US Codex
U.S.C.
Notes

§1412. Dumping permit program — Inbound Citations

33 U.S.C. § 1412

Cited by 23 provisions in release 119-102.

Citations to 33 U.S.C. § 1412 as a whole

Citations to §1412(a)

  • (b) In making the determination required by subsection (a), the Secretary shall apply those criteria, established pursuant to section 1412(a) of this title, relating to the effects of the dumping. Based upon an evaluation of the potential effect of a permit denial on navigation, economic and industrial development, and foreign and domestic commerce of the United States, the Secretary shall make an independent determination as to the need for the dumping. The Secretary shall also make an independent determination as to other possible methods of disposal and as to appropriate locations for the dumping. In considering appropriate locations, he shall, to the maximum extent feasible, utilize the recommended sites designated by the Administrator pursuant to section 1412(c) of this title. In any case in which the use of a designated site is not feasible, the Secretary may, with the concurrence of the Administrator, select an alternative site. The criteria and factors established in section 1412(a) of this title relating to site selection shall be used in selecting the alternative site in a manner consistent with the application of such factors and criteria pursuant to section 1412(c) of this title. Disposal at or in the vicinity of an alternative site shall be limited to a period of not greater than 5 years unless the site is subsequently designated pursuant to section 1412(c) of this title; except that an alternative site may continue to be used for an additional period of time that shall not exceed 5 years if—
    (1) no feasible disposal site has been designated by the Administrator;
    (2) the continued use of the alternative site is necessary to maintain navigation and facilitate interstate or international commerce; and
    (3) the Administrator determines that the continued use of the site does not pose an unacceptable risk to human health, aquatic resources, or the environment.
  • (2) Within 45 days after receiving from the Secretary all information the Administrator considers to be necessary to evaluate the proposed permit, the Administrator shall, in writing, concur with (either entirely or with conditions) or decline to concur with the determination of the Secretary as to compliance with the criteria, conditions, and restrictions established pursuant to sections 1412(a) and 1412(c) of this title relating to the environmental impact of the permit. The Administrator may request one 45-day extension in writing and the Secretary shall grant such request on receipt of the request.
  • (d) If, in any case, the Secretary finds that, in the disposition of dredged material, there is no economically feasible method or site available other than a dumping site the utilization of which would result in non-compliance with the criteria established pursuant to section 1412(a) of this title relating to the effects of dumping or with the restrictions established pursuant to section 1412(c) of this title relating to critical areas, he shall so certify and request a waiver from the Administrator of the specific requirements involved. Within thirty days of the receipt of the waiver request, unless the Administrator finds that the dumping of the material will result in an unacceptably adverse impact on municipal water supplies, shell-fish beds, wildlife, fisheries (including spawning and breeding areas), or recreational areas, he shall grant the waiver.
  • (f) In addition to other provisions of law and not withstanding the specific exclusion relating to dredged material in the first sentence in section 1412(a) of this title, the dumping of dredged material in Long Island Sound from any Federal project (or pursuant to Federal authorization) or from a dredging project by a non-Federal applicant exceeding 25,000 cubic yards shall comply with the requirements of this subchapter.

Citations to §1412(c)

  • (b) In making the determination required by subsection (a), the Secretary shall apply those criteria, established pursuant to section 1412(a) of this title, relating to the effects of the dumping. Based upon an evaluation of the potential effect of a permit denial on navigation, economic and industrial development, and foreign and domestic commerce of the United States, the Secretary shall make an independent determination as to the need for the dumping. The Secretary shall also make an independent determination as to other possible methods of disposal and as to appropriate locations for the dumping. In considering appropriate locations, he shall, to the maximum extent feasible, utilize the recommended sites designated by the Administrator pursuant to section 1412(c) of this title. In any case in which the use of a designated site is not feasible, the Secretary may, with the concurrence of the Administrator, select an alternative site. The criteria and factors established in section 1412(a) of this title relating to site selection shall be used in selecting the alternative site in a manner consistent with the application of such factors and criteria pursuant to section 1412(c) of this title. Disposal at or in the vicinity of an alternative site shall be limited to a period of not greater than 5 years unless the site is subsequently designated pursuant to section 1412(c) of this title; except that an alternative site may continue to be used for an additional period of time that shall not exceed 5 years if—
    (1) no feasible disposal site has been designated by the Administrator;
    (2) the continued use of the alternative site is necessary to maintain navigation and facilitate interstate or international commerce; and
    (3) the Administrator determines that the continued use of the site does not pose an unacceptable risk to human health, aquatic resources, or the environment.
  • (2) Within 45 days after receiving from the Secretary all information the Administrator considers to be necessary to evaluate the proposed permit, the Administrator shall, in writing, concur with (either entirely or with conditions) or decline to concur with the determination of the Secretary as to compliance with the criteria, conditions, and restrictions established pursuant to sections 1412(a) and 1412(c) of this title relating to the environmental impact of the permit. The Administrator may request one 45-day extension in writing and the Secretary shall grant such request on receipt of the request.
  • (d) If, in any case, the Secretary finds that, in the disposition of dredged material, there is no economically feasible method or site available other than a dumping site the utilization of which would result in non-compliance with the criteria established pursuant to section 1412(a) of this title relating to the effects of dumping or with the restrictions established pursuant to section 1412(c) of this title relating to critical areas, he shall so certify and request a waiver from the Administrator of the specific requirements involved. Within thirty days of the receipt of the waiver request, unless the Administrator finds that the dumping of the material will result in an unacceptably adverse impact on municipal water supplies, shell-fish beds, wildlife, fisheries (including spawning and breeding areas), or recreational areas, he shall grant the waiver.
  • (a) Permits issued under this subchapter shall designate and include (1) the type of material authorized to be transported for dumping or to be dumped; (2) the amount of material authorized to be transported for dumping or to be dumped; (3) the location where such transport for dumping will be terminated or where such dumping will occur; (4) such requirements, limitations, or conditions as are necessary to assure consistency with any site management plan approved pursuant to section 1412(c) of this title; (5) any special provisions deemed necessary by the Administrator or the Secretary, as the case may be, after consultation with the Secretary of the Department in which the Coast Guard is operating, for the monitoring and surveillance of the transportation or dumping; and (6) such other matters as the Administrator or the Secretary, as the case may be, deems appropriate. Permits issued under this subchapter shall be issued for a period of not to exceed 7 years.
  • (b) The Administrator may not issue or renew any permit under this subchapter which authorizes any person, other than a person that is an eligible authority within the meaning of subsection (a)(1)(C), to dump, or to transport for the purposes of dumping, municipal sludge within the site designated under section 1412(c) of this title by the Administrator and known as the “106-Mile Ocean Waste Dump Site” (as described in 49 F.R. 19005).
  • (B) at the site designated by the Administrator under section 1412(c) of this title and known as the “106-Mile Ocean Waste Dump Site” (as described in 49 F.R. 19005);