§2133. Commercial licenses — Inbound Citations
42 U.S.C. § 2133
Cited by 43 provisions in release 119-102.
Citations to 42 U.S.C. § 2133 as a whole
-
Every licensee under this chapter who holds a license from the Commission for a utilization or production facility for the generation of commercial electric energy under section 2133 of this title and who transmits such electric energy in interstate commerce or sells it at wholesale in interstate commerce shall be subject to the regulatory provisions of the Federal Power Act [16 U.S.C. 791a et seq.].
-
Nothing in this chapter shall preclude any Government agency now or hereafter authorized by law to engage in the production, marketing, or distribution of electric energy from obtaining a license under section 2133 of this title, if qualified under the provisions of said section, for the construction and operation of production or utilization facilities for the primary purpose of producing electric energy for disposition for ultimate public consumption.
-
(3) The term “commercial nuclear power reactor” means any unit of a civilian light-water moderated utilization facility required to be licensed under section 2133 or 2134(b) of this title.
-
(3) for use under a license issued pursuant to section 2133 of this title;
-
(1) The Commission may distribute special nuclear material licensed under this section by sale, lease, lease with option to buy, or grant: Provided, however, That unless otherwise authorized by law, the Commission shall not after December 31, 1970, distribute special nuclear material except by sale to any person who possesses or operates a utilization facility under a license issued pursuant to section 2133 or 2134(b) of this title for use in the course of activities under such license; nor shall the Commission permit any such person after June 30, 1973, to continue leasing for use in the course of such activities special nuclear material previously leased to such person by the Commission.
-
(d) In determining the reasonable charge to be made by the Commission for the use of special nuclear material distributed by lease to licensees of utilization or production facilities licensed pursuant to section 2133 or 2134 of this title, in addition to consideration of the cost thereof, the Commission shall take into consideration—(1) the use to be made of the special nuclear material;(2) the extent to which the use of the special nuclear material will advance the development of the peaceful uses of atomic energy;(3) the energy value of the special nuclear material in the particular use for which the license is issued;(4) whether the special nuclear material is to be used in facilities licensed pursuant to section 2133 or 2134 of this title. In this respect, the Commission shall, insofar as practicable, make uniform, nondiscriminatory charges for the use of special nuclear material distributed to facilities licensed pursuant to section 2133 of this title; and(5) with respect to special nuclear material consumed in a facility licensed pursuant to section 2133 of this title, the Commission shall make a further charge equivalent to the sale price for similar special nuclear material established by the Commission in accordance with subsection (c)(2), and the Commission may make such a charge with respect to such material consumed in a facility licensed pursuant to section 2134 of this title.
-
(4) whether the special nuclear material is to be used in facilities licensed pursuant to section 2133 or 2134 of this title. In this respect, the Commission shall, insofar as practicable, make uniform, nondiscriminatory charges for the use of special nuclear material distributed to facilities licensed pursuant to section 2133 of this title; and
-
(5) with respect to special nuclear material consumed in a facility licensed pursuant to section 2133 of this title, the Commission shall make a further charge equivalent to the sale price for similar special nuclear material established by the Commission in accordance with subsection (c)(2), and the Commission may make such a charge with respect to such material consumed in a facility licensed pursuant to section 2134 of this title.
-
The Commission shall establish guaranteed purchase prices for plutonium produced in a nuclear reactor by a person licensed under section 2134 of this title and delivered to the Commission before January 1, 1971. The Commission shall also establish for such periods of time as it may deem necessary, but not to exceed ten years as to any such period, guaranteed purchase prices for uranium enriched in the isotope 233 produced in a nuclear reactor by a person licensed under section 2133 or section 2134 and delivered to the Commission within the period of the guarantee. Guaranteed purchase prices established under the authority of this section shall not exceed the Commission’s determination of the estimated value of plutonium or uranium enriched in the isotope 233 as fuel in nuclear reactors, and such prices shall be established on a nondiscriminatory basis: Provided, That the Commission is authorized to establish such guaranteed purchase prices only for such plutonium or uranium enriched in the isotope 233 as the Commission shall determine is produced through the use of special nuclear material which was leased or sold by the Commission pursuant to section 2073 of this title.
-
(e) Special nuclear material, as defined in section 2014 of this title, produced in facilities licensed under section 2133 or 2134 of this title may not be transferred, reprocessed, used, or otherwise made available by any instrumentality of the United States or any other person for nuclear explosive purposes.
-
(3) for use under a license issued pursuant to section 2133 of this title; or
-
It shall be unlawful, except as provided in section 2121 of this title, for any person within the United States to transfer or receive in interstate commerce, manufacture, produce, transfer, acquire, possess, use, import, or export any utilization or production facility except under and in accordance with a license issued by the Commission pursuant to section 2133 or 2134 of this title.
-
(a) Except as provided in subsections (b) and (c), or otherwise specifically authorized by law, any license hereafter issued for a utilization or production facility for industrial or commercial purposes shall be issued pursuant to section 2133 of this title.
-
(2) Paragraph (1) of this subsection shall apply to an application for a license to construct or operate a utilization or production facility under section 2133 of this title: Provided, however, That paragraph (1) shall not apply to an application for a license to operate a utilization or production facility for which a construction permit was issued under section 2133 of this title unless the Commission determines such review is advisable on the ground that significant changes in the licensee’s activities or proposed activities have occurred subsequent to the previous review by the Attorney General and the Commission under this subsection in connection with the construction permit for the facility.
-
(8) With respect to any application for a construction permit on file at the time of enactment into law of this subsection, which permit would be for issuance under section 2133 of this title, and with respect to any application for an operating license in connection with which a written request for an antitrust review is made as provided for in paragraph (3), the Commission, after consultation with the Attorney General, may, upon determination that such action is necessary in the public interest to avoid unnecessary delay, establish by rule or order periods for Commission notification and receipt of advice differing from those set forth above and may issue a construction permit or operating license in advance of consideration of and findings with respect to the matters covered in this subsection: Provided, That any construction permit or operating license so issued shall contain such conditions as the Commission deems appropriate to assure that any subsequent findings and orders of the Commission with respect to such matters will be given full force and effect.
-
(9) This subsection does not apply to an application for a license to construct or operate a utilization facility or production facility under section 2133 or 2134(b) of this title that is filed on or after August 8, 2005.
-
(a) group the facilities licensed either under section 2133 or 2134 of this title into classes which may include either production or utilization facilities or both, upon the basis of the similarity of operating and technical characteristics of the facilities;
-
Whenever the Congress declares that a state of war or national emergency exists, the Commission is authorized to suspend any licenses granted under this chapter if in its judgment such action is necessary to the common defense and security. The Commission is authorized during such period, if the Commission finds it necessary to the common defense and security, to order the recapture of any special nuclear material or to order the operation of any facility licensed under section 2133 or 2134 of this title, and is authorized to order the entry into any plant or facility in order to recapture such material, or to operate such facility. Just compensation shall be paid for any damages caused by the recapture of any special nuclear material or by the operation of any such facility.
-
(d) the proposed agreement for cooperation (if arranged pursuant to section 2121(c), 2164(b), 2164(c), or 2164(d) of this title, or if entailing implementation of section 2073, 2074(a), 2133, or 2134 of this title in relation to a reactor that may be capable of producing more than five thermal megawatts or special nuclear material for use in connection therewith) has been submitted to the Congress, together with the approval and determination of the President, for a period of sixty days of continuous session (as defined in section 2159(g) of this title) and referred to the Committee on Foreign Affairs of the House of Representatives and the Committee on Foreign Relations of the Senate, and in addition, in the case of a proposed agreement for cooperation arranged pursuant to section 2121(c), 2164(b), 2164(c), or 2164(d) of this title, the Committee on Armed Services of the House of Representatives and the Committee on Armed Services of the Senate, but such proposed agreement for cooperation shall not become effective if during such sixty-day period the Congress adopts, and there is enacted, a joint resolution stating in substance that the Congress does not favor the proposed agreement for cooperation: Provided, That the sixty-day period shall not begin until a Nuclear Proliferation Assessment Statement prepared by the Secretary of State, and any annexes thereto, when required by subsection (a), have been submitted to the Congress: Provided further, That an agreement for cooperation exempted by the President pursuant to subsection (a) from any requirement contained in that subsection, or an agreement exempted pursuant to section 8003(a)(1) of title 22, shall not become effective unless the Congress adopts, and there is enacted, a joint resolution stating that the Congress does favor such agreement. During the sixty-day period the Committee on Foreign Affairs of the House of Representatives and the Committee on Foreign Relations of the Senate shall each hold hearings on the proposed agreement for cooperation and submit a report to their respective bodies recommending whether it should be approved or disapproved. Any such proposed agreement for cooperation shall be considered pursuant to the procedures set forth in section 2159(i) of this title.
-
The President is authorized to enter into an international arrangement with a group of nations providing for international cooperation in the nonmilitary applications of atomic energy and he may thereafter cooperate with that group of nations pursuant to sections 2074(a), 2077, 2094, 2112, 2133, 2134, or 2164(a) of this title: Provided, however, That the cooperation is undertaken pursuant to an agreement for cooperation entered into in accordance with section 2153 of this title.
-
(a) No arrangement shall be made under section 2051 of this title, no contract shall be made or continued in effect under section 2061 of this title, and no license shall be issued under section 2133 or 2134 of this title, unless the person with whom such arrangement is made, the contractor or prospective contractor, or the prospective licensee agrees in writing not to permit any individual to have access to Restricted Data until the Director of the Office of Personnel Management shall have made an investigation and report to the Commission on the character, associations, and loyalty of such individual, and the Commission shall have determined that permitting such person to have access to Restricted Data will not endanger the common defense and security.
-
(1) who has made application to the Commission for a license under sections 2073, 2092, 2093, 2111, 2133 or 2134 of this title, or a permit or lease under section 2097 of this title;
-
(i) prescribe such regulations or orders as it may deem necessary (1) to protect Restricted Data received by any person in connection with any activity authorized pursuant to this chapter, (2) to guard against the loss or diversion of any special nuclear material acquired by any person pursuant to section 2073 of this title or produced by any person in connection with any activity authorized pursuant to this chapter, to prevent any use or disposition thereof which the Commission may determine to be inimical to the common defense and security, including regulations or orders designating activities, involving quantities of special nuclear material which in the opinion of the Commission are important to the common defense and security, that may be conducted only by persons whose character, associations, and loyalty shall have been investigated under standards and specifications established by the Commission and as to whom the Commission shall have determined that permitting each such person to conduct the activity will not be inimical to the common defense and security, (3) to govern any activity authorized pursuant to this chapter, including standards and restrictions governing the design, location, and operation of facilities used in the conduct of such activity, in order to protect health and to minimize danger to life or property, and (4) to ensure that sufficient funds will be available for the decommissioning of any production or utilization facility licensed under section 2133 or 2134(b) of this title, including standards and restrictions governing the control, maintenance, use, and disbursement by any former licensee under this chapter that has control over any fund for the decommissioning of the facility;
-
(m) enter into agreements with persons licensed under section 2133, 2134, 2073(a)(4), or 2093(a)(4) of this title for such periods of time as the Commission may deem necessary or desirable (1) to provide for the processing, fabricating, separating, or refining in facilities owned by the Commission of source, byproduct, or other material or special nuclear material owned by or made available to such licensees and which is utilized or produced in the conduct of the licensed activity, and (2) to sell, lease, or otherwise make available to such licensees such quantities of source or byproduct material, and other material not defined as special nuclear material pursuant to this chapter, as may be necessary for the conduct of the licensed activity: Provided, however, That any such agreement may be canceled by the licensee at any time upon payment of such reasonable cancellation charges as may be agreed upon by the licensee and the Commission: And provided further, That the Commission shall establish prices to be paid by licensees for material or services to be furnished by the Commission pursuant to this subsection, which prices shall be established on such a nondiscriminatory basis as, in the opinion of the Commission, will provide reasonable compensation to the Government for such material or services and will not discourage the development of sources of supply independent of the Commission;
-
(o) require by rule, regulation, or order, such reports, and the keeping of such records with respect to, and to provide for such inspections of, activities and studies of types specified in section 2051 of this title and of activities under licenses issued pursuant to sections 2073, 2093, 2111, 2133, and 2134 of this title, as may be necessary to effectuate the purposes of this chapter, including section 2135 of this title; and
-
(t) enter into contracts for the processing, fabricating, separating, or refining in facilities owned by the Commission of source, byproduct or other material, or special nuclear material, in accordance with and within the period of an agreement for cooperation while comparable services are available to persons licensed under section 2133 or 2134 of this title: Provided, That the prices for services under such contracts shall be no less than the prices currently charged by the Commission pursuant to subsection (m);
-
No funds of the Commission shall be employed in the construction or operation of facilities licensed under section 2133 or 2134 of this title except under contract or other arrangement entered into pursuant to section 2051 of this title.
-
(a) Each license issued under section 2133 or 2134 of this title and each construction permit issued under section 2235 of this title shall, and each license issued under section 2073, 2093, or 2111 of this title may, for the public purposes cited in section 2012(i) of this title, have as a condition of the license a requirement that the licensee have and maintain financial protection of such type and in such amounts as the Nuclear Regulatory Commission (in this section referred to as the “Commission”) in the exercise of its licensing and regulatory authority and responsibility shall require in accordance with subsection (b) to cover public liability claims. Whenever such financial protection is required, it may be a further condition of the license that the licensee execute and maintain an indemnification agreement in accordance with subsection (c). The Commission may require, as a further condition of issuing a license, that an applicant waive any immunity from public liability conferred by Federal or State law.
-
(f) The Commission or the Secretary, as appropriate, is authorized to collect a fee from all persons with whom an indemnification agreement is executed under this section. This fee shall be $30 per year per thousand kilowatts of thermal energy capacity for facilities licensed under section 2133 of this title: Provided, That the Commission or the Secretary, as appropriate, is authorized to reduce the fee for such facilities in reasonable relation to increases in financial protection required above a level of $60,000,000. For facilities licensed under section 2134 of this title, and for construction permits under section 2235 of this title, the Commission is authorized to reduce the fee set forth above. The Commission shall establish criteria in writing for determination of the fee for facilities licensed under section 2134 of this title, taking into consideration such factors as (1) the type, size, and location of facility involved, and other factors pertaining to the hazard, and (2) the nature and purpose of the facility. For other licenses, the Commission shall collect such nominal fees as it deems appropriate. No fee under this subsection shall be less than $100 per year.
-
(a) Each application for a license hereunder shall be in writing and shall specifically state such information as the Commission, by rule or regulation, may determine to be necessary to decide such of the technical and financial qualifications of the applicant, the character of the applicant, the citizenship of the applicant, or any other qualifications of the applicant as the Commission may deem appropriate for the license. In connection with applications for licenses to operate production or utilization facilities, the applicant shall state such technical specifications, including information of the amount, kind, and source of special nuclear material required, the place of the use, the specific characteristics of the facility, and such other information as the Commission may, by rule or regulation, deem necessary in order to enable it to find that the utilization or production of special nuclear material will be in accord with the common defense and security and will provide adequate protection to the health and safety of the public. Such technical specifications shall be a part of any license issued. The Commission may at any time after the filing of the original application, and before the expiration of the license, require further written statements in order to enable the Commission to determine whether the application should be granted or denied or whether a license should be modified or revoked. All applications and statements shall be signed by the applicant or licensee. Applications for, and statements made in connection with, licenses under sections 2133 and 2134 of this title shall be made under oath or affirmation. The Commission may require any other applications or statements to be made under oath or affirmation.
-
(b) The Advisory Committee on Reactor Safeguards shall review each application under section 2133 or section 2134(b) of this title for a construction permit or an operating license for a facility, any application under section 2134(c) of this title for a construction permit or an operating license for a testing facility, any application under subsection (a) or (c) of section 2134 of this title specifically referred to it by the Commission, and any application for an amendment to a construction permit or an amendment to an operating license under section 2133 or 2134(a), (b), or (c) of this title specifically referred to it by the Commission, and shall submit a report thereon which shall be made part of the record of the application and available to the public except to the extent that security classification prevents disclosure.
-
(c) The Commission shall not issue any license under section 2133 of this title for a utilization or production facility for the generation of commercial power until it has given notice in writing to such regulatory agency as may have jurisdiction over the rates and services incident to the proposed activity; until it has published notice of the application in such trade or news publications as the Commission deems appropriate to give reasonable notice to municipalities, private utilities, public bodies, and cooperatives which might have a potential interest in such utilization or production facility; and until it has published notice of such application once each week for four consecutive weeks in the Federal Register, and until four weeks after the last notice.
-
(d) The Commission, in issuing any license for a utilization or production facility for the generation of commercial power under section 2133 of this title, shall give preferred consideration to applications for such facilities which will be located in high cost power areas in the United States if there are conflicting applications for a limited opportunity for such license. Where such conflicting applications resulting from limited opportunity for such license include those submitted by public or cooperative bodies such applications shall be given preferred consideration.
-
(A) In any proceeding under this chapter, for the granting, suspending, revoking, or amending of any license or construction permit, or application to transfer control, and in any proceeding for the issuance or modification of rules and regulations dealing with the activities of licensees, and in any proceeding for the payment of compensation, an award or royalties under sections1 2183, 2187, 2236(c) or 2238 of this title, the Commission shall grant a hearing upon the request of any person whose interest may be affected by the proceeding, and shall admit any such person as a party to such proceeding. The Commission shall hold a hearing after thirty days’ notice and publication once in the Federal Register, on each application under section 2133 or 2134(b) of this title for a construction permit for a facility, and on any application under section 2134(c) of this title for a construction permit for a testing facility. In cases where such a construction permit has been issued following the holding of such a hearing, the Commission may, in the absence of a request therefor by any person whose interest may be affected, issue an operating license or an amendment to a construction permit or an amendment to an operating license without a hearing, but upon thirty days’ notice and publication once in the Federal Register of its intent to do so. The Commission may dispense with such thirty days’ notice and publication with respect to any application for an amendment to a construction permit or an amendment to an operating license upon a determination by the Commission that the amendment involves no significant hazards consideration.
-
(a) In any proceeding upon an application for an operating license for a utilization facility required to be licensed under section 2133 or 2134(b) of this title, in which a hearing is otherwise required pursuant to section 2239(a) of this title, the applicant may petition the Commission for a temporary operating license for such facility authorizing fuel loading, testing, and operation at a specific power level to be determined by the Commission, pending final action by the Commission on the application. The initial petition for a temporary operating license for each such facility, and any temporary operating license issued for such facility based upon the initial petition, shall be limited to power levels not to exceed 5 percent of rated full thermal power. Following issuance by the Commission of the temporary operating license for each such facility, the licensee may file petitions with the Commission to amend the license to allow facility operation in staged increases at specific power levels, to be determined by the Commission, exceeding 5 percent of rated full thermal power. The initial petition for a temporary operating license for each such facility may be filed at any time after the filing of: (1) the report of the Advisory Committee on Reactor Safeguards required by section 2232(b) of this title; (2) the filing of the initial Safety Evaluation Report by the Nuclear Regulatory Commission staff and the Nuclear Regulatory Commission staff’s first supplement to the report prepared in response to the report of the Advisory Committee on Reactor Safeguards for the facility; (3) the Nuclear Regulatory Commission staff’s final detailed statement on the environmental impact of the facility prepared pursuant to section 4332(2)(C) of this title; and (4) a State, local, or utility emergency preparedness plan for the facility. Petitions for the issuance of a temporary operating license, or for an amendment to such a license allowing operation at a specific power level greater than that authorized in the initial temporary operating license, shall be accompanied by an affidavit or affidavits setting forth the specific facts upon which the petitioner relies to justify issuance of the temporary operating license or the amendment thereto. The Commission shall publish notice of each such petition in the Federal Register and in such trade or news publications as the Commission deems appropriate to give reasonable notice to persons who might have a potential interest in the grant of such temporary operating license or amendment thereto. Any person may file affidavits or statements in support of, or in opposition to, the petition within thirty days after the publication of such notice in the Federal Register.
-
(b) Any individual director, officer, or employee of a firm constructing, or supplying the components of any utilization facility required to be licensed under section 2133 or 2134(b) of this title who by act or omission, in connection with such construction or supply, knowingly and willfully violates or causes to be violated, any section of this chapter, any rule, regulation, or order issued thereunder, or any license condition, which violation results, or if undetected could have resulted, in a significant impairment of a basic component of such a facility shall, upon conviction, be subject to a fine of not more than $25,000 for each day of violation, or to imprisonment not to exceed two years, or both. If the conviction is for a violation committed after a first conviction under this subsection, punishment shall be a fine of not more than $50,000 per day of violation, or imprisonment for not more than two years, or both. For the purposes of this subsection, the term “basic component” means a facility structure, system, component or part thereof necessary to assure—(1) the integrity of the reactor coolant pressure boundary,(2) the capability to shut-down the facility and maintain it in a safe shut-down condition, or(3) the capability to prevent or mitigate the consequences of accidents which could result in an unplanned offsite release of quantities of fission products in excess of the limits established by the Commission.The provisions of this subsection shall be prominently posted at each site where a utilization facility required to be licensed under section 2133 or 2134(b) of this title is under construction and on the premises of each plant where components for such a facility are fabricated.
-
(a) Any person who (1) violates any licensing or certification provision of section 2073, 2092, 2093, 2111, 2112, 2131, 2133, 2134, 2137, 2139, or 2297f of this title or any rule, regulation, or order issued thereunder, or any term, condition, or limitation of any license or certification issued thereunder, (2) violates any provision of section 2077 of this title, or (3) commits any violation for which a license may be revoked under section 2236 of this title, shall be subject to a civil penalty, to be imposed by the Commission, of not to exceed $100,000 for each such violation. If any violation is a continuing one, each day of such violation shall constitute a separate violation for the purpose of computing the applicable civil penalty. The Commission shall have the power to compromise, mitigate, or remit such penalties.
-
(2) are carried out to satisfy requirements under this chapter or under any other Federal law governing the safety of utilization facilities required to be licensed under section 2133 or 2134(b) of this title, or the safety of radioactive materials,
-
(A) The Commission shall not issue or renew a license to any person to use a utilization or production facility under the authority of section 2133 or 2134 of this title unless—(i) such person has entered into a contract with the Secretary under this section; or
-
(B) The Commission, as it deems necessary or appropriate, may require as a precondition to the issuance or renewal of a license under section 2133 or 2134 of this title that the applicant for such license shall have entered into an agreement with the Secretary for the disposal of high-level radioactive waste and spent nuclear fuel that may result from the use of such license.