§3309. Design-build selection procedures — Inbound Citations
41 U.S.C. § 3309
Cited by 1 provision in release 119-102.
Citations to 41 U.S.C. § 3309 as a whole
-
(a) Notwithstanding any other provision of law, the Architect of the Capitol may use the two-phase selection procedures authorized in section 3309 of title 41 for entering into a contract for the design and construction of a public building, facility, or work in the same manner and under the same terms and conditions as the head of an executive agency under such section.