US Codex
U.S.C.
Notes

§620. Upper Colorado River Basin; purpose of development of water resources; initial units; construction of Wayne N. Aspinall unit contingent upon certification; participating projects; Rainbow Bridge National Monument — Inbound Citations

43 U.S.C. § 620

Cited by 10 provisions in release 119-102.

Citations to 43 U.S.C. § 620 as a whole

  • The Secretary shall administer, protect, and develop the recreation area in accordance with the provisions of the Act of August 25, 1916 (39 Stat. 535; 16 U.S.C. 1 et seq.),1 as amended and supplemented, and with any other statutory authority available to him for the conservation and management of natural resources to the extent he finds such authority will further the purposes of this subchapter: Provided, however, That nothing in this subchapter shall affect or interfere with the authority of the Secretary granted by Public Law 485, Eighty-fourth Congress, second session [43 U.S.C. 620 et seq.], to operate Glen Canyon Dam and Reservoir in accordance with the purposes of the Colorado River Storage Project Act [43 U.S.C. 620 et seq.] for river regulation, irrigation, flood control, and generation of hydroelectric power.
  • It is not the intention of Congress, in authorizing only those projects designated in section 620 of this title, and in authorizing priority in planning only those additional projects designated in section 620a of this title, to limit, restrict, or otherwise interfere with such comprehensive development as will provide for the consumptive use by States of the Upper Colorado River Basin of waters, the use of which is apportioned to the Upper Colorado River Basin by the Colorado River Compact and to each State thereof by the Upper Colorado River Basin Compact, nor to preclude consideration and authorization by the Congress of additional projects under the allocations in the compacts as additional needs are indicated. It is the intention of Congress that no dam or reservoir constructed under the authorization of this chapter shall be within any national park or monument.
  • Except as otherwise provided in this chapter, in constructing, operating, and maintaining the units of the Colorado River storage project and the participating projects listed in section 620 of this title, the Secretary shall be governed by the Federal reclamation laws (Act of June 17, 1902, 32 Stat. 388, and Acts amendatory thereof or supplementary thereto): Provided, That (a) irrigation repayment contracts shall be entered into which, except as otherwise provided for the Paonia and Eden projects, provide for repayment of the obligation assumed thereunder with respect to any project contract unit over a period of not more than fifty years exclusive of any development period authorized by law; (b) prior to construction of irrigation distribution facilities, repayment contracts shall be made with an “organization” as defined in section 485a(g) of this title which has the capacity to levy assessments upon all taxable real property located within its boundaries to assist in making repayments, except where a substantial proportion of the lands to be served are owned by the United States; (c) contracts relating to municipal water supply may be made without regard to the limitations of the last sentence of section 485h(c) of this title; and (d), as to Indian lands within, under or served by any participating project, payment of construction costs within the capability of the land to repay shall be subject to section 386a of title 25: Provided further, That for a period of ten years from April 11, 1956, no water from any participating project authorized by this chapter shall be delivered to any water user for the production on newly irrigated lands of any basic agricultural commodity, as defined in the Agricultural Act of 1949 [7 U.S.C. 1421 et seq.], or any amendment thereof, if the total supply of such commodity for the marketing year in which the bulk of the crop would normally be marketed is in excess of the normal supply as defined in section 1301(b)(10) of title 7 unless the Secretary of Agriculture calls for an increase in production of such commodity in the interest of national security. All units and participating projects shall be subject to the apportionments of the use of water between the Upper and Lower Basins of the Colorado River and among the States of the Upper Basin fixed in the Colorado River Compact and the Upper Colorado River Basin Compact, respectively, and to the terms of the treaty with the United Mexican States (Treaty Series 994).
  • In the diversion and storage of water for any project or any parts thereof constructed under the authority of the Colorado River Basin Project Act [43 U.S.C. 1501 et seq.] or the Colorado River Storage Project Act [43 U.S.C. 620 et seq.] within and for the benefit of the State of Colorado only, the Secretary is directed to comply with the constitution and statutes of the State of Colorado relating to priority of appropriation; with State and Federal court decrees entered pursuant thereto; and with operating principles, if any, adopted by the Secretary and approved by the State of Colorado.
  • (a) Nothing in this chapter shall be construed to alter, amend, repeal, modify, or be in conflict with the provisions of the Colorado River Compact (45 Stat. 1057), the Upper Colorado River Basin Compact (63 Stat. 31), the Water Treaty of 1944 with the United Mexican States (Treaty Series 994; 59 Stat. 1219), the decree entered by the Supreme Court of the United States in Arizona against California and others (376 U.S. 340), or, except as otherwise provided herein, the Boulder Canyon Project Act (45 Stat. 1057) [43 U.S.C. 617 et seq.], the Boulder Canyon Project Adjustment Act (54 Stat. 774), [43 U.S.C. 618 et seq.], or the Colorado River Storage Project Act (70 Stat. 105) [43 U.S.C. 620 et seq.].
  • (a) In order to comply with and carry out the provisions of the Colorado River Compact, the Upper Colorado River Basin Compact, and the Mexican Water Treaty, the Secretary shall propose criteria for the coordinated long-range operation of the reservoirs constructed and operated under the authority of the Colorado River Storage Project Act [43 U.S.C. 620 et seq.], the Boulder Canyon Project Act [43 U.S.C. 617 et seq.], and the Boulder Canyon Project Adjustment Act [43 U.S.C. 618 et seq.]. To effect in part the purposes expressed in this paragraph, the criteria shall make provision for the storage of water in storage units of the Colorado River storage project and releases of water form Lake Powell in the following listed order of priority:
    (1) releases to supply one-half the deficiency described in article III(c) of the Colorado River Compact, if any such deficiency exists and is chargeable to the States of the Upper Division, but in any event such releases, if any, shall not be required in any year that the Secretary makes the determination and issues the proclamation specified in section 1512 of this title;
    (2) releases to comply with article III(d) of the Colorado River Compact, less such quantities of water delivered into the Colorado River below Lee Ferry to the credit of the States of the Upper Division from other sources; and
    (3) storage of water not required for the releases specified in clauses (1) and (2) of this subsection to the extent that the Secretary, after consultation with the Upper Colorado River Commission and representatives of the three Lower Division States and taking into consideration all relevant factors (including, but not limited to, historic stream-flows, the most critical period of record, and probabilities of water supply), shall find this to be reasonably necessary to assure deliveries under clauses (1) and (2) without impairment of annual consumptive uses in the upper basin pursuant to the Colorado River Compact: Provided, That water not so required to be stored shall be released from Lake Powell: (i) to the extent it can be reasonably applied in the States of the Lower Division to the uses specified in article III(e) of the Colorado River Compact, but no such releases shall be made when the active storage in Lake Powell is less than the active storage in Lake Mead, (ii) to maintain, as nearly as practicable, active storage in Lake Mead equal to the active storage in Lake Powell, and (iii) to avoid anticipated spills from Lake Powell.
  • (5) Portions of the McElmo Creek unit, Colorado, as components of the Dolores participating project, Colorado River Storage project, authorized by Public Law 90–537 [43 U.S.C. 1501 et seq.] and Public Law 84–485 [43 U.S.C. 620 et seq.], consisting of all measures and all necessary appurtenant and associated works to reduce seepage only from the Towaoc-Highline combined canal, Rocky Ford laterals, Lone Pine lateral, and Upper Hermana lateral, and consisting of measures to replace incidental fish and wildlife values foregone. The Dolores participating project shall have salinity control as a project purpose insofar as these specific facilities are concerned: Provided, That the costs of construction and replacement of these specific facilities shall be allocated by the Secretary to salinity control and irrigation only after consultation with the State of Colorado, the Montezuma Valley Irrigation District, Colorado, and the Dolores Water Conservancy District, Colorado: And provided further, That such allocation of costs to salinity control will include only the separable and specific costs of these specific facilities and will not include any joint costs of any other facilities of the Dolores participating project. Repayment of costs allocated to salinity control shall be subject to this chapter. Repayment of costs allocated to irrigation shall be subject to the Acts which authorized the Dolores participating project, the Reclamation Act of 1902, and Acts amendatory and supplementary thereto. Prior to initiation of construction of these specific facilities, or a portion thereof, the Secretary shall enter into contracts through which the non-Federal entities owning, operating, and maintaining the water distribution systems, or portions thereof, in the Montezuma Valley, singly or in concert, will assume the obligations specified in subsection (b)(2) relating to the continued operation and maintenance of the unit’s facilities.
  • (e) The Secretary is authorized to make upward adjustments in rates charged for electrical energy under all contracts administered by the Secretary under the Colorado River Storage Project Act (70 Stat. 105; 43 U.S.C. 620) as soon as practicable and to the extent necessary to cover the costs allocated to the Upper Colorado River Basin Fund under subsection (a)(2) and in conformity with subsection (a)(3), subsection (a)(4) and subsection (a)(5): Provided, That revenues derived from said rate adjustments shall be available solely for the construction, operation, maintenance, and replacement of salinity control units, for the construction, operation, and maintenance of measures to replace incidental fish and wildlife values foregone, and for the implementation of on-farm measures in the Colorado River Basin herein authorized.
  • Except as provided in sections 620d(d)(5), 1543(g)(2), and 1595(b) of this title, with respect to the Colorado River Basin Project Act [43 U.S.C. 1501 et seq.] and the Colorado River Storage Project Act [43 U.S.C. 620 et seq.], respectively, nothing in this subchapter shall be construed to alter, amend, repeal, modify, interpret, or be in conflict with the provisions of the Colorado River Compact (45 Stat. 1057), the Upper Colorado River Basin Compact (63 Stat. 31), the Water Treaty of 1944 with the United Mexican States (Treaty Series 994; 59 Stat. 1219), the decree entered by the Supreme Court of the United States in Arizona against California and others (376 U.S. 340), the Boulder Canyon Project Act (45 Stat. 1057) [43 U.S.C. 617 et seq.], Boulder Canyon Project Adjustment Act (54 Stat. 774; 43 U.S.C. 618a) [43 U.S.C. 618 et seq.], section 15 of the Colorado River Storage Project Act (70 Stat. 111; 43 U.S.C. 620n), the Colorado River Basin Project Act (82 Stat. 885), section 6 of the Fryingpan-Arkansas Project Act (76 Stat. 393) [43 U.S.C. 616e)], section 15 of the Navajo Indian irrigation project and initial stage of the San Juan-Chama Project Act (76 Stat. 102) [43 U.S.C. 615ww)], the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], and the Federal Water Pollution Control Act, as amended [33 U.S.C. 1251 et seq.].
  • Nothing contained in this chapter shall be construed to alter, amend, repeal, modify, interpret, or be in conflict with the provisions of the Colorado River Compact (45 Stat. 1057), the Upper Colorado River Basin Compact (63 Stat. 31), the Water Treaty of 1944 with the United Mexican States (Treaty Series 944, 59 Stat. 1219), the Flood Control Act of 1944 (58 Stat. 887), the decree entered by the Supreme Court of the United States in Arizona v. California, and others (376 U.S. 340), the Boulder Canyon Project Act (45 Stat. 1057) [43 U.S.C. 617 et seq.], the Boulder Canyon Project Adjustment Act (54 Stat. 774; 43 U.S.C. 618a) [43 U.S.C. 618 et seq.], the Colorado River Storage Project Act (70 Stat. 105; 43 U.S.C. 620) [43 U.S.C. 620 et seq.], the Colorado River Basin Project Act (82 Stat. 885; 43 U.S.C. 1501) [43 U.S.C. 1501 et seq.]. Furthermore, nothing contained in this chapter shall be construed as indicating an intent on the part of the Congress to change the existing relationship of other Federal laws to the law of a State, or a political subdivision of a State, or to relieve any person of any obligation imposed by any law of any State, tribe, or political subdivision of a State. No provision of this chapter shall be construed to invalidate any provision of State, tribal, or local law unless there is a direct conflict between such provision and the law of the State, or political subdivision of the State or tribe, so that the two cannot be reconciled or consistently stand together. Inconsistencies shall be reviewed by the task force, and the task force shall make recommendations concerning such local laws. This chapter shall in no way be interpreted to interfere with a State’s or tribe’s right to protect, rehabilitate, preserve, and restore lands within its established boundary.