§4332. Cooperation of agencies; reports; availability of information; recommendations; international and national coordination of efforts — Inbound Citations
42 U.S.C. § 4332
Cited by 73 provisions in release 119-102.
Citations to 42 U.S.C. § 4332 as a whole
-
(a) The issuance of a certificate of public convenience and necessity authorizing the construction and operation of any Alaska natural gas transportation project under section 720a of this title shall be treated as a major Federal action significantly affecting the quality of the human environment within the meaning of section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)).
-
(B) shall be responsible for preparing the environmental impact statement required by section 102(2)(c)1 of that Act [42 U.S.C. 4332(2)(C)] with respect to an Alaska natural gas transportation project under section 720a of this title.
-
(2) The environmental impact statement prepared under this section shall be adopted by each Federal agency described in paragraph (1) in satisfaction of the responsibilities of the Federal agency under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) with respect to the Alaska natural gas transportation project covered by the environmental impact statement.
-
(2) No action under section 792 of this title for a period of one year after initiation of such action shall be deemed a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.]. However, before any action under section 792 of this title that has a significant impact on the environment is taken, if practicable, or in any event within sixty days after such action is taken, an environmental evaluation with analysis equivalent to that required under section 102(2)(C) of the National Environmental Policy Act [42 U.S.C. 4332(2)(C)], to the greatest extent practicable within this time constraint, shall be prepared and circulated to appropriate Federal, State, and local government agencies and to the public for a thirty-day comment period after which a public hearing shall be held upon request to review outstanding environmental issues. Such an evaluation shall not be required where the action in question has been preceded by compliance with the National Environmental Policy Act by the appropriate Federal agency. Any action taken under section 792 of this title which will be in effect for more than a one-year period or any action to extend an action taken under section 792 of this title to a total period of more than one year shall be subject to the full provisions of the National Environmental Policy Act, notwithstanding any other provision of this chapter.
-
(d) In order to expedite the prompt construction of facilities for the importation of hydroelectric energy thereby helping to reduce the shortage of petroleum products in the United States, the Federal Power Commission is hereby authorized and directed to issue a Presidential permit pursuant to Executive Order 10485 of September 3, 1953, for the construction, operation, maintenance, and connection of facilities for the transmission of electric energy at the borders of the United States without preparing an environmental impact statement pursuant to section 102 of the National Environmental Policy Act of 1969 [42 U.S.C. 4332] for facilities for the transmission of electric energy between Canada and the United States in the vicinity of Fort Covington, New York.
-
(1) Actions by the Secretary pursuant to subsections (f), (g), and (h) of section 544d of this title; subsections (f), (j), (k), and (l) of section 544f of this title; section 544g of this title; and subsections (a) and (b)(2) of section 544h of this title shall neither be considered major Federal actions significantly affecting the quality of the environment under section 102 of the National Environmental Policy Act (42 U.S.C. 4332) nor require the preparation of an environmental assessment in accordance with that Act [42 U.S.C. 4321 et seq.].
-
(g) Neither the transfer of management authority to a State under subsection (b)(1), nor the revocation or voluntary return of such authority under subsection (e), shall be deemed to be an action for which an environmental impact statement is required under section 4332 of title 42.
-
(1) To facilitate compliance with the requirements of subsection (a)(2), each Federal agency shall, with respect to any agency action of such agency for which no contract for construction has been entered into and for which no construction has begun on November 10, 1978, request of the Secretary information whether any species which is listed or proposed to be listed may be present in the area of such proposed action. If the Secretary advises, based on the best scientific and commercial data available, that such species may be present, such agency shall conduct a biological assessment for the purpose of identifying any endangered species or threatened species which is likely to be affected by such action. Such assessment shall be completed within 180 days after the date on which initiated (or within such other period as is mutually agreed to by the Secretary and such agency, except that if a permit or license applicant is involved, the 180-day period may not be extended unless such agency provides the applicant, before the close of such period, with a written statement setting forth the estimated length of the proposed extension and the reasons therefor) and, before any contract for construction is entered into and before construction is begun with respect to such action. Such assessment may be undertaken as part of a Federal agency’s compliance with the requirements of section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332).
-
(1) specifying procedures to insure that land management plans are prepared in accordance with the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], including, but not limited to, direction on when and for what plans an environmental impact statement required under section 102(2)(C) of that Act [42 U.S.C. 4332(2)(C)] shall be prepared;
-
(B) The obligations contained in section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) shall apply to all proposals for Federal agency activities occurring in Antarctica and affecting the quality of the human environment in Antarctica or dependent or associated ecosystems, only as specified in this section. For purposes of the application of such section 102(2)(C) under this subsection, the term “significantly affecting the quality of the human environment” shall have the same meaning as the term “more than a minor or transitory impact”.
-
(b) If the Secretary is required to prepare an environmental impact statement pursuant to section 4332(2)(C) of title 42, he shall provide the notice and hearing and include the findings required by subsection (a) as part of such environmental impact statement.
-
(c) If the Secretary determines that the requirements of section 4332(2)(C) of title 42 do not apply to his decision, the Secretary shall render his decision within six months after receipt of a lease application. If such requirements are applicable to the Secretary’s decision, he shall render his decision within three months after publication of the final environmental impact statement.
-
(3) in any case in which an environmental impact statement is required under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], a statement which complies with the requirements of section 102(2)(C) of such Act [42 U.S.C. 4332(2)(C)]. In the case of any recommendation for which an environmental impact statement is not required under section 102(2)(C) of the National environmental Policy Act of 1969 [42 U.S.C. 4332(2)(C)], the President may, if he deems it desirable, include such a statement in his transmittal to the Congress.
-
(b) The Secretary shall prepare an environmental assessment or an environmental impact statement pursuant to section 102(2) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)) for each authorized hazardous fuel reduction project.
-
(1) For an authorized hazardous fuel reduction project that is proposed to be conducted in the wildland-urban interface, the Secretary is not required to study, develop, or describe more than the proposed agency action and 1 action alternative in the environmental assessment or environmental impact statement prepared pursuant to section 102(2) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)).
-
(2) Notwithstanding paragraph (1), but subject to paragraph (3), if an authorized hazardous fuel reduction project proposed to be conducted in the wildland-urban interface is located no further than 1½ miles from the boundary of an at-risk community, the Secretary is not required to study, develop, or describe any alternative to the proposed agency action in the environmental assessment or environmental impact statement prepared pursuant to section 102(2) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)).
-
(3) In the case of an authorized hazardous fuel reduction project described in paragraph (2), if the at-risk community has adopted a community wildfire protection plan and the proposed agency action does not implement the recommendations in the plan regarding the general location and basic method of treatments, the Secretary shall evaluate the recommendations in the plan as an alternative to the proposed agency action in the environmental assessment or environmental impact statement prepared pursuant to section 102(2) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)).
-
(g) In accordance with section 102(2) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)) and the applicable regulations and administrative guidelines, the Secretary shall provide an opportunity for public comment during the preparation of any environmental assessment or environmental impact statement for an authorized hazardous fuel reduction project.
-
(1) If the Secretary determines that an authorized emergency action requires an environmental assessment or an environmental impact statement pursuant to section 4332(2) of title 42, the Secretary shall study, develop, and describe—(A) the proposed agency action, taking into account the probable environmental consequences of the authorized emergency action and mitigating foreseeable adverse environmental effects, to the extent practicable; and(B) the alternative of no action.
-
Notwithstanding any other provision of law, an environmental impact statement prepared in accordance with the regulations published in part 25 of title 21, Code of Federal Regulations (as in effect on August 31, 1997) in connection with an action carried out under (or a recommendation or report relating to) this chapter, shall be considered to meet the requirements for a detailed statement under section 4332(2)(C) of title 42.
-
(B) Final design under a design-build contract referred to in subparagraph (A) shall not commence before compliance with section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332).
-
(i) do not preclude a State transportation department or local transportation agency, prior to compliance with section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332), from—(I) issuing requests for proposals;(II) proceeding with awards of design-build contracts; or(III) issuing notices to proceed with preliminary design work under design-build contracts;
-
(i) Prior to the completion of the environmental review process required under section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332), a contracting agency may—(I) issue requests for proposals;(II) proceed with the award of a contract for preconstruction services under subparagraph (A)(ii); and(III) issue notices to proceed with a preliminary design and any work related to preliminary design, to the extent that those actions do not limit any reasonable range of alternatives.
-
(ii) A contracting agency shall not proceed with the award of the construction services phase of a contract under subparagraph (A)(iv) and shall not proceed, or permit any consultant or contractor to proceed, with final design or construction until completion of the environmental review process required under section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332).
-
(4) The term “environmental impact statement” means a detailed statement required under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)).
-
(a) The Secretary shall approve or disapprove any Minerals Agreement submitted to him for approval within (1) one hundred and eighty days after submission or (2) sixty days after compliance, if required, with section 4332(2)(C) of title 42 or any other requirement of Federal law, whichever is later. Any party to such an agreement may enforce the provisions of this subsection pursuant to section 1361 of title 28.
-
(b) In approving or disapproving a Minerals Agreement, the Secretary shall determine if it is in the best interest of the Indian tribe or of any individual Indian who may be party to such agreement and shall consider, among other things, the potential economic return to the tribe; the potential environmental, social, and cultural effects on the tribe; and provisions for resolving disputes that may arise between the parties to the agreement: Provided, That the Secretary shall not be required to prepare any study regarding environmental, socioeconomic, or cultural effects of the implementation of a Minerals Agreement apart from that which may be required under section 4332(2)(C) of title 42.
-
(b) The review required by subsection (a) of this section may be performed prior to the promulgation of regulations required under section 2107 of this title and shall not be considered a Federal action within the meaning of that term in section 4332(2)(C) of title 42.
-
(1) Nothing in this section shall be construed to amend, repeal, modify, or change in any way the requirements of section 102(2)(C) [42 U.S.C. 4332(2)(C)] or any other provision of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
-
(B) The national minimum acceptable bid shall be $10 per acre during the 10-year period beginning on August 16, 2022. Thereafter, the Secretary, subject to paragraph (2)(B), may establish by regulation a higher national minimum acceptable bid for all leases based upon a finding that such action is necessary: (i) to enhance financial returns to the United States; and (ii) to promote more efficient management of oil and gas resources on Federal lands. Ninety days before the Secretary makes any change in the national minimum acceptable bid, the Secretary shall notify the Committee on Natural Resources of the United States House of Representatives and the Committee on Energy and Natural Resources of the United States Senate. The proposal or promulgation of any regulation to establish a national minimum acceptable bid shall not be considered a major Federal action subject to the requirements of section 4332(2)(C) of title 42.
-
(d) Approval of the State programs, pursuant to section 1253(b) of this title, promulgation of Federal programs, pursuant to section 1254 of this title, and implementation of the Federal lands programs, pursuant to section 1273 of this title, shall not constitute a major action within the meaning of section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332). Adoption of regulations under section 1251(b) of this title shall constitute a major action within the meaning of section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332).
-
(d) The issuance of, but not the certification of an application for, any license or permit under this subchapter shall be deemed to be a major Federal action significantly affecting the quality of the human environment for purposes of section 4332 of title 42. In preparing an environmental impact statement pursuant to this subsection, the Administrator shall consult with the agency heads referred to in subsection (b) and shall take into account, and give due consideration to, the relevant information contained in any applicable studies and any other environmental impact statement prepared pursuant to this section. Each draft environmental impact statement prepared pursuant to this subsection shall be published, with the terms, conditions, and restrictions proposed pursuant to section 1415(b) of this title, within 180 days (or such longer period as the Administrator may establish for good cause shown in writing) following the date on which the application for the license or permit concerned is certified by the Administrator. Each final environmental impact statement shall be published 180 days (or such longer period as the Administrator may establish for good cause shown in writing) following the date on which the draft environmental impact statement is published.
-
(ii) Receipt by the Secretary of a request submitted under clause (i) shall be considered the receipt of a proposal or application that will lead to a major Federal action that is subject to the requirements of section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) that would be required if the Secretary were to undertake the feasibility study.
-
(3) The term “environmental impact statement” means a detailed written statement required under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)).
-
(a) In any proceeding upon an application for an operating license for a utilization facility required to be licensed under section 2133 or 2134(b) of this title, in which a hearing is otherwise required pursuant to section 2239(a) of this title, the applicant may petition the Commission for a temporary operating license for such facility authorizing fuel loading, testing, and operation at a specific power level to be determined by the Commission, pending final action by the Commission on the application. The initial petition for a temporary operating license for each such facility, and any temporary operating license issued for such facility based upon the initial petition, shall be limited to power levels not to exceed 5 percent of rated full thermal power. Following issuance by the Commission of the temporary operating license for each such facility, the licensee may file petitions with the Commission to amend the license to allow facility operation in staged increases at specific power levels, to be determined by the Commission, exceeding 5 percent of rated full thermal power. The initial petition for a temporary operating license for each such facility may be filed at any time after the filing of: (1) the report of the Advisory Committee on Reactor Safeguards required by section 2232(b) of this title; (2) the filing of the initial Safety Evaluation Report by the Nuclear Regulatory Commission staff and the Nuclear Regulatory Commission staff’s first supplement to the report prepared in response to the report of the Advisory Committee on Reactor Safeguards for the facility; (3) the Nuclear Regulatory Commission staff’s final detailed statement on the environmental impact of the facility prepared pursuant to section 4332(2)(C) of this title; and (4) a State, local, or utility emergency preparedness plan for the facility. Petitions for the issuance of a temporary operating license, or for an amendment to such a license allowing operation at a specific power level greater than that authorized in the initial temporary operating license, shall be accompanied by an affidavit or affidavits setting forth the specific facts upon which the petitioner relies to justify issuance of the temporary operating license or the amendment thereto. The Commission shall publish notice of each such petition in the Federal Register and in such trade or news publications as the Commission deems appropriate to give reasonable notice to persons who might have a potential interest in the grant of such temporary operating license or amendment thereto. Any person may file affidavits or statements in support of, or in opposition to, the petition within thirty days after the publication of such notice in the Federal Register.
-
(g) The execution or transfer of the lease between the Secretary and the Corporation or the private corporation, and any extension or renewal thereof, shall not be considered to be a major Federal action significantly affecting the quality of the human environment for purposes of section 4332 of this title.
-
Nothing in section 4332 or 4333 of this title shall in any way affect the specific statutory obligations of any Federal agency (1) to comply with criteria or standards of environmental quality, (2) to coordinate or consult with any other Federal or State agency, or (3) to act, or refrain from acting contingent upon the recommendations or certification of any other Federal or State agency.
-
(c) Each notice of intent to prepare an environmental impact statement under section 4332 of this title shall include a request for public comment on alternatives or impacts and on relevant information, studies, or analyses with respect to the proposed agency action.
-
(i) the date on which such agency determines that section 4332(2)(C) of this title requires the issuance of an environmental impact statement with respect to such action;
-
(a) The Council on Environmental Quality shall conduct a study and submit a report to Congress within 1 year of the enactment of this Act1 on the potential for online and digital technologies to address delays in reviews and improve public accessibility and transparency under section 4332(2)(C) of this title including, but not limited to, a unified permitting portal that would—(1) allow applicants to—(A) submit required documents or materials for their project in one unified portal;(B) upload and collaborate with the applicable agencies to edit documents in real-time, as required;(C) upload and display visual features such as video, animation, geographic information system displays, and three-dimensional renderings; and(D) track the progress of individual applications;(2) include a cloud based, digital tool for more complex reviews that would enhance interagency coordination in consultation by—(A) centralizing, across all necessary agencies, the data, visuals, and documents, including but not limited to geographic information system displays, other visual renderings, and completed reports and analyses necessary for reviews;(B) streamlining communications between all necessary agencies and the applicant;(C) allowing for comments and responses by and to all necessary agencies in one unified portal;(D) generating analytical reports to aid in organizing and cataloguing public comments; and(E) be2 accessible on mobile devices;(3) boost transparency in agency processes and present information suitable for a lay audience, including but not limited to—(A) scientific data and analysis; and(B) anticipated agency process and timeline; and(4) include examples describing how at least five permits would be reviewed and processed through this portal.
-
(1) The term “categorical exclusion” means a category of actions that a Federal agency has determined normally does not significantly affect the quality of the human environment within the meaning of section 4332(2)(C) of this title.
-
(6) The term “environmental impact statement” means a detailed written statement that is required by section 4332(2)(C) of this title.
-
(10) The term “environmental impact statement” means the detailed written statement required under section 102(2)(C) of NEPA [42 U.S.C. 4332(2)(C)].
-
(1) Any action seeking judicial review of the adequacy of any program or site-specific environmental impact statement under section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332) concerning oil and gas leasing in the National Petroleum Reserve-Alaska shall be barred unless brought in the appropriate District Court within 60 days after notice of the availability of such statement is published in the Federal Register.
-
(2) The detailed environmental studies and assessments that have been conducted on the exploration program and the comprehensive land-use studies carried out in response to sections3 6505(b) and (c) of this title shall be deemed to have fulfilled the requirements of section 102(2)(c)4 of the National Environmental Policy Act (Public Law 91–190) [42 U.S.C. 4332(2)(C)], with regard to the first two oil and gas lease sales in the National Petroleum Reserve-Alaska: Provided, That not more than a total of 2,000,000 acres may be leased in these two sales: Provided further, That any exploration or production undertaken pursuant to this section shall be in accordance with section 6504(a) of this title.
-
(d) The Department of the Interior shall be the lead agency for the purpose of preparation of an environmental impact statement required by section 4332(2)(C) of this title for any action with respect to the Federal leases taken under the authority of this section, unless the action involves only matters within the exclusive authority of the Secretary.
-
(b) The development and adoption of any part of any plan (including any preliminary form of any such plan) under subsection (a) shall not be considered a major Federal action for the purposes of subparagraph (C), (E), or (F) of section 4332(2) of this title. Nothing in this subsection shall affect the Department of Energy’s ongoing preparation of a programmatic environmental impact statement on environmental restoration and waste management.
-
(a) The Administrator shall review and comment in writing on the environmental impact of any matter relating to duties and responsibilities granted pursuant to this chapter or other provisions of the authority of the Administrator, contained in any (1) legislation proposed by any Federal department or agency, (2) newly authorized Federal projects for construction and any major Federal agency action (other than a project for construction) to which section 4332(2)(C) of this title applies, and (3) proposed regulations published by any department or agency of the Federal Government. Such written comment shall be made public at the conclusion of any such review.
-
The following actions are not deemed to be major Federal actions for purposes of section 4332(2)(C) of this title:
-
(e) The issuance of any license for ownership, construction, and operation of an ocean thermal energy conversion facility or plantship shall be deemed to be a major Federal action significantly affecting the quality of the human environment for purposes of section 4332(2)(C) of this title. For all timely applications covering proposed facilities in a single application area, and for each application relating to a proposed plantship, the Administrator shall, pursuant to such section 4332(2)(C) of this title and in cooperation with other involved Federal agencies and departments, prepare a single environmental impact statement, which shall fulfill the requirement of all Federal agencies in carrying out their responsibilities pursuant to this chapter to prepare an environmental impact statement. Each such draft environmental impact statement relating to proposed facilities shall be prepared and published within 180 days after notice of the initial application has been published pursuant to section 9112(d) of this title. Each such draft environmental impact statement relating to a proposed plantship shall be prepared and published within 180 days after notice of the application has been published pursuant to section 9112(d) of this title. Each final environmental impact statement shall be published not later than 90 days following the date on which public hearings are concluded pursuant to section 9112(g) of this title. The Administrator may extend the deadline for publication of a specific draft or final environmental impact statement to a later specified time for good cause shown in writing.
-
(d) Except as otherwise provided in this section, each activity of the President or the Secretary under this section shall be considered to be a preliminary decisionmaking activity. No such activity shall require the preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)), or to require any environmental review under subparagraph (E) or (F) of section 102(2) of such Act.
-
(d) Each activity of the Secretary under this section that is in compliance with the provisions of subsection (c) shall be considered a preliminary decisionmaking activity. No such activity shall require the preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)), or to3 require any environmental review under subparagraph (E) or (F) of section 102(2) of such Act.
-
(B) No recommendation of a site by the President under this subsection shall require the preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)), or to1 require any environmental review under subparagraph (E) or (F) of section 102(2) of such Act.
-
(c) The promulgation of standards or criteria in accordance with the provisions of this section shall not require the preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)), or to require any environmental review under subparagraph (E) or (F) of section 102(2) of such Act.
-
(ii) except as provided in subsection (c) require the preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)), such1 facility is already being used, or has previously been used, for such storage or for any similar purpose.2
-
(1) The provision of 300 or more metric tons of storage capacity at any one Federal site under subsection (a)(1)(A) shall be considered to be a major Federal action requiring preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)).
-
(1) Preparation and submission to the Congress of the proposal required in this section shall not require the preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)). The Secretary shall prepare, in accordance with regulations issued by the Secretary implementing such Act [42 U.S.C. 4321 et seq.], an environmental assessment with respect to such proposal. Such environmental assessment shall be based upon available information regarding alternative technologies for the storage of spent nuclear fuel and high-level radioactive waste. The Secretary shall submit such environmental assessment to the Congress at the time such proposal is submitted.
-
(d) Site specific activities and selection of a site under this section shall not require the preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)). The Secretary shall prepare an environmental assessment with respect to such selection in accordance with regulations issued by the Secretary implementing such Act [42 U.S.C. 4321 et seq.]. Such environmental assessment shall be based upon available information regarding alternative technologies for the storage of spent nuclear fuel and high-level radioactive waste. The Secretary shall submit such environmental assessment to the Congress at the time such site is selected.
-
(1) No action of the Secretary or any other Federal agency required by this subchapter or section 10221 of this title with respect to a test and evaluation facility to be taken prior to the initiation of onsite construction of a test and evaluation facility shall require the preparation of an environmental impact statement under section 102(2)(C) of the Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)), or to require the preparation of environmental reports, except as otherwise specifically provided for in this subchapter.
-
(g) The Secretary shall prepare an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) prior to conducting tests with radioactive materials at the test and evaluation facility. Such environmental impact statement shall incorporate, to the extent practicable, the environmental assessment prepared under subsection (a). Nothing in this subsection may be construed to limit siting research activities conducted under section 10194 of this title. This subsection shall apply only to activities performed exclusively for a test and evaluation facility.
-
(A) ensure expeditious compliance with section 4332(2)(C) of this title and any other applicable environmental and cultural resources laws;
-
(1) Not later than 18 months after August 8, 2005, in accordance with section 4332(2)(C) of this title, the Secretary shall complete a programmatic environmental impact statement for a commercial leasing program for oil shale and tar sands resources on public lands, with an emphasis on the most geologically prospective lands within each of the States of Colorado, Utah, and Wyoming.
-
(p) The term “major Federal action” means any action or proposal by the Secretary which is subject to the provisions of section 4332(2)(C) of title 42.
-
(3) conduct environmental studies and prepare any environmental impact statement required in accordance with this subchapter and with section 4332(2)(C) of title 42; and
-
(a) The Secretary of the Interior, after consultation with the heads of appropriate Federal agencies, shall establish an expedited schedule for conducting reviews and making recommendations concerning crude oil transportation systems proposed in applications filed under section 2004 of this title and for obtaining information necessary for environmental impact statements required under section 4332 of title 42 with respect to such proposed systems.
-
(a) Any Federal agency required under section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332) to issue an environmental impact statement concerning a proposed crude oil transportation system eligible for consideration under this chapter shall, in preparing such statement, utilize, to the maximum extent practicable and consistent with such Act [42 U.S.C. 4321 et seq.], appropriate data, analyses, conclusions, findings, and decisions regarding environmental impacts developed or made by any other Federal or State agency.
-
(b) On or before December 1, 1978, all environmental impact statements concerning proposed crude oil transportation systems eligible for consideration under this chapter and required under section 102 of the National Environmental Policy Act of 1969 [42 U.S.C. 4332] shall be completed, made available for public review and comment, revised to the extent appropriate in light of such comment, and submitted to the President and the Council on Environmental Quality; except that in the case of any environmental impact statement concerning any crude oil transportation system which is eligible for consideration and which was filed under section 2004(2) of this title, such actions may be taken not later than 60 days after December 1, 1978.
-
(c) The provisions of section 4332(2)(C) of title 42 shall not apply with respect to any action taken under authority of this chapter before, and including, the conveyance of rail properties ordered by the special court under section 743 (b)(1) of this title, and shall not apply thereafter to any action taken in compliance with the requirements of the final system plan.
-
(a) The provisions of chapters 5 and 7 of title 5 (popularly known as the Administrative Procedure Act and including provisions popularly known as the Government in the Sunshine Act), chapter 10 of title 5, section 102(2)(C) of the National Environmental Policy Act of 1969 [42 U.S.C. 4332(2)(C)], division A of subtitle III of title 54, and section 303 of title 49 are inapplicable to actions taken in negotiating, approving, or implementing service transfers under title IV of the Regional Rail Reorganization Act of 1973 [45 U.S.C. 761) et seq.]1 and to the implementation of the sale of the interest of the United States in Conrail under the Conrail Privatization Act [45 U.S.C. 1301 et seq.].
-
(2) In establishing an air tour management plan under this subsection, the Administrator and the Director shall each sign the environmental decision document required by section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332) which may include a finding of no significant impact, an environmental assessment, or an environmental impact statement and the record of decision for the air tour management plan.
-
(B) identify any statement related to an action under subsection (c) of this section filed under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C));
-
(e) The Administrator of the Environmental Protection Agency may request the Administrator of the Federal Aviation Administration to file a supplemental report if the report under subsection (d) of this section indicates that the proposed regulations under subsection (c) of this section, for which a statement under section 102(2)(C) of the Act (42 U.S.C. 4332(2)(C)) is not required, should not be prescribed. The supplemental report shall be published in the Federal Register within the time the Administrator of the Environmental Protection Agency specifies. However, the time specified must be at least 90 days after the date of the request. The supplemental report shall contain a comparison of the environmental effects, including those that cannot be avoided, of the action of the Administrator of the Federal Aviation Administration and the proposed regulations of the Administrator of the Environmental Protection Agency.
-
(B) The term “environmental impact statement” means a detailed statement required under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)).