US Codex
U.S.C.
Notes

§702l. Repeal of inconsistent laws — Inbound Citations

33 U.S.C. § 702l

Cited by 10 provisions in release 119-102.

Citations to 33 U.S.C. § 702l as a whole

  • Nothing in this Act shall be construed as repealing or amending any provision of sections 702a, 702b to 702d, 702e to 702g, 702h, 702i, 702j, 702k, 702l, 702m, and 704 of this title. The authority conferred by this Act and any funds appropriated pursuant thereto for expenditure are supplemental to all other authority and appropriations relating to the departments or agencies concerned, and nothing in this Act shall be construed to limit or retard any department or agency in carrying out similar and related activities heretofore or hereafter authorized, or to limit the exercise of powers conferred on any department or agency by other provisions of law is1 carrying out similar and related activities.
  • The project for the flood control of the Mississippi River in its alluvial valley and for its improvement from the Head of Passes to Cape Girardeau, Missouri, in accordance with the engineering plan set forth and recommended in the report submitted by the Chief of Engineers to the Secretary of the Army dated December 1, 1927, and printed in House Document Numbered 90, Seventieth Congress, first session, is adopted and authorized to be prosecuted under the direction of the Secretary of the Army and the supervision of the Chief of Engineers: Provided, That a board to consist of the Chief of Engineers, the president of the Mississippi River Commission, and a civil engineer chosen from civil life to be appointed by the President, by and with the advice and consent of the Senate, whose compensation shall be fixed by the President and be paid out of the appropriations made to carry on this project, is created; and such board is authorized and directed to consider the engineering differences between the adopted project and the plans recommended by the Mississippi River Commission in its special report dated November 28, 1927, and after such study and such further surveys as may be necessary, to recommend to the President such action as it may deem necessary to be taken in respect to such engineering differences and the decision of the President upon all recommendations or questions submitted to him by such board shall be followed in carrying out the project herein adopted. The board shall not have any power or authority in respect to such project except as hereinbefore provided. Such project and the changes therein, if any, shall be executed in accordance with the provisions of section 702h of this title. Such surveys shall be made between Baton Rouge, Louisiana, and Cape Girardeau, Missouri, as the board may deem necessary to enable it to ascertain and determine the best method of securing flood relief in addition to levees, before any flood-control works other than levees and revetments are undertaken on that portion of the river: Provided, That all diversion works and outlets constructed under the provisions of sections 702a, 702b to 702d, 702e to 702g, 702h, 702i, 702j, 702k, 702l, 702m and 704 of this title shall be built in a manner and of a character which will fully and amply protect the adjacent lands: Provided further, That pending completion of any floodway, spillway, or diversion channel, the areas within the same shall be given the same degree of protection as is afforded by levees on the west side of the river contiguous to the levee at the head of said floodway, but nothing herein shall prevent, postpone, delay, or in anywise interfere with the execution of that part of the project on the east side of the river, including raising, strengthening, and enlarging the levees on the east side of the river. The sum of $325,000,000 is authorized to be appropriated for this purpose.
  • The United States may, within the discretion of the Chief of Engineers, irrespective of other provisions of law, proceed to acquire all easements needed and of the character considered advisable in the Morganza floodway and to construct said Morganza floodway. Said Morganza floodway may, within the discretion of the Chief of Engineers, be modified as to its design and inflow.
  • (a) The existing engineering plan for flood control in the alluvial valley of the Mississippi River is modified so as to provide for the construction of plan 4 as set forth in the report of the Mississippi River Commission, dated March 7, 1941, to the Chief of Engineers, except that the levees in the Yazoo Basin on the east bank of the Mississippi River south of the Coahoma-Bolivar County line in said plan shall have a three foot freeboard over the project flood, and all levees shall be constructed with adequate section and foundation to conform to increased levee heights. The Boeuf Floodway in the project adopted by sections 702a, 702b to 702d, 702e to 702g, 702h, 702i, 702j, 702k, 702l, 702m, and 704 of this title, and the Eudora Floodway as well as the Northward Extension and the back protection levee extending from the head of the said Eudora Floodway north to the Arkansas River in the project adopted by sections 642a, 702a–1, 702a–2 to 702a–12, 702g–1, 702j–1, 702j–2, 702k–1, and 702k–2 of this title, are abandoned, and the provisions of said sections relating to the prosecution of work on said floodways and extension are repealed; except that the Ouachita River Levees, Louisiana, authorized by section 702a of this title, shall remain as a component of the Mississippi River and Tributaries Project and afforded operation and maintenance responsibilities as provided under section 702c of this title.
  • Except when authorized by the Secretary of the Army upon the recommendation of the Chief of Engineers, no money appropriated under authority of sections 702a and 702g of this title shall be expended on the construction of any item of the project until the States or levee districts have given assurances satisfactory to the Secretary of the Army that they will (a) maintain all flood-control works after their completion, except controlling and regulating spillway structures, including special relief levees; maintenance includes normally such matters as cutting grass, removal of weeds, local drainage, and minor repairs of main river levees; (b) agree to accept land turned over to them under the provisions of section 702d of this title; (c) provide without cost to the United States, all rights-of-way for levee foundations and levees on the main stem of the Mississippi River between Cape Girardeau, Missouri, and the Head of Passes.
  • The project herein authorized shall be prosecuted by the Mississippi River Commission under the direction of the Secretary of the Army and supervision of the Chief of Engineers and subject to the provisions of sections 702a, 702b to 702d, 702e to 702g, 702h, 702i, 702j, 702k, 702l, 702m, and 704 of this title. It shall perform such functions and through such agencies as they shall designate after consultation and discussion with the president of the commission. For all other purposes the existing laws governing the constitution and activities of the commission shall remain unchanged. The commission shall make inspection trips of such frequency and duration as will enable it to acquire first-hand information as to conditions and problems germane to the matter of flood control within the area of its jurisdiction; and on such trips of inspection ample opportunity for hearings and suggestions shall be afforded persons affected by or interested in such problems. The president of the commission shall be the executive officer thereof and shall have the qualifications prescribed by law on May 15, 1928, for the Assistant Chief of Engineers, shall have the title brigadier general, Corps of Engineers, and shall have the rank, pay, and allowances of a brigadier general while actually assigned to such duty: Provided, That the incumbent of the office on May 15, 1928, may be appointed a brigadier general of the Army, retired, and shall be eligible for the position of president of the commission if recalled to active service by the President under the provisions of existing law.
  • The provisions of sections 407, 408, 411, 412, and 413 of this title are made applicable to all lands, waters, easements, and other property and rights acquired or constructed under the provisions of sections 702a, 702b to 702d, 702e to 702g, 702h, 702i, 702j, 702k, 702l, 702m, and 704 of this title.
  • It is the sense of Congress that the surveys of the Mississippi River and its tributaries, authorized pursuant to the Act of January 21, 1927 [ch. 47, 44 Stat. 1010], and House Document Numbered 308, Sixty-ninth Congress, first session, be prosecuted as speedily as practicable, and the Secretary of the Army, through the Corps of Engineers, United States Army, is directed to prepare and submit to Congress at the earliest practicable date projects for flood control on all tributary streams of the Mississippi River system subject to destructive floods which projects shall include: The Red River and tributaries, the Yazoo River and tributaries, the White River and tributaries, the Saint Francis River and tributaries, the Arkansas River and tributaries, the Ohio River and tributaries, the Missouri River and tributaries, and the Illinois River and tributaries; and the reports thereon, in addition to the surveys provided by said House Document 308, Sixty-ninth Congress, first session, shall include the effect on the subject of further flood control of the lower Mississippi River to be attained through the control of the flood waters in the drainage basins of the tributaries by the establishment of a reservoir system; the benefits that will accrue to navigation and agriculture from the prevention of erosion and siltage entering the stream; a determination of the capacity of the soils of the district to receive and hold waters from such reservoirs; the prospective income from the disposal of reservoired waters; the extent to which reservoired waters may be made available for public and private uses; and inquiry as to the return flow of waters placed in the soils from reservoirs, and as to their stabilizing effect on stream flow as a means of preventing erosion, siltage, and improving navigation: Provided, That before transmitting such reports to Congress the same shall be presented to the Mississippi River Commission, and its conclusions and recommendations thereon shall be transmitted to Congress by the Secretary of the Army with his report.
  • In every contract or agreement to be made or entered into for the acquisition of land either by private sale or condemnation as in sections 702a, 702b to 702d, 702e to 702g, 702h, 702i, 702j, 702k, 702l, 702m, and 704 of this title provided the provisions contained in section 6306(a) of title 41 shall be applicable.
  • The Secretary of the Army is authorized, out of any money available for carrying out the provisions of sections 702a, 702b to 702d, 702e to 702g, 702h, 702i, 702j, 702k, 702l, 702m, and 704 of this title, to purchase from, or to reimburse States or local levee districts for the cost of, any levee rights-of-way or easements for the building of levees in the Mississippi Valley for which the United States was or is under obligation to pay under the provisions of said sections regardless of whether said States or local levee districts have furnished such rights-of-way in the past and regardless of the conditions under which such levee rights-of-way were furnished, or may be furnished in the future: Provided, That after careful investigation the prices are found to be reasonable: And provided further, That payments or reimbursements for levee rights-of-way or easements conveying the privilege of building levees may be made as soon as they have been acquired in conformity with local custom or legal procedure in such matters and to the satisfaction of the Chief of Engineers.