resolution cannot be achieved within the 30-day period beginning on the date of a meeting under this paragraph and a determination is made by the Secretary that all information necessary to resolve the issue has been obtained, the Secretary shall forward the dispute to the heads of the relevant agencies for resolution.
(E)
Convention by secretary— The Secretary may convene an issue resolution meeting under this paragraph at any time, at the discretion of the Secretary, regardless of whether a meeting is requested under subparagraph (A).
(5)
Financial penalty provisions—
(A)
In general— A Federal jurisdictional agency shall complete any required approval or decision for the environmental review process on an expeditious basis using the shortest existing applicable process.
(B)
Failure to decide—
(i)
In general—
(I)
Transfer of funds— If a Federal jurisdictional agency fails to render a decision required under any Federal law relating to a project study that requires the preparation of an environmental impact statement or environmental assessment, including the issuance or denial of a permit, license, statement, opinion, or other approval by the date described in clause (ii), the amount of funds made available to support the office of the head of the Federal jurisdictional agency shall be reduced by an amount of funding equal to the amount specified in item (aa) or (bb) of subclause (II), and those funds shall be made available to the division of the Federal jurisdictional agency charged with rendering the decision by not later than 1 day after the applicable date under clause (ii), and once each week thereafter until a final decision is rendered, subject to subparagraph (C).
(II)
Amount to be transferred— The amount referred to in subclause (I) is—
(aa)
$20,000 for any project study requiring the preparation of an environmental assessment or environmental impact statement; or
(bb)
$10,000 for any project study requiring any type of review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) other than an environmental assessment or environmental impact statement.
(ii)
Description of date— The date referred to in clause (i) is the later of—
(I)
the date that is 180 days after the date on which an application for the permit, license, or approval is complete; and
(II)
the date that is 180 days after the date on which the Federal lead agency issues a decision on the project under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
(C)
Limitations—
(i)
In general— No transfer of funds under subparagraph (B) relating to an individual project study shall exceed, in any fiscal year, an amount equal to 1 percent of the funds made available for the applicable agency office.
(ii)
Failure to decide— The total amount transferred in a fiscal year as a result of a failure by an agency to make a decision by an applicable deadline shall not exceed an amount equal to 5 percent of the funds made available for the applicable agency office for that fiscal year.
(iii)
Aggregate— Notwithstanding any other provision of law, for each fiscal year, the aggregate amount of financial penalties assessed against each applicable agency office under this Act and any other Federal law as a result of a failure of the agency to make a decision by an applicable deadline for environmental review, including the total amount transferred under this paragraph, shall not exceed an amount equal to 9.5 percent of the funds made available for the agency office for that fiscal year.
(D)
added Notification of transfers— Not later than 10 days after the last date in a fiscal year on which funds of the Federal jurisdictional agency may be transferred under subparagraph (B)(5) with respect to an individual decision, the agency shall submit to the appropriate committees of the House of Representatives and the Senate written notification that includes a description of—
(i)
added the decision;
(ii)
added the project study involved;
(iii)
added the amount of each transfer under subparagraph (B) in that fiscal year relating to the decision;
(iv)
added the total amount of all transfers under subparagraph (B) in that fiscal year relating to the decision; and
(v)
added the total amount of all transfers of the agency under subparagraph (B) in that fiscal year.
(E)
added No fault of agency—
(D)
removed No fault of agency—
(i)
renumbered was (10)(6)(5)(2) In general— A transfer of funds under this paragraph shall not be made if the applicable agency described in subparagraph (A) notifies, with a supporting explanation, the Federal lead agency, cooperating agencies, and project sponsor, as applicable, that—
(I)
renumbered was (10)(6)(5)(2)(3) the agency has not received necessary information or approvals from another entity in a manner that affects the ability of the agency to meet any requirements under Federal, State, or local law;
(II)
renumbered was (10)(6)(5)(2)(4) significant new information, including from public comments, or circumstances, including a major modification to an aspect of the project, requires additional analysis for the agency to make a decision on the project application; or
(III)
renumbered was (10)(6)(5)(2)(5) the agency lacks the financial resources to complete the review under the scheduled timeframe, including a description of the number of full-time employees required to complete the review, the amount of funding required to complete the review, and a justification as to why not enough funding is available to complete the review by the deadline.
(ii)
renumbered was (10)(6)(5)(3) Lack of financial resources— If the agency provides notice under clause (i)(III), the Inspector General of the agency shall—
(I)
renumbered was (10)(6)(5)(3)(3) conduct a financial audit to review the notice; and
(II)
added not later than 90 days after the date on which the review described in subclause (I) is completed, submit to the Committee on Natural Resources of the House of Representatives and the Committee on Energy and Natural Resources of the Senate the results of the audit conducted under subclause (I).
(II)
removed not later than 90 days after the date on which the review described in subclause (I) is completed, submit to the Committee on Natural Resources of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a notification on the notice.
(F)
renumbered was (10)(6)(6) Limitation— The Federal agency from which funds are transferred pursuant to this paragraph shall not reprogram funds to the office of the head of the agency, or equivalent office, to reimburse that office for the loss of the funds.
(G)
renumbered was (10)(6)(7) Effect of paragraph— Nothing in this paragraph affects or limits the application of, or obligation to comply with, any Federal, State, local, or tribal law.
(j)
Memorandum of agreements for early coordination—
(1)
Sense of congress— It is the sense of Congress that—
(A)
the Secretary and other Federal agencies with relevant jurisdiction in the environmental review process should cooperate with each other, State and local agencies, and Indian tribes on environmental review and Bureau of Reclamation project delivery activities at the earliest practicable time to avoid delays and duplication of effort later in the process, prevent potential conflicts, and ensure that planning and project development decisions reflect environmental values; and
(B)
the cooperation referred to in subparagraph (A) should include the development of policies and the designation of staff that advise planning agencies and project sponsors of studies or other information foreseeably required for later Federal action and early consultation with appropriate State and local agencies and Indian tribes.
(2)
Technical assistance— If requested at any time by a State or project sponsor, the Secretary and other Federal agencies with relevant jurisdiction in the environmental review process, shall, to the maximum extent practicable and appropriate, as determined by the agencies, provide technical assistance to the State or project sponsor in carrying out early coordination activities.
(3)
Memorandum of agency agreement— If requested at any time by a State or project sponsor, the Federal lead agency, in consultation with other Federal agencies with relevant jurisdiction in the environmental review process, may establish memoranda of agreement with the project sponsor, Indian tribes, State and local governments, and other appropriate entities to carry out the early coordination activities, including providing technical assistance in identifying potential impacts and mitigation issues in an integrated fashion.
(k)
Limitations— Nothing in this section preempts or interferes with—
(1)
any obligation to comply with the provisions of any Federal law, including—
(A)
the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
(B)
any other Federal environmental law;
(2)
the reviewability of any final Federal agency action in a court of the United States or in the court of any State;
(3)
any requirement for seeking, considering, or responding to public comment; or
(4)
any power, jurisdiction, responsibility, duty, or authority that a Federal, State, or local governmental agency, Indian tribe, or project sponsor has with respect to carrying out a project or any other provision of law applicable to projects.
(l)
Timing of claims—
(1)
Timing—
(A)
In general— Notwithstanding any other provision of law, a claim arising under Federal law seeking judicial review of a permit, license, or other approval issued by a Federal agency for a project study shall be barred unless the claim is filed not later than 3 years after publication of a notice in the Federal Register announcing that the permit, license, or other approval is final pursuant to the law under which the agency action is taken, unless a shorter time is specified in the Federal law that allows judicial review.
(B)
Applicability— Nothing in this subsection creates a right to judicial review or places any limit on filing a claim that a person has violated the terms of a permit, license, or other approval.
(2)
New information—
(A)
In general— The Secretary shall consider new information received after the close of a comment period if the information satisfies the requirements for a supplemental environmental impact statement under title 40, Code of Federal Regulations (including successor regulations).
(B)
Separate action— The preparation of a supplemental environmental impact statement or other environmental document, if required under this section, shall be considered a separate final agency action and the deadline for filing a claim for judicial review of the action shall be 3 years after the date of publication of a notice in the Federal Register announcing the action relating to such supplemental environmental impact statement or other environmental document.
(m)
Categorical exclusions—
(1)
In general— Not later than 180 days after the date of enactment of this Act, the Secretary shall—
(A)
survey the use by the Bureau of Reclamation of categorical exclusions in projects since 2005;
(B)
publish a review of the survey that includes a description of—
(i)
the types of actions that were categorically excluded or could be the basis for developing a new categorical exclusion; and
(ii)
any requests previously received by the Secretary for new categorical exclusions; and
(C)
solicit requests from other Federal agencies and project sponsors for new categorical exclusions.
(2)
New categorical exclusions— Not later than 1 year after the date of enactment of this Act, if the Secretary has identified a category of activities that merit establishing a categorical exclusion that did not exist on the day before the date of enactment this Act based on the review under paragraph (1), the Secretary shall publish a notice of proposed rulemaking to propose that new categorical exclusion, to the extent that the categorical exclusion meets the criteria for a categorical exclusion under section 1508.4 of title 40, Code of Federal Regulations (or successor regulation).
(n)
Review of project acceleration reforms—
(1)
In general— The Comptroller General of the United States shall—
(A)
assess the reforms carried out under this section; and
(B)
not later than 5 years and not later than 10 years after the date of enactment of this Act, submit to the Committee on Natural Resources of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that describes the results of the assessment.
(2)
Contents— The reports under paragraph (1) shall include an evaluation of impacts of the reforms carried out under this section on—
(A)
project delivery;
(B)
compliance with environmental laws; and
(C)
the environmental impact of projects.
(o)
Performance measurement— The Secretary shall establish a program to measure and report on progress made toward improving and expediting the planning and environmental review process.
(p)
Categorical exclusions in emergencies— For the repair, reconstruction, or rehabilitation of a Bureau of Reclamation surface water storage project that is in operation or under construction when damaged by an event or incident that results in a declaration by the President of a major disaster or emergency pursuant to the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5121 et seq.), the Secretary shall treat such repair, reconstruction, or rehabilitation activity as a class of action categorically excluded from the requirements relating to environmental assessments or environmental impact statements under section 1508.4 of title 40, Code of Federal Regulations (or successor regulations), if the repair or reconstruction activity is—
(1)
in the same location with the same capacity, dimensions, and design as the original Bureau of Reclamation surface water storage project as before the declaration described in this section; and
(2)
commenced within a 2-year period beginning on the date of a declaration described in this subsection.

Sec. 902 Prepayment of certain repayment contracts between the United States and contractors of federally developed water supplies

(a)
Conversion and prepayment of contracts—
(1)
Conversion— Upon request of the contractor, the Secretary of the Interior shall convert any water service contract in effect on the date of enactment of this Act and between the United States and a water users’ association to allow for prepayment of the repayment contract pursuant to paragraph (2) under mutually agreeable terms and conditions. The manner of conversion under this paragraph shall be as follows:
(A)
Water service contracts that were entered into under section 9(e) of the Act of August 4, 1939 (53 Stat. 1196), to be converted under this section shall be converted to repayment contracts under section 9(d) of that Act (53 Stat. 1195).
(B)
Water service contracts that were entered under subsection (c)(2) of section 9 of the Act of August 4, 1939 (53 Stat. 1194), to be converted under this section shall be converted to a contract under subsection (c)(1) of section 9 of that Act (53 Stat. 1195).
(2)
changed Prepayment— All Except for those repayment contracts under which the contractor has previously negotiated for prepayment, all repayment contracts under section 9(d) of that Act (53 Stat. 1195) in effect on the date of enactment of this Act at the request of the contractor, and all contracts converted pursuant to paragraph (1)(A) shall—
(A)
changed upon request of the contractor, provide for the repayment, either in lump sum or by accelerated prepayment, of the remaining construction costs identified in water project specific irrigation rate repayment schedules, as adjusted to reflect payment not reflected in such schedule, and properly assignable for ultimate return by the contractor, or if made in approximately equal installments, no later than 3 years after the effective date of the repayment contract; contract, such amount to be discounted by ½ the Treasury rate. An estimate of the remaining construction costs, as adjusted, shall be provided by the Secretary to the contractor no later than 90 days following receipt of request of the contractor;
(B)
require that construction costs or other capitalized costs incurred after the effective date of the contract or not reflected in the rate schedule referenced in subparagraph (A), and properly assignable to such contractor shall be repaid in not more than 5 years after notification of the allocation if such amount is a result of a collective annual allocation of capital costs to the contractors exercising contract conversation under this subsection of less than $5,000,000. If such amount is $5,000,000 or greater, such cost shall be repaid as provided by applicable reclamation law;
(C)
provide that power revenues will not be available to aid in repayment of construction costs allocated to irrigation under the contract; and
(D)
continue so long as the contractor pays applicable charges, consistent with section 9(d) of the Act of August 4, 1939 (53 Stat. 1195), and applicable law.
(3)
changed Contract requirements— The Except for those repayment contracts under which the contractor has previously negotiated for prepayment, the following shall apply with regard to all repayment contracts under subsection (c)(1) of section 9 of that Act (53 Stat. 1195) in effect on the date of enactment of this Act at the request of the contractor, and all contracts converted pursuant to paragraph (1)(B):
(A)
changed Upon request of the contractor, provide Provide for the repayment in lump sum of the remaining construction costs identified in water project specific municipal and industrial rate repayment schedules, as adjusted to reflect payments not reflected in such schedule, and properly assignable for ultimate return by the contractor. An estimate of the remaining construction costs, as adjusted, shall be provided by the Secretary to the contractor no later than 90 days after receipt of request of contractor.
(B)
The contract shall require that construction costs or other capitalized costs incurred after the effective date of the contract or not reflected in the rate schedule referenced in subparagraph (A), and properly assignable to such contractor, shall be repaid in not more than 5 years after notification of the allocation if such amount is a result of a collective annual allocation of capital costs to the contractors exercising contract conversation under this subsection of less than $5,000,000. If such amount is $5,000,000 or greater, such cost shall be repaid as provided by applicable reclamation law.
(C)
Continue so long as the contractor pays applicable charges, consistent with section 9(c)(1) of the Act of August 4, 1939 (53 Stat. 1195), and applicable law.
(4)
Conditions— All contracts entered into pursuant to paragraphs (1), (2), and (3) shall—
(A)
not be adjusted on the basis of the type of prepayment financing used by the water users’ association;
(B)
conform to any other agreements, such as applicable settlement agreements and new constructed appurtenant facilities; and
(C)
not modify other water service, repayment, exchange and transfer contractual rights between the water users’ association, and the Bureau of Reclamation, or any rights, obligations, or relationships of the water users’ association and their landowners as provided under State law.
(b)
Accounting— The amounts paid pursuant to subsection (a) shall be subject to adjustment following a final cost allocation by the Secretary of the Interior. In the event that the final cost allocation indicates that the costs properly assignable to the contractor are greater than what has been paid by the contractor, the contractor shall be obligated to pay the remaining allocated costs. The term of such additional repayment contract shall be not less than one year and not more than 10 years, however, mutually agreeable provisions regarding the rate of repayment of such amount may be developed by the parties. In the event that the final cost allocation indicates that the costs properly assignable to the contractor are less than what the contractor has paid, the Secretary shall credit such overpayment as an offset against any outstanding or future obligation of the contractor.
(c)
Applicability of certain provisions—
(1)
Effect of existing law— Upon a contractor’s compliance with and discharge of the obligation of repayment of the construction costs pursuant to a contract entered into pursuant to subsection (a)(2)(A), subsections (a) and (b) of section 213 of the Reclamation Reform Act of 1982 (96 Stat. 1269) shall apply to affected lands.
(2)
Effect of other obligations— The obligation of a contractor to repay construction costs or other capitalized costs described in subsection (a)(2)(B), (a)(3)(B), or (b) shall not affect a contractor’s status as having repaid all of the construction costs assignable to the contractor or the applicability of subsections (a) and (b) of section 213 of the Reclamation Reform Act of 1982 (96 Stat. 1269) once the amount required to be paid by the contractor under the repayment contract entered into pursuant to subsection (a)(2)(A) have been paid.
(d)
Effect on existing law not altered— Implementation of the provisions of this title shall not alter—
(1)
the repayment obligation of any water service or repayment contractor receiving water from the same water project, or shift any costs that would otherwise have been properly assignable to the water users’ association identified in subsections (a)(1), (a)(2), and (a)(3) absent this section, including operation and maintenance costs, construction costs, or other capitalized costs incurred after the date of the enactment of this Act, or to other contractors; and
(2)
specific requirements for the disposition of amounts received as repayments by the Secretary under the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act (43 U.S.C. 371 et seq.).
(e)
Surface water storage enhancement program—
(1)
changed In general— Except as provided in subsection (d)(2), three years following the date of enactment of this Act, no less than __ 50 percent of receipts generated from prepayment of contracts under this section beyond amounts necessary to cover the amount of receipts forgone from scheduled payments under current law for the 10-year period following the date of enactment of this Act shall be directed to the Reclamation Surface Water Storage Account under paragraph (2).
(2)
Surface storage account— The Secretary shall allocate amounts collected under paragraph (1) into the “Reclamation Surface Storage Account” to fund the construction of surface water storage. The Secretary may also enter into cooperative agreements with water users’ associations for the construction of surface water storage and amounts within the Surface Storage Account may be used to fund such construction. Surface water storage projects that are otherwise not federally authorized shall not be considered Federal facilities as a result of any amounts allocated from the Surface Storage Account for part or all of such facilities.
(3)
changed Repayment— Amounts used for surface water storage construction from the Account shall be fully reimbursed to the Account consistent with the requirements under Federal reclamation law (the law (the Act of June 17, 1902 (32 Stat. 388, chapter 1093))), and Acts supplemental to and amendatory of that Act (43 U.S.C. 371 et seq.) except that all funds reimbursed shall be deposited in the Account established under paragraph (1).(2).
(4)
Availability of amounts— Amounts deposited in the Account under this subsection shall—
(A)
be made available in accordance with this section, subject to appropriation; and
(B)
be in addition to amounts appropriated for such purposes under any other provision of law.
(5)
Purposes of surface water storage— Construction of surface water storage under this section shall be made for the following purposes:
(A)
Increased municipal and industrial water supply.
(B)
Agricultural floodwater, erosion, and sedimentation reduction.
(C)
Agricultural drainage improvements.
(D)
Agricultural irrigation.
(E)
Increased recreation opportunities.
(F)
Reduced adverse impacts to fish and wildlife from water storage or diversion projects within watersheds associated with water storage projects funded under this section.
(G)
Any other purposes consistent with reclamation laws or other Federal law.
(f)
Definitions— For the purposes of this title, the following definitions apply:
(1)
Account— The term Account means the Reclamation Surface Water Storage Account established under subsection (e)(2).
(2)
Construction— The term construction means the designing, materials engineering and testing, surveying, and building of surface water storage including additions to existing surface water storage and construction of new surface water storage facilities, exclusive of any Federal statutory or regulatory obligations relating to any permit, review, approval, or other such requirement.
(3)
Surface water storage— The term surface water storage means any federally owned facility under the jurisdiction of the Bureau of Reclamation or any non-Federal facility used for the surface storage and supply of water resources.
(4)
Treasury rate— The term Treasury rate means the 20-year Constant Maturity Treasury (CMT) rate published by the United States Department of the Treasury existing on the effective date of the contract.
(5)
Water users’ association— The term water users’ association means—
(A)
an entity organized and recognized under State laws that is eligible to enter into contracts with reclamation to receive contract water for delivery to and users of the water and to pay applicable charges; and
(B)
includes a variety of entities with different names and differing functions, such as associations, conservatory district, irrigation district, municipality, and water project contract unit.

Sec. 1001 Authorization of additional project benefits

The Reclamation Safety of Dams Act of 1978 is amended—

(1)
in section 3, by striking “Construction” and inserting “Except as provided in section 5B, construction”; and
(2)
by inserting after section 5A (43 U.S.C. 509) the following:

“5B. Authorization of additional project benefits

“Notwithstanding section 3, if the Secretary determines that additional project benefits, including but not limited to additional conservation storage capacity, are feasible and not inconsistent with the purposes of this Act, the Secretary is authorized to develop additional project benefits through the construction of new or supplementary works on a project in conjunction with the Secretary’s activities under section 2 of this Act and subject to the conditions described in the feasibility study, provided—

“(1) the Secretary determines that developing additional project benefits through the construction of new or supplementary works on a project will promote more efficient management of water and water-related facilities;

“(2) the feasibility study pertaining to additional project benefits has been authorized pursuant to section 8 of the Federal Water Project Recreation Act of 1965 (16 U.S.C. 4601–18); and

changed “(3) the costs associated with developing the additional project benefits are agreed to in writing between the Secretary and project proponents and shall be allocated to the authorized purposes of the structure and repaid consistent with all provisions of Federal Reclamation law (the Act of June 17, 1902, 43 U.S.C. 371 et seq.) and Acts supplemental to and amendatory of that Act.”

Sec. 1104 Recognition of State authority

(a)
changed In general— In carrying out section 3, 1103, the Secretary of the Interior and the Secretary of Agriculture shall—
(1)
recognize the longstanding authority of the States relating to evaluating, protecting, allocating, regulating, and adjudicating groundwater by any means, including a rulemaking, permitting, directive, water court adjudication, resource management planning, regional authority, or other policy; and
(2)
coordinate with the States in the adoption and implementation by the Secretary of the Interior or the Secretary of Agriculture of any rulemaking, policy, directive, management plan, or other similar Federal action so as to ensure that such actions are consistent with, and impose no greater restrictions or regulatory requirements than, State groundwater laws and programs.
(b)
changed Effect on state water rights— In carrying out this Act, title, the Secretary of the Interior and the Secretary of Agriculture shall not take any action that adversely affects—
(1)
any water rights granted by a State;
(2)
the authority of a State in adjudicating water rights;
(3)
definitions established by a State with respect to the term beneficial use, priority of water rights, or terms of use;
(4)
terms and conditions of groundwater withdrawal, guidance and reporting procedures, and conservation and source protection measures established by a State;
(5)
the use of groundwater in accordance with State law; or
(6)
any other rights and obligations of a State established under State law.