  • (b) The Administrator shall, as appropriate, in the case of any person that is the owner or operator of an affected source, a major emitting facility, or a major stationary source, and may, in the case of any other person, commence a civil action for a permanent or temporary injunction, or to assess and recover a civil penalty of not more than $25,000 per day for each violation, or both, in any of the following instances:
    (1) Whenever such person has violated, or is in violation of, any requirement or prohibition of an applicable implementation plan or permit. Such an action shall be commenced (A) during any period of federally assumed enforcement, or (B) more than 30 days following the date of the Administrator’s notification under subsection (a)(1) that such person has violated, or is in violation of, such requirement or prohibition.
    (2) Whenever such person has violated, or is in violation of, any other requirement or prohibition of this subchapter, section 7603 of this title, subchapter IV–A, subchapter V, or subchapter VI, including, but not limited to, a requirement or prohibition of any rule, order, waiver or permit promulgated, issued, or approved under this chapter, or for the payment of any fee owed the United States under this chapter (other than subchapter II).
    (3) Whenever such person attempts to construct or modify a major stationary source in any area with respect to which a finding under subsection (a)(5) has been made.
    Any action under this subsection may be brought in the district court of the United States for the district in which the violation is alleged to have occurred, or is occurring, or in which the defendant resides, or where the defendant’s principal place of business is located, and such court shall have jurisdiction to restrain such violation, to require compliance, to assess such civil penalty, to collect any fees owed the United States under this chapter (other than subchapter II) and any noncompliance assessment and nonpayment penalty owed under section 7420 of this title, and to award any other appropriate relief. Notice of the commencement of such action shall be given to the appropriate State air pollution control agency. In the case of any action brought by the Administrator under this subsection, the court may award costs of litigation (including reasonable attorney and expert witness fees) to the party or parties against whom such action was brought if the court finds that such action was unreasonable.
  • (C) The Administrator shall promulgate regulations not later than six months after August 7, 1977, to assure, insofar as practicable, that prior to any public hearing on redesignation of any area, there shall be available for public inspection any specific plans for any new or modified major emitting facility which may be permitted to be constructed and operated only if the area in question is designated or redesignated as class III.
  • (e) If any State affected by the redesignation of an area by an Indian tribe or any Indian tribe affected by the redesignation of an area by a State disagrees with such redesignation of any area, or if a permit is proposed to be issued for any new major emitting facility proposed for construction in any State which the Governor of an affected State or governing body of an affected Indian tribe determines will cause or contribute to a cumulative change in air quality in excess of that allowed in this part within the affected State or tribal reservation, the Governor or Indian ruling body may request the Administrator to enter into negotiations with the parties involved to resolve such dispute. If requested by any State or Indian tribe involved, the Administrator shall make a recommendation to resolve the dispute and protect the air quality related values of the lands involved. If the parties involved do not reach agreement, the Administrator shall resolve the dispute and his determination, or the results of agreements reached through other means, shall become part of the applicable plan and shall be enforceable as part of such plan. In resolving such disputes relating to area redesignation, the Administrator shall consider the extent to which the lands involved are of sufficient size to allow effective air quality management or have air quality related values of such an area.
  • (a) No major emitting facility on which construction is commenced after August 7, 1977, may be constructed in any area to which this part applies unless—
    (1) a permit has been issued for such proposed facility in accordance with this part setting forth emission limitations for such facility which conform to the requirements of this part;
    (2) the proposed permit has been subject to a review in accordance with this section, the required analysis has been conducted in accordance with regulations promulgated by the Administrator, and a public hearing has been held with opportunity for interested persons including representatives of the Administrator to appear and submit written or oral presentations on the air quality impact of such source, alternatives thereto, control technology requirements, and other appropriate considerations;
    (3) the owner or operator of such facility demonstrates, as required pursuant to section 7410(j) of this title, that emissions from construction or operation of such facility will not cause, or contribute to, air pollution in excess of any (A) maximum allowable increase or maximum allowable concentration for any pollutant in any area to which this part applies more than one time per year, (B) national ambient air quality standard in any air quality control region, or (C) any other applicable emission standard or standard of performance under this chapter;
    (4) the proposed facility is subject to the best available control technology for each pollutant subject to regulation under this chapter emitted from, or which results from, such facility;
    (5) the provisions of subsection (d) with respect to protection of class I areas have been complied with for such facility;
    (6) there has been an analysis of any air quality impacts projected for the area as a result of growth associated with such facility;
    (7) the person who owns or operates, or proposes to own or operate, a major emitting facility for which a permit is required under this part agrees to conduct such monitoring as may be necessary to determine the effect which emissions from any such facility may have, or is having, on air quality in any area which may be affected by emissions from such source; and
    (8) in the case of a source which proposes to construct in a class III area, emissions from which would cause or contribute to exceeding the maximum allowable increments applicable in a class II area and where no standard under section 7411 of this title has been promulgated subsequent to August 7, 1977, for such source category, the Administrator has approved the determination of best available technology as set forth in the permit.
  • (7) the person who owns or operates, or proposes to own or operate, a major emitting facility for which a permit is required under this part agrees to conduct such monitoring as may be necessary to determine the effect which emissions from any such facility may have, or is having, on air quality in any area which may be affected by emissions from such source; and
  • (b) The demonstration pertaining to maximum allowable increases required under subsection (a)(3) shall not apply to maximum allowable increases for class II areas in the case of an expansion or modification of a major emitting facility which is in existence on August 7, 1977, whose allowable emissions of air pollutants, after compliance with subsection (a)(4), will be less than fifty tons per year and for which the owner or operator of such facility demonstrates that emissions of particulate matter and sulfur oxides will not cause or contribute to ambient air quality levels in excess of the national secondary ambient air quality standard for either of such pollutants.
  • (c) Any completed permit application under section 7410 of this title for a major emitting facility in any area to which this part applies shall be granted or denied not later than one year after the date of filing of such completed application.
  • (1) Each State shall transmit to the Administrator a copy of each permit application relating to a major emitting facility received by such State and provide notice to the Administrator of every action related to the consideration of such permit.
  • (B) The Federal Land Manager and the Federal official charged with direct responsibility for management of such lands shall have an affirmative responsibility to protect the air quality related values (including visibility) of any such lands within a class I area and to consider, in consultation with the Administrator, whether a proposed major emitting facility will have an adverse impact on such values.
  • (i) In any case where the Federal official charged with direct responsibility for management of any lands within a class I area or the Federal Land Manager of such lands, or the Administrator, or the Governor of an adjacent State containing such a class I area files a notice alleging that emissions from a proposed major emitting facility may cause or contribute to a change in the air quality in such area and identifying the potential adverse impact of such change, a permit shall not be issued unless the owner or operator of such facility demonstrates that emissions of particulate matter and sulfur dioxide will not cause or contribute to concentrations which exceed the maximum allowable increases for a class I area.
  • (i) In any case where the owner or operator of a proposed major emitting facility who has been denied a certification under subparagraph (C)(iii) demonstrates to the satisfaction of the Governor, after notice and public hearing, and the Governor finds, that the facility cannot be constructed by reason of any maximum allowable increase for sulfur dioxide for periods of twenty-four hours or less applicable to any class I area and, in the case of Federal mandatory class I areas, that a variance under this clause will not adversely affect the air quality related values of the area (including visibility), the Governor, after consideration of the Federal Land Manager’s recommendation (if any) and subject to his concurrence, may grant a variance from such maximum allowable increase. If such variance is granted, a permit may be issued to such source pursuant to the requirements of this subparagraph.
  • (1) The review provided for in subsection (a) shall be preceded by an analysis in accordance with regulations of the Administrator, promulgated under this subsection, which may be conducted by the State (or any general purpose unit of local government) or by the major emitting facility applying for such permit, of the ambient air quality at the proposed site and in areas which may be affected by emissions from such facility for each pollutant subject to regulation under this chapter which will be emitted from such facility.
  • (B) shall require an analysis of the ambient air quality, climate and meteorology, terrain, soils and vegetation, and visibility at the site of the proposed major emitting facility and in the area potentially affected by the emissions from such facility for each pollutant regulated under this chapter which will be emitted from, or which results from the construction or operation of, such facility, the size and nature of the proposed facility, the degree of continuous emission reduction which could be achieved by such facility, and such other factors as may be relevant in determining the effect of emissions from a proposed facility on any air quality control region,
  • The Administrator shall, and a State may, take such measures, including issuance of an order, or seeking injunctive relief, as necessary to prevent the construction or modification of a major emitting facility which does not conform to the requirements of this part, or which is proposed to be constructed in any area designated pursuant to section 7407(d) of this title as attainment or unclassifiable and which is not subject to an implementation plan which meets the requirements of this part.
  • (A) by the time the source is to commence operation, sufficient offsetting emissions reductions have been obtained, such that total allowable emissions from existing sources in the region, from new or modified sources which are not major emitting facilities, and from the proposed source will be sufficiently less than total emissions from existing sources (as determined in accordance with the regulations under this paragraph) prior to the application for such permit to construct or modify so as to represent (when considered together with the plan provisions required under section 7502 of this title) reasonable further progress (as defined in section 7501 of this title); or
  • (j) Except as otherwise expressly provided, the terms “major stationary source” and “major emitting facility” mean any stationary facility or source of air pollutants which directly emits, or has the potential to emit, one hundred tons per year or more of any air pollutant (including any major emitting facility or source of fugitive emissions of any such pollutant, as determined by rule by the Administrator).
  • (3) against any person who proposes to construct or constructs any new or modified major emitting facility without a permit required under part C of subchapter I (relating to significant deterioration of air quality) or part D of subchapter I (relating to nonattainment) or who is alleged to have violated (if there is evidence that the alleged violation has been repeated) or to be in violation of any condition of such permit.

Citations to §7479(2)

Citations to §7479(2)(A)

Citations to §7479(2)(C)

  • (2) provide for Federal grants to public or nonprofit agencies, institutions, and organizations and to individuals, and contracts with public or private agencies, institutions, or persons, for payment of (A) part of the cost of acquiring, constructing, or otherwise securing for research and development purposes, new or improved devices or methods having industrywide application of preventing or controlling discharges into the air of various types of pollutants; (B) part of the cost of programs to develop low emission alternatives to the present internal combustion engine; (C) the cost to purchase vehicles and vehicle engines, or portions thereof, for research, development, and testing purposes; and (D) carrying out the other provisions of this section, without regard to section 3324(a) and (b) of title 31 and section 6101 of title 41: Provided, That research or demonstration contracts awarded pursuant to this subsection (including contracts for construction) may be made in accordance with, and subject to the limitations provided with respect to research contracts of the military departments in, section 23532 of title 10, except that the determination, approval, and certification required thereby shall be made by the Administrator; Provided further, That no grant may be made under this paragraph in excess of $1,500,000;
  • (4) construct, operate, and maintain, or assist in meeting the cost of the construction, operation, and maintenance of new or improved demonstration plants or processes which have promise of accomplishing the purposes of this chapter;3
  • (ii) restriction of certain roads or lanes to, or construction of such roads or lanes for use by, passenger buses or high occupancy vehicles;
  • (xv) programs for new construction and major reconstructions of paths, tracks or areas solely for the use by pedestrian or other non-motorized means of transportation when economically feasible and in the public interest. For purposes of this clause, the Administrator shall also consult with the Secretary of the Interior; and
  • (C) include a program to provide for the enforcement of the measures described in subparagraph (A), and regulation of the modification and construction of any stationary source within the areas covered by the plan as necessary to assure that national ambient air quality standards are achieved, including a permit program as required in parts C and D;
  • (j) As a condition for issuance of any permit required under this subchapter, the owner or operator of each new or modified stationary source which is required to obtain such a permit must show to the satisfaction of the permitting authority that the technological system of continuous emission reduction which is to be used at such source will enable it to comply with the standards of performance which are to apply to such source and that the construction or modification and operation of such source will be in compliance with all other requirements of this chapter.
  • (3) In the case of an area to which, immediately before November 15, 1990, the prohibition on construction or modification of major stationary sources prescribed in subsection (a)(2)(I) (as in effect immediately before November 15, 1990) applied by virtue of a finding of the Administrator that the State containing such area had not submitted an implementation plan meeting the requirements of section 7502(b)(6) of this title (relating to establishment of a permit program) (as in effect immediately before November 15, 1990) or 7502(a)(1) of this title (to the extent such requirements relate to provision for attainment of the primary national ambient air quality standard for sulfur oxides by December 31, 1982) as in effect immediately before November 15, 1990, no major stationary source of the relevant air pollutant or pollutants shall be constructed or modified in such area until the Administrator finds that the plan for such area meets the applicable requirements of section 7502(c)(5) of this title (relating to permit programs) or subpart 5 of part D (relating to attainment of the primary national ambient air quality standard for sulfur dioxide), respectively.
  • (2) The term “new source” means any stationary source, the construction or modification of which is commenced after the publication of regulations (or, if earlier, proposed regulations) prescribing a standard of performance under this section which will be applicable to such source.
  • (6) The revised standards of performance required by enactment of subsection (a)(1)(A)(i) and (ii)1 shall be promulgated not later than one year after August 7, 1977. Any new or modified fossil fuel fired stationary source which commences construction prior to the date of publication of the proposed revised standards shall not be required to comply with such revised standards.
  • (4) The term “new source” means a stationary source the construction or reconstruction of which is commenced after the Administrator first proposes regulations under this section establishing an emission standard applicable to such source.
  • (ii) as a basis for emission standards under this subsection for new coke oven batteries that begin construction after the date of proposal of such standards, the Jewell design Thompson non-recovery coke oven batteries and other non-recovery coke oven technologies, and other appropriate emission control and coke production technologies, as to their effectiveness in reducing coke oven emissions and their capability for production of steel quality coke.
  • (2) Notwithstanding the requirements of paragraph (1), a new source which commences construction or reconstruction after a standard, limitation or regulation applicable to such source is proposed and before such standard, limitation or regulation is promulgated shall not be required to comply with such promulgated standard until the date 3 years after the date of promulgation if—
    (A) the promulgated standard, limitation or regulation is more stringent than the standard, limitation or regulation proposed; and
    (B) the source complies with the standard, limitation, or regulation as proposed during the 3-year period immediately after promulgation.
  • (7) A source for which construction or reconstruction is commenced after the date an emission standard applicable to such source is proposed pursuant to subsection (d) but before the date an emission standard applicable to such source is proposed pursuant to subsection (f) shall not be required to comply with the emission standard under subsection (f) until the date 10 years after the date construction or reconstruction is commenced.
  • (D) In carrying out the authority of this paragraph, the Administrator shall consult with the Secretary of Labor and the Secretary of Transportation and shall coordinate any requirements under this paragraph with any requirements established for comparable purposes by the Occupational Safety and Health Administration or the Department of Transportation. Nothing in this subsection shall be interpreted, construed or applied to impose requirements affecting, or to grant the Administrator, the Chemical Safety and Hazard Investigation Board, or any other agency any authority to regulate (including requirements for hazard assessment), the accidental release of radionuclides arising from the construction and operation of facilities licensed by the Nuclear Regulatory Commission.
  • (5) Whenever, on the basis of any available information, the Administrator finds that a State is not acting in compliance with any requirement or prohibition of the chapter relating to the construction of new sources or the modification of existing sources, the Administrator may—
    (A) issue an order prohibiting the construction or modification of any major stationary source in any area to which such requirement applies;1
    (B) issue an administrative penalty order in accordance with subsection (d), or
    (C) bring a civil action under subsection (b).
  • (A) issue an order prohibiting the construction or modification of any major stationary source in any area to which such requirement applies;1
  • (2) The amount of the penalty which shall be assessed and collected with respect to any source under this section shall be equal to—
    (A) the amount determined in accordance with regulations promulgated by the Administrator under subsection (a), which is no less than the economic value which a delay in compliance beyond July 1, 1979, may have for the owner of such source, including the quarterly equivalent of the capital costs of compliance and debt service over a normal amortization period, not to exceed ten years, operation and maintenance costs foregone as a result of noncompliance, and any additional economic value which such a delay may have for the owner or operator of such source, minus
    (B) the amount of any expenditure made by the owner or operator of that source during any such quarter for the purpose of bringing that source into, and maintaining compliance with, such requirement, to the extent that such expenditures have not been taken into account in the calculation of the penalty under subparagraph (A).
    To the extent that any expenditure under subparagraph (B) made during any quarter is not subtracted for such quarter from the costs under subparagraph (A), such expenditure may be subtracted for any subsequent quarter from such costs. In no event shall the amount paid be less than the quarterly payment minus the amount attributed to actual cost of construction.
  • (a) The degree of emission limitation required for control of any air pollutant under an applicable implementation plan under this subchapter shall not be affected in any manner by—
    (1) so much of the stack height of any source as exceeds good engineering practice (as determined under regulations promulgated by the Administrator), or
    (2) any other dispersion technique.
    The preceding sentence shall not apply with respect to stack heights in existence before December 31, 1970, or dispersion techniques implemented before such date. In establishing an emission limitation for coal-fired steam electric generating units which are subject to the provisions of section 7418 of this title and which commenced operation before July 1, 1957, the effect of the entire stack height of stacks for which a construction contract was awarded before February 8, 1974, may be taken into account.
  • (1) require each major proposed new (or modified) source—
    (A) subject to part C (relating to significant deterioration of air quality) or
    (B) which may significantly contribute to levels of air pollution in excess of the national ambient air quality standards in any air quality control region outside the State in which such source intends to locate (or make such modification),
    to provide written notice to all nearby States the air pollution levels of which may be affected by such source at least sixty days prior to the date on which commencement of construction is to be permitted by the State providing notice, and
  • (e) Beginning (1) 36 months after the promulgation of a performance standard under subsection (a) and section 7411 of this title applicable to a category of solid waste incineration units, or (2) the effective date of a permit program under subchapter V in the State in which the unit is located, whichever is later, each unit in the category shall operate pursuant to a permit issued under this subsection and subchapter V. Permits required by this subsection may be renewed according to the provisions of subchapter V. Notwithstanding any other provision of this chapter, each permit for a solid waste incineration unit combusting municipal waste issued under this chapter shall be issued for a period of up to 12 years and shall be reviewed every 5 years after date of issuance or reissuance. Each permit shall continue in effect after the date of issuance until the date of termination, unless the Administrator or State determines that the unit is not in compliance with all standards and conditions contained in the permit. Such determination shall be made at regular intervals during the term of the permit, such intervals not to exceed 5 years, and only after public comment and public hearing. No permit for a solid waste incineration unit may be issued under this chapter by an agency, instrumentality or person that is also responsible, in whole or part, for the design and construction or operation of the unit. Notwithstanding any other provision of this subsection, the Administrator or the State shall require the owner or operator of any unit to comply with emissions limitations or implement any other measures, if the Administrator or the State determines that emissions in the absence of such limitations or measures may reasonably be anticipated to endanger public health or the environment. The Administrator’s determination under the preceding sentence is a discretionary decision.
  • (2) The term “new solid waste incineration unit” means a solid waste incineration unit the construction of which is commenced after the Administrator proposes requirements under this section establishing emissions standards or other requirements which would be applicable to such unit or a modified solid waste incineration unit.
  • (3) The term “modified solid waste incineration unit” means a solid waste incineration unit at which modifications have occurred after the effective date of a standard under subsection (a) if (A) the cumulative cost of the modifications, over the life of the unit, exceed 50 per centum of the original cost of construction and installation of the unit (not including the cost of any land purchased in connection with such construction or installation) updated to current costs, or (B) the modification is a physical change in or change in the method of operation of the unit which increases the amount of any air pollutant emitted by the unit for which standards have been established under this section or section 7411 of this title.
  • (5) No requirement of an applicable implementation plan under section 7475 of this title (relating to construction of facilities in regions identified pursuant to section 7407(d)(1)(A)(ii) or (iii) of this title) or under section 7502(c)(5) of this title (relating to permits for construction and operation in nonattainment areas) may be used to weaken the standards in effect under this section.
  • (C) concentrations of particulate matter attributable to the increase in emissions from construction or other temporary emission-related activities, and
  • (e) If any State affected by the redesignation of an area by an Indian tribe or any Indian tribe affected by the redesignation of an area by a State disagrees with such redesignation of any area, or if a permit is proposed to be issued for any new major emitting facility proposed for construction in any State which the Governor of an affected State or governing body of an affected Indian tribe determines will cause or contribute to a cumulative change in air quality in excess of that allowed in this part within the affected State or tribal reservation, the Governor or Indian ruling body may request the Administrator to enter into negotiations with the parties involved to resolve such dispute. If requested by any State or Indian tribe involved, the Administrator shall make a recommendation to resolve the dispute and protect the air quality related values of the lands involved. If the parties involved do not reach agreement, the Administrator shall resolve the dispute and his determination, or the results of agreements reached through other means, shall become part of the applicable plan and shall be enforceable as part of such plan. In resolving such disputes relating to area redesignation, the Administrator shall consider the extent to which the lands involved are of sufficient size to allow effective air quality management or have air quality related values of such an area.
  • (a) No major emitting facility on which construction is commenced after August 7, 1977, may be constructed in any area to which this part applies unless—
    (1) a permit has been issued for such proposed facility in accordance with this part setting forth emission limitations for such facility which conform to the requirements of this part;
    (2) the proposed permit has been subject to a review in accordance with this section, the required analysis has been conducted in accordance with regulations promulgated by the Administrator, and a public hearing has been held with opportunity for interested persons including representatives of the Administrator to appear and submit written or oral presentations on the air quality impact of such source, alternatives thereto, control technology requirements, and other appropriate considerations;
    (3) the owner or operator of such facility demonstrates, as required pursuant to section 7410(j) of this title, that emissions from construction or operation of such facility will not cause, or contribute to, air pollution in excess of any (A) maximum allowable increase or maximum allowable concentration for any pollutant in any area to which this part applies more than one time per year, (B) national ambient air quality standard in any air quality control region, or (C) any other applicable emission standard or standard of performance under this chapter;
    (4) the proposed facility is subject to the best available control technology for each pollutant subject to regulation under this chapter emitted from, or which results from, such facility;
    (5) the provisions of subsection (d) with respect to protection of class I areas have been complied with for such facility;
    (6) there has been an analysis of any air quality impacts projected for the area as a result of growth associated with such facility;
    (7) the person who owns or operates, or proposes to own or operate, a major emitting facility for which a permit is required under this part agrees to conduct such monitoring as may be necessary to determine the effect which emissions from any such facility may have, or is having, on air quality in any area which may be affected by emissions from such source; and
    (8) in the case of a source which proposes to construct in a class III area, emissions from which would cause or contribute to exceeding the maximum allowable increments applicable in a class II area and where no standard under section 7411 of this title has been promulgated subsequent to August 7, 1977, for such source category, the Administrator has approved the determination of best available technology as set forth in the permit.
  • (3) the owner or operator of such facility demonstrates, as required pursuant to section 7410(j) of this title, that emissions from construction or operation of such facility will not cause, or contribute to, air pollution in excess of any (A) maximum allowable increase or maximum allowable concentration for any pollutant in any area to which this part applies more than one time per year, (B) national ambient air quality standard in any air quality control region, or (C) any other applicable emission standard or standard of performance under this chapter;
  • (B) shall require an analysis of the ambient air quality, climate and meteorology, terrain, soils and vegetation, and visibility at the site of the proposed major emitting facility and in the area potentially affected by the emissions from such facility for each pollutant regulated under this chapter which will be emitted from, or which results from the construction or operation of, such facility, the size and nature of the proposed facility, the degree of continuous emission reduction which could be achieved by such facility, and such other factors as may be relevant in determining the effect of emissions from a proposed facility on any air quality control region,
  • The Administrator shall, and a State may, take such measures, including issuance of an order, or seeking injunctive relief, as necessary to prevent the construction or modification of a major emitting facility which does not conform to the requirements of this part, or which is proposed to be constructed in any area designated pursuant to section 7407(d) of this title as attainment or unclassifiable and which is not subject to an implementation plan which meets the requirements of this part.
  • (b) If any regulation in effect prior to August 7, 1977, to prevent significant deterioration of air quality would be inconsistent with the requirements of section 7472(a), section 7473(b) or section 7474(a) of this title, then such regulations shall be deemed amended so as to conform with such requirements. In the case of a facility on which construction was commenced (in accordance with the definition of “commenced” in section 7479(2) of this title) after June 1, 1975, and prior to August 7, 1977, the review and permitting of such facility shall be in accordance with the regulations for the prevention of significant deterioration in effect prior to August 7, 1977.
  • (B) the imposition of the requirements of part D of this subchapter affecting the construction of new major stationary sources or major modifications to existing sources in such clean air corridors specifically including the alternative siting analysis provisions of section 7503(a)(5) of this title; and
  • (4) Such plan provisions shall expressly identify and quantify the emissions, if any, of any such pollutant or pollutants which will be allowed, in accordance with section 7503(a)(1)(B) of this title, from the construction and operation of major new or modified stationary sources in each such area. The plan shall demonstrate to the satisfaction of the Administrator that the emissions quantified for this purpose will be consistent with the achievement of reasonable further progress and will not interfere with attainment of the applicable national ambient air quality standard by the applicable attainment date.
  • (5) Such plan provisions shall require permits for the construction and operation of new or modified major stationary sources anywhere in the nonattainment area, in accordance with section 7503 of this title.
  • (5) an analysis of alternative sites, sizes, production processes, and environmental control techniques for such proposed source demonstrates that benefits of the proposed source significantly outweigh the environmental and social costs imposed as a result of its location, construction, or modification.
  • (b) The amount granted to any organization under subsection (a) shall be 100 percent of any additional costs of developing a plan revision under this part for the first two fiscal years following receipt of the grant under this paragraph, and shall supplement any funds available under Federal law to such organization for transportation or air quality maintenance planning. Grants under this section shall not be used for construction.
  • (ii) construction or restriction of certain roads or lanes solely for the use of passenger buses or high occupancy vehicles;
  • (i) Provisions to require permits, in accordance with sections 7502(c)(5) and 7503 of this title, for the construction and operation of each new or modified major stationary source (with respect to ozone) to be located in the area.
  • (i) 6 months after the adoption date, in the case of gasoline dispensing facilities for which construction commenced after November 15, 1990;
  • (A) For the purpose of meeting the requirements of section 7502(c)(5) of this title, a permit program providing that permits meeting the requirements of section 7503 of this title are required for the construction and operation of new and modified major stationary sources of PM–10.
  • (A) New engines which are used in construction equipment or vehicles or used in farm equipment or vehicles and which are smaller than 175 horsepower.
  • (i) Not later than 1 year after August 8, 2005, the Administrator shall promulgate regulations to ensure that gasoline sold or introduced into commerce in the United States (except in noncontiguous States or territories), on an annual average basis, contains the applicable volume of renewable fuel determined in accordance with subparagraph (B). Not later than 1 year after December 19, 2007, the Administrator shall revise the regulations under this paragraph to ensure that transportation fuel sold or introduced into commerce in the United States (except in noncontiguous States or territories), on an annual average basis, contains at least the applicable volume of renewable fuel, advanced biofuel, cellulosic biofuel, and biomass-based diesel, determined in accordance with subparagraph (B) and, in the case of any such renewable fuel produced from new facilities that commence construction after December 19, 2007, achieves at least a 20 percent reduction in lifecycle greenhouse gas emissions compared to baseline lifecycle greenhouse gas emissions.
  • (G) If the Administrator adjusts, or revises, a percent level referred to in this paragraph or makes a change in the analytical methodology used for determining the lifecycle greenhouse gas emissions, such adjustment, revision, or change (or any combination thereof) shall only apply to renewable fuel from new facilities that commence construction after the effective date of such adjustment, revision, or change.
  • (5) The term “covered fleet” means 10 or more motor vehicles which are owned or operated by a single person. In determining the number of vehicles owned or operated by a single person for purposes of this paragraph, all motor vehicles owned or operated, leased or otherwise controlled by such person, by any person who controls such person, by any person controlled by such person, and by any person under common control with such person shall be treated as owned by such person. The term “covered fleet” shall not include motor vehicles held for lease or rental to the general public, motor vehicles held for sale by motor vehicle dealers (including demonstration vehicles), motor vehicles used for motor vehicle manufacturer product evaluations or tests, law enforcement and other emergency vehicles, or nonroad vehicles (including farm and construction vehicles).
  • (a) The Administrator shall review and comment in writing on the environmental impact of any matter relating to duties and responsibilities granted pursuant to this chapter or other provisions of the authority of the Administrator, contained in any (1) legislation proposed by any Federal department or agency, (2) newly authorized Federal projects for construction and any major Federal agency action (other than a project for construction) to which section 4332(2)(C) of this title applies, and (3) proposed regulations published by any department or agency of the Federal Government. Such written comment shall be made public at the conclusion of any such review.
  • The Administrator shall take such action as may be necessary to insure that all laborers and mechanics employed by contractors or subcontractors on projects assisted under this chapter shall be paid wages at rates not less than those prevailing for the same type of work on similar construction in the locality as determined by the Secretary of Labor, in accordance with sections 3141–3144, 3146, and 3147 of title 40. The Secretary of Labor shall have, with respect to the labor standards specified in this subsection,1 the authority and functions set forth in Reorganization Plan Numbered 14 of 1950 (15 F.R. 3176; 64 Stat. 1267) and section 3145 of title 40.
  • (a) No grant which the Administrator is authorized to make to any applicant for construction of sewage treatment works in any area in any State may be withheld, conditioned, or restricted by the Administrator on the basis of any requirement of this chapter except as provided in subsection (b).
  • (b) The Administrator may withhold, condition, or restrict the making of any grant for construction referred to in subsection (a) only if he determines that—
    (1) such treatment works will not comply with applicable standards under section 7411 or 7412 of this title,
    (2) the State does not have in effect, or is not carrying out, a State implementation plan approved by the Administrator which expressly quantifies and provides for the increase in emissions of each air pollutant (from stationary and mobile sources in any area to which either part C or part D of subchapter I applies for such pollutant) which increase may reasonably be anticipated to result directly or indirectly from the new sewage treatment capacity which would be created by such construction.1
    (3) the construction of such treatment works would create new sewage treatment capacity which—
    (A) may reasonably be anticipated to cause or contribute to, directly or indirectly, an increase in emissions of any air pollutant in excess of the increase provided for under the provisions referred to in paragraph (2) for any such area, or
    (B) would otherwise not be in conformity with the applicable implementation plan, or
    (4) such increase in emissions would interfere with, or be inconsistent with, the applicable implementation plan for any other State.
    In the case of construction of a treatment works which would result, directly or indirectly, in an increase in emissions of any air pollutant from stationary and mobile sources in an area to which part D of subchapter I applies, the quantification of emissions referred to in paragraph (2) shall include the emissions of any such pollutant resulting directly or indirectly from areawide and nonmajor stationary source growth (mobile and stationary) for each such area.
  • (2) the State does not have in effect, or is not carrying out, a State implementation plan approved by the Administrator which expressly quantifies and provides for the increase in emissions of each air pollutant (from stationary and mobile sources in any area to which either part C or part D of subchapter I applies for such pollutant) which increase may reasonably be anticipated to result directly or indirectly from the new sewage treatment capacity which would be created by such construction.1
  • (3) the construction of such treatment works would create new sewage treatment capacity which—
    (A) may reasonably be anticipated to cause or contribute to, directly or indirectly, an increase in emissions of any air pollutant in excess of the increase provided for under the provisions referred to in paragraph (2) for any such area, or
    (B) would otherwise not be in conformity with the applicable implementation plan, or
  • (c) Nothing in this section shall be construed to amend or alter any provision of the National Environmental Policy Act [42 U.S.C. 4321 et seq.] or to affect any determination as to whether or not the requirements of such Act have been met in the case of the construction of any sewage treatment works.
  • (C) The terms “Outer Continental Shelf source” and “OCS source” include any equipment, activity, or facility which—
    (i) emits or has the potential to emit any air pollutant,
    (ii) is regulated or authorized under the Outer Continental Shelf Lands Act [43 U.S.C. 1331 et seq.], and
    (iii) is located on the Outer Continental Shelf or in or on waters above the Outer Continental Shelf.
    Such activities include, but are not limited to, platform and drill ship exploration, construction, development, production, processing, and transportation. For purposes of this subsection, emissions from any vessel servicing or associated with an OCS source, including emissions while at the OCS source or en route to or from the OCS source within 25 miles of the OCS source, shall be considered direct emissions from the OCS source.
  • (a) After the effective date of any permit program approved or promulgated under this subchapter, it shall be unlawful for any person to violate any requirement of a permit issued under this subchapter, or to operate an affected source (as provided in subchapter IV–A), a major source, any other source (including an area source) subject to standards or regulations under section 7411 or 7412 of this title, any other source required to have a permit under parts1 C or D of subchapter I, or any other stationary source in a category designated (in whole or in part) by regulations promulgated by the Administrator (after notice and public comment) which shall include a finding setting forth the basis for such designation, except in compliance with a permit issued by a permitting authority under this subchapter. (Nothing in this subsection shall be construed to alter the applicable requirements of this chapter that a permit be obtained before construction or modification.) The Administrator may, in the Administrator’s discretion and consistent with the applicable provisions of this chapter, promulgate regulations to exempt one or more source categories (in whole or in part) from the requirements of this subsection if the Administrator finds that compliance with such requirements is impracticable, infeasible, or unnecessarily burdensome on such categories, except that the Administrator may not exempt any major source from such requirements.
  • (c) Any person required to have a permit shall, not later than 12 months after the date on which the source becomes subject to a permit program approved or promulgated under this subchapter, or such earlier date as the permitting authority may establish, submit to the permitting authority a compliance plan and an application for a permit signed by a responsible official, who shall certify the accuracy of the information submitted. The permitting authority shall approve or disapprove a completed application (consistent with the procedures established under this subchapter for consideration of such applications), and shall issue or deny the permit, within 18 months after the date of receipt thereof, except that the permitting authority shall establish a phased schedule for acting on permit applications submitted within the first full year after the effective date of a permit program (or a partial or interim program). Any such schedule shall assure that at least one-third of such permits will be acted on by such authority annually over a period of not to exceed 3 years after such effective date. Such authority shall establish reasonable procedures to prioritize such approval or disapproval actions in the case of applications for construction or modification under the applicable requirements of this chapter.
  • (d) Except for sources required to have a permit before construction or modification under the applicable requirements of this chapter, if an applicant has submitted a timely and complete application for a permit required by this subchapter (including renewals), but final action has not been taken on such application, the source’s failure to have a permit shall not be a violation of this chapter, unless the delay in final action was due to the failure of the applicant timely to submit information required or requested to process the application. No source required to have a permit under this subchapter shall be in violation of section 7661a(a) of this title before the date on which the source is required to submit an application under subsection (c).