US Codex
U.S.C.
Notes

§1311. Effluent limitations — Inbound Citations

33 U.S.C. § 1311

Cited by 75 provisions in release 119-102.

Citations to 33 U.S.C. § 1311 as a whole

  • (c) In order to carry out the purposes of section 1311 of this title, the Administrator is authorized to (1) conduct in the Environmental Protection Agency, (2) make grants to persons, and (3) enter into contracts with persons, for research and demonstration projects for prevention of pollution of any waters by industry including, but not limited to, the prevention, reduction, and elimination of the discharge of pollutants. No grant shall be made for any project under this subsection unless the Administrator determines that such project will develop or demonstrate a new or improved method of treating industrial wastes or otherwise prevent pollution by industry, which method shall have industrywide application.
  • (B) In addition to the definition contained in subparagraph (A) of this paragraph, “treatment works” means any other method or system for preventing, abating, reducing, storing, treating, separating, or disposing of municipal waste, including storm water runoff, or industrial waste, including waste in combined storm water and sanitary sewer systems. Any application for construction grants which includes wholly or in part such methods or systems shall, in accordance with guidelines published by the Administrator pursuant to subparagraph (C) of this paragraph, contain adequate data and analysis demonstrating such proposal to be, over the life of such works, the most cost efficient alternative to comply with sections 1311 or 1312 of this title, or the requirements of section 1281 of this title.
  • (c) The establishment of effluent limitations under this section shall not operate to delay the application of any effluent limitation established under section 1311 of this title.
  • (B) Each State shall identify those waters or parts thereof within its boundaries for which controls on thermal discharges under section 1311 of this title are not stringent enough to assure protection and propagation of a balanced indigenous population of shellfish, fish, and wildlife.
  • (H) an inventory and ranking, in order of priority, of needs for construction of waste treatment works required to meet the applicable requirements of sections 1311 and 1312 of this title.
  • (B) specify factors to be taken into account in determining the control measures and practices to be applicable to point sources (other than publicly owned treatment works) within such categories or classes. Factors relating to the assessment of best practicable control technology currently available to comply with subsection (b)(1) of section 1311 of this title shall include consideration of the total cost of application of technology in relation to the effluent reduction benefits to be achieved from such application, and shall also take into account the age of equipment and facilities involved, the process employed, the engineering aspects of the application of various types of control techniques, process changes, non-water quality environmental impact (including energy requirements), and such other factors as the Administrator deems appropriate;
  • (B) specify factors to be taken into account in determining the best measures and practices available to comply with subsection (b)(2) of section 1311 of this title to be applicable to any point source (other than publicly owned treatment works) within such categories or classes. Factors relating to the assessment of best available technology shall take into account the age of equipment and facilities involved, the process employed, the engineering aspects of the application of various types of control techniques, process changes, the cost of achieving such effluent reduction, non-water quality environmental impact (including energy requirements), and such other factors as the Administrator deems appropriate;
  • (e) The Administrator, after consultation with appropriate Federal and State agencies and other interested persons, may publish regulations, supplemental to any effluent limitations specified under subsections (b) and (c) of this section for a class or category of point sources, for any specific pollutant which the Administrator is charged with a duty to regulate as a toxic or hazardous pollutant under section 1317(a)(1) or 1321 of this title, to control plant site runoff, spillage or leaks, sludge or waste disposal, and drainage from raw material storage which the Administrator determines are associated with or ancillary to the industrial manufacturing or treatment process within such class or category of point sources and may contribute significant amounts of such pollutants to navigable waters. Any applicable controls established under this subsection shall be included as a requirement for the purposes of section 1311, 1312, 1316, 1317, or 1343 of this title, as the case may be, in any permit issued to a point source pursuant to section 1342 of this title.
  • (1) Whenever, on the basis of any information available to him, the Administrator finds that any person is in violation of any condition or limitation which implements section 1311, 1312, 1316, 1317, 1318, 1328, or 1345 of this title in a permit issued by a State under an approved permit program under section 1342 or 1344 of this title he shall proceed under his authority in paragraph (3) of this subsection or he shall notify the person in alleged violation and such State of such finding. If beyond the thirtieth day after the Administrator’s notification the State has not commenced appropriate enforcement action, the Administrator shall issue an order requiring such person to comply with such condition or limitation or shall bring a civil action in accordance with subsection (b) of this section.
  • (3) Whenever on the basis of any information available to him the Administrator finds that any person is in violation of section 1311, 1312, 1316, 1317, 1318, 1322(p), 1328, or 1345 of this title, or is in violation of any permit condition or limitation implementing any of such sections in a permit issued under section 1342 of this title by him or by a State or in a permit issued under section 1344 of this title by a State, he shall issue an order requiring such person to comply with such section or requirement, or he shall bring a civil action in accordance with subsection (b) of this section.
  • (A) negligently violates section 1311, 1312, 1316, 1317, 1318, 1321(b)(3), 1322(p), 1328, or 1345 of this title, or any permit condition or limitation implementing any of such sections in a permit issued under section 1342 of this title by the Administrator or by a State, or any requirement imposed in a pretreatment program approved under section 1342(a)(3) or 1342(b)(8) of this title or in a permit issued under section 1344 of this title by the Secretary of the Army or by a State; or
  • (A) knowingly violates section 1311, 1312, 1316, 1317, 1318, 1321(b)(3), 1322(p), 1328, or 1345 of this title, or any permit condition or limitation implementing any of such sections in a permit issued under section 1342 of this title by the Administrator or by a State, or any requirement imposed in a pretreatment program approved under section 1342(a)(3) or 1342(b)(8) of this title or in a permit issued under section 1344 of this title by the Secretary of the Army or by a State; or
  • (A) Any person who knowingly violates section 1311, 1312, 1313, 1316, 1317, 1318, 1321(b)(3), 1322(p), 1328, or 1345 of this title, or any permit condition or limitation implementing any of such sections in a permit issued under section 1342 of this title by the Administrator or by a State, or in a permit issued under section 1344 of this title by the Secretary of the Army or by a State, and who knows at that time that he thereby places another person in imminent danger of death or serious bodily injury, shall, upon conviction, be subject to a fine of not more than $250,000 or imprisonment of not more than 15 years, or both. A person which is an organization shall, upon conviction of violating this subparagraph, be subject to a fine of not more than $1,000,000. If a conviction of a person is for a violation committed after a first conviction of such person under this paragraph, the maximum punishment shall be doubled with respect to both fine and imprisonment.
  • (d) Any person who violates section 1311, 1312, 1316, 1317, 1318, 1322(p), 1328,,1 or 1345 of this title, or any permit condition or limitation implementing any of such sections in a permit issued under section 1342 of this title by the Administrator, or by a State, or in a permit issued under section 1344 of this title by a State, or any requirement imposed in a pretreatment program approved under section 1342(a)(3) or 1342(b)(8) of this title, and any person who violates any order issued by the Administrator under subsection (a) of this section, shall be subject to a civil penalty not to exceed $25,000 per day for each violation. In determining the amount of a civil penalty the court shall consider the seriousness of the violation or violations, the economic benefit (if any) resulting from the violation, any history of such violations, any good-faith efforts to comply with the applicable requirements, the economic impact of the penalty on the violator, and such other matters as justice may require. For purposes of this subsection, a single operational upset which leads to simultaneous violations of more than one pollutant parameter shall be treated as a single violation.
  • (A) the Administrator finds that any person has violated section 1311, 1312, 1316, 1317, 1318, 1322(p), 1328, or 1345 of this title, or has violated any permit condition or limitation implementing any of such sections in a permit issued under section 1342 of this title by the Administrator or by a State, or in a permit issued under section 1344 of this title by a State, or
  • (a) With respect to any point source otherwise subject to the provisions of section 1311 of this title or section 1316 of this title, whenever the owner or operator of any such source, after opportunity for public hearing, can demonstrate to the satisfaction of the Administrator (or, if appropriate, the State) that any effluent limitation proposed for the control of the thermal component of any discharge from such source will require effluent limitations more stringent than necessary to assure the projection and propagation of a balanced, indigenous population of shellfish, fish, and wildlife in and on the body of water into which the discharge is to be made, the Administrator (or, if appropriate, the State) may impose an effluent limitation under such sections for such plant, with respect to the thermal component of such discharge (taking into account the interaction of such thermal component with other pollutants), that will assure the protection and propagation of a balanced, indigenous population of shellfish, fish, and wildlife in and on that body of water.
  • (b) Any standard established pursuant to section 1311 of this title or section 1316 of this title and applicable to a point source shall require that the location, design, construction, and capacity of cooling water intake structures reflect the best technology available for minimizing adverse environmental impact.
  • (c) Notwithstanding any other provision of this chapter, any point source of a discharge having a thermal component, the modification of which point source is commenced after October 18, 1972, and which, as modified, meets effluent limitations established under section 1311 of this title or, if more stringent, effluent limitations established under section 1313 of this title and which effluent limitations will assure protection and propagation of a balanced, indigenous population of shellfish, fish, and wildlife in or on the water into which the discharge is made, shall not be subject to any more stringent effluent limitation with respect to the thermal component of its discharge during a ten year period beginning on the date of completion of such modification or during the period of depreciation or amortization of such facility for the purpose of section 167 or 169 (or both) of title 26, whichever period ends first.
  • (1) Any applicant for a Federal license or permit to conduct any activity including, but not limited to, the construction or operation of facilities, which may result in any discharge into the navigable waters, shall provide the licensing or permitting agency a certification from the State in which the discharge originates or will originate, or, if appropriate, from the interstate water pollution control agency having jurisdiction over the navigable waters at the point where the discharge originates or will originate, that any such discharge will comply with the applicable provisions of sections 1311, 1312, 1313, 1316, and 1317 of this title. In the case of any such activity for which there is not an applicable effluent limitation or other limitation under sections 1311(b) and 1312 of this title, and there is not an applicable standard under sections 1316 and 1317 of this title, the State shall so certify, except that any such certification shall not be deemed to satisfy section 1371(c) of this title. Such State or interstate agency shall establish procedures for public notice in the case of all applications for certification by it and, to the extent it deems appropriate, procedures for public hearings in connection with specific applications. In any case where a State or interstate agency has no authority to give such a certification, such certification shall be from the Administrator. If the State, interstate agency, or Administrator, as the case may be, fails or refuses to act on a request for certification, within a reasonable period of time (which shall not exceed one year) after receipt of such request, the certification requirements of this subsection shall be waived with respect to such Federal application. No license or permit shall be granted until the certification required by this section has been obtained or has been waived as provided in the preceding sentence. No license or permit shall be granted if certification has been denied by the State, interstate agency, or the Administrator, as the case may be.
  • (3) The certification obtained pursuant to paragraph (1) of this subsection with respect to the construction of any facility shall fulfill the requirements of this subsection with respect to certification in connection with any other Federal license or permit required for the operation of such facility unless, after notice to the certifying State, agency, or Administrator, as the case may be, which shall be given by the Federal agency to whom application is made for such operating license or permit, the State, or if appropriate, the interstate agency or the Administrator, notifies such agency within sixty days after receipt of such notice that there is no longer reasonable assurance that there will be compliance with the applicable provisions of sections 1311, 1312, 1313, 1316, and 1317 of this title because of changes since the construction license or permit certification was issued in (A) the construction or operation of the facility, (B) the characteristics of the waters into which such discharge is made, (C) the water quality criteria applicable to such waters or (D) applicable effluent limitations or other requirements. This paragraph shall be inapplicable in any case where the applicant for such operating license or permit has failed to provide the certifying State, or, if appropriate, the interstate agency or the Administrator, with notice of any proposed changes in the construction or operation of the facility with respect to which a construction license or permit has been granted, which changes may result in violation of section 1311, 1312, 1313, 1316, or 1317 of this title.
  • (4) Prior to the initial operation of any federally licensed or permitted facility or activity which may result in any discharge into the navigable waters and with respect to which a certification has been obtained pursuant to paragraph (1) of this subsection, which facility or activity is not subject to a Federal operating license or permit, the licensee or permittee shall provide an opportunity for such certifying State, or, if appropriate, the interstate agency or the Administrator to review the manner in which the facility or activity shall be operated or conducted for the purposes of assuring that applicable effluent limitations or other limitations or other applicable water quality requirements will not be violated. Upon notification by the certifying State, or if appropriate, the interstate agency or the Administrator that the operation of any such federally licensed or permitted facility or activity will violate applicable effluent limitations or other limitations or other water quality requirements such Federal agency may, after public hearing, suspend such license or permit. If such license or permit is suspended, it shall remain suspended until notification is received from the certifying State, agency, or Administrator, as the case may be, that there is reasonable assurance that such facility or activity will not violate the applicable provisions of section 1311, 1312, 1313, 1316, or 1317 of this title.
  • (5) Any Federal license or permit with respect to which a certification has been obtained under paragraph (1) of this subsection may be suspended or revoked by the Federal agency issuing such license or permit upon the entering of a judgment under this chapter that such facility or activity has been operated in violation of the applicable provisions of section 1311, 1312, 1313, 1316, or 1317 of this title.
  • (d) Any certification provided under this section shall set forth any effluent limitations and other limitations, and monitoring requirements necessary to assure that any applicant for a Federal license or permit will comply with any applicable effluent limitations and other limitations, under section 1311 or 1312 of this title, standard of performance under section 1316 of this title, or prohibition, effluent standard, or pretreatment standard under section 1317 of this title, and with any other appropriate requirement of State law set forth in such certification, and shall become a condition on any Federal license or permit subject to the provisions of this section.
  • (1) Except as provided in sections 1328 and 1344 of this title, the Administrator may, after opportunity for public hearing issue a permit for the discharge of any pollutant, or combination of pollutants, notwithstanding section 1311(a) of this title, upon condition that such discharge will meet either (A) all applicable requirements under sections 1311, 1312, 1316, 1317, 1318, and 1343 of this title, or (B) prior to the taking of necessary implementing actions relating to all such requirements, such conditions as the Administrator determines are necessary to carry out the provisions of this chapter.
  • (A) apply, and insure compliance with, any applicable requirements of sections 1311, 1312, 1316, 1317, and 1343 of this title;
  • (8) To insure that any permit for a discharge from a publicly owned treatment works includes conditions to require the identification in terms of character and volume of pollutants of any significant source introducing pollutants subject to pretreatment standards under section 1317(b) of this title into such works and a program to assure compliance with such pretreatment standards by each such source, in addition to adequate notice to the permitting agency of (A) new introductions into such works of pollutants from any source which would be a new source as defined in section 1316 of this title if such source were discharging pollutants, (B) new introductions of pollutants into such works from a source which would be subject to section 1311 of this title if it were discharging such pollutants, or (C) a substantial change in volume or character of pollutants being introduced into such works by a source introducing pollutants into such works at the time of issuance of the permit. Such notice shall include information on the quality and quantity of effluent to be introduced into such treatment works and any anticipated impact of such change in the quantity or quality of effluent to be discharged from such publicly owned treatment works; and
  • (k) Compliance with a permit issued pursuant to this section shall be deemed compliance, for purposes of sections 1319 and 1365 of this title, with sections 1311, 1312, 1316, 1317, and 1343 of this title, except any standard imposed under section 1317 of this title for a toxic pollutant injurious to human health. Until December 31, 1974, in any case where a permit for discharge has been applied for pursuant to this section, but final administrative disposition of such application has not been made, such discharge shall not be a violation of (1) section 1311, 1316, or 1342 of this title, or (2) section 407 of this title, unless the Administrator or other plaintiff proves that final administrative disposition of such application has not been made because of the failure of the applicant to furnish information reasonably required or requested in order to process the application. For the 180-day period beginning on October 18, 1972, in the case of any point source discharging any pollutant or combination of pollutants immediately prior to such date which source is not subject to section 407 of this title, the discharge by such source shall not be a violation of this chapter if such a source applies for a permit for discharge pursuant to this section within such 180-day period.
  • (A) Permits for discharges associated with industrial activity shall meet all applicable provisions of this section and section 1311 of this title.
  • (p) Compliance with a permit issued pursuant to this section, including any activity carried out pursuant to a general permit issued under this section, shall be deemed compliance, for purposes of sections 1319 and 1365 of this title, with sections 1311, 1317, and 1343 of this title.
  • (f) For purposes of this section, the term “effluent standard or limitation under this chapter” means (1) effective July 1, 1973, an unlawful act under subsection (a) of section 1311 of this title; (2) an effluent limitation or other limitation under section 1311 or 1312 of this title; (3) standard of performance under section 1316 of this title; (4) prohibition, effluent standard or pretreatment standards under section 1317 of this title; (5) a standard of performance or requirement under section 1322(p) of this title; (6) a certification under section 1341 of this title; (7) a permit or condition of a permit issued under section 1342 of this title that is in effect under this chapter (including a requirement applicable by reason of section 1323 of this title); or (8) a regulation under section 1345(d) of this title.
  • (d) This section shall have no application to any employee who, acting without direction from his employer (or his agent) deliberately violates any prohibition of effluent limitation or other limitation under section 1311 or 1312 of this title, standards of performance under section 1316 of this title, effluent standard, prohibition or pretreatment standard under section 1317 of this title, or any other prohibition or limitation established under this chapter.
  • (1) Review of the Administrator’s action (A) in promulgating any standard of performance under section 1316 of this title, (B) in making any determination pursuant to section 1316(b)(1)(C) of this title, (C) in promulgating any effluent standard, prohibition, or pretreatment standard under section 1317 of this title, (D) in making any determination as to a State permit program submitted under section 1342(b) of this title, (E) in approving or promulgating any effluent limitation or other limitation under section 1311, 1312, 1316, or 1345 of this title, (F) in issuing or denying any permit under section 1342 of this title, and (G) in promulgating any individual control strategy under section 1314(l) of this title, may be had by any interested person in the Circuit Court of Appeals of the United States for the Federal judicial district in which such person resides or transacts business which is directly affected by such action upon application by such person. Any such application shall be made within 120 days from the date of such determination, approval, promulgation, issuance or denial, or after such date only if such application is based solely on grounds which arose after such 120th day.
  • (A) ambient water quality, including contaminant levels in relation to criteria and standards issued pursuant to title III or1 the Federal Water Pollution Control Act (33 U.S.C. 1311 et seq.);
  • (B) benthic environmental quality, including analysis of contaminant levels in sediments in relation to criteria and standards issued pursuant to title III of the Federal Water Pollution Control Act (33 U.S.C. 1311 et seq.); and
  • (A) in establishing effluent limitations and standards under section 1311, 1314, 1316, 1317, or 1342 of title 33 based on effluent limitations guidelines and standards promulgated any time before twelve months after November 8, 1984; or
  • (B) in establishing any other effluent limitations to carry out the provisions of section 1311, 1317, or 1342 of title 33 on or before October 1, 1986.

Citations to §1311(a)

  • (1) Except as provided in sections 1328 and 1344 of this title, the Administrator may, after opportunity for public hearing issue a permit for the discharge of any pollutant, or combination of pollutants, notwithstanding section 1311(a) of this title, upon condition that such discharge will meet either (A) all applicable requirements under sections 1311, 1312, 1316, 1317, 1318, and 1343 of this title, or (B) prior to the taking of necessary implementing actions relating to all such requirements, such conditions as the Administrator determines are necessary to carry out the provisions of this chapter.
  • (1) Except as provided in paragraph (2) of this subsection, the discharge of dredged or fill material—
    (A) from normal farming, silviculture, and ranching activities such as plowing, seeding, cultivating, minor drainage, harvesting for the production of food, fiber, and forest products, or upland soil and water conservation practices;
    (B) for the purpose of maintenance, including emergency reconstruction of recently damaged parts, of currently serviceable structures such as dikes, dams, levees, groins, riprap, breakwaters, causeways, and bridge abutments or approaches, and transportation structures;
    (C) for the purpose of construction or maintenance of farm or stock ponds or irrigation ditches, or the maintenance of drainage ditches;
    (D) for the purpose of construction of temporary sedimentation basins on a construction site which does not include placement of fill material into the navigable waters;
    (E) for the purpose of construction or maintenance of farm roads or forest roads, or temporary roads for moving mining equipment, where such roads are constructed and maintained, in accordance with best management practices, to assure that flow and circulation patterns and chemical and biological characteristics of the navigable waters are not impaired, that the reach of the navigable waters is not reduced, and that any adverse effect on the aquatic environment will be otherwise minimized;
    (F) resulting from any activity with respect to which a State has an approved program under section 1288(b)(4) of this title which meets the requirements of subparagraphs (B) and (C) of such section,
    is not prohibited by or otherwise subject to regulation under this section or section 1311(a) or 1342 of this title (except for effluent standards or prohibitions under section 1317 of this title).
  • (r) The discharge of dredged or fill material as part of the construction of a Federal project specifically authorized by Congress, whether prior to or on or after December 27, 1977, is not prohibited by or otherwise subject to regulation under this section, or a State program approved under this section, or section 1311(a) or 1342 of this title (except for effluent standards or prohibitions under section 1317 of this title), if information on the effects of such discharge, including consideration of the guidelines developed under subsection (b)(1) of this section, is included in an environmental impact statement for such project pursuant to the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and such environmental impact statement has been submitted to Congress before the actual discharge of dredged or fill material in connection with the construction of such proj­ect and prior to either authorization of such project or an appropriation of funds for such construction.

Citations to §1311(b)

  • (B) a list of all navigable waters in such State for which the State does not expect the applicable standard under section 1313 of this title will be achieved after the requirements of sections 1311(b), 1316, and 1317(b) of this title are met, due entirely or substantially to discharges from point sources of any toxic pollutants listed pursuant to section 1317(a) of this title;
  • (1) Any applicant for a Federal license or permit to conduct any activity including, but not limited to, the construction or operation of facilities, which may result in any discharge into the navigable waters, shall provide the licensing or permitting agency a certification from the State in which the discharge originates or will originate, or, if appropriate, from the interstate water pollution control agency having jurisdiction over the navigable waters at the point where the discharge originates or will originate, that any such discharge will comply with the applicable provisions of sections 1311, 1312, 1313, 1316, and 1317 of this title. In the case of any such activity for which there is not an applicable effluent limitation or other limitation under sections 1311(b) and 1312 of this title, and there is not an applicable standard under sections 1316 and 1317 of this title, the State shall so certify, except that any such certification shall not be deemed to satisfy section 1371(c) of this title. Such State or interstate agency shall establish procedures for public notice in the case of all applications for certification by it and, to the extent it deems appropriate, procedures for public hearings in connection with specific applications. In any case where a State or interstate agency has no authority to give such a certification, such certification shall be from the Administrator. If the State, interstate agency, or Administrator, as the case may be, fails or refuses to act on a request for certification, within a reasonable period of time (which shall not exceed one year) after receipt of such request, the certification requirements of this subsection shall be waived with respect to such Federal application. No license or permit shall be granted until the certification required by this section has been obtained or has been waived as provided in the preceding sentence. No license or permit shall be granted if certification has been denied by the State, interstate agency, or the Administrator, as the case may be.

Citations to §1311(b)(1)

Citations to §1311(b)(1)(A)

Citations to §1311(b)(1)(B)

Citations to §1311(b)(1)(C)

Citations to §1311(b)(2)

Citations to §1311(b)(2)(A)

  • (2) Each toxic pollutant listed in accordance with paragraph (1) of this subsection shall be subject to effluent limitations resulting from the application of the best available technology economically achievable for the applicable category or class of point sources established in accordance with sections 1311(b)(2)(A) and 1314(b)(2) of this title. The Administrator, in his discretion, may publish in the Federal Register a proposed effluent standard (which may include a prohibition) establishing requirements for a toxic pollutant which, if an effluent limitation is applicable to a class or category of point sources, shall be applicable to such category or class only if such standard imposes more stringent requirements. Such published effluent standard (or prohibition) shall take into account the toxicity of the pollutant, its persistence, degradability, the usual or potential presence of the affected organisms in any waters, the importance of the affected organisms and the nature and extent of the effect of the toxic pollutant on such organisms, and the extent to which effective control is being or may be achieved under other regulatory authority. The Administrator shall allow a period of not less than sixty days following publication of any such proposed effluent standard (or prohibition) for written comment by interested persons on such proposed standard. In addition, if within thirty days of publication of any such proposed effluent standard (or prohibition) any interested person so requests, the Administrator shall hold a public hearing in connection therewith. Such a public hearing shall provide an opportunity for oral and written presentations, such cross-examination as the Administrator determines is appropriate on disputed issues of material fact, and the transcription of a verbatim record which shall be available to the public. After consideration of such comments and any information and material presented at any public hearing held on such proposed standard or prohibition, the Administrator shall promulgate such standard (or prohibition) with such modification as the Administrator finds are justified. Such promulgation by the Administrator shall be made within two hundred and seventy days after publication of proposed standard (or prohibition). Such standard (or prohibition) shall be final except that if, on judicial review, such standard was not based on substantial evidence, the Administrator shall promulgate a revised standard. Effluent limitations shall be established in accordance with sections 1311(b)(2)(A) and 1314(b)(2) of this title for every toxic pollutant referred to in table 1 of Committee Print Numbered 95–30 of the Committee on Public Works and Transportation of the House of Representatives as soon as practicable after December 27, 1977, but no later than July 1, 1980. Such effluent limitations or effluent standards (or prohibitions) shall be established for every other toxic pollutant listed under paragraph (1) of this subsection as soon as practicable after it is so listed.
  • (i) best available technology economically achievable (within the meaning of section 1311(b)(2)(A) of this title);

Citations to §1311(b)(2)(B)

Citations to §1311(b)(2)(C)

Citations to §1311(b)(2)(D)

Citations to §1311(b)(2)(E)

  • (B) specify factors to be taken into account in determining the best conventional pollutant control technology measures and practices to comply with section 1311(b)(2)(E) of this title to be applicable to any point source (other than publicly owned treatment works) within such categories or classes. Factors relating to the assessment of best conventional pollutant control technology (including measures and practices) shall include consideration of the reasonableness of the relationship between the costs of attaining a reduction in effluents and the effluent reduction benefits derived, and the comparison of the cost and level of reduction of such pollutants from the discharge from publicly owned treatment works to the cost and level of reduction of such pollutants from a class or category of industrial sources, and shall take into account the age of equipment and facilities involved, the process employed, the engineering aspects of the application of various types of control techniques, process changes, non-water quality environmental impact (including energy requirements), and such other factors as the Administrator deems appropriate.
  • (i) best conventional pollutant control technology (within the meaning of section 1311(b)(2)(E) of this title);

Citations to §1311(c)

Citations to §1311(g)

Citations to §1311(h)

Citations to §1311(i)

Citations to §1311(i)(2)

Citations to §1311(k)

Citations to §1311(n)