(a)
In general— The Secretary of the Army, acting through the Chief of Engineers, the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service and the Director of the United States Geological Survey, the Administrator of the Environmental Protection Agency, and each other applicable Federal agency shall take actions to prevent the transfer of aquatic invasive species, with a focus on Asian carp species, through the Brandon Road Lock and Dam.
(b)
Construction—
(1)
Required measures— The Chief of Engineers shall construct measures to improve the Brandon Road Lock and Dam to prevent the upstream transfer of swimming aquatic invasive species through the lock and dam, including—
(A)
an engineered channel in the approach from the Mississippi River direction, as outlined in the report issued pursuant to section 1538 of
Public Law 112–141;
(B)
adding additional structures necessary for aquatic invasive species control; and
(C)
the construction and operation of electric dispersal barriers.
(2)
Cost estimate and schedule— Not later than 6 months after the date of enactment of this Act, the Chief of Engineers shall submit to Congress a cost estimate for, and schedule for completion of, measures to be constructed under this subsection.
(c)
Other measures— The Director of the United States Fish and Wildlife Service, in consultation with the Director of the United States Geological Survey, the Chief of Engineers, the Commandant of the United States Coast Guard, the Administrator of the Environmental Protection Agency, and the heads of other relevant agencies, shall implement all appropriate measures in compliance with applicable State and Federal law around the Brandon Road Lock and Dam on the Illinois River to prevent the upstream and downstream transfer of swimming and floating aquatic invasive species, with a focus on Asian carp species, including—
(1)
implementing existing Asian carp monitoring and control strategies at the Brandon Road location, as applicable;
(2)
using the Brandon Road location to the greatest extent possible to test new aquatic invasive species control technologies;
(3)
implementing all control strategies identified through this testing necessary to fulfill the objectives of this section; and
(4)
developing best management practices to mitigate aquatic invasive species transfer by boat and barge operators on the Illinois River and Chicago Sanitary and Shipping Canal and working with operators to implement them.
(d)
Administration—
(1)
Acquisition of real estate— The Chief of Engineers, the Director of the United States Fish and Wildlife Service, and the Director of the United States Geological Survey may acquire any real estate necessary to carry out this section.
(2)
Cooperation— In carrying out this section, the Chief of Engineers, the Director of the United States Fish and Wildlife Service, and the Director of the United States Geological Survey shall coordinate with each other and—
(A)
the Governors of Illinois, Indiana, Michigan, Minnesota, New York, Ohio, Pennsylvania, and Wisconsin;
(B)
the Metropolitan Water Reclamation District of Greater Chicago;
(C)
the Asian Carp Regional Coordinating Committee;
(D)
the Great Lakes Commission;
(E)
the Great Lakes Fishery Commission;
(F)
the Great Lakes and St. Lawrence Cities Initiative; and
(G)
any other applicable State, local, or international government entity.