§4321. Congressional declaration of purpose — Inbound Citations
42 U.S.C. § 4321
Cited by 363 provisions in release 119-102.
Citations to 42 U.S.C. § 4321 as a whole
-
Eff. July 1, 1979, 44 F.R. 33663, 93 Stat. 1373
-
(b) In the event an environmental assessment or environmental impact statement is required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) to implement plant control agreements, Federal agencies shall complete such assessments or statements within 1 year after the requirement for such assessment or statement is ascertained.
-
(cc) a plan that the Secretary determines is equivalent to a plan described in item (aa) or (bb) and consistent with Executive Order 13112 (42 U.S.C. 4321 note; relating to invasive species);
-
(1) The term “covered military unit” means a unit of the armed forces whose initial assignment to a military installation or relocation from a military installation to a different military installation requires the preparation of an environmental impact statement in accordance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(a) Whenever the Secretary of Defense or the Secretary of the military department concerned publicly announces that a military installation is a candidate for closure or that a final decision has been made to close a military installation and the Secretary of Defense determines, because of the location, facilities, or other particular characteristics of the installation, that the installation may be suitable for some specific Federal, State, or local use potentially beneficial to the Nation, the Secretary of Defense may conduct such studies, including the preparation of an environmental impact statement in accordance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), in connection with such installation and such potential use as may be necessary to provide information sufficient to make sound conclusions and recommendations regarding the possible use of the installation.
-
(A) Notwithstanding the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), the scope of any environmental impact analysis necessary to support an interim lease of property under this subsection shall be limited to the environmental consequences of activities authorized under the proposed lease and the cumulative impacts of other past, present, and reasonably foreseeable future actions during the period of the proposed lease.
-
(f) If the Secretary of Defense or the Secretary of the military department concerned determines, pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), that a significant transportation impact will occur as a result of an action described in subsection (a), the action may not be taken unless and until the Secretary of Defense or the Secretary of the military department concerned—(1) analyzes the adequacy of transportation infrastructure at and in the vicinity of each military installation that would be impacted by the action;(2) concludes consultation with the Secretary of Transportation with regard to such impact;(3) analyzes the impact of the action on local businesses, neighborhoods, and local governments; and(4) includes in the notification required by subsection (b)(1) a description of how the Secretary intends to remediate the significant transportation impact.
-
(B) Each report under subparagraph (A) shall include an analysis of each option set forth in the report, including the cost and schedule for implementation of such option, and any requirements under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) relating to consideration or selection of such option.
-
(c) If the MOX production objective is not achieved as of January 1, 2014, the Secretary shall, consistent with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and other applicable laws, remove from the State of South Carolina, for storage or disposal elsewhere—(1) not later than January 1, 2016, not less than 1 metric ton of defense plutonium or defense plutonium materials; and(2) not later than January 1, 2022, an amount of defense plutonium or defense plutonium materials equal to the amount of defense plutonium or defense plutonium materials transferred to the Savannah River Site between April 15, 2002, and January 1, 2022, but not processed by the MOX facility.
-
(e) The cost of any environmental assessment required pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) in connection with a proposed lease under this section shall be paid out of unobligated amounts available for administrative expenses of the Bureau of Land Management.
-
(5) for projects under the purview of the Committee, establish or designate one or more systems for ocean-related and ocean-mapping-related documents prepared under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), in accordance with subsection (h).
-
(k) For purposes of environmental,3 review, decisionmaking, and action under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and any other law that furthers the purposes of that Act, a loan guarantee under this section shall—(1) be treated as a grant under the Native American Housing Assistance and Self-Determination Act of 1996 (25 U.S.C. 4101 et seq.); and(2) be subject to the regulations promulgated by the Secretary to carry out section 105 of the Native American Housing Assistance and Self-Determination Act of 1996 (25 U.S.C. 4115).
-
(I) In order to assure that the policies of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and other provisions of law which further the purposes of such Act (as specified in regulations issued by the Secretary) are most effectively implemented in connection with the insurance of mortgages under subsection (c)(2), and to assure to the public undiminished protection of the environment, the Secretary may, under such regulations, in lieu of the environmental protection procedures otherwise applicable, provide for agreements to endorse for insurance mortgages under subsection (c)(2) upon the request of qualified housing finance agencies under this subsection, if the State or unit of general local government, as designated by the Secretary in accordance with regulations, assumes all of the responsibilities for environmental review, decisionmaking, and action pursuant to such Act, and such other provisions of law as the regulations of the Secretary may specify, that would otherwise apply to the Secretary with respect to the insurance of mortgages on particular properties.
-
(ii) The Secretary shall approve a mortgage for the provision of mortgage insurance subject to the procedures authorized by this paragraph only if, not less than 15 days prior to such approval, prior to any approval, commitment, or endorsement of mortgage insurance on the property on behalf of the Secretary, and prior to any commitment by the qualified housing finance agency to provide financing under the risk-sharing agreement with respect to the property, the qualified housing finance agency submits to the Secretary a request for such approval, accompanied by a certification of the State or unit of general local government that meets the requirements of clause (iii). The Secretary’s approval of any such certification shall be deemed to satisfy the Secretary’s responsibilities under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and such other provisions of law as the regulations of the Secretary specify insofar as those responsibilities relate to the provision of mortgage insurance on the property that is covered by such certification.
-
(IV) specify that the certifying officer consents to assume the status of a responsible Federal official under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and under each provision of law specified in regulations issued by the Secretary insofar as the provisions of such Act or such other provisions of law apply pursuant to clause (i), and is authorized and consents on behalf of the State or unit of general local government and himself or herself to accept the jurisdiction of the Federal courts for the purpose of enforcement of the responsibilities as such an official.
-
(a) The Commission shall promulgate regulations on the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) pre-filing process within 60 days after August 8, 2005. An applicant shall comply with pre-filing process required under the National Environmental Policy Act of 1969 prior to filing an application with the Commission. The regulations shall require that the pre-filing process commence at least 6 months prior to the filing of an application for authorization to construct an LNG terminal and encourage applicants to cooperate with State and local officials.
-
(1) The Commission shall act as the lead agency for the purposes of coordinating all applicable Federal authorizations and for the purposes of complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(e) The President shall find that any required environmental impact statement relative to the Alaska natural gas transportation system designated for approval by the President has been prepared and that such statement is in compliance with the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.]. Such finding shall be set forth in the report of the President submitted under section 719e of this title. The President may supplement or modify the environmental impact statements prepared by the Commission or other Federal officers or agencies. Any such environmental impact statement shall be submitted contemporaneously with the transmittal to the Senate and House of Representatives of the President’s decision pursuant to section 719e(b) of this title or subsection (b) of this section.
-
(3) The enactment of a joint resolution under section 719f of this title approving the decision of the President shall be conclusive as to the legal and factual sufficiency of the environmental impact statements submitted by the President relative to the approved transportation system and no court shall have jurisdiction to consider questions respecting the sufficiency of such statements under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
-
(A) shall be the lead agency for purposes of complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(C) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(1) No action taken under the Clean Air Act [42 U.S.C. 7401 et seq.] shall be deemed a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
-
(2) No action under section 792 of this title for a period of one year after initiation of such action shall be deemed a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.]. However, before any action under section 792 of this title that has a significant impact on the environment is taken, if practicable, or in any event within sixty days after such action is taken, an environmental evaluation with analysis equivalent to that required under section 102(2)(C) of the National Environmental Policy Act [42 U.S.C. 4332(2)(C)], to the greatest extent practicable within this time constraint, shall be prepared and circulated to appropriate Federal, State, and local government agencies and to the public for a thirty-day comment period after which a public hearing shall be held upon request to review outstanding environmental issues. Such an evaluation shall not be required where the action in question has been preceded by compliance with the National Environmental Policy Act by the appropriate Federal agency. Any action taken under section 792 of this title which will be in effect for more than a one-year period or any action to extend an action taken under section 792 of this title to a total period of more than one year shall be subject to the full provisions of the National Environmental Policy Act, notwithstanding any other provision of this chapter.
-
(1) Notwithstanding any other provision of law, the provision by the Secretary of Federal financial assistance for a project described in this section that satisfies the requirements under subsection (a)(2)(C)(i) of this section shall not be considered to be a major Federal action under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) (referred to in this subsection as “NEPA”) or an undertaking for the purposes of division A of subtitle III of title 54 if—(A) the activity described in the application for that project has commenced not later than December 31, 2024;(B) the Federal financial assistance provided is in the form of a loan or loan guarantee; or(C) the Federal financial assistance provided, excluding any loan or loan guarantee, comprises not more than 10 percent of the total estimated cost of the project.
-
(2) The term “NEPA” means the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(A) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(B) after the completion and consideration of an analysis under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), the Secretary has determined that proposed use is in the public interest.
-
(i) in accordance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and any other applicable law;
-
(1) Whenever any Federal department, agency, or instrumentality proposes to undertake any action, or provide Federal assistance for any action, or issue any license or permit for an action within the corridor referred to in section 460ii of this title which may have a direct and adverse effect on the natural or cultural resources of the recreation area, the head of such department, agency, or instrumentality shall—(A) promptly notify the Secretary of the action at the time it is planning the action, preparing an environmental assessment regarding the action, or preparing an environmental impact statement under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] for the action;(B) provide the Secretary a reasonable opportunity to comment and make recommendations regarding the effect of the Federal action on the natural and cultural resources of the recreation area; and(C) notify the Secretary of the specific decisions made in respect to the comments and recommendations of the Secretary.The requirements of this subsection shall be carried out in accordance with procedures established by the Federal agency responsible for undertaking or approving the Federal action. These procedures may utilize the procedures developed by such Agency pursuant to the National Environmental Policy Act [42 U.S.C. 4321 et seq.].
-
(A) promptly notify the Secretary of the action at the time it is planning the action, preparing an environmental assessment regarding the action, or preparing an environmental impact statement under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] for the action;
-
(viii) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(d) The Secretary shall prepare, and may from time to time amend, a management plan for the national recreation area. The plan may be prepared in conjunction with, or incorporated with, ongoing planning for the Allegheny National Forest in accordance with the National Forest Management Act of 1976. The initial management plan and significant amendments or revisions shall be accompanied by an environmental impact statement prepared in accordance with the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
-
(7) after an Environmental Impact Statement for the proposed Habitat Conservation Plan has been prepared and completed in accordance with the applicable provisions of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.]; and
-
(3) The National Environmental Policy Act [42 U.S.C. 4321 et seq.] shall apply to the development and implementation of the management plan.
-
(e) Nothing in this section shall be deemed to amend, modify or otherwise affect the Secretary’s duties under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and the Forest and Rangeland Renewable Resources Planning Act of 1974 (16 U.S.C. 1600 et seq.), including his duties to involve the public in his decisionmaking and planning for the national forests.
-
(i) is categorically excluded from documentation requirements under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); or
-
(A) Except as otherwise provided in this section, the Secretary shall carry out the land exchange in accordance with the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(B) Prior to conveying Federal land under this section, the Secretary shall prepare a single environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), which shall be used as the basis for all decisions under Federal law related to the proposed mine and the Resolution mine plan of operations and any related major Federal actions significantly affecting the quality of the human environment, including the granting of any permits, rights-of-way, or approvals for the construction of associated power, water, transportation, processing, tailings, waste disposal, or other ancillary facilities.
-
(D) Nothing in this paragraph precludes the Secretary from using separate environmental review documents prepared in accordance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) or other applicable laws for exploration or other activities not involving—(i) the land exchange; or(ii) the extraction of minerals in commercial quantities by Resolution Copper on or under the Federal land.
-
(1) Actions by the Secretary pursuant to subsections (f), (g), and (h) of section 544d of this title; subsections (f), (j), (k), and (l) of section 544f of this title; section 544g of this title; and subsections (a) and (b)(2) of section 544h of this title shall neither be considered major Federal actions significantly affecting the quality of the environment under section 102 of the National Environmental Policy Act (42 U.S.C. 4332) nor require the preparation of an environmental assessment in accordance with that Act [42 U.S.C. 4321 et seq.].
-
(a) Where the Federal Energy Regulatory Commission is required to prepare a draft or final environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 and following) in connection with an application for a license under part I of the Federal Power Act [16 U.S.C. 791a et seq.], the Commission may permit, at the election of the applicant, a contractor, consultant or other person funded by the applicant and chosen by the Commission from among a list of such individuals or companies determined by the Commission to be qualified to do such work, to prepare such statement for the Commission. The contractor shall execute a disclosure statement prepared by the Commission specifying that it has no financial or other interest in the outcome of the project. The Commission shall establish the scope of work and procedures to assure that the contractor, consultant or other person has no financial or other potential conflict of interest in the outcome of the proceeding. Nothing herein shall affect the Commission’s responsibility to comply with the National Environmental Policy Act of 1969.
-
(b) Where an environmental assessment is required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 and following) in connection with an application for a license under part I of the Federal Power Act [16 U.S.C. 791a et seq.], the Commission may permit an applicant, or a contractor, consultant or other person selected by the applicant, to prepare such environmental assessment. The Commission shall institute procedures, including pre-application consultations, to advise potential applicants of studies or other information foreseeably required by the Commission. The Commission may allow the filing of such applicant-prepared environmental assessments as part of the application. Nothing herein shall affect the Commission’s responsibility to comply with the National Environmental Policy Act of 1969.
-
(c) Interagency cooperation in the preparation of environmental documents under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to an application for a license for a qualifying facility under this section, and interagency communications relating to licensing process coordination pursuant to this section, shall not—(1) be considered to be ex parte communications under Commission rules; or(2) preclude an agency from participating in a licensing proceeding under this subchapter, providing that any agency participating as a party in a licensing proceeding under this subchapter shall, to the extent practicable, demonstrate a separation of staff cooperating with the Commission under the National Environmental Policy Act1 (42 U.S.C. 4321 et seq.) and staff participating in the applicable proceeding under this subchapter.
-
(2) preclude an agency from participating in a licensing proceeding under this subchapter, providing that any agency participating as a party in a licensing proceeding under this subchapter shall, to the extent practicable, demonstrate a separation of staff cooperating with the Commission under the National Environmental Policy Act1 (42 U.S.C. 4321 et seq.) and staff participating in the applicable proceeding under this subchapter.
-
(e) Interagency cooperation in the preparation of environmental documents under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to an application for a license for a closed-loop pumped storage project submitted pursuant to this section, and interagency communications relating to licensing process coordination pursuant to this section, shall not—(1) be considered to be ex parte communications under Commission rules; or(2) preclude an agency from participating in a licensing proceeding under this subchapter, providing that any agency participating as a party in a licensing proceeding under this subchapter shall, to the extent practicable, demonstrate a separation of staff cooperating with the Commission under the National Environmental Policy Act1 (42 U.S.C. 4321 et seq.) and staff participating in the applicable proceeding under this subchapter.
-
(2) preclude an agency from participating in a licensing proceeding under this subchapter, providing that any agency participating as a party in a licensing proceeding under this subchapter shall, to the extent practicable, demonstrate a separation of staff cooperating with the Commission under the National Environmental Policy Act1 (42 U.S.C. 4321 et seq.) and staff participating in the applicable proceeding under this subchapter.
-
(iv) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(1) Except as specifically provided, nothing in this section affects any requirement of an environmental law of the United States, including the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(A) submit to the appropriate committees of the Congress the administrative record of the decision (including any determination by the Council under paragraph (2)) and a statement of the procedures followed or to be followed for compliance with the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.],
-
(A) A draft environmental impact statement pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(2) Within 30 days after the date the Secretary receives any proposed amendment, the Secretary shall notify the State whether the Secretary approves or disapproves the amendment, or whether the Secretary finds it is necessary to extend the review of the proposed amendment for a period not to exceed 120 days after the date the Secretary received the proposed amendment. The Secretary may extend this period only as necessary to meet the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). If the Secretary does not notify the coastal state that the Secretary approves or disapproves the amendment within that period, then the amendment shall be conclusively presumed as approved.
-
(k) An exemption decision by the Committee under this section shall not be a major Federal action for purposes of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.]: Provided, That an environmental impact statement which discusses the impacts upon endangered species or threatened species or their critical habitats shall have been previously prepared with respect to any agency action exempted by such order.
-
In order to provide for periodic review of programs for management and administration of the National Forest System, for research, for cooperative State and private Forest Service programs, and for conduct of other Forest Service activities in relation to the findings of the Assessment, the Secretary, utilizing information available to the Forest Service and other agencies within the Department of Agriculture, including data prepared pursuant to section 1010a of title 7, shall prepare and transmit to the President a recommended Renewable Resource Program (hereinafter called the “Program”). The Program transmitted to the President may include alternatives, and shall provide in appropriate detail for protection, management, and development of the National Forest System, including forest development roads and trails; for cooperative Forest Service programs; and for research. The Program shall be developed in accordance with principles set forth in the Multiple-Use Sustained-Yield Act of June 12, 1960 (74 Stat. 215; 16 U.S.C. 528–531)), and the National Environmental Policy Act of 1969 (83 Stat. 852) [42 U.S.C. 4321 et seq.]. The Program shall be prepared not later than December 31, 1975, to cover the four-year period beginning October 1, 1976, and at least each of the four fiscal decades next following such period, and shall be updated no later than during the first half of the fiscal year ending September 30, 1980, and the first half of each fifth fiscal year thereafter to cover at least each of the four fiscal decades beginning next after such updating. The Program shall include, but not be limited to—
-
(1) specifying procedures to insure that land management plans are prepared in accordance with the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], including, but not limited to, direction on when and for what plans an environmental impact statement required under section 102(2)(C) of that Act [42 U.S.C. 4332(2)(C)] shall be prepared;
-
(F) other relevant legal and regulatory requirements, including the National Environmental Policy Act (42 U.S.C. 4321 et seq.);
-
(3) Any decision required to be made under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to any authorized restoration services to be provided under this section on Federal land shall not be delegated to a Governor or county.
-
(A) The obligations of the United States under Article 8 of and Annex I to the Protocol shall be implemented by applying the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) to proposals for Federal agency activities in Antarctica, as specified in this section.
-
(b) Before issuing any license under the Federal Power Act [16 U.S.C. 791a et seq.] for the construction or operation of any small hydroelectric power project the Commission—(1) shall assess the safety of existing structures in any proposed project (including possible consequences associated with failure of such structures), and(2) shall provide an opportunity for consultation with the Council on Environmental Quality and the Environmental Protection Agency with respect to the environmental effects of such project.Nothing in this subsection exempts any such project from any requirement applicable to any such project under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], the Fish and Wildlife Coordination Act [16 U.S.C. 661 et seq.], the Endangered Species Act [16 U.S.C. 1531 et seq.], or any other provision of Federal law.
-
(e) The draft of any environmental impact statement required under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] in connection with any application filed under this section shall be completed, within nine months from the date of filing, by the head of the Federal agency assigned lead responsibility for the statement. Any such statement shall be jointly prepared by all Federal agencies with which the application was filed under subsection (c). The final environmental impact statement shall be completed within one year from the date of such filing. Such nine-month and one-year periods may be extended for good cause by the Federal agency head assigned lead responsibility for the preparation of such statement if he determines that additional time is necessary for such preparation, notifies the applicant in writing of such determination, and publishes notice of such determination, together with the reasons therefor, in the Federal Register. The provisions of section 1734 of title 43 shall apply to each environmental impact statement under this subsection in the same manner as such provisions apply to applications relating to the public lands referred to in section 1734 of title 43. The Federal agency assigned lead responsibility shall, in conjunction with such other Federal agencies before which the application is pending, hold public hearings in the District of Columbia and an appropriate location in the State on each draft joint environmental impact statement and the views expressed therein shall be considered by all Federal agencies concerned before publication of the final joint environmental impact statement.
-
(3) in any case in which an environmental impact statement is required under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], a statement which complies with the requirements of section 102(2)(C) of such Act [42 U.S.C. 4332(2)(C)]. In the case of any recommendation for which an environmental impact statement is not required under section 102(2)(C) of the National environmental Policy Act of 1969 [42 U.S.C. 4332(2)(C)], the President may, if he deems it desirable, include such a statement in his transmittal to the Congress.
-
(b) For purposes of this section, the term “resolution” means a joint resolution, the resolving clause of which is as follows: “That the House of Representatives and Senate approve the recommendation of the President for in submitted to the Congress on 19 .”, the first blank space therein to be filled in with appropriate activity, the second blank space therein to be filled in with the name or description of the area of land affected by the activity, and the third blank space therein to be filled with the date on which the President submits his recommendation to the House of Representatives and the Senate. Such resolution may also include material relating to the application and effect of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] to the recommendation.
-
(a) The Secretary, in consultation with the Secretary of the Interior, the Secretary of the Department in which the Coast Guard is operating and the appropriate Regional Fishery Management Council, shall promulgate such regulations as may be necessary to carry out the United States international obligations under the Treaty and this chapter, pursuant to section 3635 of this title, as well as conforming amendatory regulations applicable to the United States Exclusive Economic Zone. Any such regulation may be made applicable, as necessary, to all persons and all vessels subject to the jurisdiction of the United States, wherever located. Such regulations as are necessary and appropriate to carry out obligations of the United States under the Treaty involve a foreign affairs function, and as such shall not be subject to sections 553 through 557 of title 5, or the National Environmental Policy Act (42 U.S.C. 4321 et seq.).
-
(D) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(A) one shall be the Director of the United States Fish and Wildlife Service, who shall be the responsible Federal official for ensuring Council compliance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(b) The Council shall submit to the Migratory Bird Conservation Commission each year a description, including estimated costs, of the wetlands conservation projects which the Council has considered under subsection (a) of this section and which it recommends, in order of priority, that the Migratory Bird Conservation Commission approve for Federal funding under this chapter and section 669b(b) of this title. Solely for the purpose of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), recommendations by the Council for carrying out wetlands conservation projects under section 4405(a) of this title shall be considered Federal actions requiring the preparation of environmental assessments or, where appropriate, environmental impact statements.
-
(a) The ministerial issuance or amendment of an organizational camp special use authorization shall not be subject to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(1) Federal agency involvement in developing a community wildfire protection plan, or a recommendation made in a community wildfire protection plan, shall not be considered a Federal agency action under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(2) In implementing authorized hazardous fuel reduction projects on Federal land, the Secretary shall, in accordance with section 6514 of this title, comply with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(1) the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.]; and
-
(a) Nothing in this subchapter affects, or otherwise biases, the use by the Secretary of other statutory or administrative authority (including categorical exclusions adopted to implement the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.)) to conduct a hazardous fuel reduction project on Federal land (including Federal land identified in section 6512(d) of this title) that is not conducted using the process authorized by section 6514 of this title.
-
(3) The Secretary may conduct a single environmental impact statement or similar analysis required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.)—(A) for each watershed protection and restoration project included in the water source management plan; or(B) as part of the development of, or after the finalization of, the water source management plan.
-
(1) Applied silvicultural assessment and research treatments carried out under this section on not more than 1,000 acres for an assessment or treatment may be categorically excluded from documentation in an environmental impact statement and environmental assessment under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(1) considered an action categorically excluded from the requirements of Public Law 91–190 (42 U.S.C. 4321 et seq.); and
-
(2) considered an action categorically excluded from the requirements of Public Law 91–190 (42 U.S.C. 4321 et seq.); and
-
(A) comply with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(1) for which any applicable processes under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) have been completed on November 15, 2021;
-
(ii) to prioritize projects for which any applicable processes under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) have been completed as of November 15, 2021;
-
(iv) to develop interagency teams to increase coordination and efficiency under the National Environmental Policy Act of 1969 (42 U.S.C. 4321) [42 U.S.C. 4321 et seq.]; and
-
(b) Forest management activities described in subsection (c) are a category of actions designated as being categorically excluded from the preparation of an environmental assessment or an environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) if the categorical exclusion is documented through a supporting record and decision memorandum.
-
(2) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(B) evaluate whether a modification of an existing categorical exclusion or the establishment of 1 or more new categorical exclusions developed in compliance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) is necessary to undertake an activity described in paragraph (1) in a manner consistent with the authorities and requirements in this subchapter; and
-
(4) Any decision required to be made under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to any authorized recreation services to be provided under this section on Federal land shall not be delegated to a Governor, Indian Tribe, or county.
-
(E) an environmental assessment that meets the requirements of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], as amended, and as defined in 21 CFR Part 25, as it appears on August 2, 2004, and amended thereafter or information to support a categorical exclusion from the requirement to prepare an environmental assessment;
-
(2) Implementation of a new Treaty Minute or of a modification of Treaty Minute 283 under sections 277d–43 to 277d–46 of this title shall be subject to the provisions of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(1) A State may carry out, at the expense of the State, acquisitions of interests in real property for a project before completion of the review process required for the project under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) without affecting subsequent approvals required for the project by the State or any Federal agency.
-
(F) before the time that the cost incurred by a State is approved for Federal participation, environmental compliance pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) has been completed for the project for which the real property interest was acquired by the State, and the acquisition has been approved by the Secretary under this title, and in compliance with section 303 of title 49, section 7 of the Endangered Species Act, and all other applicable environmental laws shall be identified by the Secretary in regulations; and
-
(A) Before authorizing Federal funding for an acquisition of a real property interest, the Secretary shall complete the review process under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to the acquisition of the real property interest.
-
(i) shall be treated as having independent utility for purposes of the review process under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(I) A contracting agency may proceed, at the expense of the contracting agency, with design activities at any level of detail for a project before completion of the review process required for the project under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) without affecting subsequent approvals required for the project.
-
(viii) before the cost incurred by a State is approved for Federal participation, environmental compliance pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) has been completed for the transportation project for which the early utility relocation project was necessitated; and
-
(B) a record of decision, a finding of no significant impact, or a categorical exclusion under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) has been issued for the eligible project; and
-
(q) Since plans and TIPs described in this section are subject to a reasonable opportunity for public comment, since individual projects included in plans and TIPs are subject to review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), and since decisions by the Secretary concerning plans and TIPs described in this section have not been reviewed under that Act as of January 1, 1997, any decision by the Secretary concerning a plan or TIP described in this section shall not be considered to be a Federal action subject to review under that Act.
-
(k) Since the statewide transportation plan and the transportation improvement program described in this section are subject to a reasonable opportunity for public comment, since individual projects included in the statewide transportation plans and the transportation improvement program are subject to review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), and since decisions by the Secretary concerning statewide transportation plans or the transportation improvement program described in this section have not been reviewed under that Act as of January 1, 1997, any decision by the Secretary concerning a metropolitan or statewide transportation plan or the transportation improvement program described in this section shall not be considered to be a Federal action subject to review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(A) align, to the maximum extent practicable, with the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and section 306108 of title 54, including implementing regulations; and
-
(A) If, in an analysis required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), the Secretary determines that there is no feasible or prudent alternative to avoid use of a historic site, the Secretary may—(i) include the determination of the Secretary in the analysis required under that Act;(ii) provide a notice of the determination to—(I) each applicable State historic preservation officer and tribal historic preservation officer;(II) the Council, if the Council is participating in the consultation process under section 306108 of title 54; and(III) the Secretary of the Interior; and(iii) request from the applicable preservation officer, the Council, and the Secretary of the Interior a concurrence that the determination is sufficient to satisfy subsection (a)(1).
-
(3) The term “environmental document” includes an environmental assessment, finding of no significant impact, notice of intent, environmental impact statement, or record of decision under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(4) The term “environmental impact statement” means the detailed statement of environmental impacts required to be prepared under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(A) The term “environmental review process” means the process for preparing for a project an environmental impact statement, environmental assessment, categorical exclusion, or other document prepared under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(B) The term “environmental review process” includes the process and schedule, including a timetable for and completion of any environmental permit, approval, review, or study required for a project under any Federal law other than the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(i) multiple permits, approvals, reviews, or studies are required under a Federal law other than the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(1) The project development procedures in this section are applicable to all projects, including major projects, for which an environmental impact statement is prepared under the National Environmental Policy Act (42 U.S.C. 4321 et seq.) of 1969 and may be applied, as requested by a project sponsor and to the extent determined appropriate by the Secretary, to other projects for which an environmental document is prepared pursuant to such Act.
-
(I) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(2) Nothing in this section precludes another agency from being a joint lead agency in accordance with regulations under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(3) Any project sponsor that is a State or local governmental entity receiving funds under this title or chapter 53 of title 49 for the project shall serve as a joint lead agency with the Department for purposes of preparing any environmental document under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and may prepare any such environmental document required in support of any action or approval by the Secretary if the Federal lead agency furnishes guidance in such preparation and independently evaluates such document and the document is approved and adopted by the Secretary prior to the Secretary taking any subsequent action or making any approval based on such document, whether or not the Secretary’s action or approval results in Federal funding.
-
(B) to prepare or ensure that any required environmental impact statement or other document required to be completed under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) is completed in accordance with this section and applicable Federal law;
-
(A) carry out the obligations of that agency under other applicable law concurrently, and in conjunction, with the review required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), unless doing so would impair the ability of the Federal agency to conduct needed analysis or otherwise carry out those obligations; and
-
(A) Except as inconsistent with paragraph (7) and except as provided in subparagraph (D), to the maximum extent practicable and consistent with Federal law, all Federal authorizations and reviews for a project shall rely on a single environmental document for each kind of environmental document prepared under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) under the leadership of the lead agency.
-
(ii) the obligations of a cooperating agency or participating agency under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) have already been satisfied with respect to the project; or
-
(II) for the lead agency or a participating agency to fulfill the responsibilities of the agency under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) in a timely manner.
-
(I) the evaluation of alternatives under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(II) the lead agency provided guidance to the metropolitan planning organization or State or local transportation agency, as applicable, regarding analysis of alternatives in the metropolitan planning process or State environmental review process, including guidance on the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and any other Federal law necessary for approval of the project;
-
(aa) in consultation with Federal participating or cooperating agencies, that the alternative to be eliminated from consideration is not necessary for compliance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); or
-
(bb) the date that is 180 days after the date on which the Federal lead agency issues a decision on the project under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); or
-
(A) adequate resources made available under this title shall be devoted to ensuring that applicable environmental reviews under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) are completed on an expeditious basis and that the shortest existing applicable process under that Act is implemented; and
-
(B) the President shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate, not less frequently than once every 120 days after the date of enactment of the MAP–21, a report on the status and progress of the following projects and activities funded under this title with respect to compliance with applicable requirements under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.):(i) Projects and activities required to prepare an annual financial plan under section 106(i).
-
(2) Nothing in this section shall be construed as superseding, amending, or modifying the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) or any other Federal environmental statute or affect the responsibility of any Federal officer to comply with or enforce any such statute.
-
(A) that has an ongoing environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(1) In preparing a final environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), if the lead agency modifies the statement in response to comments that are minor and are confined to factual corrections or explanations of why the comments do not warrant additional agency response, the lead agency may write on errata sheets attached to the statement instead of rewriting the draft statement, subject to the condition that the errata sheets—(A) cite the sources, authorities, and reasons that support the position of the agency; and(B) if appropriate, indicate the circumstances that would trigger agency reappraisal or further response.
-
(i) to make publicly available the status and progress of projects requiring an environmental assessment or an environmental impact statement with respect to compliance with applicable requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and any other Federal, State, or local approval required for those projects; and
-
(3) A State with delegated authority for responsibilities under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) pursuant to section 327 shall be responsible for supplying to the Secretary project development and compliance status for all applicable projects.
-
(6) The term “NEPA process” means the entirety of the development and documentation of the analysis required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), including the assessment and analysis of any impacts, alternatives, and mitigation of a proposed action, and any interagency participation and public involvement required to be carried out before the Secretary undertakes a proposed action.
-
(7) The term “proposed action” means an action (within the meaning of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.)) under this title that the Secretary proposes to carry out.
-
(A) The lead agency for a project, with respect to an environmental impact statement, environmental assessment, categorical exclusion, or other document prepared under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(B) The cooperating agency with responsibility under Federal law, with respect to the process for and completion of any environmental permit, approval, review, or study required for a project under any Federal law other than the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), if consistent with that law.
-
(9) The planning product is appropriate for adoption or incorporation by reference and use in the environmental review process for the project and is incorporated in accordance with, and is sufficient to meet the requirements of, the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and section 1502.21 of title 40, Code of Federal Regulations (as in effect on the date of enactment of the FAST Act).
-
(f) If a programmatic mitigation plan has been developed pursuant to this section, any Federal agency responsible for environmental reviews, permits, or approvals for a transportation project shall give substantial weight to the recommendations in a programmatic mitigation plan when carrying out the responsibilities under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) or other Federal environmental law.
-
(g) Nothing in this section limits the use of programmatic approaches to reviews under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(5) A decision to add or remove a facility from the inventory shall not be considered a Federal action for purposes of review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(A) The term “environmental document” means an environmental impact statement, environmental assessment, categorical exclusion, or other document prepared under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(2) The Federal Highway Administration may prepare an environmental document pursuant to the implementing procedures of the Federal Highway Administration to comply with the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) if—(A) requested by a project sponsor; and(B) all areas of analysis required by the project sponsor can be addressed.
-
(4) In carrying out requirements under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) for a project, the project sponsor may use categorical exclusions designated under that Act in the implementing regulations of the Federal Highway Administration, subject to the conditions that—(A) the project sponsor makes a determination, in consultation with the Federal Highway Administration, that the categorical exclusion applies to the project;(B) the project satisfies the conditions for a categorical exclusion under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(B) the project satisfies the conditions for a categorical exclusion under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(iv) approved by each Federal agency having jurisdiction over the affected lands under such terms and conditions as the head of the Federal agency determines to be appropriate, except that the approval shall be contingent on compliance by the Federal agency with all applicable laws, including the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), the Forest and Rangeland Renewable Resources Planning Act of 1974 (16 U.S.C. 1600 et seq.), and the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.);
-
(h) The requirements under this section shall apply to all contracts eligible for assistance under this chapter for a project carried out within the scope of the applicable finding, determination, or decision under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), regardless of the funding source of such contracts, if at least 1 contract for the project is funded with amounts made available to carry out this title.
-
(d) A gift or donation in accordance with subsection (a) may be made at any time during the development of a project. Any document executed as part of such donation prior to the approval of an environmental document prepared pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) shall clearly indicate that—(1) all alternatives to a proposed alignment will be studied and considered pursuant to such Act;(2) acquisition of property under this section shall not influence the environmental assessment of a project including the decision relative to the need to construct the project or the selection of a specific location; and(3) any property acquired by gift or donation shall be revested in the grantor or successors in interest if such property is not required for the alignment chosen after public hearings, if required, and completion of the environmental document.
-
(3) The criteria under paragraph (2) shall include provisions for public availability of information consistent with section 552 of title 5 and the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(A) Subject to the other provisions of this section, with the written agreement of the Secretary and a State, which may be in the form of a memorandum of understanding, the Secretary may assign, and the State may assume, the responsibilities of the Secretary with respect to one or more highway projects within the State under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(ii) at the request of the State, the Secretary may also assign to the State, and the State may assume, the responsibilities of the Secretary with respect to 1 or more railroad, public transportation, or multimodal projects within the State under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(iii) in a State that has assumed the responsibilities of the Secretary under clause (ii), a recipient of assistance under chapter 53 of title 49 may request that the Secretary maintain the responsibilities of the Secretary with respect to 1 or more public transportation projects within the State under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); but
-
(2) provide guidance and training on consolidating and minimizing the documentation and environmental analyses necessary for sponsors of a locally administered project to comply with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and any comparable requirements under State law.
-
(1) The Secretary shall establish a pilot program to authorize States that have assumed responsibilities of the Secretary under section 327 and are approved to participate in the program under this section to conduct environmental reviews and make approvals for projects under State environmental laws and regulations instead of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), consistent with the requirements of this section.
-
(i) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(ii) any provisions of section 139 establishing procedures for the implementation of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) that are under the authority of the Secretary, as the Secretary, in consultation with the State, considers appropriate; and
-
(i) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(ii) any provisions of section 139 establishing procedures for the implementation of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) that are under the authority of the Secretary, as the Secretary, in consultation with the State, considers appropriate; and
-
(2) The National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) shall not apply to a decision by the Secretary to approve or disapprove an application submitted under this section.
-
(f) A State participating in the programs under this section and section 327, at the discretion of the State, may elect to apply the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) instead of the alternative environmental review and approval procedures of the State.
-
(g) To the maximum extent practicable and consistent with Federal law, other Federal agencies with authority over a project subject to this section shall adopt or incorporate by reference documents produced by a participating State under this section to satisfy the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(2) For up to 25 local governments selected by a State with an approved program under this section, the State shall be responsible for ensuring that any environmental review, consultation, or other action required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) or the State program, or both, meets the requirements of such Act or program.
-
(5) At the conclusion of the review process under paragraph (2), the Secretary may extend for an additional 5-year period or terminate the authority of a State under this section to substitute the laws and regulations of the State for the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(i) completion of an environmental impact statement or similar analysis required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(B) The National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(2) No funding shall be obligated for a project that has not received an environmental categorical exclusion, a finding of no significant impact, or a record of decision under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(v) The project has received a categorical exclusion, a finding of no significant impact, or a record of decision under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(A) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(1) In order to ensure that the policies of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and other provisions of law that further the purposes of such Act (as specified in regulations issued by the Secretary) are most effectively implemented in connection with the expenditure of grant amounts provided under this chapter, and to ensure to the public undiminished protection of the environment, the Secretary, in lieu of the environmental protection procedures otherwise applicable, may by regulation provide for the release of amounts for particular projects to tribes which assume all of the responsibilities for environmental review, decisionmaking, and action pursuant to such Act, and such other provisions of law as the regulations of the Secretary specify, that would apply to the Secretary were the Secretary to undertake such projects as Federal projects.
-
(b) The Secretary shall approve the release of funds subject to the procedures authorized by this section only if, not less than 15 days prior to such approval and prior to any commitment of funds to such projects, the tribe has submitted to the Secretary a request for such release accompanied by a certification that meets the requirements of subsection (c). The approval of the Secretary of any such certification shall be deemed to satisfy the responsibilities of the Secretary under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and such other provisions of law as the regulations of the Secretary specify insofar as those responsibilities relate to the releases of funds for projects to be carried out pursuant thereto that are covered by such certification.
-
(A) consents to assume the status of a responsible Federal official under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and each provision of law specified in regulations issued by the Secretary insofar as the provisions of such Act or such other provisions of law apply pursuant to subsection (a); and
-
(1) will not frustrate the goals of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] or any other provision of law that furthers the goals of that Act;
-
(i) that the policies of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and other provisions of law that further the purposes of such Act (as specified in regulations issued by the Secretary) are most effectively implemented in connection with the expenditure of grant amounts provided under this subchapter; and
-
(B) In lieu of applying environmental protection procedures otherwise applicable, the Secretary may by regulation provide for the release of funds for specific projects to the Department of Hawaiian Home Lands if the Director of the Department assumes all of the responsibilities for environmental review, decisionmaking, and action under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), and such other provisions of law as the regulations of the Secretary specify, that would apply to the Secretary were the Secretary to undertake those projects as Federal projects.
-
(2) The approval of the Secretary of a certification described in paragraph (1) shall be deemed to satisfy the responsibilities of the Secretary under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and such other provisions of law as the regulations of the Secretary specify to the extent that those responsibilities relate to the releases of funds for projects that are covered by that certification.
-
(A) consents to assume the status of a responsible Federal official under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and each provision of law specified in regulations issued by the Secretary to the extent that those laws apply by reason of subsection (a); and
-
(b) In carrying out a construction project under this subchapter, an Indian Tribe may, subject to the agreement of the Secretary, elect to assume some Federal responsibilities under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), division A of subtitle III of title 54, and related provisions of other law and regulations that would apply if the Secretary were to undertake a construction project, by adopting a resolution—(1) designating a certifying Tribal officer to represent the Indian Tribe and to assume the status of a responsible Federal official under those Acts, laws, or regulations; and(2) accepting the jurisdiction of the United States courts for the purpose of enforcing the responsibilities of the certifying Tribal officer assuming the status of a responsible Federal official under those Acts, laws, or regulations.
-
(c) Notwithstanding subsection (b), nothing in this section authorizes the Secretary to include in any compact or funding agreement duties of the Secretary under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), division A of subtitle III of title 54, and other related provisions of law that are inherent Federal functions.
-
(a) Indian tribes participating in tribal self-governance may carry out construction projects under this subchapter if they elect to assume all Federal responsibilities under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), division A of subtitle III of title 54, and related provisions of law that would apply if the Secretary were to undertake a construction project, by adopting a resolution—(1) designating a certifying officer to represent the Indian tribe and to assume the status of a responsible Federal official under such laws; and(2) accepting the jurisdiction of the Federal court for the purpose of enforcement of the responsibilities of the responsible Federal official under such environmental laws.
-
(1) Nothing in this section shall be construed to amend, repeal, modify, or change in any way the requirements of section 102(2)(C) [42 U.S.C. 4332(2)(C)] or any other provision of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
-
(t) The Secretary or agency head may ratify and confirm any right-of-way or permit for an oil or gas pipeline or related facility that was granted under any provision of law before the effective date of this subsection, if it is modified by mutual agreement to comply to the extent practical with the provisions of this section. Any action taken by the Secretary or agency head pursuant to this subsection shall not be considered a major Federal action requiring a detailed statement pursuant to section 102(2)(C) of the National Environmental Policy Act of 1970 (Public Law 90–190; 42 U.S.C. 4321).1
-
(A) issue the permit, if the requirements under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and other applicable law have been completed within such timeframe; or
-
(b) The declaration under subsection (a) shall apply only to those parts of the areas described in the Committee print referred to in subsection (a) which are or will be bulkheaded and filled or otherwise occupied by permanent structures, including marina facilities. All such work is subject to all applicable Federal statutes and regulations including, but not limited to, sections 401 and 403 of this title, section 1344 of this title, and the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
-
(c) The declaration under subsection (a) shall apply to those parts of the areas described in subsection (b) that are filled portions of Lake Erie. Any work on these filled portions shall be subject to all applicable Federal statutes and regulations, including sections 401 and 403 of this title, section 1344 of this title, and the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(C) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
If the Secretary of the Army, acting through the Chief of Engineers, finds that the proposed project to be erected at the location to be declared non-navigable under this section is in the public interest, on the basis of engineering studies to determine the location and structural stability of the bulkheading and filling and permanent pile-supported structures in order to preserve and maintain the remaining navigable waterway and on the basis of environmental studies conducted pursuant to the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], then those portions of the East River in New York County, State of New York, bounded and described as follows are hereby declared to be not navigable waters of the United States within the meaning of the laws of the United States, and the consent of Congress is hereby given to the filling in of all or any part thereof or the erection of permanent pile-supported structures thereon: That portion of the East River in New York County, State of New York, lying shoreward of a line with the United States pierhead line as it exists on March 7, 1974, bounded on the north by the south side of Rutgers Slip extended easterly, and bounded on the south by the southeasterly border of Battery Park at a point adjacent to the westerly end of South Street extended south by southwest, is hereby declared to be non-navigable waters of the United States. This declaration shall apply only to portions of the above-described area which are bulkheaded and filled or occupied by permanent pile-supported structures. Plans for bulkheading and filling and permanent pile-supported structures shall be approved by the Secretary of the Army, acting through the Chief of Engineers. Local interests shall reimburse the Federal Government for engineering and all other costs incurred under this section.
-
(C) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(e) The declaration under subsection (d) shall apply only to those parts of the areas described in subsection (d) which are or will be bulkheaded and filled or otherwise occupied by permanent structures, including marina facilities. All such work is subject to all applicable Federal statutes and regulations, including sections 401 and 403 of this title, section 1344 of this title, and the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
-
(c) The declaration under subsection (a) shall apply only to those parts of the areas described in subsection (a) of this section and not described in subsection (b) of this section which are or will be bulkheaded and filled or otherwise occupied by permanent structures or other permanent physical improvements, including marina facilities. All such work is subject to applicable Federal statutes and regulations, including sections 401 and 403 of this title, section 1344 of this title and the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
-
(b) The declaration under subsection (a) shall apply to those parts of the areas described in subsection (a) which are or will be bulkheaded and filled or otherwise occupied by permanent structures, including marina facilities. All such work is subject to all applicable Federal statutes and regulations, including sections 401 and 403 of this title, section 1344 of this title, and the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
-
(b) The declaration of nonnavigability under subsection (a) applies only to those parts of the area described in subsection (a) that are or will be bulkheaded, filled, or otherwise occupied or covered by permanent structures and does not affect the applicability of any Federal statute or regulation that relates to filling of navigable waters or to other regulated activities within the area described in subsection (a), including sections 401 and 403 of this title, section 1344 of this title, and the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
-
(2) The declaration under paragraph (1) shall apply only to those parts of the parcel described in subsection (a) which are or will be bulkheaded and filled or otherwise occupied by permanent structures, including marina facilities. All such work is subject to all applicable Federal statutes and regulations including, but not limited to, sections 401 and 403 of this title, section 1344 of this title, and the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
-
(C) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(b) The declaration under subsection (a) shall apply only to those parts of the areas described in subsection (a) of this section which are or will be bulkheaded and filled or otherwise occupied by permanent structures, including marina facilities. All such work is subject to all applicable Federal statutes and regulations, including, but not necessarily limited to, sections 401 and 403 of this title, section 1344 of this title, and the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
-
(a) If the Secretary of the Army acting through the Chief of Engineers, finds that the proposed project in Salisbury, Maryland, to be undertaken at the locations to be declared nonnavigable under this section is in the public interest, on the basis of engineering studies to determine the location and structural stability of any bulkheading and filling and permanent pile-supported structures, in order to preserve and maintain the remaining navigable waterway and on the basis of environmental studies conducted pursuant to the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], then those portions of the South Prong of the Wicomico River in Wicomico County, State of Maryland, bounded and described as follows, are declared to be not a navigable water of the United States within the meaning of the laws of the United States, and the consent of Congress is hereby given, consistent with subsection (b) of this section, to the filling in of a part thereof or the erection of permanent pile-supported structures thereon: That portion of the South Prong of the Wicomico River in Salisbury, Maryland, bounded on the east by the west side of United States Route 13; on the west by the west side of the Mill Street Bridge; on the south by a line five feet landward from the present water’s edge at high tide extending the entire length of the South Prong from the east boundary at United States Route 13 to the west boundary at the Mill Street Bridge; and on the north by a line five feet landward from the present water’s edge at high tide extending the entire length of the South Prong from the east boundary at United States Route 13 to the west boundary at the Mill Street Bridge.
-
(a) If the Secretary of the Army, acting through the Chief of Engineers, finds that the proposed project to be erected at the location to be declared nonnavigable under this section is in the public interest, on the basis of engineering studies to determine the location and structural stability of any bulkheading and filling and permanent pile-supported structure, in order to preserve and maintain the remaining navigable waterway and on the basis of environmental studies conducted pursuant to the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], then that portion of the Hudson River in Hudson County, State of New Jersey, bounded and described as follows is hereby declared to be nonnavigable water of the United States within the meaning of the laws of the United States, and the consent of Congress is hereby given to the filling in of all or any part thereof and the erection of permanent pile-supported structures thereon:Such portion is in the township of North Bergen in the county of Hudson and State of New Jersey, and is more particularly described as follows: At a point in the easterly right-of-way of New Jersey Shore Line Railroad (formerly New Jersey Junction Railroad) said point being located northerly, measured along said easterly right-of-way, 81.93 feet from Station 54+42.4 as shown on construction drawing dated May 23, 1931, of River Road, filed in the Office of the Hudson County Engineer, Jersey City, New Jersey:thence (1) northerly and along said easterly right-of-way on a bearing of north 12 degrees 11 minutes 14 seconds east, a distance of 280 feet to a point;thence (2) south 75 degrees 28 minutes 24 seconds east, a distance of 310 feet to a point;thence (3) south 17 degrees 15 minutes 41 seconds east, a distance of 101.70 feet to a point;thence (4) south 62 degrees 18 minutes 12 seconds east a distance of 355.64 feet to a point in the exterior solid fill line of April 7, 1903, and the bulkhead line of April 28, 1904, on the Hudson River;thence (5) along said exterior solid fill and bulkhead lines south 28 degrees 55 minutes 51 seconds west, a distance of 523 feet to a point in the northerly line of lands now or formerly of New York State Realty and Terminal Company;thence (6) north 61 degrees 34 minutes 29 seconds west, and along said northerly line of the New York State Realty and Terminal Company, a distance of 590.08 feet to a point in the aforementioned easterly right-of-way of the New Jersey Shore Line Railroad;thence (7) northerly and along said easterly right-of-way of the New Jersey Shore Line Railroad on a curve to the left a radius of 995.09 feet, an arc length of 170.96 feet to a point therein;thence (8) northerly, still along the same, on a bearing of north 12 degrees 11 minutes 14 seconds east, a distance of 81.93 feet to the point and place of beginning.Said parcel containing 8 acres being the same more or less.
-
(a) If the Secretary of the Army, acting through the Chief of Engineers finds that the proposed project to be erected at the location to be declared nonnavigable under this section is in the public interest, on the basis of engineering studies to determine the location and structural stability of any bulkheading and filling and permanent pile-supported structure, in order to preserve and maintain the remaining navigable waterway, and on the basis of environmental studies conducted pursuant to the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], then those portions of the Hackensack River in Hudson County, State of New Jersey, bounded and described as follows are hereby declared to be nonnavigable waters of the United States within the meaning of the laws of the United States, and the consent of Congress is hereby given to the filling in of all or any part thereof and the erection of permanent pile-supported structures thereon:Beginning at a point where the southeasterly shoreline (mean high water line) of the Hackensack River intersects the easterly line of the Erie Railroad said point property being 2,015.38 feet northerly along said railroad property from where it intersects the northerly line of the Meadowlands Parkway (100 feet wide) and running from:thence north 19 degrees 20 minutes 54 seconds west 50.00 feet;thence north 37 degrees 30 minutes 08 seconds east 615.38 feet;thence north 03 degrees 02 minutes 56 seconds east, 2,087 feet;thence north 31 degrees 11 minutes 06 seconds east 577 feet;thence north 74 degrees 29 minutes 18 seconds east 541.25 feet;thence south 62 degrees 01 minutes 31 seconds east 400 feet;thence south 55 degrees 46 minutes 27 seconds east 612.52 feet;thence south 34 degrees 13 minutes 33 seconds west 517.79 feet;thence south 55 degrees 46 minutes 27 seconds east 158.81 feet;thence south 34 degrees 13 minutes 33 seconds west 310 feet;thence north 55 degrees 26 minutes 27 seconds north 15 feet;thence south 34 degrees 13 minutes 33 seconds west 592 feet;thence running in a southwesterly direction along the shoreline (mean high water line) of the Hackensack River, a distance of 2,360 feet being the same more or less to the easterly property line of the Erie Railroad and the point or place of beginning.Said parcel containing 67.6 acres being the same more or less.
-
(b) The declaration under subsection (a) shall apply only to those parts of the areas described in subsection (a) of this section which are or will be bulkheaded and filled or otherwise occupied by permanent structures, including marina facilities. All such work is subject to all applicable Federal statutes and regulations, including, but not necessarily limited to, sections 401 and 403 of this title, section 1344 of this title, and the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
-
(A) In any case in which an activity subject to this section requires a review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), review and approval of the activity under this section shall, to the maximum extent practicable, occur concurrently with any review and decisions made under that Act.
-
(ii) adopt and use any environmental document prepared under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) by the lead agency to the same extent that a Federal agency could adopt or use a document prepared by another Federal agency under—(I) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and(II) parts 1500 through 1508 of title 40, Code of Federal Regulations (or successor regulations).
-
(I) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(B) As a condition on a Presidential permit considered to be granted under subparagraph (A), the eligible applicant shall complete all applicable environmental documents required pursuant to Public Law 91–190 (42 U.S.C. 4321 et seq.).
-
(1) to include in the application under subsection (b) environmental documents prepared pursuant to Public Law 91–190 (42 U.S.C. 4321 et seq.); or
-
(2) to have completed any environmental review under Public Law 91–190 (42 U.S.C. 4321 et seq.) prior to the President granting a Presidential permit under subsection (d).
-
(1) prohibits the President from granting a Presidential permit conditioned on the eligible applicant completing all environmental documents pursuant to Public Law 91–190 (42 U.S.C. 4321 et seq.) and complying with relevant laws;
-
(3) exempts an eligible applicant from the requirement to complete all environmental documents pursuant to Public Law 91–190 (42 U.S.C. 4321 et seq.) prior to construction of an international bridge; or
-
(4) exempts an eligible applicant from complying with Public Law 91–190 (42 U.S.C. 4321 et seq.) or any other law.
-
(a) The Secretary of the Army, acting through the Chief of Engineers, is authorized to construct, operate, and maintain, subject to the provisions of subsection (c), contained spoil disposal facilities of sufficient capacity for a period not to exceed ten years, to meet the requirements of this section. Before establishing each such facility, the Secretary of the Army shall obtain the concurrence of appropriate local governments and shall consider the views and recommendations of the Administrator of the Environmental Protection Agency and shall comply with requirements of section 1171 of this title), and of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.]. Section 401 of this title shall not apply to any facility authorized by this section.
-
(b) The Secretary of the Army, acting through the Chief of Engineers, shall establish the contained spoil disposal facilities authorized in subsection (a) at the earliest practicable date, taking into consideration the views and recommendations of the Administrator of the Environmental Protection Agency as to those areas which, in the Administrator’s judgment, are most urgently in need of such facilities and pursuant to the requirements of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and the Federal Water Pollution Control Act [33 U.S.C. 1251 et seq.].
-
(r) The discharge of dredged or fill material as part of the construction of a Federal project specifically authorized by Congress, whether prior to or on or after December 27, 1977, is not prohibited by or otherwise subject to regulation under this section, or a State program approved under this section, or section 1311(a) or 1342 of this title (except for effluent standards or prohibitions under section 1317 of this title), if information on the effects of such discharge, including consideration of the guidelines developed under subsection (b)(1) of this section, is included in an environmental impact statement for such project pursuant to the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and such environmental impact statement has been submitted to Congress before the actual discharge of dredged or fill material in connection with the construction of such project and prior to either authorization of such project or an appropriation of funds for such construction.
-
(1) Except for the provision of Federal financial assistance for the purpose of assisting the construction of publicly owned treatment works as authorized by section 1281 of this title, and the issuance of a permit under section 1342 of this title for the discharge of any pollutant by a new source as defined in section 1316 of this title, no action of the Administrator taken pursuant to this chapter shall be deemed a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (83 Stat. 852) [42 U.S.C. 4321 et seq.]; and
-
(A) For all applications, the Maritime Administration shall be the Federal lead agency for purposes of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(B) Compliance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) in accordance with subparagraph (A) shall fulfill the requirement of the Federal lead agency in carrying out the responsibilities under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) pursuant to this chapter.
-
(ii) The Secretary had determined that the project as specified in the initial license application was not likely to have any significant adverse environmental impact on species and habitat, consistent with law including National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(a) The Secretary, in accordance with the recommendations of the Administrator of the Environmental Protection Agency and the Administrator of the National Oceanic and Atmospheric Administration and after consultation with any other Federal departments and agencies having jurisdiction over any aspect of the construction or operation of a deepwater port, shall establish, as soon as practicable after January 3, 1975, environmental review criteria consistent with the National Environmental Policy Act [42 U.S.C. 4321 et seq.]. Such criteria shall be used to evaluate a deepwater port as proposed in an application, including—(1) the effect on the marine environment;(2) the effect on oceanographic currents and wave patterns;(3) the effect on alternate uses of the oceans and navigable waters, such as scientific study, fishing, and exploitation of other living and nonliving resources;(4) the potential dangers to a deepwater port from waves, winds, weather, and geological conditions, and the steps which can be taken to protect against or minimize such dangers;(5) effects of land-based developments related to deepwater port development;(6) the effect on human health and welfare; and(7) such other considerations as the Secretary deems necessary or appropriate.
-
(B) completes all of the Federal analyses, reviews, and compliance processes under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), that would be required with respect to the proposed project if the Secretary had undertaken the feasibility study.
-
(1) Not later than 12 months after November 8, 2007, the Chief of Engineers shall establish benchmarks for determining the length of time it should take to conduct a feasibility study for a water resources project and its associated review process under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). The Chief of Engineers shall use such benchmarks as a management tool to make the feasibility study process more efficient in all districts of the Corps of Engineers.
-
(9) If a programmatic environmental mitigation plan has been developed under this subsection, any Federal agency responsible for environmental reviews, permits, or approvals for a water resources development project may use the recommendations in that programmatic environmental mitigation plan when carrying out the responsibilities of the agency under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(10) Nothing in this subsection limits the use of programmatic approaches to reviews under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(i) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(2) No environmental impact statement or environmental assessment required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) shall substantially commence with respect to a water storage project until the date on which the District Engineer provides to the applicant a purpose and need statement as required under paragraph (1).
-
(1) The term “environmental impact statement” means the detailed statement of environmental impacts of a project required to be prepared pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(A) The term “environmental review process” means the process of preparing an environmental impact statement, environmental assessment, categorical exclusion, or other document under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) for a project study.
-
(B) The term “environmental review process” includes the process for and completion of any environmental permit, approval, review, or study required for a project study under any Federal law other than the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(A) shall apply to each project study that is initiated after June 10, 2014, and for which an environmental impact statement is prepared under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(A) At the discretion of the Secretary and subject to the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and the requirements of section 1506.8 of title 40, Code of Federal Regulations (or successor regulations), including the concurrence of the proposed joint lead agency, a project sponsor may serve as the joint lead agency.
-
(i) with the concurrence of the Secretary, serve as a joint lead agency with the Federal lead agency for purposes of preparing any environmental document under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(ii) prepare any environmental review process document under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) required in support of any action or approval by the Secretary if—(I) the Secretary provides guidance in the preparation process and independently evaluates that document;(II) the project sponsor complies with all requirements applicable to the Secretary under—(aa) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);(bb) any regulation implementing that Act; and(cc) any other applicable Federal law; and
-
(aa) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(A) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(B) to prepare or ensure that any required environmental impact statement or other environmental review document for a project study required to be completed under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) is completed in accordance with this section and applicable Federal law.
-
(i) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(A) Not later than 1 year after June 10, 2014, the Secretary shall establish and maintain an electronic database and, in coordination with other Federal and State agencies, issue reporting requirements to make publicly available the status and progress with respect to compliance with applicable requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et. seq.) and any other Federal, State, or local approval or action required for a project study for which this section is applicable.
-
(II) $10,000 for any project study requiring any type of review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) other than an environmental assessment or environmental impact statement.
-
(II) the date that is 180 days after the date on which the Federal lead agency issues a decision on the project under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(A) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(5) The term “project study” means a feasibility study for a project carried out pursuant to section 2282 of this title for which a categorical exclusion may apply, or an environmental assessment or an environmental impact statement is required, pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(2) the completion of any actions required for the project pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(II) the requirements of titles 23, 40, and 49, title I of the Housing and Community Development Act of 1974 (42 U.S.C. 5301 et seq.), and the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et. seq)1 shall apply to funds provided under a payment made under this section that are used for projects described in subparagraph (B); and
-
(II) the requirements of titles 23, 40, and 49, title I of the Housing and Community Development Act of 1974 (42 U.S.C. 5301 et seq.), and the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et. seq)1 shall apply to funds provided under a payment made under this section that are used for projects described in section 802(c)(5)(B) of this title.
-
(1) In order to assure that the policies of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and other provisions of law which further the purposes of such Act (as specified in regulations issued by the Secretary) are most effectively implemented in connection with the expenditure of funds under this subchapter, and to assure to the public undiminished protection of the environment, the Secretary may, under such regulations, in lieu of the environmental protection procedures otherwise applicable, provide for the release of funds for projects or activities under this subchapter, as specified by the Secretary upon the request of a public housing agency under this section, if the State or unit of general local government, as designated by the Secretary in accordance with regulations, assumes all of the responsibilities for environmental review, decisionmaking, and action pursuant to such Act, and such other provisions of law as the regulations of the Secretary may specify, which would otherwise apply to the Secretary with respect to the release of funds.
-
(b) The Secretary shall approve the release of funds subject to the procedures authorized by this section only if, not less than 15 days prior to such approval and prior to any commitment of funds to such projects or activities, the public housing agency has submitted to the Secretary a request for such release accompanied by a certification of the State or unit of general local government which meets the requirements of subsection (c). The Secretary’s approval of any such certification shall be deemed to satisfy the Secretary’s responsibilities under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and such other provisions of law as the regulations of the Secretary specify insofar as those responsibilities relate to the release of funds which are covered by such certification.
-
(A) consents to assume the status of a responsible Federal official under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and each provision of law specified in regulations issued by the Secretary insofar as the provisions of such Act or other such provision of law apply pursuant to subsection (a); and
-
(1) The issuance of a license under sections 2073 and 2093 of this title for the construction and operation of any uranium enrichment facility shall be considered a major Federal action significantly affecting the quality of the human environment for purposes of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(a) Except as provided in subsection (b), the Secretary may, for purposes of environmental review, decision making, and action pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), and other provisions of law that further the purposes of such Act, designate the treatment of assistance administered by the Secretary as funds for a special project for purposes of section 3547 of this title.
-
(b) The designation described in subsection (a) shall not apply to assistance for which a procedure for carrying out the responsibilities of the Secretary under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), and other provisions of law that further the purposes of such Act, is otherwise specified in law.
-
(A) In order to assure that the policies of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and other provisions of law which further the purposes of such Act (as specified in regulations issued by the Secretary) are most effectively implemented in connection with the expenditure of funds for special projects appropriated under an appropriations Act for the Department of Housing and Urban Development, such as special projects under the head “Annual Contributions for Assisted Housing” in title II of the Departments of Veterans Affairs and Housing and Urban Development, and Independent Agencies Appropriations Act, 1993, and to assure to the public undiminished protection of the environment, the Secretary of Housing and Urban Development may, under such regulations, in lieu of the environmental protection procedures otherwise applicable, provide for the release of funds for particular special projects upon the request of recipients of special projects assistance, if the State, Indian Tribe, or unit of general local government, as designated by the Secretary in accordance with regulations, assumes all of the responsibilities for environmental review, decisionmaking, and action pursuant to such Act, and such other provisions of law as the regulations of the Secretary specify, that would otherwise apply to the Secretary were the Secretary to undertake such special projects as Federal projects.
-
(2) The Secretary shall approve the release of funds for projects subject to the procedures authorized by this section only if, not less than 15 days prior to such approval and prior to any commitment of funds to such projects, the recipient submits to the Secretary a request for such release, accompanied by a certification of the State, Indian Tribe, or unit of general local government which meets the requirements of paragraph (3). The Secretary’s approval of any such certification shall be deemed to satisfy the Secretary’s responsibilities under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and such other provisions of law as the regulations of the Secretary specify insofar as those responsibilities relate to the releases of funds for special projects to be carried out pursuant thereto which are covered by such certification.
-
(i) consents to assume the status of a responsible Federal official under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and each provision of law specified in regulations issued by the Secretary insofar as the provisions of such Act or other such provision of law apply pursuant to paragraph (1); and
-
(16) The term “NEPA” means the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
Nothing in this subchapter amends the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(1) For purposes of environmental review, decisionmaking, and action pursuant to the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and other provisions of law that further the purposes of such Act, a grant under this section shall be treated as assistance under the HOME Investment Partnership2 Act, established under title II of the Cranston-Gonzalez National Affordable Housing Act [42 U.S.C. 12721 et seq.], and shall be subject to the regulations promulgated by the Secretary to implement section 288 of such Act [42 U.S.C. 12838].
-
(e) The Administrator may delegate to a participating entity all of the responsibilities for environmental review, decision making, and action pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), and other applicable Federal environmental laws including the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.) and the National Historic Preservation Act of 1966 (54 U.S.C. 300101 et seq.) that would apply to the Administrator were the Administrator to undertake projects under this section as Federal projects so long as the participating entity carries out such responsibilities in the same manner and subject to the same requirements as if the Administrator carried out such responsibilities.
-
An action which is taken or assistance which is provided pursuant to section 5170a, 5170b, 5172, 5173, or 5192 of this title, including such assistance provided pursuant to the procedures provided for in section 5189 of this title, which has the effect of restoring a facility substantially to its condition prior to the disaster or emergency, shall not be deemed a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (83 Stat. 852) [42 U.S.C. 4321 et seq.]. Nothing in this section shall alter or affect the applicability of the National Environmental Policy Act of 1969 to other Federal actions taken under this chapter or under any other provisions of law.
-
(A) adequate resources are devoted to ensure that applicable environmental reviews under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and historic preservation reviews under the National Historic Preservation Act1 are completed on an expeditious basis; and
-
(B) the shortest existing applicable process under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and the National Historic Preservation Act1 is utilized.
-
(1) In order to assure that the policies of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and other provisions of law which further the purposes of such Act (as specified in regulations issued by the Secretary) are most effectively implemented in connection with the expenditure of funds under this chapter, and to assure to the public undiminished protection of the environment, the Secretary, in lieu of the environmental protection procedures otherwise applicable, may under regulations provide for the release of funds for particular projects to recipients of assistance under this chapter who assume all of the responsibilities for environmental review, decisionmaking, and action pursuant to such Act, and such other provisions of law as the regulations of the Secretary specify, that would apply to the Secretary were he to undertake such projects as Federal projects. The Secretary shall issue regulations to carry out this subsection only after consultation with the Council on Environmental Quality.
-
(2) The Secretary shall approve the release of funds for projects subject to the procedures authorized by this subsection only if, at least fifteen days prior to such approval and prior to any commitment of funds to such projects other than for purposes authorized by section 5305(a)(12) of this title or for environmental studies, the recipient of assistance under this chapter has submitted to the Secretary a request for such release accompanied by a certification which meets the requirements of paragraph (3). The Secretary’s approval of any such certification shall be deemed to satisfy his responsibilities under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and such other provisions of law as the regulations of the Secretary specify insofar as those responsibilities relate to the releases of funds for projects to be carried out pursuant thereto which are covered by such certification.
-
(D) specify that the certifying officer (i) consents to assume the status of a responsible Federal official under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and each provision of law specified in regulations issued by the Secretary insofar as the provisions of such Act or other such provision of law apply pursuant to paragraph (1) of this subsection, and (ii) is authorized and consents on behalf of the recipient of assistance under this chapter and himself to accept the jurisdiction of the Federal courts for the purpose of enforcement of his responsibilities as such an official.
-
(2) Notwithstanding section 5304(g)(2) of this title, the Secretary or a State may, upon receipt of a request for release of funds and certification, immediately approve the release of funds for an activity or project to be assisted under this section if the recipient has adopted an environmental review, approval, or permit under paragraph (1) or the activity or project is categorically excluded from review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(d) The;1 first lease sale shall be conducted within twenty months of December 12, 1980: Provided, That the first lease sale shall be conducted only after publication of a final environmental impact statement if such is deemed necessary under the provisions of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(a) The provisions of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] shall apply to actions of the Administrator implementing sections 7275 to 7276c of this title in the same manner and to the same extent as such provisions apply to other major Federal actions significantly affecting the quality of the human environment.
-
(c) Nothing in this section shall be construed to amend or alter any provision of the National Environmental Policy Act [42 U.S.C. 4321 et seq.] or to affect any determination as to whether or not the requirements of such Act have been met in the case of the construction of any sewage treatment works.
-
Where necessary or appropriate in order to consolidate in a safe and environmentally sound manner the location of residual radioactive materials which are removed from processing sites under cooperative agreements under this subchapter, or where otherwise necessary for the permanent disposition and stabilization of such materials in such manner—
-
(B) any other standard, limitation, or other requirement established by, or pursuant to, the Clean Air Act [42 U.S.C. 7401 et seq.], the Federal Water Pollution Control Act [33 U.S.C. 1251 et seq.], the Solid Waste Disposal Act [42 U.S.C. 6901 et seq.], or the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
-
(1) The Secretary may conduct at the Yucca Mountain site only such site characterization activities as the Secretary considers necessary to provide the data required for evaluation of the suitability of such site for an application to be submitted to the Commission for a construction authorization for a repository at such site, and for compliance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(D) a final environmental impact statement prepared for the Yucca Mountain site pursuant to subsection (f) and the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), together with comments made concerning such environmental impact statement by the Secretary of the Interior, the Council on Environmental Quality, the Administrator, and the Commission, except that the Secretary shall not be required in any such environmental impact statement to consider the need for a repository, the alternatives to geological disposal, or alternative sites to the Yucca Mountain site;
-
(1) Any recommendation made by the Secretary under this section shall be considered a major Federal action significantly affecting the quality of the human environment for purposes of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). A final environmental impact statement prepared by the Secretary under such Act shall accompany any recommendation to the President to approve a site for a repository.
-
(2) With respect to the requirements imposed by the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), compliance with the procedures and requirements of this chapter shall be deemed adequate consideration of the need for a repository, the time of the initial availability of a repository, and all alternatives to the isolation of high-level radioactive waste and spent nuclear fuel in a repository.
-
(3) For purposes of complying with the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and this section, the Secretary need not consider alternate sites to the Yucca Mountain site for the repository to be developed under this part.
-
(4) Any environmental impact statement prepared in connection with a repository proposed to be constructed by the Secretary under this part shall, to the extent practicable, be adopted by the Commission in connection with the issuance by the Commission of a construction authorization and license for such repository. To the extent such statement is adopted by the Commission, such adoption shall be deemed to also satisfy the responsibilities of the Commission under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and no further consideration shall be required, except that nothing in this subsection shall affect any independent responsibilities of the Commission to protect the public health and safety under the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.).
-
(D) for review of any environmental impact statement prepared pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to any action under this part, or as required under section 10155(c)(1) of this title, or alleging a failure to prepare such statement with respect to any such action;
-
(1) Preparation and submission to the Congress of the proposal required in this section shall not require the preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)). The Secretary shall prepare, in accordance with regulations issued by the Secretary implementing such Act [42 U.S.C. 4321 et seq.], an environmental assessment with respect to such proposal. Such environmental assessment shall be based upon available information regarding alternative technologies for the storage of spent nuclear fuel and high-level radioactive waste. The Secretary shall submit such environmental assessment to the Congress at the time such proposal is submitted.
-
(2) If the Congress by law, after review of the proposal submitted by the Secretary under subsection (b), specifically authorizes construction of a monitored retrievable storage facility, the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) shall apply with respect to construction of such facility, except that any environmental impact statement prepared with respect to such facility shall not be required to consider the need for such facility or any alternative to the design criteria for such facility set forth in subsection (b)(1).
-
(d) Site specific activities and selection of a site under this section shall not require the preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)). The Secretary shall prepare an environmental assessment with respect to such selection in accordance with regulations issued by the Secretary implementing such Act [42 U.S.C. 4321 et seq.]. Such environmental assessment shall be based upon available information regarding alternative technologies for the storage of spent nuclear fuel and high-level radioactive waste. The Secretary shall submit such environmental assessment to the Congress at the time such site is selected.
-
(1) Once the selection of a site is effective under section 10166 of this title, the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) shall apply with respect to construction of a monitored retrievable storage facility, except that any environmental impact statement prepared with respect to such facility shall not be required to consider the need for such facility or any alternative to the design criteria for such facility set forth in section 10161(b)(1) of this title.
-
(2) The Secretary and the heads of all other Federal agencies shall, to the maximum extent possible, avoid duplication of efforts in the preparation of reports under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(a) Issuance of a construction authorization for a repository or monitored retrievable storage facility under section 10245(b) of this title shall be considered a major Federal action significantly affecting the quality of the human environment for purposes of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(a) In order to assure that the policies of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and other provisions of law which further the purposes of such Act (as specified in regulations issued by the Secretary) are most effectively implemented in connection with the expenditure of funds under this subchapter, and to assure to the public undiminished protection of the environment, the Secretary, in lieu of the environmental protection procedures otherwise applicable, may under regulations provide for the release of funds for particular projects to jurisdictions or insular areas under this subchapter who assume all of the responsibilities for environmental review, decisionmaking, and action pursuant to such Act, and such other provisions of law as the regulations of the Secretary specify, that would apply to the Secretary were he to undertake such projects as Federal projects. The Secretary shall issue regulations to carry out this section only after consultation with the Council on Environmental Quality. The regulations shall provide—(1) for the monitoring of the environmental reviews performed under this section;(2) in the discretion of the Secretary, to facilitate training for the performance of such reviews; and(3) for the suspension or termination of the assumption under this section.The Secretary’s duty under the preceding sentence shall not be construed to limit or reduce any responsibility assumed by a State or unit of general local government with respect to any particular release of funds.
-
(b) The Secretary shall approve the release of funds subject to the procedures authorized by this section only if, at least 15 days prior to such approval and prior to any commitment of funds to such projects1 the jurisdiction or insular area has submitted to the Secretary a request for such release accompanied by a certification which meets the requirements of subsection (c). The Secretary’s approval of any such certification shall be deemed to satisfy his responsibilities under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and such other provisions of law as the regulations of the Secretary specify insofar as those responsibilities relate to the releases of funds for projects to be carried out pursuant thereto which are covered by such certification.
-
(4) specify that the certifying officer (A) consents to assume the status of a responsible Federal official under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and each provision of law specified in regulations issued by the Secretary insofar as the provisions of such Act or other such provision of law apply pursuant to subsection (a), and (B) is authorized and consents on behalf of the jurisdiction or insular area and himself to accept the jurisdiction of the Federal courts for the purpose of enforcement of his responsibilities as such an official.
-
(e) The following categories of activities carried out under this subchapter shall be statutorily exempt from environmental review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), and shall not require further review under such Act:(1) New construction infill housing projects.(2) Acquisition of real property for affordable housing purposes.(3) Rehabilitation projects carried out pursuant to section 12742(a)(1) of this title.(4) New construction projects of 15 units or less.
-
(2) The Secretary shall, by regulation, provide for coordination of environmental review responsibilities with other Federal agencies to streamline interagency compliance and avoid unnecessary duplication of effort under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and other applicable laws.
-
(E) the preparation of analyses under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(a) Action by the Secretary of the Interior in managing the public lands, or the Secretary of Agriculture in managing National Forest System Lands, with respect to any of the activities described in subsection (b) shall be subject to a rebuttable presumption that the use of a categorical exclusion under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] (NEPA) would apply if the activity is conducted pursuant to the Mineral Leasing Act [30 U.S.C. 181 et seq.] for the purpose of exploration or development of oil or gas.
-
(1) Subject to paragraph (2), the issuance of a sundry notice or right-of-way for a gathering line and associated field compression or pumping unit that is located on Federal land or Indian land and that services any oil or gas well may be considered by the Secretary to be an action that is categorically excluded (as defined in section 1508.1 of title 40, Code of Federal Regulations (as in effect on November 15, 2021)) for purposes of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) if the gathering line and associated field compression or pumping unit—(A) are within a field or unit for which an approved land use plan or an environmental document prepared pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) analyzed transportation of oil, natural gas, or produced water from 1 or more oil or gas wells in the field or unit as a reasonably foreseeable activity;(B) are located adjacent to or within—(i) any existing disturbed area; or(ii) an existing corridor for a right-of-way; and(C) would reduce—(i) in the case of a gathering line and associated field compression or pumping unit transporting methane, the total quantity of methane that would otherwise be vented, flared, or unintentionally emitted from the field or unit; or(ii) in the case of a gathering line and associated field compression or pumping unit not transporting methane, the vehicular traffic that would otherwise service the field or unit.
-
(A) are within a field or unit for which an approved land use plan or an environmental document prepared pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) analyzed transportation of oil, natural gas, or produced water from 1 or more oil or gas wells in the field or unit as a reasonably foreseeable activity;
-
(A) to which the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) applies; and
-
(2) makes the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) applicable to land to which that Act otherwise would not apply.
-
(2) Federal credit assistance may only be provided under this part for a project that has received an environmental categorical exclusion, a finding of no significant impact, or a record of decision under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(1) any Federal environmental law, including the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
The Secretary may hereafter partner, provide a grant to, or enter into a cooperative agreement with local joint powers authorities formed pursuant to State law by irrigation districts and other local water districts and local governments, to advance planning and feasibility studies authorized by Congress for water storage project: Provided, That the Secretary shall ensure that all documents associated with the preparation of planning and feasibility studies and applicable environmental reviews under the National Environmental Policy Act [42 U.S.C. 4321 et seq.] for a project covered by this section shall be made available to any joint powers authority with whom the Secretary enters into an agreement to advance such project: Provided further, That the Secretary, acting through the Commissioner of the Bureau of Reclamation, shall ensure that all applicable environmental reviews under the National Environmental Policy Act, to the degree such reviews are required, are completed on an expeditious basis and that the shortest existing applicable process under the National Environmental Policy Act shall be utilized, including in the completion of feasibility studies, Draft Environmental Impact Statements (DEIS) and Final Environmental Impact Statements (FEIS): Provided further, That the Bureau of Reclamation need not complete the applicable feasibility study, DEIS or FEIS if the Commissioner determines, and the Secretary concurs, that the project can be expedited by a joint powers authority as a non-Federal project or if the project fails to meet applicable Federal cost-benefit requirements or standards: Provided further, That the Secretary shall not provide financial assistance towards these studies or projects, unless there is a demonstrable Federal interest.
-
(a) The Secretary shall undertake appraisal investigations to identify opportunities for water reclamation and reuse. Each such investigation shall take into account environmental considerations as provided by the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and regulations issued to implement the provisions thereof, and shall include recommendations as to the preparation of a feasibility study of the potential reclamation and reuse measures.
-
Works financed by loans made under sections 421a to 421h of this title shall be subject to all procedural and substantive requirements of the Fish and Wildlife Coordination Act [16 U.S.C. 661 et seq.], the Federal Water Pollution Control Act, as amended [33 U.S.C. 1251 et seq.], and the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
-
(3) The Bureau of Reclamation shall apply its categorical exclusion process under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) to small conduit hydropower development under this subsection, excluding siting of associated transmission facilities on Federal lands.
-
(2) The Secretary may require lessees of tracts for which development and production plans have not been approved, to submit preliminary or final plans for their leases, prior to or immediately after a determination by the Secretary that the procedures under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] shall commence.
-
(1) After reviewing the record of any public hearing held with respect to the approval of a plan pursuant to the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] or the comments and recommendations submitted under subsection (g) of this section, the Secretary shall, within sixty days after the release of the final environmental impact statement prepared pursuant to the National Environmental Policy Act of 1969 in accordance with subsection (e) of this section, or sixty days after the period provided for comment under subsection (g) of this section, approve, disapprove, or require modifications of the plan. The Secretary shall require modification of a plan if he determines that the lessee has failed to make adequate provision in such plan for safe operations on the lease area or for protection of the human, marine, or coastal environment, including compliance with the regulations prescribed by the Secretary pursuant to paragraph (8) of section 1334(a) of this title. Any modification required by the Secretary which involves activities for which a Federal license or permit is required and which affects any land use or water use in the coastal zone of a State with a coastal zone management program approved pursuant to section 306 of the Coastal Zone Management Act of 1972 (16 U.S.C. 1455) must receive concurrence by such State with respect to the consistency certification accompanying such plan pursuant to section 307(c)(3)(B)(i) or (ii) of such Act [16 U.S.C. 1456(c)(3)(B)(i) or (ii)] unless the Secretary of Commerce makes the finding authorized by section 307(c)(3)(B)(iii) of such Act [16 U.S.C. 1456(c)(3)(B)(iii)]. The Secretary shall disapprove a plan—(A) if the lessee fails to demonstrate that he can comply with the requirements of this subchapter or other applicable Federal law, including the regulations prescribed by the Secretary pursuant to paragraph (8) of section 1334(a) of this title;(B) if any of the activities described in detail in the plan for which a Federal license or permit is required and which affects any land use or water use in the coastal zone of a State with a coastal zone management program approved pursuant to section 306 of the Coastal Zone Management Act of 1972 (16 U.S.C. 1455) do not receive concurrence by such State with respect to the consistency certification accompanying such plan pursuant to section 307(c)(3)(B)(i) or (ii) of such Act [16 U.S.C. 1456(c)(3)(B)(i) or (ii)] and the Secretary of Commerce does not make the finding authorized by section 307(c)(3)(B)(iii) of such Act [16 U.S.C. 1456(c)(3)(B)(iii)];(C) if operations threaten national security or national defense; or(D) if the Secretary determines, because of exceptional geological conditions in the lease areas, exceptional resource values in the marine or coastal environment, or other exceptional circumstances, that (i) implementation of the plan would probably cause serious harm or damage to life (including fish and other aquatic life), to property, to any mineral deposits (in areas leased or not leased), to the national security or defense, or to the marine, coastal or human environments, (ii) the threat of harm or damage will not disappear or decrease to an acceptable extent within a reasonable period of time, and (iii) the advantages of disapproving the plan outweigh the advantages of development and production.
-
(k) If any development and production plan submitted to the Secretary pursuant to this section provides for the production and transportation of natural gas, the lessee shall contemporaneously submit to the Federal Energy Regulatory Commission that portion of such plan which relates to production of natural gas and the facilities for transportation of natural gas. The Secretary and the Federal Energy Regulatory Commission shall agree as to which of them shall prepare an environmental impact statement pursuant to the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] applicable to such portion of such plan, or conduct studies as to the effect on the environment of implementing it. Thereafter, the findings and recommendations by the agency preparing such environmental impact statement or conducting such studies pursuant to such agreement shall be adopted by the other agency, and such other agency shall not independently prepare another environmental impact statement or duplicate such studies with respect to such portion of such plan, but the Federal Energy Regulatory Commission, in connection with its review of an application for a certificate of public convenience and necessity applicable to such transportation facilities pursuant to section 717f of title 15, may prepare such environmental studies or statement relevant to certification of such transportation facilities as have not been covered by an environmental impact statement or studies prepared by the Secretary. The Secretary, in consultation with the Federal Energy Regulatory Commission, shall promulgate rules to implement this subsection, but the Federal Energy Regulatory Commission shall retain sole authority with respect to rules and procedures applicable to the filing of any application with the Commission and to all aspects of the Commission’s review of, and action on, any such application.
-
Nothing in this chapter shall be deemed to modify the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], the Federal Water Pollution Control Act, as amended [33 U.S.C. 1251 et seq.], or, except as expressly stated herein, the provisions of any other Federal law.
-
Except as provided in sections 620d(d)(5), 1543(g)(2), and 1595(b) of this title, with respect to the Colorado River Basin Project Act [43 U.S.C. 1501 et seq.] and the Colorado River Storage Project Act [43 U.S.C. 620 et seq.], respectively, nothing in this subchapter shall be construed to alter, amend, repeal, modify, interpret, or be in conflict with the provisions of the Colorado River Compact (45 Stat. 1057), the Upper Colorado River Basin Compact (63 Stat. 31), the Water Treaty of 1944 with the United Mexican States (Treaty Series 994; 59 Stat. 1219), the decree entered by the Supreme Court of the United States in Arizona against California and others (376 U.S. 340), the Boulder Canyon Project Act (45 Stat. 1057) [43 U.S.C. 617 et seq.], Boulder Canyon Project Adjustment Act (54 Stat. 774; 43 U.S.C. 618a) [43 U.S.C. 618 et seq.], section 15 of the Colorado River Storage Project Act (70 Stat. 111; 43 U.S.C. 620n), the Colorado River Basin Project Act (82 Stat. 885), section 6 of the Fryingpan-Arkansas Project Act (76 Stat. 393) [43 U.S.C. 616e)], section 15 of the Navajo Indian irrigation project and initial stage of the San Juan-Chama Project Act (76 Stat. 102) [43 U.S.C. 615ww)], the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], and the Federal Water Pollution Control Act, as amended [33 U.S.C. 1251 et seq.].
-
The National Environmental Policy Act of 1969 (83 Stat. 852) [42 U.S.C. 4321 et seq.] shall not be construed, in whole or in part, as requiring the preparation or submission of an environmental impact statement for withdrawals, conveyances, regulations, orders, easement determinations, or other actions which lead to the issuance of conveyances to Natives or Native Corporations, pursuant to the Alaska Native Claims Settlement Act [43 U.S.C. 1601 et seq.], or this Act. Nothing in this section shall be construed as affirming or denying the validity of any withdrawals by the Secretary under section 14(h)(3) of the Alaska Native Claims Settlement Act [43 U.S.C. 1613(h)(3)].
-
(d) The actions taken pursuant to this chapter which relate to the construction and completion of the pipeline system, and to the applications filed in connection therewith necessary to the pipeline’s operation at full capacity, as described in the Final Environmental Impact Statement of the Department of the Interior, shall be taken without further action under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.]; and the actions of the Federal officers concerning the issuance of the necessary rights-of-way, permits, leases, and other authorizations for construction and initial operation at full capacity of said pipeline system shall not be subject to judicial review under any law except that claims alleging the invalidity of this section may be brought within sixty days following November 16, 1973, and claims alleging that an action will deny rights under the Constitution of the United States, or that the action is beyond the scope of authority conferred by this chapter, may be brought within sixty days following the date of such action. A claim shall be barred unless a complaint is filed within the time specified. Any such complaint shall be filed in a United States district court, and such court shall have exclusive jurisdiction to determine such proceeding in accordance with the procedures hereinafter provided, and no other court of the United States, of any State, territory, or possession of the United States, or of the District of Columbia, shall have jurisdiction of any such claim whether in a proceeding instituted prior to or on or after November 16, 1973. Such court shall not have jurisdiction to grant any injunctive relief against the issuance of any right-of-way, permit, lease, or other authorization pursuant to this section except in conjunction with a final judgment entered in a case involving a claim filed pursuant to this section. An interlocutory or final judgment, decree, or order of such district court may be reviewed only upon petition for a writ of certiorari to the Supreme Court of the United States.
-
(C) assurances that all relevant documents concerning the proposed exchange or purchase for which such authority is proposed to be exercised (including documents related to compliance with the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and all other applicable provisions of law) are available for public inspection in the office of the Secretary concerned located nearest to the lands proposed for transfer out of Federal ownership in furtherance of such exchange and that the relevant portions of such documents are also available in the offices of the Secretary concerned in Washington, District of Columbia; and
-
(2) The terms and conditions in a grazing permit or lease that has expired, or was terminated due to a grazing preference transfer, shall be continued under a new permit or lease until the date on which the Secretary concerned completes any environmental analysis and documentation for the permit or lease required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and other applicable laws.
-
(4) The Secretary concerned shall seek to conduct environmental reviews on an allotment or multiple allotment basis, to the extent practicable, if the allotments share similar ecological conditions, for purposes of compliance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and other applicable laws.
-
(1) The issuance of a grazing permit or lease by the Secretary concerned may be categorically excluded from the requirement to prepare an environmental assessment or an environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) if—(A) the issued permit or lease continues the current grazing management of the allotment; and(B) the Secretary concerned—(i) has assessed and evaluated the grazing allotment associated with the lease or permit; and(ii) based on the assessment and evaluation under clause (i), has determined that the allotment—(I) with respect to public land administered by the Secretary of the Interior—(aa) is meeting land health standards; or(bb) is not meeting land health standards due to factors other than existing livestock grazing; or(II) with respect to National Forest System land administered by the Secretary of Agriculture—(aa) is meeting objectives in the applicable land and resource management plan; or(bb) is not meeting the objectives in the applicable land resource management plan due to factors other than existing livestock grazing.
-
(2) The trailing and crossing of livestock across public land and National Forest System land and the implementation of trailing and crossing practices by the Secretary concerned may be categorically excluded from the requirement to prepare an environmental assessment or an environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(a) Except as otherwise expressly provided in this chapter, nothing in this chapter shall be construed to amend, modify, or repeal any provision of the Coastal Zone Management Act of 1972 [16 U.S.C. 1451 et seq.], the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], the Mining and Mineral Policy Act of 1970 [30 U.S.C. 21a], or any other Act.
-
(d) Prior to the use of any funds authorized by this section the Secretary shall cause to have prepared an environmental assessment record on each range improvement project. Thereafter, improvement projects may be constructed unless the Secretary determines that the project will have a significant impact on the quality of human environment, necessitating an environmental impact statement pursuant to the National Environmental Policy Act [42 U.S.C. 4321 et seq.] prior to the expenditure of funds.
-
(a) Any Federal agency required under section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332) to issue an environmental impact statement concerning a proposed crude oil transportation system eligible for consideration under this chapter shall, in preparing such statement, utilize, to the maximum extent practicable and consistent with such Act [42 U.S.C. 4321 et seq.], appropriate data, analyses, conclusions, findings, and decisions regarding environmental impacts developed or made by any other Federal or State agency.
-
(d) The contingency plans and plan elements shall comply with all requirements of applicable Federal law, including the National Environmental Policy Act of 1969 (42 U.S.C. 4321), section 2265(a) of title 33, and the Fish and Wildlife Coordination Act [16 U.S.C. 661 et seq.], and shall be in accordance with applicable State law.
-
(1) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(F) the preparation of analyses under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(c) In providing funding for a project under this section, the Secretary shall comply with all applicable environmental laws, including the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(d) In providing funding for a grant for a project under this section, the Secretary shall comply with all applicable environmental laws, including the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(g) In providing a grant for an eligible project under the program, the Secretary shall comply with all applicable environmental laws, including the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(1) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
The provisions of the National Environmental Policy Act [42 U.S.C. 4321 et seq.] shall not apply to transactions carried out pursuant to this chapter.
-
The provisions of the National Environmental Policy Act [42 U.S.C. 4321 et seq.] and section 6362(b) of title 42 shall not apply to transactions carried out pursuant to this chapter.
-
(b) As soon as practicable after January 14, 1983, the Interstate Commerce Commission shall promulgate an expedited, modified procedure for providing on the date of transfer a certificate of public convenience and necessity to the State-owned railroad. No inventory, valuation, or classification of property owned or used by the State-owned railroad pursuant to subchapter V2 of chapter 107 of title 49 shall be required during the two-year period after the date of transfer. The provisions of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and section 382(b) of the Energy Policy and Conservation Act (42 U.S.C. 6362(b)) shall not apply to actions of the Commission under this subsection.
-
(a) The provisions of chapter 5 of title 5 (popularly known as the Administrative Procedure Act, and including provisions popularly known as the Government in the Sunshine Act), chapter 10 of title 5, division A of subtitle III of title 54, section 303 of title 49, and the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) shall not apply to actions taken pursuant to this chapter, except to the extent that such laws may be applicable to granting of rights-of-way under section 1208 of this title.
-
In accordance with section 139 of title 23, the Maritime Administrator may approve any action qualifying as a categorical exclusion applicable to the Federal Highway Administration, the Federal Transit Administration, or the Federal Railroad Administration when the applicable requirements of that categorical exclusion have been met that are in compliance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), and any other applicable law. Nothing in this section shall be interpreted to limit any existing authority of the Maritime Administration to approve, promulgate, or publish categorical exclusions consistent with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) or any other applicable law.
-
(1) coordinate with other Federal agencies to expedite the process established under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) for the improvement of port facilities to improve the efficiency of the transportation system, to increase port security, or to provide greater access to port facilities;
-
(C) Nothing in this paragraph shall be construed to relieve an executive agency of the requirements of division A of subtitle III of title 54 or the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(2) provide for coordination among appropriate governmental agencies to expedite the review process under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) for projects carried out under the Program;
-
(III) identifying, developing, and tracking metrics for permit reviews and decisions by Federal agencies for projects under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(i) Subject to clause (ii), at the request of an entity that is carrying out a project, the Center, in coordination with the appropriate operating administrations within the Department, shall provide technical assistance relating to compliance with the applicable requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and applicable Federal authorizations.
-
(A) align, to the maximum extent practicable, the requirements of this section with the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and section 306108 of title 54, including implementing regulations; and
-
(A) If, in an analysis required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), the Secretary determines that there is no feasible or prudent alternative to avoid use of a historic site, the Secretary may—(i) include the determination of the Secretary in the analysis required under that Act;(ii) provide a notice of the determination to—(I) each applicable State historic preservation officer and tribal historic preservation officer;(II) the Council, if the Council is participating in the consultation process under section 306108 of title 54; and(III) the Secretary of the Interior; and(iii) request from the applicable preservation officer, the Council, and the Secretary of the Interior a concurrence that the determination is sufficient to satisfy subsection (c)(1).
-
(2) The term “lead authority” means a Department of Transportation operating administration or secretarial office that has the lead responsibility for compliance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to a proposed multimodal project.
-
(c) In considering the environmental impacts of a proposed multimodal project, a lead authority may apply categorical exclusions designated under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) in implementing regulations or procedures of a cooperating authority for a proposed multimodal project, subject to the conditions that—(1) the lead authority makes a determination, with the concurrence of the cooperating authority—(A) on the applicability of a categorical exclusion to a proposed multimodal project; and(B) that the project satisfies the conditions for a categorical exclusion under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and this section;(2) the lead authority follows the implementing regulations of the cooperating authority or procedures under that Act; and(3) the lead authority determines that—(A) the proposed multimodal project does not individually or cumulatively have a significant impact on the environment; and(B) extraordinary circumstances do not exist that merit additional analysis and documentation in an environmental impact statement or environmental assessment required under that Act.
-
(B) that the project satisfies the conditions for a categorical exclusion under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and this section;
-
(a) In preparing a final environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), if the lead agency modifies the statement in response to comments that are minor and are confined to factual corrections or explanations of why the comments do not warrant additional agency response, the lead agency may write on errata sheets attached to the statement, instead of rewriting the draft statement, subject to the condition that the errata sheets—(1) cite the sources, authorities, and reasons that support the position of the agency; and(2) if appropriate, indicate the circumstances that would trigger agency reappraisal or further response.
-
(C) such actions are consistent with the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(a) Not later than 1 year after the date of enactment of this section, the Department of Transportation, in coordination with the heads of Federal agencies likely to have substantive review or approval responsibilities under Federal law, shall develop a coordinated and concurrent environmental review and permitting process for transportation projects when initiating an environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) (in this section referred to as “NEPA”).
-
(q) Since plans and TIPs described in this section are subject to a reasonable opportunity for public comment, since individual projects included in plans and TIPs are subject to review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), and since decisions by the Secretary concerning plans and TIPs described in this section have not been reviewed under that Act as of January 1, 1997, any decision by the Secretary concerning a plan or TIP described in this section shall not be considered to be a Federal action subject to review under that Act.
-
(j) Since the statewide transportation plan and the transportation improvement program described in this section are subject to a reasonable opportunity for public comment, since individual projects included in the statewide transportation plans and the transportation improvement program are subject to review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), and since decisions by the Secretary concerning statewide transportation plans or the transportation improvement program described in this section have not been reviewed under that Act as of January 1, 1997, any decision by the Secretary concerning a metropolitan or statewide transportation plan or the transportation improvement program described in this section shall not be considered to be a Federal action subject to review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(II) initiates activities required to be carried out under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to the project; and
-
(B) Concurrent with the analysis required to be made under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), each applicant shall develop sufficient information to enable the Secretary to make findings of project justification and local financial commitment under this subsection.
-
(A) A new fixed guideway capital project may advance to the engineering phase upon completion of activities required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), as demonstrated by a record of decision with respect to the project, a finding that the project has no significant impact, or a determination that the project is categorically excluded, only if the Secretary determines that the project—(i) is selected as the locally preferred alternative at the completion of the process required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);(ii) is adopted into the metropolitan transportation plan required under section 5303;(iii) is justified based on a comprehensive review of the project’s mobility improvements, the project’s environmental benefits, congestion relief associated with the project, economic development effects associated with the project, policies and land use patterns of the project that support public transportation, and the project’s cost-effectiveness as measured by cost per rider; and(iv) is supported by an acceptable degree of local financial commitment (including evidence of stable and dependable financing sources), as required under subsection (f).
-
(i) is selected as the locally preferred alternative at the completion of the process required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(II) initiates activities required to be carried out under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to the project; and
-
(B) Concurrent with the analysis required to be made under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), each applicant shall develop sufficient information to enable the Secretary to make findings of project justification and local financial commitment under this subsection.
-
(A) A core capacity improvement project may advance into the engineering phase upon completion of activities required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), as demonstrated by a record of decision with respect to the project, a finding that the project has no significant impact, or a determination that the project is categorically excluded, only if the Secretary determines that the project—(i) is selected as the locally preferred alternative at the completion of the process required under the National Environmental Policy Act of 1969;(ii) is adopted into the metropolitan transportation plan required under section 5303;(iii) is in a corridor that is—(I) at or over capacity; or(II) projected to be at or over capacity within the next 10 years, without regard to any temporary measures employed by the applicant expected to increase short-term capacity within the next 10 years;(iv) is justified based on a comprehensive review of the project’s mobility improvements, the project’s environmental benefits, congestion relief associated with the project, economic development effects associated with the project, the capacity needs of the corridor, and the project’s cost-effectiveness as measured by cost per rider; and(v) is supported by an acceptable degree of local financial commitment (including evidence of stable and dependable financing sources), as required under subsection (f).
-
(II) initiates activities required to be carried out under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to the project; and
-
(B) Concurrent with the analysis required to be made under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), each applicant shall develop sufficient information to enable the Secretary to make findings of project justification, policies and land use patterns that promote public transportation, and local financial commitment under this subsection.
-
(B) At the request of the project sponsor, the Secretary shall evaluate and rate the project in accordance with paragraphs (4) and (5) and subparagraph (A) of this paragraph upon completion of the analysis required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(A) The Secretary may enter into an early systems work agreement with an applicant if a record of decision under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) has been issued on the project and the Secretary finds there is reason to believe—(i) a full funding grant agreement for the project will be made; and(ii) the terms of the work agreement will promote ultimate completion of the project more rapidly and at less cost.
-
(I) Date of compliance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(2) The National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) shall apply to financial assistance for capital projects under this chapter.
-
(iii) shall provide that any funds disbursed under the program for the project before the completion of any review required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) may only cover costs associated with development-phase activities described in subsection (h)(1)(A).
-
(4) The Secretary may only provide to an eligible entity a full grant under the program in a single year if all reviews required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to the applicable project have been completed before the receipt of any program funds.
-
(C) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(ix) a description of any Federal permits required, including under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and any waivers under section 5323(j) (commonly known as the “Buy America Act”);
-
(1) The Secretary of Transportation shall apply the project development procedures, to the greatest extent feasible, described in section 139 of title 23 to any railroad project that requires the approval of the Secretary under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(c) Not later than 1 year after the date of enactment of the Passenger Rail Reform and Investment Act of 2015, the Secretary shall publish a notice of proposed rulemaking to propose new and existing categorical exclusions for railroad projects that require the approval of the Secretary under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), including those identified under subsection (b), and develop a process for considering new categorical exclusions to the extent that the categorical exclusions meet the criteria for a categorical exclusion under section 1508.4 of title 40, Code of Federal Regulations.
-
(v) if applicable, specify when the process for complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and related environmental laws will be completed for the project.
-
(iv) If an applicant does not carry out the project for reasons within the control of the applicant, the applicant shall repay all Federal grant funds awarded for the project from all Federal funding sources, for all project activities, facilities, and equipment, plus reasonable interest and penalty charges allowable by law or established by the Secretary in the phased funding agreement. For purposes of this clause, a process for complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) that results in the selection of the no build alternative is not within the applicant’s control.
-
(2) The Administrator may require that each test range sponsor designated by the Administrator under subsection (a) provide a draft environmental review consistent with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), subject to the supervision of and adoption by the Administrator, with respect to any request for the establishment of a restricted area, special use airspace, or other similar type of airspace under this subsection.
-
(4) finding that the State has agreed to comply with United States Government standard requirements for administering the block grant, including the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), State and local environmental policy acts, Executive orders, agency regulations and guidance, and other Federal environmental requirements; and
-
(1) provides for streamlined coordination among the Federal, regional, State, and local agencies concerned with the preparation of environmental impact statements or environmental assessments under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(II) the potential for undertaking the environmental review under existing emergency procedures under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
-
(B) changes necessary to ensure the agency is carrying out the obligations of that agency under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and other applicable law.
-
(l) In applying subsections (j) and (k), the Secretary shall solicit and consider comments from interested persons and governmental entities in accordance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and section 1503 of title 40), Code of Federal Regulations.
-
(A) carry out the obligations of such agency under other applicable law concurrently, and in conjunction, with the review required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), unless doing so would impair the ability of such agency to conduct needed analysis or otherwise carry out such obligations; and
-
(A) To the maximum extent practicable and consistent with Federal law, all Federal permits and reviews for a project shall rely on a single environmental document prepared under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) under the leadership of the Secretary.
-
(ii) the obligations of a cooperating agency or participating agency under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) have already been satisfied with respect to the project; or
-
(1) In preparing a final environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) for a project described or designated under subsection (b), if the Secretary modifies the statement in response to comments that are minor and are confined to factual corrections or explanations of why the comments do not warrant additional agency response, the Secretary may write on errata sheets attached to the statement instead of rewriting the draft statement, subject to the condition that the errata sheets—(A) cite the sources, authorities, and reasons that support the position of the agency; and(B) if appropriate, indicate the circumstances that would trigger agency reappraisal or further response.
-
(A) The lead agency for a project, with respect to an environmental impact statement, environmental assessment, categorical exclusion, or other document prepared under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(B) A cooperating agency with responsibility under Federal law with respect to the process for and completion of any environmental permit, approval, review, or study required for a project under any Federal law other than the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), if consistent with such Act.
-
(I) The planning product is appropriate for adoption or incorporation by reference and use in the environmental review process for the project and is incorporated in accordance with, and is sufficient to meet the requirements of, the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and section 1502.21 of title 40, Code of Federal Regulations.
-
(C) The term “NEPA process” means the entirety of the development and documentation of the analysis required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), including the assessment and analysis of any impacts, alternatives, and mitigation of a proposed action, and any interagency participation and public involvement required to be carried out before the Secretary undertakes a proposed action.
-
(D) The term “proposed action” means an action (within the meaning of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.)) under this title that the Secretary proposes to carry out.
-
(4) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
-
(5) Each study shall be completed in compliance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
-
(1) require the preparation of an environmental impact statement where the statement would not otherwise be required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); or