Satisfying Energy Needs and Saving the Environment Act of 2013

H.R. 3138 · 113th Congress · Sep 19, 2013 · Lineage

A BILL

To provide that certain emission limits for hydrogen chloride and sulfur dioxide shall not apply to certain existing electric utility steam generating units that use circulating fluidized bed technology to convert coal refuse into energy.

1. Short title

This Act may be cited as the “Satisfying Energy Needs and Saving the Environment Act of 2013” or the “SENSE Act of 2013”.

2. Inapplicability of certain emission limits for electric utility steam generating units that convert coal refuse into energy

(a)
Inapplicability of certain emission limits for certain EGUs— The emission limits for hydrogen chloride and sulfur dioxide in table 2 to subpart UUUUU of part 63 of title 40, Code of Federal Regulations, entitled “Emission Limits for Existing EGUs”, shall not apply to an electric utility steam generating unit in the subcategory “Coal-fired unit not low rank virgin coal” if such electric utility steam generating unit—
(1)
is in operation as of the date of enactment of this Act;
(2)
utilizes circulating fluidized bed technology to convert coal refuse into energy; and
(3)
(A)
derives at least 75 percent of its heat input from coal refuse; or
(B)
is a qualifying facility.
(b)
Definitions— In this section:
(1)
Coal refuse— The term coal refuse means any byproduct of coal mining, physical coal cleaning, or coal preparation operations, that contains coal, matrix material, clay, and other organic and inorganic material.
(2)
Qualifying cogeneration facility— The term qualifying cogeneration facility has the meaning given such term in section 3 of the Federal Power Act (16 U.S.C. 796).
(3)
Qualifying facility— The term qualifying facility means—
(A)
a qualifying small power production facility; or
(B)
a qualifying cogeneration facility.
(4)
Qualifying small power production facility— The term qualifying small power production facility has the meaning given such term in section 3 of the Federal Power Act (16 U.S.C. 796).