§702a–12. Modified Lower Mississippi River project as of August 18, 1941 — Inbound Citations

33 U.S.C. § 702a–12

Cited by 4 provisions in release 119-102.

Citations to 33 U.S.C. § 702a–12 as a whole

  • The project for the control of floods of the Mississippi River and its tributaries, adopted by section 702a of this title, is modified in accordance with the recommendations of section 43 of the report submitted by the Chief of Engineers to the Chairman of the Committee on Flood Control, dated February 12, 1935, and printed in House Committee on Flood Control Document Numbered 1, Seventy-fourth Congress, first session, as, in sections 642a, 702a–2 to 702a–12, 702g–1, 702j–1, 702j–2, 702k–1, and 702k–2 of this title, further modified and amended; and as so modified is adopted and authorized and directed to be prosecuted under the direction of the Secretary of the Army and the supervision of the Chief of Engineers.
  • (1) Neither of the projects for the flood control of the Saint Francis River or the Yazoo River, authorized by sections 642a, 702a–1, 702a–2 to 702a–12, 702g–1, 702j–1, 702j–2, 702k–1, and 702k–2 of this title, shall be undertaken until the States, or other qualified agencies, shall have furnished satisfactory assurances that they will undertake, without cost to the United States, all alterations of highways made necessary because of the construction of the authorized reservoirs, and meet all damages because of such highway alterations, and have agreed also to furnish without cost to the United States all lands and easements necessary to the construction of levees and drainage ditches constructed under this project: Provided, That the reservoirs for control of headwater flow of the Yazoo River system may be located by the Chief of Engineers, in his discretion: And provided further, That the Chief of Engineers may, in his discretion, substitute levees, floodways, or auxiliary channels, or any or all of them, for any or all of the seven detention reservoirs recommended in his report of February 12, 1935, for the control of floods of the Yazoo River: And provided further, That the Chief of Engineers, with the approval of the Secretary of the Army, may modify the project for the flood control of the Saint Francis River as recommended in said report, to include therein the construction of a detention reservoir for the reduction of floods, and the acquisition at the cost of the United States of all lands and flowage necessary to the construction of said reservoir except flowage of highways: Provided further, That the estimated cost to the United States of the project is not increased by reason of such detention reservoir.
  • $272,000,000 is authorized to be appropriated for the carrying out of the modified adopted project, and all unexpended balances of appropriations heretofore made for the prosecution of said flood-control project are made available for the purposes of sections 642a, 702a–1, 702a–2 to 702a–12, 702g–1, 702j–1, 702j–2, 702k–1, and 702k–2 of this title.
  • If any provision of sections 642a, 702a–1, 702a–2 to 702a–12, 702g–1, 702j–1, 702j–2, and 702k–1 of this title, or the application thereof, to any person or circumstances, is held invalid, the remainder of the said sections, and the application of such provisions to other persons or circumstances, shall not be affected thereby.