(1) Every such proposal shall include a showing that the organization already holds or can acquire all lands and interests in land (except public and other lands and interests in land owned by the United States which are within the administrative jurisdiction of the Secretary and subject to disposition by him) and rights, pursuant to applicable State law, to the use of water necessary for the successful construction, operation, and maintenance of the project and that it is ready, able, and willing to finance otherwise than by loan and grant of Federal funds such portion of the cost of the project (which portion shall include all costs of acquiring lands, interests in land, and rights to the use of water), except as provided in section 422e(b)(2) of this title as the Secretary shall have advised is proper in the circumstances.
-
(c) At such time as a project is found by the Secretary and the Governor of the State in which it is located (or an appropriate State agency designated by him) to be financially feasible, is determined by the Secretary to constitute a reasonable risk under the provisions of this subchapter, and is approved by the Secretary, such findings and approval shall be transmitted to the Congress. Each project proposal transmitted by the Secretary to the Congress shall include a certification by the Secretary that an adequate soil survey and land classification has been made, or that the successful irrigability of those lands and their susceptibility to sustained production of agricultural crops by means of irrigation has been demonstrated in practice. Such proposal shall also include an investigation of soil characteristics which might result in toxic or hazardous irrigation return flows. The Secretary, at the time of submitting the project proposal to Congress or at the time of his determination that the requested project constitutes a reasonable risk under the provisions of this subchapter, may reserve from use or disposition inimical to the project any lands and interests in land owned by the United States which are within his administrative jurisdiction and subject to disposition by him and which are required for use by the project. Any such reservation shall expire at the end of two years unless the contract provided for in section 422e of this title shall have been executed.
-
Any proposal with respect to the construction of a project which has theretofore been authorized for construction under the Federal reclamation laws shall be made in like manner as a proposal under section 422d of this title, but the Secretary may waive such requirements of subsections (a) and (b) of section 422d of this title as he finds to be duplicative of, or rendered unnecessary or impossible by, action already taken by the United States. Upon approval of any such proposal by the Secretary he may negotiate and execute a contract which conforms, as nearly as may be, to the provisions of section 422e of this title.
-
Upon request of an organization which has made or intends to make a proposal under this subchapter, the head of any Federal department or agency may make available to the organization any existing engineering, economic, or hydrologic information and printed material that it may have and that will be useful in connection with the planning, design, construction, or operation and maintenance of the project concerned. The reasonable cost of any plans, specifications, and other unpublished material furnished by the Secretary pursuant to this section and the cost of making and administering any loan under this subchapter shall, to the extent that they would not be nonreimbursable in the case of a project constructed under the Federal reclamation laws, be treated as a loan and covered in the provisions of the contract entered into under section 422e of this title unless they are otherwise paid for by the organization.
Citations to §422e(a)
-
(d) At the time of his submitting the project proposal to the Congress, or at any subsequent time prior to completion of construction of the project, including projects heretofore approved, the Secretary may increase the amount of the requested loan and/or grant to an amount within the maximum allowed by section 422e(a) of this title, as amended by Pub. L. 94–181, to compensate for increases in construction costs due to price escalation.
Citations to §422e(b)
-
(2) The Secretary shall require each organization to contribute toward the cost of the project (other than by loan and/or grant of Federal funds) an amount equal to 25 percent or more of the allowable estimated cost of the project: Provided, That the Secretary, at his discretion, may reduce the amount of such contribution to the extent that he determines that the organization is unable to secure financing from other sources under reasonable terms and conditions, and shall include letters from lenders or other written evidence in support of any funding of an applicant’s inability to secure such financing in any project proposal transmitted to the Congress: Provided further, That under no circumstances shall the Secretary reduce the amount of such contribution to less than 10 percent of the allowable estimated total project costs. In determining the amount of the contribution as required by this paragraph, the Secretary shall credit toward that amount the cost of investigations, surveys, engineering, and other services necessary to the preparation of proposals and plans for the project as required by the Secretary, and the costs of lands and rights-of-way required for the project, and the $5,000 fee described in section 422c of this title. In determining the allowable estimated cost of the project, the Secretary shall not include the amount of grants accorded to the organization under section 422e(b) of this title.