§702k–2. Separability — Inbound Citations
33 U.S.C. § 702k–2
Cited by 5 provisions in release 119-102.
Citations to 33 U.S.C. § 702k–2 as a whole
-
The project for the control of floods of the Mississippi River and its tributaries, adopted by section 702a of this title, is modified in accordance with the recommendations of section 43 of the report submitted by the Chief of Engineers to the Chairman of the Committee on Flood Control, dated February 12, 1935, and printed in House Committee on Flood Control Document Numbered 1, Seventy-fourth Congress, first session, as, in sections 642a, 702a–2 to 702a–12, 702g–1, 702j–1, 702j–2, 702k–1, and 702k–2 of this title, further modified and amended; and as so modified is adopted and authorized and directed to be prosecuted under the direction of the Secretary of the Army and the supervision of the Chief of Engineers.
-
(a) The existing engineering plan for flood control in the alluvial valley of the Mississippi River is modified so as to provide for the construction of plan 4 as set forth in the report of the Mississippi River Commission, dated March 7, 1941, to the Chief of Engineers, except that the levees in the Yazoo Basin on the east bank of the Mississippi River south of the Coahoma-Bolivar County line in said plan shall have a three foot freeboard over the project flood, and all levees shall be constructed with adequate section and foundation to conform to increased levee heights. The Boeuf Floodway in the project adopted by sections 702a, 702b to 702d, 702e to 702g, 702h, 702i, 702j, 702k, 702l, 702m, and 704 of this title, and the Eudora Floodway as well as the Northward Extension and the back protection levee extending from the head of the said Eudora Floodway north to the Arkansas River in the project adopted by sections 642a, 702a–1, 702a–2 to 702a–12, 702g–1, 702j–1, 702j–2, 702k–1, and 702k–2 of this title, are abandoned, and the provisions of said sections relating to the prosecution of work on said floodways and extension are repealed; except that the Ouachita River Levees, Louisiana, authorized by section 702a of this title, shall remain as a component of the Mississippi River and Tributaries Project and afforded operation and maintenance responsibilities as provided under section 702c of this title.
-
(b) The project for flood control of the Yazoo River shall be as authorized by sections 642a, 702a–1, 702a–2 to 702a–12, 702g–1, 702j–1, 702j–2, 702k–1, and 702k–2 of this title, except that the Chief of Engineers may, in his discretion, from time to time, substitute therefor combinations of reservoirs, levees, and channel improvements; and except that the extension of the authorized project and improvements contemplated in plan C of the report of March 7, 1941, of the Mississippi River Commission are authorized, including the extension of the levee on the east bank of the Mississippi River generally along the west bank of the Yazoo River to a connection in the vicinity of Yazoo City with the Yazoo River levee, authorized by the existing project for protection against headwater floods of the Yazoo River system, and the adjustment in the discretion of the Chief of Engineers of the grades of the existing levees in the backwater area on the east bank of Yazoo River below Yazoo City, all at an estimated additional cost of $11,982,000: Provided, That the Chief of Engineers shall fix the grade of the extension levees along the Yazoo River, with higher levees in his discretion, so that their construction will give the maximum practical protection without jeopardizing the safety and integrity of the main Mississippi River levees: And provided further, That prior to the beginning of construction local authorities shall furnish satisfactory assurances that they will (1) maintain the levees in accordance with the provisions of section 702c of this title, and will (2) not raise the levees in the backwater above the limiting elevations established therefor by the Chief of Engineers.
-
(1) Neither of the projects for the flood control of the Saint Francis River or the Yazoo River, authorized by sections 642a, 702a–1, 702a–2 to 702a–12, 702g–1, 702j–1, 702j–2, 702k–1, and 702k–2 of this title, shall be undertaken until the States, or other qualified agencies, shall have furnished satisfactory assurances that they will undertake, without cost to the United States, all alterations of highways made necessary because of the construction of the authorized reservoirs, and meet all damages because of such highway alterations, and have agreed also to furnish without cost to the United States all lands and easements necessary to the construction of levees and drainage ditches constructed under this project: Provided, That the reservoirs for control of headwater flow of the Yazoo River system may be located by the Chief of Engineers, in his discretion: And provided further, That the Chief of Engineers may, in his discretion, substitute levees, floodways, or auxiliary channels, or any or all of them, for any or all of the seven detention reservoirs recommended in his report of February 12, 1935, for the control of floods of the Yazoo River: And provided further, That the Chief of Engineers, with the approval of the Secretary of the Army, may modify the project for the flood control of the Saint Francis River as recommended in said report, to include therein the construction of a detention reservoir for the reduction of floods, and the acquisition at the cost of the United States of all lands and flowage necessary to the construction of said reservoir except flowage of highways: Provided further, That the estimated cost to the United States of the project is not increased by reason of such detention reservoir.
-
$272,000,000 is authorized to be appropriated for the carrying out of the modified adopted project, and all unexpended balances of appropriations heretofore made for the prosecution of said flood-control project are made available for the purposes of sections 642a, 702a–1, 702a–2 to 702a–12, 702g–1, 702j–1, 702j–2, 702k–1, and 702k–2 of this title.