(a)
In general— The non-Federal interest for a project for flood damage reduction or hurricane and storm damage reduction may submit to the Secretary a request for a review under this section for the project if—
(1)
the Secretary determines that the project is not feasible;
(2)
the Chief of Engineers issues an unfavorable report for the project; or
(3)
the Secretary identifies the feasibility study for the project as inactive.
(b)
Review panels—
(1)
Establishment— The Secretary shall establish, for each division of the Corps of Engineers, a review panel to conduct reviews and make determinations under this section.
(2)
Membership—
(A)
In general— The Secretary shall appoint to each review panel 5 members—
(i)
each of whom shall have relevant experience in flood damage reduction or hurricane and storm damage reduction in the geographic area represented by the division for which the review panel is established; and
(ii)
at least one of whom shall have education or experience in the field of economics.
(B)
Limitation— Not more than 2 members of each review panel may be employees (including uniformed members) or contractors of the Corps of Engineers.
(C)
Term— Each member shall be appointed to a review panel for a term of 4 years.
(3)
Deadline— The Secretary shall establish a review panel for a division not later than 60 days after the first request for a review under this section is submitted for a project within the division.
(4)
Duties— A review panel established under this section shall, with respect to each request for a review submitted to the Secretary for a project within the division for which the review panel is established—
(A)
conduct a review of—
(i)
the feasibility study for the project;
(ii)
the adequacy and acceptability of the economic, engineering, and environmental methods, models, and analyses used by the Secretary in the preparation of the feasibility study for the project;
(iii)
the public written and oral comments provided to the Secretary for the project; and
(iv)
any additional information submitted by the non-Federal interest as part of the request for a review; and
(B)
submit to the Secretary a final report containing—
(i)
an economic, engineering, and environmental analysis of the feasibility study for the project, including an assessment of the adequacy and acceptability of the economic, engineering, and environmental methods, models, and analyses used by the Secretary in the preparation of the feasibility study; and
(ii)
a determination of the feasibility of the project, taking into account calculations of costs and benefits described in section 2(a).
(c)
Effect of review panel determination— If a review panel determines that a project for which a request for a review has been submitted is feasible, the Chief of Engineers shall issue a favorable report for the project.
(d)
Procedures— Not later than 60 days after the date of enactment of this Act, the Secretary shall establish procedures for reviews under this section.