US Codex
U.S.C.
Notes

§20157. Implementation of positive train control systems — Inbound Citations

49 U.S.C. § 20157

Cited by 5 provisions in release 119-102.

Citations to 49 U.S.C. § 20157 as a whole

Citations to §20157(i)

  • (2) A railroad carrier’s technology implementation plan shall include an analysis of the safety impact, feasibility, and cost and benefits of implementing technologies, including processor-based technologies, positive train control systems (as defined in section 20157(i)), electronically controlled pneumatic brakes, rail integrity inspection systems, rail integrity warning systems, switch position monitors and indicators, trespasser prevention technology, highway-rail grade crossing technology, and other new or novel railroad safety technology, as appropriate, that may mitigate risks to railroad safety identified in the risk analysis required by subsection (c).
  • (1) enhance public safety, including projects for the installation of a positive train control system (as defined in section 20157(i));