US Codex
U.S.C.
Notes

§1292. Definitions — Inbound Citations

33 U.S.C. § 1292

Cited by 226 provisions in release 119-102.

Citations to 33 U.S.C. § 1292 as a whole

Citations to §1292(1)

  • (d) The Administrator shall encourage waste treatment management which results in the construction of revenue producing facilities providing for—
    (1) the recycling of potential sewage pollutants through the production of agriculture, silviculture, or aquaculture products, or any combination thereof;
    (2) the confined and contained disposal of pollutants not recycled;
    (3) the reclamation of wastewater; and
    (4) the ultimate disposal of sludge in a manner that will not result in environmental hazards.
  • (1) The Administrator is authorized to make grants to any State, municipality, or intermunicipal or interstate agency for the construction of publicly owned treatment works. On and after October 1, 1984, grants under this subchapter shall be made only for projects for secondary treatment or more stringent treatment, or any cost effective alternative thereto, new interceptors and appurtenances, and infiltration-in-flow correction. Notwithstanding the preceding sentences, the Administrator may make grants on and after October 1, 1984, for (A) any project within the definition set forth in section 1292(2) of this title, other than for a project referred to in the preceding sentence, and (B) any purpose for which a grant may be made under sections1 1329(h) and (i) of this title (including any innovative and alternative approaches for the control of nonpoint sources of pollution), except that not more than 20 per centum (as determined by the Governor of the State) of the amount allotted to a State under section 1285 of this title for any fiscal year shall be obligated in such State under authority of this sentence.
  • (j) The Administrator is authorized to make a grant for any treatment works utilizing processes and techniques meeting the guidelines promulgated under section 1314(d)(3) of this title, if the Administrator determines it is in the public interest and if in the cost effectiveness study made of the construction grant application for the purpose of evaluating alternative treatment works, the life cycle cost of the treatment works for which the grant is to be made does not exceed the life cycle cost of the most cost effective alternative by more than 15 per centum.
  • (k) No grant made after November 15, 1981, for a publicly owned treatment works, other than for facility planning and the preparation of construction plans and specifications, shall be used to treat, store, or convey the flow of any industrial user into such treatment works in excess of a flow per day equivalent to fifty thousand gallons per day of sanitary waste. This subsection shall not apply to any project proposed by a grantee which is carrying out an approved project to prepare construction plans and specifications for a facility to treat wastewater, which received its grant approval before May 15, 1980. This subsection shall not be in effect after November 15, 1981.
  • (1) After December 29, 1981, Federal grants shall not be made for the purpose of providing assistance solely for facility plans, or plans, specifications, and estimates for any proposed project for the construction of treatment works. In the event that the proposed project receives a grant under this section for construction, the Administrator shall make an allowance in such grant for non-Federal funds expended during the facility planning and advanced engineering and design phase at the prevailing Federal share under section 1282(a) of this title, based on the percentage of total project costs which the Administrator determines is the general experience for such projects.
  • (B) Such an advance shall be limited to the allowance for such costs which the Administrator establishes under paragraph (1) of this subsection, and shall be provided only to a potential grant applicant which is a small community and which in the judgment of the State would otherwise be unable to prepare a request for a grant for construction costs under this section.
  • (C) In the event a grant for construction costs is made under this section for a project for which an advance has been made under this paragraph, the Administrator shall reduce the amount of such grant by the allowance established under paragraph (1) of this subsection. In the event no such grant is made, the State is authorized to seek repayment of such advance on such terms and conditions as it may determine.
  • (p) In any case in which a dispute arises with respect to the awarding of a contract for construction of treatment works by a grantee of funds under this subchapter and a party to such dispute files an appeal with the Administrator under this subchapter for resolution of such dispute, the Administrator shall make a final decision on such appeal within 90 days of the filing of such appeal.
  • Notwithstanding any other provision of law, in any case where the Administrator of the Environmental Protection Agency finds that the total of all grants made under section 201 of the Federal Water Pollution Control Act [33 U.S.C. 1281] for the same treatment works exceeds the actual construction costs for such treatment works (as defined in that Act [33 U.S.C. 1251 et seq.]) such excess amount shall be a grant of the Federal share (as defined in that Act) of the cost of construction of a sewage collection system if—
  • (2) an application for assistance for the construction of such sewage collection system was filed in accordance with section 3102 of title 42) before all such section 201 grants were made and such grant under section 3102 of title 42) could not be approved due to lack of funding under such section 3102 of title 42).
  • Notwithstanding any other provision of law, Federal assistance made available by the Farmers Home Administration to any political subdivision of a State may be used to provide the non-Federal share of the cost of any construction project carried out under section 1281 of this title.
  • (1) The amount of any grant for treatment works made under this chapter from funds authorized for any fiscal year beginning after June 30, 1971, and ending before October 1, 1984, shall be 75 per centum of the cost of construction thereof (as approved by the Administrator), and for any fiscal year beginning on or after October 1, 1984, shall be 55 per centum of the cost of construction thereof (as approved by the Administrator), unless modified to a lower percentage rate uniform throughout a State by the Governor of that State with the concurrence of the Administrator. Within ninety days after October 21, 1980, the Administrator shall issue guidelines for concurrence in any such modification, which shall provide for the consideration of the unobligated balance of sums allocated to the State under section 1285 of this title, the need for assistance under this subchapter in such State, and the availability of State grant assistance to replace the Federal share reduced by such modification. The payment of any such reduced Federal share shall not constitute an obligation on the part of the United States or a claim on the part of any State or grantee to reimbursement for the portion of the Federal share reduced in any such State. Any grant (other than for reimbursement) made prior to October 18, 1972, from any funds authorized for any fiscal year beginning after June 30, 1971, shall, upon the request of the applicant, be increased to the applicable percentage under this section. Notwithstanding the first sentence of this paragraph, in any case where a primary, secondary, or advanced waste treatment facility or its related interceptors or a project for infiltration-in-flow correction has received a grant for erection, building, acquisition, alteration, remodeling, improvement, extension, or correction before October 1, 1984, all segments and phases of such facility, interceptors, and project for infiltration-in-flow correction shall be eligible for grants at 75 per centum of the cost of construction thereof for any grant made pursuant to a State obligation which obligation occurred before October 1, 1990. Notwithstanding the first sentence of this paragraph, in the case of a project for which an application for a grant under this subchapter has been made to the Administrator before October 1, 1984, and which project is under judicial injunction on such date prohibiting its construction, such project shall be eligible for grants at 75 percent of the cost of construction thereof. Notwithstanding the first sentence of this paragraph, in the case of the Wyoming Valley Sanitary Authority project mandated by judicial order under a proceeding begun prior to October 1, 1984, and a project for wastewater treatment for Altoona, Pennsylvania, such projects shall be eligible for grants at 75 percent of the cost of construction thereof.
  • (2) The amount of any grant made after September 30, 1978, and before October 1, 1981, for any eligible treatment works or significant portion thereof utilizing innovative or alternative wastewater treatment processes and techniques referred to in section 1281(g)(5) of this title shall be 85 per centum of the cost of construction thereof, unless modified by the Governor of the State with the concurrence of the Administrator to a percentage rate no less than 15 per centum greater than the modified uniform percentage rate in which the Administrator has concurred pursuant to paragraph (1) of this subsection. The amount of any grant made after September 30, 1981, for any eligible treatment works or unit processes and techniques thereof utilizing innovative or alternative wastewater treatment processes and techniques referred to in section 1281(g)(5) of this title shall be a percentage of the cost of construction thereof equal to 20 per centum greater than the percentage in effect under paragraph (1) of this subsection for such works or unit processes and techniques, but in no event greater than 85 per centum of the cost of construction thereof. No grant shall be made under this paragraph for construction of a treatment works in any State unless the proportion of the State contribution to the non-Federal share of construction costs for all treatment works in such State receiving a grant under this paragraph is the same as or greater than the proportion of the State contribution (if any) to the non-Federal share of construction costs for all treatment works receiving grants in such State under paragraph (1) of this subsection.
  • (b) The amount of the grant for any project approved by the Administrator after January 1, 1971, and before July 1, 1971, for the construction of treatment works, the actual erection, building or acquisition of which was not commenced prior to July 1, 1971, shall, upon the request of the applicant, be increased to the applicable percentage under subsection (a) of this section for grants for treatment works from funds for fiscal years beginning after June 30, 1971, with respect to the cost of such actual erection, building, or acquisition. Such increased amount shall be paid from any funds allocated to the State in which the treatment works is located without regard to the fiscal year for which such funds were authorized. Such increased amount shall be paid for such project only if—
    (1) a sewage collection system that is a part of the same total waste treatment system as the treatment works for which such grant was approved is under construction or is to be constructed for use in conjunction with such treatment works, and if the cost of such sewage collection system exceeds the cost of such treatment works, and
    (2) the State water pollution control agency or other appropriate State authority certifies that the quantity of available ground water will be insufficient, inadequate, or unsuitable for public use, including the ecological preservation and recreational use of surface water bodies, unless effluents from publicly-owned treatment works after adequate treatment are returned to the ground water consistent with acceptable technological standards.
  • (1) a sewage collection system that is a part of the same total waste treatment system as the treatment works for which such grant was approved is under construction or is to be constructed for use in conjunction with such treatment works, and if the cost of such sewage collection system exceeds the cost of such treatment works, and
  • (1) Each applicant for a grant shall submit to the Administrator for his approval, plans, specifications, and estimates for each proposed project for the construction of treatment works for which a grant is applied for under section 1281(g)(1) of this title from funds allotted to the State under section 1285 of this title and which otherwise meets the requirements of this chapter. The Administrator shall act upon such plans, specifications, and estimates as soon as practicable after the same have been submitted, and his approval of any such plans, specifications, and estimates shall be deemed a contractual obligation of the United States for the payment of its proportional contribution to such project.
  • (3) In the case of a treatment works that has an estimated total cost of $8,000,000 or less (as determined by the Administrator), and the population of the applicant municipality is twenty-five thousand or less (according to the most recent United States census), upon completion of an approved facility plan, a single grant may be awarded for the combined Federal share of the cost of preparing construction plans and specifications, and the building and erection of the treatment works.
  • (b) The Administrator shall, from time to time as the work progresses, make payments to the recipient of a grant for costs of construction incurred on a project. These payments shall at no time exceed the Federal share of the cost of construction incurred to the date of the voucher covering such payment plus the Federal share of the value of the materials which have been stockpiled in the vicinity of such construction in conformity to plans and specifications for the project.
  • (d) Nothing in this chapter shall be construed to require, or to authorize the Administrator to require, that grants under this chapter for construction of treatment works be made only for projects which are operable units usable for sewage collection, transportation, storage, waste treatment, or for similar purposes without additional construction.
  • (1) Consistent with State law, an applicant who proposes to construct waste water treatment works may enter into an agreement with the Administrator under this subsection providing for the preparation of construction plans and specifications and the erection of such treatment works, in lieu of proceeding under the other provisions of this section.
  • (A) set forth an amount agreed to as the maximum Federal contribution to the project, based upon a competitively bid document of basic design data and applicable standard construction specifications and a determination of the federally eligible costs of the project at the applicable Federal share under section 1282 of this title;
  • (B) set forth dates for the start and completion of construction of the treatment works by the applicant and a schedule of payments of the Federal contribution to the project;
  • (C) contain assurances by the applicant that (i) engineering and management assistance will be provided to manage the project; (ii) the proposed treatment works will be an operable unit and will meet all the requirements of this subchapter; and (iii) not later than 1 year after the date specified as the date of completion of construction of the treatment works, the treatment works will be operating so as to meet the requirements of any applicable permit for such treatment works under section 1342 of this title;
  • (8) In no event shall the Federal contribution for the cost of preparing construction plans and specifications and the building and erection of treatment works pursuant to this subsection exceed the amount agreed upon under paragraph (3).
  • (3) that such works have been certified by the appropriate State water pollution control agency as entitled to priority over such other works in the State in accordance with any applicable State plan under section 1313(e) of this title, except that any priority list developed pursuant to section 1313(e)(3)(H) of this title may be modified by such State in accordance with regulations promulgated by the Administrator to give higher priority for grants for the Federal share of the cost of preparing construction drawings and specifications for any treatment works utilizing processes and techniques meeting the guidelines promulgated under section 1314(d)(3) of this title and for grants for the combined Federal share of the cost of preparing construction drawings and specifications and the building and erection of any treatment works meeting the requirements of the next to the last sentence of section 1283(a) of this title which utilizes processes and techniques meeting the guidelines promulgated under section 1314(d)(3) of this title.1
  • (4) that the applicant proposing to construct such works agrees to pay the non-Federal costs of such works and has made adequate provisions satisfactory to the Administrator for assuring proper and efficient operation, including the employment of trained management and operations personnel, and the maintenance of such works in accordance with a plan of operation approved by the State water pollution control agency or, as appropriate, the interstate agency, after construction thereof;
  • (1) Notwithstanding any other provision of this subchapter, the Administrator shall not approve any grant for any treatment works under section 1281(g)(1) of this title after March 1, 1973, unless he shall first have determined that the applicant (A) has adopted or will adopt a system of charges to assure that each recipient of waste treatment services within the applicant’s jurisdiction, as determined by the Administrator, will pay its proportionate share (except as otherwise provided in this paragraph) of the costs of operation and maintenance (including replacement) of any waste treatment services provided by the applicant; and (B) has legal, institutional, managerial, and financial capability to insure adequate construction, operation, and maintenance of treatment works throughout the applicant’s jurisdiction, as determined by the Administrator. In any case where an applicant which, as of December 27, 1977, uses a system of dedicated ad valorem taxes and the Administrator determines that the applicant has a system of charges which results in the distribution of operation and maintenance costs for treatment works within the applicant’s jurisdiction, to each user class, in proportion to the contribution to the total cost of operation and maintenance of such works by each user class (taking into account total waste water loading of such works, the constituent elements of the wastes, and other appropriate factors), and such applicant is otherwise in compliance with clause (A) of this paragraph with respect to each industrial user, then such dedicated ad valorem tax system shall be deemed to be the user charge system meeting the requirements of clause (A) of this paragraph for the residential user class and such small non-residential user classes as defined by the Administrator. In defining small non-residential users, the Administrator shall consider the volume of wastes discharged into the treatment works by such users and the constituent elements of such wastes as well as such other factors as he deems appropriate. A system of user charges which imposes a lower charge for low-income residential users (as defined by the Administrator) shall be deemed to be a user charge system meeting the requirements of clause (A) of this paragraph if the Administrator determines that such system was adopted after public notice and hearing.
  • (1) A grant for the construction of treatment works under this subchapter shall provide that the engineer or engineering firm supervising construction or providing architect engineering services during construction shall continue its relationship to the grant applicant for a period of one year after the completion of construction and initial operation of such treatment works. During such period such engineer or engineering firm shall supervise operation of the treatment works, train operating personnel, and prepare curricula and training material for operating personnel. Costs associated with the implementation of this paragraph shall be eligible for Federal assistance in accordance with this subchapter.
  • (2) On the date one year after the completion of construction and initial operation of such treatment works, the owner and operator of such treatment works shall certify to the Administrator whether or not such treatment works meet the design specifications and effluent limitations contained in the grant agreement and permit pursuant to section 1342 of this title for such works. If the owner and operator of such treatment works cannot certify that such treatment works meet such design specifications and effluent limitations, any failure to meet such design specifications and effluent limitations shall be corrected in a timely manner, to allow such affirmative certification, at other than Federal expense.
  • (a) Sums authorized to be appropriated pursuant to section 1287 of this title for each fiscal year beginning after June 30, 1972, and before September 30, 1977, shall be allotted by the Administrator not later than the January 1st immediately preceding the beginning of the fiscal year for which authorized, except that the allotment for fiscal year 1973 shall be made not later than 30 days after October 18, 1972. Such sums shall be allotted among the States by the Administrator in accordance with regulations promulgated by him, in the ratio that the estimated cost of constructing all needed publicly owned treatment works in each State bears to the estimated cost of construction of all needed publicly owned treatment works in all of the States. For the fiscal years ending June 30, 1973, and June 30, 1974, such ratio shall be determined on the basis of table III of House Public Works Committee Print No. 92–50. For the fiscal year ending June 30, 1975, such ratio shall be determined one-half on the basis of table I of House Public Works Committee Print Numbered 93–28 and one-half on the basis of table II of such print, except that no State shall receive an allotment less than that which it received for the fiscal year ending June 30, 1972, as set forth in table III of such print. Allotments for fiscal years which begin after the fiscal year ending June 30, 1975, shall be made only in accordance with a revised cost estimate made and submitted to Congress in accordance with section 1375(b) of this title and only after such revised cost estimate shall have been approved by law specifically enacted after October 18, 1972.
  • (2) The Administrator is authorized to grant to any State from amounts reserved to such State under this subsection, the reasonable costs of administering any aspects of sections 1281, 1283, 1284, and 1292 of this title the responsibility for administration of which the Administrator has delegated to such State. The Administrator may increase such grant to take into account the reasonable costs of administering an approved program under section 1342 or 1344 of this title, administering a state-wide waste treatment management planning program under section 1288(b)(4) of this title, and managing waste treatment construction grants for small communities.
  • (i) Not less than ½ of 1 percent of funds allotted to a State for each of the fiscal years ending September 30, 1979, through September 30, 1990, under subsection (c) of this section shall be expended only for increasing the Federal share of grants for construction of treatment works utilizing innovative processes and techniques pursuant to section 1282(a)(2) of this title. Including the expenditures authorized by the preceding sentence, a total of 2 percent of the funds allotted to a State for each of the fiscal years ending September 30, 1979, and September 30, 1980, and 3 percent of the funds allotted to a State for the fiscal year ending September 30, 1981, under subsection (c) of this section shall be expended only for increasing grants for construction of treatment works pursuant to section 1282(a)(2) of this title. Including the expenditures authorized by the first sentence of this subsection, a total (as determined by the Governor of the State) of not less than 4 percent nor more than 7½ percent of the funds allotted to such State under subsection (c) of this section for each of the fiscal years ending September 30, 1982, through September 30, 1990, shall be expended only for increasing the Federal share of grants for construction of treatment works pursuant to section 1282(a)(2) of this title.
  • (D) determining those publicly owned treatment works which should be constructed with assistance under this subchapter, in which areas and in what sequence, taking into account the relative degree of effluent reduction attained, the relative contributions to water quality of other point or nonpoint sources, and the consideration of alternatives to such construction, and implementing section 1313(e) of this title.
  • (a) Any publicly owned treatment works in a State on which construction was initiated after June 30, 1966, but before July 1, 1973, which was approved by the appropriate State water pollution control agency and which the Administrator finds meets the requirements of section 1158 of this title) in effect at the time of the initiation of construction shall be reimbursed a total amount equal to the difference between the amount of Federal financial assistance, if any, received under such section 1158 of this title) for such project and 50 per centum of the cost of such project, or 55 per centum of the project cost where the Administrator also determines that such treatment works was constructed in conformity with a comprehensive metropolitan treatment plan as described in section 1158(f) of this title) as in effect immediately prior to October 18, 1972. Nothing in this subsection shall result in any such works receiving Federal grants from all sources in excess of 80 per centum of the cost of such project.
  • (1) In any case where a substantial portion of the funds allotted to a State for the current fiscal year under this subchapter have been obligated under section 1281(g) of this title, or will be so obligated in a timely manner (as determined by the Administrator), and there is construction of any treatment works project without the aid of Federal funds and in accordance with all procedures and all requirements applicable to treatment works projects, except those procedures and requirements which limit construction of projects to those constructed with the aid of previously allotted Federal funds, the Administrator, upon his approval of an application made under this subsection therefor, is authorized to pay the Federal share of the cost of construction of such project when additional funds are allotted to the State under this subchapter if prior to the construction of the project the Administrator approves plans, specifications, and estimates therefor in the same manner as other treatment works projects. The Administrator may not approve an application under this subsection unless an authorization is in effect for the first fiscal year in the period for which the application requests payment and such requested payment for that fiscal year does not exceed the State’s expected allotment from such authorization. The Administrator shall not be required to make such requested payment for any fiscal year—
    (A) to the extent that such payment would exceed such State’s allotment of the amount appropriated for such fiscal year; and
    (B) unless such payment is for a project which, on the basis of an approved funding priority list of such State, is eligible to receive such payment based on the allotment and appropriation for such fiscal year.
    To the extent that sufficient funds are not appropriated to pay the full Federal share with respect to a project for which obligations under the provisions of this subsection have been made, the Administrator shall reduce the Federal share to such amount less than 75 per centum as such appropriations do provide.
  • (B) the establishment of construction priorities for such treatment works and time schedules for the initiation and completion of all treatment works;
  • (ii) regulate the location, modification, and construction of any facilities within such area which may result in any discharge in such area, and
  • (H) a process to (i) identify construction activity related sources of pollution, and (ii) set forth procedures and methods (including land use requirements) to control to the extent feasible such sources;
  • (d) After a waste treatment management agency having the authority required by subsection (c) has been designated under such subsection for an area and a plan for such area has been approved under subsection (b) of this section, the Administrator shall not make any grant for construction of a publicly owned treatment works under section 1281(g)(1) of this title within such area except to such designated agency and for works in conformity with such plan.
  • (a) Subject to the conditions of this section and to such terms and conditions as the Administrator determines to be necessary to carry out the purposes of this subchapter, the Administrator is authorized to guarantee, and to make commitments to guarantee, the principal and interest (including interest accruing between the date of default and the date of the payment in full of the guarantee) of any loan, obligation, or participation therein of any State, municipality, or intermunicipal or interstate agency issued directly and exclusively to the Federal Financing Bank to finance that part of the cost of any grant-eligible project for the construction of publicly owned treatment works not paid for with Federal financial assistance under this subchapter (other than this section), which project the Administrator has determined to be eligible for such financial assistance under this subchapter, including, but not limited to, proj­ects eligible for reimbursement under section 1286 of this title.
  • (c) Prior to construction of any such facility, the appropriate State or States, interstate agency, municipality, or other appropriate political subdivision of the State shall agree in writing to (1) furnish all lands, easements, and rights-of-way necessary for the construction, operation, and maintenance of the facility; (2) contribute to the United States 25 per centum of the construction costs, such amount to be payable either in cash prior to construction, in installments during construction, or in installments, with interest at a rate to be determined by the Secretary of the Treasury, as of the beginning of the fiscal year in which construction is initiated, on the basis of the computed average interest rate payable by the Treasury upon its outstanding marketable public obligations, which are neither due or callable for redemption for fifteen years from date of issue; (3) hold and save the United States free from damages due to construction, operation, and maintenance of the facility; and (4) except as provided in subsection (f), maintain the facility after completion of its use for disposal purposes in a manner satisfactory to the Secretary of the Army.
  • (d) The requirement for appropriate non-Federal interest or interests to furnish an agreement to contribute 25 per centum of the construction costs as set forth in subsection (c) shall be waived by the Secretary of the Army upon a finding by the Administrator of the Environmental Protection Agency that for the area to which such construction applies, the State or States involved, interstate agency, municipality, and other appropriate political subdivision of the State and industrial concerns are participating in and in compliance with an approved plan for the general geographical area of the dredging activity for construction, modification, expansion, or rehabilitation of waste treatment facilities and the Administrator has found that applicable water quality standards are not being violated. In the event such findings occur after the appropriate non-Federal interest or interests have entered into the agreement required by subsection (c), any payments due after the date of such findings as part of the required local contribution of 25 per centum of the construction costs shall be waived by the Secretary of the Army.
  • (g) Any spoil disposal facilities constructed under the provisions of this section shall be made available to Federal licensees or permittees upon payment of an appropriate charge for such use. Twenty-five per centum of such charge shall be remitted to the participating non-Federal interest or interests except for those excused from contributing to the construction costs under subsections (d) and (e).
  • Notwithstanding any other provision of this chapter, the determination of the priority to be given each category of projects for construction of publicly owned treatment works within each State shall be made solely by that State, except that if the Administrator, after a public hearing, determines that a specific project will not result in compliance with the enforceable requirements of this chapter, such project shall be removed from the State’s priority list and such State shall submit a revised priority list. These categories shall include, but not be limited to (A) secondary treatment, (B) more stringent treatment, (C) infiltration-in-flow correction, (D) major sewer system rehabilitation, (E) new collector sewers and appurtenances, (F) new interceptors and appurtenances, and (G) correction of combined sewer overflows. Not less than 25 per centum of funds allocated to a State in any fiscal year under this subchapter for construction of publicly owned treatment works in such State shall be obligated for those types of projects referred to in clauses (D), (E), (F), and (G) of this section, if such projects are on such State’s priority list for that year and are otherwise eligible for funding in that fiscal year. It is the policy of Congress that projects for wastewater treatment and management undertaken with Federal financial assistance under this chapter by any State, municipality, or intermunicipal or interstate agency shall be projects which, in the estimation of the State, are designed to achieve optimum water quality management, consistent with the public health and water quality goals and requirements of this chapter.
  • (b) In accordance with the policy set forth in subsection (a) of this section, before the Administrator approves any grant to any State, municipality, or intermunicipal or interstate agency for the erection, building, acquisition, alteration, remodeling, improvement, or extension of any treatment works the Administrator shall determine that the facilities plan of which such treatment works are a part constitutes the most economical and cost-effective combination of treatment works over the life of the project to meet the requirements of this chapter, including, but not limited to, consideration of construction costs, operation, maintenance, and replacement costs.
  • (d) This section applies to projects for waste treatment and management for which no treatment works including a facilities plan for such project have received Federal financial assistance for the preparation of construction plans and specifications under this chapter before December 29, 1981.
  • Whenever the Governor of a State which has been delegated sufficient authority to administer the construction grant program under this subchapter in that State certifies to the Administrator that a grant application meets applicable requirements of Federal and State law for assistance under this subchapter, the Administrator shall approve or disapprove such application within 45 days of the date of receipt of such application. If the Administrator does not approve or disapprove such application within 45 days of receipt, the application shall be deemed approved. If the Administrator disapproves such application the Administrator shall state in writing the reasons for such disapproval. Any grant approved or deemed approved under this section shall be subject to amounts provided in appropriation Acts.
  • (1) A project that has received construction funds under the reclamation and reuse program conducted under the Reclamation Projects Authorization and Adjustment Act of 1992 (43 U.S.C. 390h et seq.) shall not be eligible for grant assistance under this section.
  • (f) Amounts from grants received under this section may be used for engineering, design, construction, and final testing of alternative water source projects designed to meet critical water supply needs. Such amounts may not be used for planning, feasibility studies or for operation, maintenance, replacement, repair, or rehabilitation.
  • (1) The Administrator may make grants to States for the purpose of providing grants to a municipality or municipal entity for planning, design, and construction of—
    (A) treatment works to intercept, transport, control, treat, or reuse municipal combined sewer overflows, sanitary sewer overflows, or stormwater;
    (B) notification systems to inform the public of combined sewer or sanitary overflows that result in sewage being released into rivers and other waters; and
    (C) any other measures to manage, reduce, treat, or recapture stormwater or subsurface drainage water eligible for assistance under section 1383(c) of this title.
  • (I) To the extent there are sufficient eligible project applications, the Administrator shall ensure that a State uses not less than 25 percent of the amount of the grants made to the State under subsection (a) in a fiscal year to carry out projects in rural communities or financially distressed communities for the purpose of planning, design, and construction of—
    (aa) treatment works to intercept, transport, control, treat, or reuse municipal sewer overflows, sanitary sewer overflows, or stormwater; or
    (bb) any other measures to manage, reduce, treat, or recapture stormwater or subsurface drainage water eligible for assistance under section 603(c).
  • (A) for the construction, repair, or replacement of an individual household decentralized wastewater treatment system; or
  • (v) provide technical assistance to State, Tribal, and local governments to assist with the design, construction, operation, and maintenance of stormwater control infrastructure projects that use innovative technologies;
  • (iv) Developing approaches for community-based public-private partnerships for the financing and construction of stormwater control infrastructure technologies, including feasibility studies, stakeholder outreach, and needs assessments.
  • (B) The Administrator shall credit toward the non-Federal share of the cost of an implementation project carried out under this subsection the cost of planning, design, and construction work completed for the project using funds other than funds provided under this section.
  • (B) for publicly owned treatment works in existence on July 1, 1977, or approved pursuant to section 1283 of this title prior to June 30, 1974 (for which construction must be completed within four years of approval), effluent limitations based upon secondary treatment as defined by the Administrator pursuant to section 1314(d)(1) of this title; or,
  • (1) Where construction is required in order for a planned or existing publicly owned treatment works to achieve limitations under subsection (b)(1)(B) or (b)(1)(C) of this section, but (A) construction cannot be completed within the time required in such subsection, or (B) the United States has failed to make financial assistance under this chapter available in time to achieve such limitations by the time specified in such subsection, the owner or operator of such treatment works may request the Administrator (or if appropriate the State) to issue a permit pursuant to section 1342 of this title or to modify a permit issued pursuant to that section to extend such time for compliance. Any such request shall be filed with the Administrator (or if appropriate the State) within 180 days after February 4, 1987. The Administrator (or if appropriate the State) may grant such request and issue or modify such a permit, which shall contain a schedule of compliance for the publicly owned treatment works based on the earliest date by which such financial assistance will be available from the United States and construction can be completed, but in no event later than July 1, 1988, and shall contain such other terms and conditions, including those necessary to carry out subsections (b) through (g) of section 1281 of this title, section 1317 of this title, and such interim effluent limitations applicable to that treatment works as the Administrator determines are necessary to carry out the provisions of this chapter.
  • (A) Where a point source (other than a publicly owned treatment works) will not achieve the requirements of subsections (b)(1)(A) and (b)(1)(C) of this section and—
    (i) if a permit issued prior to July 1, 1977, to such point source is based upon a discharge into a publicly owned treatment works; or
    (ii) if such point source (other than a publicly owned treatment works) had before July 1, 1977, a contract (enforceable against such point source) to discharge into a publicly owned treatment works; or
    (iii) if either an application made before July 1, 1977, for a construction grant under this chapter for a publicly owned treatment works, or engineering or architectural plans or working drawings made before July 1, 1977, for a publicly owned treatment works, show that such point source was to discharge into such publicly owned treatment works,
    and such publicly owned treatment works is presently unable to accept such discharge without construction, and in the case of a discharge to an existing publicly owned treatment works, such treatment works has an extension pursuant to paragraph (1) of this subsection, the owner or operator of such point source may request the Administrator (or if appropriate the State) to issue or modify such a permit pursuant to such section 1342 of this title to extend such time for compliance. Any such request shall be filed with the Administrator (or if appropriate the State) within 180 days after December 27, 1977, or the filing of a request by the appropriate publicly owned treatment works under paragraph (1) of this subsection, whichever is later. If the Administrator (or if appropriate the State) finds that the owner or operator of such point source has acted in good faith, he may grant such request and issue or modify such a permit, which shall contain a schedule of compliance for the point source to achieve the requirements of subsections (b)(1)(A) and (C) of this section and shall contain such other terms and conditions, including pretreatment and interim effluent limitations and water conservation requirements applicable to that point source, as the Administrator determines are necessary to carry out the provisions of this chapter.
  • (iii) if either an application made before July 1, 1977, for a construction grant under this chapter for a publicly owned treatment works, or engineering or architectural plans or working drawings made before July 1, 1977, for a publicly owned treatment works, show that such point source was to discharge into such publicly owned treatment works,
  • (H) an inventory and ranking, in order of priority, of needs for construction of waste treatment works required to meet the applicable requirements of sections 1311 and 1312 of this title.
  • (C) all construction activity, including runoff from the facilities resulting from such construction;
  • (F) changes in the movement, flow, or circulation of any navigable waters or ground waters, including changes caused by the construction of dams, levees, channels, causeways, or flow diversion facilities.
  • (2) The term “new source” means any source, the construction of which is commenced after the publication of proposed regulations prescribing a standard of performance under this section which will be applicable to such source, if such standard is thereafter promulgated in accordance with this section.
  • (5) The term “construction” means any placement, assembly, or installation of facilities or equipment (including contractual obligations to purchase such facilities or equipment) at the premises where such equipment will be used, including preparation work at such premises.
  • (d) Notwithstanding any other provision of this chapter, any point source the construction of which is commenced after October 18, 1972, and which is so constructed as to meet all applicable standards of performance shall not be subject to any more stringent standard of performance during a ten-year period beginning on the date of completion of such construction or during the period of depreciation or amortization of such facility for the purposes of section 167 or 169 (or both) of title 26 whichever period ends first.
  • (B) The Administrator may, if he determines (i) that any person who is a violator of, or any person who is otherwise not in compliance with, the time requirements under this chapter or in any permit issued under this chapter, has acted in good faith, and has made a commitment (in the form of contracts or other securities) of necessary resources to achieve compliance by the earliest possible date after July 1, 1977, but not later than April 1, 1979; (ii) that any extension under this provision will not result in the imposition of any additional controls on any other point or nonpoint source; (iii) that an application for a permit under section 1342 of this title was filed for such person prior to December 31, 1974; and (iv) that the facilities necessary for compliance with such requirements are under construction, grant an extension of the date referred to in section 1311(b)(1)(A) of this title to a date which will achieve compliance at the earliest time possible but not later than April 1, 1979.
  • (1) “new vessel” includes every description of watercraft or other artificial contrivance used, or capable of being used, as a means of transportation on the navigable waters, the construction of which is initiated after promulgation of standards and regulations under this section;
  • (2) “existing vessel” includes every description of watercraft or other artificial contrivance used, or capable of being used, as a means of transportation on the navigable waters, the construction of which is initiated before promulgation of standards and regulations under this section;
  • (1) As soon as possible, after October 18, 1972, and subject to the provisions of section 1254(j) of this title, the Administrator, after consultation with the Secretary of the department in which the Coast Guard is operating, after giving appropriate consideration to the economic costs involved, and within the limits of available technology, shall promulgate Federal standards of performance for marine sanitation devices (hereafter in this section referred to as “standards”) which shall be designed to prevent the discharge of untreated or inadequately treated sewage into or upon the navigable waters from new vessels and existing vessels, except vessels not equipped with installed toilet facilities. Such standards and standards established under subsection (c)(1)(B) of this section shall be consistent with maritime safety and the marine and navigation laws and regulations and shall be coordinated with the regulations issued under this subsection by the Secretary of the department in which the Coast Guard is operating. The Secretary of the department in which the Coast Guard is operating shall promulgate regulations, which are consistent with standards promulgated under this subsection and subsection (c) of this section and with maritime safety and the marine and navigation laws and regulations governing the design, construction, installation, and operation of any marine sanitation device on board such vessels.
  • (3) Every manufacturer shall establish and maintain such records, make such reports, and provide such information as the Administrator or the Secretary of the department in which the Coast Guard is operating may reasonably require to enable him to determine whether such manufacturer has acted or is acting in compliance with this section and regulations issued thereunder and shall, upon request of an officer or employee duly designated by the Administrator or the Secretary of the department in which the Coast Guard is operating, permit such officer or employee at reasonable times to have access to and copy such records. All information reported to or otherwise obtained by the Administrator or the Secretary of the Department in which the Coast Guard is operating or their representatives pursuant to this subsection which contains or relates to a trade secret or other matter referred to in section 1905 of title 18 shall be considered confidential for the purpose of that section, except that such information may be disclosed to other officers or employees concerned with carrying out this section. This paragraph shall not apply in the case of the construction of a vessel by an individual for his own use.
  • (4) The Secretary of Defense, after consultation with the Administrator and the Secretary of the department in which the Coast Guard is operating, shall promulgate such regulations governing the design, construction, installation, and use of marine pollution control devices on board vessels of the Armed Forces as are necessary to achieve the standards promulgated under paragraph (3).
  • (A) Beginning on the effective date of—
    (i) a determination under paragraph (2) that it is not reasonable and practicable to require use of a marine pollution control device regarding a particular discharge incidental to the normal operation of a vessel of the Armed Forces; or
    (ii) regulations promulgated by the Secretary of Defense under paragraph (4);
    except as provided in paragraph (7), neither a State nor a political subdivision of a State may adopt or enforce any statute or regulation of the State or political subdivision with respect to the discharge or the design, construction, installation, or use of any marine pollution control device required to control discharges from a vessel of the Armed Forces.
  • (i) shall not impose any design, construction, manning, or equipment standard on a foreign flagged vessel engaged in innocent passage unless the prohibition implements a generally accepted international rule or standard; and
  • (A) The Secretary of the department in which the Coast Guard is operating shall promulgate such regulations governing the design, construction, installation, and use of management practices for recreational vessels as are necessary to meet the standards of performance promulgated under paragraph (3).
  • (B) The Secretary shall promulgate such regulations governing the design, construction, testing, approval, installation, and use of marine pollution control devices as are necessary to ensure compliance with the standards of performance promulgated under paragraph (4).
  • (2) Construction shall not be initiated for facilities for treatment of wastewater at any Federal property or facility after September 30, 1979, if alternative methods for wastewater treatment at such property or facility utilizing innovative treatment processes and techniques, including but not limited to methods utilizing recycle and reuse techniques and land treatment are not utilized, unless the life cycle cost of the alternative treatment works exceeds the life cycle cost of the most cost effective alternative by more than 15 per centum. The Administrator may waive the application of this paragraph in any case where the Administrator determines it to be in the public interest, or that compliance with this paragraph would interfere with the orderly compliance with conditions of a permit issued pursuant to section 1342 of this title.
  • (b) Any standard established pursuant to section 1311 of this title or section 1316 of this title and applicable to a point source shall require that the location, design, construction, and capacity of cooling water intake structures reflect the best technology available for minimizing adverse environmental impact.

Citations to §1292(2)

  • (a) The Administrator of the Environmental Protection Agency (the “Administrator”) may transfer amounts made available under the heading “Environmental Protection Agency—State and Tribal Assistance Grants” in the USMCA Supplemental Appropriations Act, 2019 (title IX of Public Law 116–113) to the International Boundary and Water Commission, United States and Mexico (the “Commission”), by entering into an interagency agreement or by awarding a grant, to support the construction of treatment works (as that term is defined in section 1292(2) of title 33), that will be owned or operated by the Commission: Provided, That the Commission shall, in consultation with the Administrator and subject to the requirements of sections 1372 and 1388 of title 33, use amounts transferred pursuant to this section for general, administrative, or other costs (including construction management) related to the planning, study, design, and construction, of treatment works that, as determined by the Commissioner of the Commission, will—
    (1) protect residents in the United States-Mexico border region from water pollution resulting from—
    (A) transboundary flows of wastewater, stormwater, or other international transboundary water flows originating in Mexico; and
    (B) any inadequacies or breakdowns of treatment works in Mexico; and
    (2) provide treatment of the flows and water pollution described in subparagraph (A) in compliance with local, State, and Federal law: Provided, That the Commission may also use amounts transferred pursuant to this section to operate and maintain any new treatment work constructed, which shall be in addition to any amounts otherwise available to the Commission for such purposes.
  • (1) The Administrator is authorized to make grants to any State, municipality, or intermunicipal or interstate agency for the construction of publicly owned treatment works. On and after October 1, 1984, grants under this subchapter shall be made only for projects for secondary treatment or more stringent treatment, or any cost effective alternative thereto, new interceptors and appurtenances, and infiltration-in-flow correction. Notwithstanding the preceding sentences, the Administrator may make grants on and after October 1, 1984, for (A) any project within the definition set forth in section 1292(2) of this title, other than for a project referred to in the preceding sentence, and (B) any purpose for which a grant may be made under sections1 1329(h) and (i) of this title (including any innovative and alternative approaches for the control of nonpoint sources of pollution), except that not more than 20 per centum (as determined by the Governor of the State) of the amount allotted to a State under section 1285 of this title for any fiscal year shall be obligated in such State under authority of this sentence.
  • (2) Notwithstanding the second sentence of paragraph (1) of this subsection, the Administrator shall make a preliminary detailed estimate called for by subparagraph (B) of such paragraph and shall submit such preliminary detailed estimate to the Congress no later than September 3, 1974. The Administrator shall require each State to prepare an estimate of cost for such State, and shall utilize the survey form EPA–1, O.M.B. No. 158–R0017, prepared for the 1973 detailed estimate, except that such estimate shall include all costs of compliance with section 1281(g)(2)(A) of this title and water quality standards established pursuant to section 1313 of this title, and all costs of treatment works as defined in section 1292(2) of this title, including all eligible costs of constructing sewage collection systems and correcting excessive infiltration or inflow and all eligible costs of correcting combined storm and sanitary sewer problems and treating storm water flows. The survey form shall be distributed by the Administrator to each State no later than January 31, 1974.

Citations to §1292(2)(A)

  • (1) The Administrator is authorized to make grants to any State, municipality, or intermunicipal or interstate agency for the construction of publicly owned treatment works. On and after October 1, 1984, grants under this subchapter shall be made only for projects for secondary treatment or more stringent treatment, or any cost effective alternative thereto, new interceptors and appurtenances, and infiltration-in-flow correction. Notwithstanding the preceding sentences, the Administrator may make grants on and after October 1, 1984, for (A) any project within the definition set forth in section 1292(2) of this title, other than for a project referred to in the preceding sentence, and (B) any purpose for which a grant may be made under sections1 1329(h) and (i) of this title (including any innovative and alternative approaches for the control of nonpoint sources of pollution), except that not more than 20 per centum (as determined by the Governor of the State) of the amount allotted to a State under section 1285 of this title for any fiscal year shall be obligated in such State under authority of this sentence.
  • (2) The Administrator shall not make grants from funds authorized for any fiscal year beginning after June 30, 1974, to any State, municipality, or intermunicipal or interstate agency for the erection, building, acquisition, alteration, remodeling, improvement, or extension of treatment works unless the grant applicant has satisfactorily demonstrated to the Administrator that—
    (A) alternative waste management techniques have been studied and evaluated and the works proposed for grant assistance will provide for the application of the best practicable waste treatment technology over the life of the works consistent with the purposes of this subchapter; and
    (B) as appropriate, the works proposed for grant assistance will take into account and allow to the extent practicable the application of technology at a later date which will provide for the reclaiming or recycling of water or otherwise eliminate the discharge of pollutants.
  • (3) The Administrator shall not approve any grant after July 1, 1973, for treatment works under this section unless the applicant shows to the satisfaction of the Administrator that each sewer collection system discharging into such treatment works is not subject to excessive infiltration.
  • (4) The Administrator is authorized to make grants to applicants for treatment works grants under this section for such sewer system evaluation studies as may be necessary to carry out the requirements of paragraph (3) of this subsection. Such grants shall be made in accordance with rules and regulations promulgated by the Administrator. Initial rules and regulations shall be promulgated under this paragraph not later than 120 days after October 18, 1972.
  • (5) The Administrator shall not make grants from funds authorized for any fiscal year beginning after September 30, 1978, to any State, municipality, or intermunicipal or interstate agency for the erection, building, acquisition, alteration, remodeling, improvement, or extension of treatment works unless the grant applicant has satisfactorily demonstrated to the Administrator that innovative and alternative wastewater treatment processes and techniques which provide for the reclaiming and reuse of water, otherwise eliminate the discharge of pollutants, and utilize recycling techniques, land treatment, new or improved methods of waste treatment management for municipal and industrial waste (discharged into municipal systems) and the confined disposal of pollutants, so that pollutants will not migrate to cause water or other environmental pollution, have been fully studied and evaluated by the applicant taking into account subsection (d) of this section and taking into account and allowing to the extent practicable the more efficient use of energy and resources.
  • (6) The Administrator shall not make grants from funds authorized for any fiscal year beginning after September 30, 1978, to any State, municipality, or intermunicipal or interstate agency for the erection, building, acquisition, alteration, remodeling, improvement, or extension of treatment works unless the grant applicant has satisfactorily demonstrated to the Administrator that the applicant has analyzed the potential recreation and open space opportunities in the planning of the proposed treatment works.
  • (h) A grant may be made under this section to construct a privately owned treatment works serving one or more principal residences or small commercial establishments constructed prior to, and inhabited on, December 27, 1977, where the Administrator finds that—
    (1) a public body otherwise eligible for a grant under subsection (g) has applied on behalf of a number of such units and certified that public ownership of such works is not feasible;
    (2) such public body has entered into an agreement with the Administrator which guarantees that such treatment works will be properly operated and maintained and will comply with all other requirements of section 1284 of this title and includes a system of charges to assure that each recipient of waste treatment services under such a grant will pay its proportionate share of the cost of operation and maintenance (including replacement); and
    (3) the total cost and environmental impact of providing waste treatment services to such residences or commercial establishments will be less than the cost of providing a system of collection and central treatment of such wastes.
  • (2) such public body has entered into an agreement with the Administrator which guarantees that such treatment works will be properly operated and maintained and will comply with all other requirements of section 1284 of this title and includes a system of charges to assure that each recipient of waste treatment services under such a grant will pay its proportionate share of the cost of operation and maintenance (including replacement); and
  • (j) The Administrator is authorized to make a grant for any treatment works utilizing processes and techniques meeting the guidelines promulgated under section 1314(d)(3) of this title, if the Administrator determines it is in the public interest and if in the cost effectiveness study made of the construction grant application for the purpose of evaluating alternative treatment works, the life cycle cost of the treatment works for which the grant is to be made does not exceed the life cycle cost of the most cost effective alternative by more than 15 per centum.
  • (k) No grant made after November 15, 1981, for a publicly owned treatment works, other than for facility planning and the preparation of construction plans and specifications, shall be used to treat, store, or convey the flow of any industrial user into such treatment works in excess of a flow per day equivalent to fifty thousand gallons per day of sanitary waste. This subsection shall not apply to any project proposed by a grantee which is carrying out an approved project to prepare construction plans and specifications for a facility to treat wastewater, which received its grant approval before May 15, 1980. This subsection shall not be in effect after November 15, 1981.
  • (1) After December 29, 1981, Federal grants shall not be made for the purpose of providing assistance solely for facility plans, or plans, specifications, and estimates for any proposed project for the construction of treatment works. In the event that the proposed project receives a grant under this section for construction, the Administrator shall make an allowance in such grant for non-Federal funds expended during the facility planning and advanced engineering and design phase at the prevailing Federal share under section 1282(a) of this title, based on the percentage of total project costs which the Administrator determines is the general experience for such projects.
  • (2) projects the nature, extent, timing, and costs of future expansion and reconstruction of treatment works which will be necessary to satisfy the applicant’s projected future requirements for waste treatment services; and
  • (p) In any case in which a dispute arises with respect to the awarding of a contract for construction of treatment works by a grantee of funds under this subchapter and a party to such dispute files an appeal with the Administrator under this subchapter for resolution of such dispute, the Administrator shall make a final decision on such appeal within 90 days of the filing of such appeal.
  • Notwithstanding any other provision of law, in any case where the Administrator of the Environmental Protection Agency finds that the total of all grants made under section 201 of the Federal Water Pollution Control Act [33 U.S.C. 1281] for the same treatment works exceeds the actual construction costs for such treatment works (as defined in that Act [33 U.S.C. 1251 et seq.]) such excess amount shall be a grant of the Federal share (as defined in that Act) of the cost of construction of a sewage collection system if—
  • (1) such sewage collection system was constructed as part of the same total treatment system as the treatment works for which such section 201 [33 U.S.C. 1281] grants were approved, and
  • (1) The amount of any grant for treatment works made under this chapter from funds authorized for any fiscal year beginning after June 30, 1971, and ending before October 1, 1984, shall be 75 per centum of the cost of construction thereof (as approved by the Administrator), and for any fiscal year beginning on or after October 1, 1984, shall be 55 per centum of the cost of construction thereof (as approved by the Administrator), unless modified to a lower percentage rate uniform throughout a State by the Governor of that State with the concurrence of the Administrator. Within ninety days after October 21, 1980, the Administrator shall issue guidelines for concurrence in any such modification, which shall provide for the consideration of the unobligated balance of sums allocated to the State under section 1285 of this title, the need for assistance under this subchapter in such State, and the availability of State grant assistance to replace the Federal share reduced by such modification. The payment of any such reduced Federal share shall not constitute an obligation on the part of the United States or a claim on the part of any State or grantee to reimbursement for the portion of the Federal share reduced in any such State. Any grant (other than for reimbursement) made prior to October 18, 1972, from any funds authorized for any fiscal year beginning after June 30, 1971, shall, upon the request of the applicant, be increased to the applicable percentage under this section. Notwithstanding the first sentence of this paragraph, in any case where a primary, secondary, or advanced waste treatment facility or its related interceptors or a project for infiltration-in-flow correction has received a grant for erection, building, acquisition, alteration, remodeling, improvement, extension, or correction before October 1, 1984, all segments and phases of such facility, interceptors, and project for infiltration-in-flow correction shall be eligible for grants at 75 per centum of the cost of construction thereof for any grant made pursuant to a State obligation which obligation occurred before October 1, 1990. Notwithstanding the first sentence of this paragraph, in the case of a project for which an application for a grant under this subchapter has been made to the Administrator before October 1, 1984, and which project is under judicial injunction on such date prohibiting its construction, such project shall be eligible for grants at 75 percent of the cost of construction thereof. Notwithstanding the first sentence of this paragraph, in the case of the Wyoming Valley Sanitary Authority project mandated by judicial order under a proceeding begun prior to October 1, 1984, and a project for wastewater treatment for Altoona, Pennsylvania, such projects shall be eligible for grants at 75 percent of the cost of construction thereof.
  • (2) The amount of any grant made after September 30, 1978, and before October 1, 1981, for any eligible treatment works or significant portion thereof utilizing innovative or alternative wastewater treatment processes and techniques referred to in section 1281(g)(5) of this title shall be 85 per centum of the cost of construction thereof, unless modified by the Governor of the State with the concurrence of the Administrator to a percentage rate no less than 15 per centum greater than the modified uniform percentage rate in which the Administrator has concurred pursuant to paragraph (1) of this subsection. The amount of any grant made after September 30, 1981, for any eligible treatment works or unit processes and techniques thereof utilizing innovative or alternative wastewater treatment processes and techniques referred to in section 1281(g)(5) of this title shall be a percentage of the cost of construction thereof equal to 20 per centum greater than the percentage in effect under paragraph (1) of this subsection for such works or unit processes and techniques, but in no event greater than 85 per centum of the cost of construction thereof. No grant shall be made under this paragraph for construction of a treatment works in any State unless the proportion of the State contribution to the non-Federal share of construction costs for all treatment works in such State receiving a grant under this paragraph is the same as or greater than the proportion of the State contribution (if any) to the non-Federal share of construction costs for all treatment works receiving grants in such State under paragraph (1) of this subsection.
  • (3) In addition to any grant made pursuant to paragraph (2) of this subsection, the Administrator is authorized to make a grant to fund all of the costs of the modification or replacement of any facilities constructed with a grant made pursuant to paragraph (2) if the Administrator finds that such facilities have not met design performance specifications unless such failure is attributable to negligence on the part of any person and if such failure has significantly increased capital or operating and maintenance expenditures. In addition, the Administrator is authorized to make a grant to fund all of the costs of the modification or replacement of biodisc equipment (rotating biological contactors) in any publicly owned treatment works if the Administrator finds that such equipment has failed to meet design performance specifications, unless such failure is attributable to negligence on the part of any person, and if such failure has significantly increased capital or operating and maintenance expenditures.
  • (4) For the purposes of this section, the term “eligible treatment works” means those treatment works in each State which meet the requirements of section 1281(g)(5) of this title and which can be fully funded from funds available for such purpose in such State.
  • (b) The amount of the grant for any project approved by the Administrator after January 1, 1971, and before July 1, 1971, for the construction of treatment works, the actual erection, building or acquisition of which was not commenced prior to July 1, 1971, shall, upon the request of the applicant, be increased to the applicable percentage under subsection (a) of this section for grants for treatment works from funds for fiscal years beginning after June 30, 1971, with respect to the cost of such actual erection, building, or acquisition. Such increased amount shall be paid from any funds allocated to the State in which the treatment works is located without regard to the fiscal year for which such funds were authorized. Such increased amount shall be paid for such project only if—
    (1) a sewage collection system that is a part of the same total waste treatment system as the treatment works for which such grant was approved is under construction or is to be constructed for use in conjunction with such treatment works, and if the cost of such sewage collection system exceeds the cost of such treatment works, and
    (2) the State water pollution control agency or other appropriate State authority certifies that the quantity of available ground water will be insufficient, inadequate, or unsuitable for public use, including the ecological preservation and recreational use of surface water bodies, unless effluents from publicly-owned treatment works after adequate treatment are returned to the ground water consistent with acceptable technological standards.
  • (1) a sewage collection system that is a part of the same total waste treatment system as the treatment works for which such grant was approved is under construction or is to be constructed for use in conjunction with such treatment works, and if the cost of such sewage collection system exceeds the cost of such treatment works, and
  • (2) the State water pollution control agency or other appropriate State authority certifies that the quantity of available ground water will be insufficient, inadequate, or unsuitable for public use, including the ecological preservation and recreational use of surface water bodies, unless effluents from publicly-owned treatment works after adequate treatment are returned to the ground water consistent with acceptable technological standards.
  • (1) Each applicant for a grant shall submit to the Administrator for his approval, plans, specifications, and estimates for each proposed project for the construction of treatment works for which a grant is applied for under section 1281(g)(1) of this title from funds allotted to the State under section 1285 of this title and which otherwise meets the requirements of this chapter. The Administrator shall act upon such plans, specifications, and estimates as soon as practicable after the same have been submitted, and his approval of any such plans, specifications, and estimates shall be deemed a contractual obligation of the United States for the payment of its proportional contribution to such project.
  • (3) In the case of a treatment works that has an estimated total cost of $8,000,000 or less (as determined by the Administrator), and the population of the applicant municipality is twenty-five thousand or less (according to the most recent United States census), upon completion of an approved facility plan, a single grant may be awarded for the combined Federal share of the cost of preparing construction plans and specifications, and the building and erection of the treatment works.
  • (d) Nothing in this chapter shall be construed to require, or to authorize the Administrator to require, that grants under this chapter for construction of treatment works be made only for projects which are operable units usable for sewage collection, transportation, storage, waste treatment, or for similar purposes without additional construction.
  • (e) At the request of a grantee under this subchapter, the Administrator is authorized to provide technical and legal assistance in the administration and enforcement of any contract in connection with treatment works assisted under this subchapter, and to intervene in any civil action involving the enforcement of such a contract.
  • (1) Consistent with State law, an applicant who proposes to construct waste water treatment works may enter into an agreement with the Administrator under this subsection providing for the preparation of construction plans and specifications and the erection of such treatment works, in lieu of proceeding under the other provisions of this section.
  • (A) treatment works that have an estimated total cost of $8,000,000 or less; and
  • (B) set forth dates for the start and completion of construction of the treatment works by the applicant and a schedule of payments of the Federal contribution to the project;
  • (C) contain assurances by the applicant that (i) engineering and management assistance will be provided to manage the project; (ii) the proposed treatment works will be an operable unit and will meet all the requirements of this subchapter; and (iii) not later than 1 year after the date specified as the date of completion of construction of the treatment works, the treatment works will be operating so as to meet the requirements of any applicable permit for such treatment works under section 1342 of this title;
  • (5) The Administrator shall reserve a portion of the grant to assure contract compliance until final project approval as defined by the Administrator. If the amount agreed to under paragraph (3)(A) exceeds the cost of designing and constructing the treatment works, the Administrator shall reallot the amount of the excess to the State in which such treatment works are located for the fiscal year in which such audit is completed.
  • (8) In no event shall the Federal contribution for the cost of preparing construction plans and specifications and the building and erection of treatment works pursuant to this subsection exceed the amount agreed upon under paragraph (3).
  • (a) Before approving grants for any project for any treatment works under section 1281(g)(1) of this title the Administrator shall determine—
    (1) that any required areawide waste treatment management plan under section 1288 of this title (A) is being implemented for such area and the proposed treatment works are included in such plan, or (B) is being developed for such area and reasonable progress is being made toward its implementation and the proposed treatment works will be included in such plan;
    (2) that (A) the State in which the project is to be located (i) is implementing any required plan under section 1313(e) of this title and the proposed treatment works are in conformity with such plan, or (ii) is developing such a plan and the proposed treatment works will be in conformity with such plan, and (B) such State is in compliance with section 1315(b) of this title;
    (3) that such works have been certified by the appropriate State water pollution control agency as entitled to priority over such other works in the State in accordance with any applicable State plan under section 1313(e) of this title, except that any priority list developed pursuant to section 1313(e)(3)(H) of this title may be modified by such State in accordance with regulations promulgated by the Administrator to give higher priority for grants for the Federal share of the cost of preparing construction drawings and specifications for any treatment works utilizing processes and techniques meeting the guidelines promulgated under section 1314(d)(3) of this title and for grants for the combined Federal share of the cost of preparing construction drawings and specifications and the building and erection of any treatment works meeting the requirements of the next to the last sentence of section 1283(a) of this title which utilizes processes and techniques meeting the guidelines promulgated under section 1314(d)(3) of this title.1
    (4) that the applicant proposing to construct such works agrees to pay the non-Federal costs of such works and has made adequate provisions satisfactory to the Administrator for assuring proper and efficient operation, including the employment of trained management and operations personnel, and the maintenance of such works in accordance with a plan of operation approved by the State water pollution control agency or, as appropriate, the interstate agency, after construction thereof;
    (5) that the size and capacity of such works relate directly to the needs to be served by such works, including sufficient reserve capacity. The amount of reserve capacity provided shall be approved by the Administrator on the basis of a comparison of the cost of constructing such reserves as a part of the works to be funded and the anticipated cost of providing expanded capacity at a date when such capacity will be required, after taking into account, in accordance with regulations promulgated by the Administrator, efforts to reduce total flow of sewage and unnecessary water consumption. The amount of reserve capacity eligible for a grant under this subchapter shall be determined by the Administrator taking into account the projected population and associated commercial and industrial establishments within the jurisdiction of the applicant to be served by such treatment works as identified in an approved facilities plan, an areawide plan under section 1288 of this title, or an applicable municipal master plan of development. For the purpose of this paragraph, section 1288 of this title, and any such plan, projected population shall be determined on the basis of the latest information available from the United States Department of Commerce or from the States as the Administrator, by regulation, determines appropriate. Beginning October 1, 1984, no grant shall be made under this subchapter to construct that portion of any treatment works providing reserve capacity in excess of existing needs (including existing needs of residential, commercial, industrial, and other users) on the date of approval of a grant for the erection, building, acquisition, alteration, remodeling, improvement, or extension of a project for secondary treatment or more stringent treatment or new interceptors and appurtenances, except that in no event shall reserve capacity of a facility and its related interceptors to which this subsection applies be in excess of existing needs on October 1, 1990. In any case in which an applicant proposes to provide reserve capacity greater than that eligible for Federal financial assistance under this subchapter, the incremental costs of the additional reserve capacity shall be paid by the applicant;
    (6) that no specification for bids in connection with such works shall be written in such a manner as to contain proprietary, exclusionary, or discriminatory requirements other than those based upon performance, unless such requirements are necessary to test or demonstrate a specific thing or to provide for necessary interchangeability of parts and equipment. When in the judgment of the grantee, it is impractical or uneconomical to make a clear and accurate description of the technical requirements, a “brand name or equal” description may be used as a means to define the performance or other salient requirements of a procurement, and in doing so the grantee need not establish the existence of any source other than the brand or source so named.
  • (1) that any required areawide waste treatment management plan under section 1288 of this title (A) is being implemented for such area and the proposed treatment works are included in such plan, or (B) is being developed for such area and reasonable progress is being made toward its implementation and the proposed treatment works will be included in such plan;
  • (2) that (A) the State in which the project is to be located (i) is implementing any required plan under section 1313(e) of this title and the proposed treatment works are in conformity with such plan, or (ii) is developing such a plan and the proposed treatment works will be in conformity with such plan, and (B) such State is in compliance with section 1315(b) of this title;
  • (3) that such works have been certified by the appropriate State water pollution control agency as entitled to priority over such other works in the State in accordance with any applicable State plan under section 1313(e) of this title, except that any priority list developed pursuant to section 1313(e)(3)(H) of this title may be modified by such State in accordance with regulations promulgated by the Administrator to give higher priority for grants for the Federal share of the cost of preparing construction drawings and specifications for any treatment works utilizing processes and techniques meeting the guidelines promulgated under section 1314(d)(3) of this title and for grants for the combined Federal share of the cost of preparing construction drawings and specifications and the building and erection of any treatment works meeting the requirements of the next to the last sentence of section 1283(a) of this title which utilizes processes and techniques meeting the guidelines promulgated under section 1314(d)(3) of this title.1
  • (5) that the size and capacity of such works relate directly to the needs to be served by such works, including sufficient reserve capacity. The amount of reserve capacity provided shall be approved by the Administrator on the basis of a comparison of the cost of constructing such reserves as a part of the works to be funded and the anticipated cost of providing expanded capacity at a date when such capacity will be required, after taking into account, in accordance with regulations promulgated by the Administrator, efforts to reduce total flow of sewage and unnecessary water consumption. The amount of reserve capacity eligible for a grant under this subchapter shall be determined by the Administrator taking into account the projected population and associated commercial and industrial establishments within the jurisdiction of the applicant to be served by such treatment works as identified in an approved facilities plan, an areawide plan under section 1288 of this title, or an applicable municipal master plan of development. For the purpose of this paragraph, section 1288 of this title, and any such plan, projected population shall be determined on the basis of the latest information available from the United States Department of Commerce or from the States as the Administrator, by regulation, determines appropriate. Beginning October 1, 1984, no grant shall be made under this subchapter to construct that portion of any treatment works providing reserve capacity in excess of existing needs (including existing needs of residential, commercial, industrial, and other users) on the date of approval of a grant for the erection, building, acquisition, alteration, remodeling, improvement, or extension of a project for secondary treatment or more stringent treatment or new interceptors and appurtenances, except that in no event shall reserve capacity of a facility and its related interceptors to which this subsection applies be in excess of existing needs on October 1, 1990. In any case in which an applicant proposes to provide reserve capacity greater than that eligible for Federal financial assistance under this subchapter, the incremental costs of the additional reserve capacity shall be paid by the applicant;
  • (1) Notwithstanding any other provision of this subchapter, the Administrator shall not approve any grant for any treatment works under section 1281(g)(1) of this title after March 1, 1973, unless he shall first have determined that the applicant (A) has adopted or will adopt a system of charges to assure that each recipient of waste treatment services within the applicant’s jurisdiction, as determined by the Administrator, will pay its proportionate share (except as otherwise provided in this paragraph) of the costs of operation and maintenance (including replacement) of any waste treatment services provided by the applicant; and (B) has legal, institutional, managerial, and financial capability to insure adequate construction, operation, and maintenance of treatment works throughout the applicant’s jurisdiction, as determined by the Administrator. In any case where an applicant which, as of December 27, 1977, uses a system of dedicated ad valorem taxes and the Administrator determines that the applicant has a system of charges which results in the distribution of operation and maintenance costs for treatment works within the applicant’s jurisdiction, to each user class, in proportion to the contribution to the total cost of operation and maintenance of such works by each user class (taking into account total waste water loading of such works, the constituent elements of the wastes, and other appropriate factors), and such applicant is otherwise in compliance with clause (A) of this paragraph with respect to each industrial user, then such dedicated ad valorem tax system shall be deemed to be the user charge system meeting the requirements of clause (A) of this paragraph for the residential user class and such small non-residential user classes as defined by the Administrator. In defining small non-residential users, the Administrator shall consider the volume of wastes discharged into the treatment works by such users and the constituent elements of such wastes as well as such other factors as he deems appropriate. A system of user charges which imposes a lower charge for low-income residential users (as defined by the Administrator) shall be deemed to be a user charge system meeting the requirements of clause (A) of this paragraph if the Administrator determines that such system was adopted after public notice and hearing.
  • (2) The Administrator shall, within one hundred and eighty days after October 18, 1972, and after consultation with appropriate State, interstate, municipal, and intermunicipal agencies, issue guidelines applicable to payment of waste treatment costs by industrial and nonindustrial recipients of waste treatment services which shall establish (A) classes of users of such services, including categories of industrial users; (B) criteria against which to determine the adequacy of charges imposed on classes and categories of users reflecting all factors that influence the cost of waste treatment, including strength, volume, and delivery flow rate characteristics of waste; and (C) model systems and rates of user charges typical of various treatment works serving municipal-industrial communities.
  • (3) Approval by the Administrator of a grant to an interstate agency established by interstate compact for any treatment works shall satisfy any other requirement that such works be authorized by Act of Congress.
  • (4) A system of charges which meets the requirement of clause (A) of paragraph (1) of this subsection may be based on something other than metering the sewage or water supply flow of residential recipients of waste treatment services, including ad valorem taxes. If the system of charges is based on something other than metering the Administrator shall require (A) the applicant to establish a system by which the necessary funds will be available for the proper operation and maintenance of the treatment works; and (B) the applicant to establish a procedure under which the residential user will be notified as to that portion of his total payment which will be allocated to the cost of the waste treatment services.
  • (1) A grant for the construction of treatment works under this subchapter shall provide that the engineer or engineering firm supervising construction or providing architect engineering services during construction shall continue its relationship to the grant applicant for a period of one year after the completion of construction and initial operation of such treatment works. During such period such engineer or engineering firm shall supervise operation of the treatment works, train operating personnel, and prepare curricula and training material for operating personnel. Costs associated with the implementation of this paragraph shall be eligible for Federal assistance in accordance with this subchapter.
  • (2) On the date one year after the completion of construction and initial operation of such treatment works, the owner and operator of such treatment works shall certify to the Administrator whether or not such treatment works meet the design specifications and effluent limitations contained in the grant agreement and permit pursuant to section 1342 of this title for such works. If the owner and operator of such treatment works cannot certify that such treatment works meet such design specifications and effluent limitations, any failure to meet such design specifications and effluent limitations shall be corrected in a timely manner, to allow such affirmative certification, at other than Federal expense.
  • (a) Sums authorized to be appropriated pursuant to section 1287 of this title for each fiscal year beginning after June 30, 1972, and before September 30, 1977, shall be allotted by the Administrator not later than the January 1st immediately preceding the beginning of the fiscal year for which authorized, except that the allotment for fiscal year 1973 shall be made not later than 30 days after October 18, 1972. Such sums shall be allotted among the States by the Administrator in accordance with regulations promulgated by him, in the ratio that the estimated cost of constructing all needed publicly owned treatment works in each State bears to the estimated cost of construction of all needed publicly owned treatment works in all of the States. For the fiscal years ending June 30, 1973, and June 30, 1974, such ratio shall be determined on the basis of table III of House Public Works Committee Print No. 92–50. For the fiscal year ending June 30, 1975, such ratio shall be determined one-half on the basis of table I of House Public Works Committee Print Numbered 93–28 and one-half on the basis of table II of such print, except that no State shall receive an allotment less than that which it received for the fiscal year ending June 30, 1972, as set forth in table III of such print. Allotments for fiscal years which begin after the fiscal year ending June 30, 1975, shall be made only in accordance with a revised cost estimate made and submitted to Congress in accordance with section 1375(b) of this title and only after such revised cost estimate shall have been approved by law specifically enacted after October 18, 1972.
  • (h) The Administrator shall set aside from funds authorized for each fiscal year beginning on or after October 1, 1978, a total (as determined by the Governor of the State) of not less than 4 percent nor more than 7½ percent of the sums allotted to any State with a rural population of 25 per centum or more of the total population of such State, as determined by the Bureau of the Census. The Administrator may set aside no more than 7½ percent of the sums allotted to any other State for which the Governor requests such action. Such sums shall be available only for alternatives to conventional sewage treatment works for municipalities having a population of three thousand five hundred or less, or for the highly dispersed sections of larger municipalities, as defined by the Administrator.
  • (i) Not less than ½ of 1 percent of funds allotted to a State for each of the fiscal years ending September 30, 1979, through September 30, 1990, under subsection (c) of this section shall be expended only for increasing the Federal share of grants for construction of treatment works utilizing innovative processes and techniques pursuant to section 1282(a)(2) of this title. Including the expenditures authorized by the preceding sentence, a total of 2 percent of the funds allotted to a State for each of the fiscal years ending September 30, 1979, and September 30, 1980, and 3 percent of the funds allotted to a State for the fiscal year ending September 30, 1981, under subsection (c) of this section shall be expended only for increasing grants for construction of treatment works pursuant to section 1282(a)(2) of this title. Including the expenditures authorized by the first sentence of this subsection, a total (as determined by the Governor of the State) of not less than 4 percent nor more than 7½ percent of the funds allotted to such State under subsection (c) of this section for each of the fiscal years ending September 30, 1982, through September 30, 1990, shall be expended only for increasing the Federal share of grants for construction of treatment works pursuant to section 1282(a)(2) of this title.
  • (D) determining those publicly owned treatment works which should be constructed with assistance under this subchapter, in which areas and in what sequence, taking into account the relative degree of effluent reduction attained, the relative contributions to water quality of other point or nonpoint sources, and the consideration of alternatives to such construction, and implementing section 1313(e) of this title.
  • (a) Any publicly owned treatment works in a State on which construction was initiated after June 30, 1966, but before July 1, 1973, which was approved by the appropriate State water pollution control agency and which the Administrator finds meets the requirements of section 1158 of this title) in effect at the time of the initiation of construction shall be reimbursed a total amount equal to the difference between the amount of Federal financial assistance, if any, received under such section 1158 of this title) for such project and 50 per centum of the cost of such project, or 55 per centum of the project cost where the Administrator also determines that such treatment works was constructed in conformity with a comprehensive metropolitan treatment plan as described in section 1158(f) of this title) as in effect immediately prior to October 18, 1972. Nothing in this subsection shall result in any such works receiving Federal grants from all sources in excess of 80 per centum of the cost of such project.
  • (b) Any publicly owned treatment works constructed with or eligible for Federal financial assistance under this Act in a State between June 30, 1956, and June 30, 1966, which was approved by the State water pollution control agency and which the Administrator finds meets the requirements of section 1158 of this title) prior to October 18, 1972 but which was constructed without assistance under such section 1158 of this title) or which received such assistance in an amount less than 30 per centum of the cost of such project shall qualify for payments and reimbursement of State or local funds used for such project from sums allocated to such State under this section in an amount which shall not exceed the difference between the amount of such assistance, if any, received for such project and 30 per centum of the cost of such project.
  • (c) No publicly owned treatment works shall receive any payment or reimbursement under subsection (a) or (b) of this section unless an application for such assistance is filed with the Administrator within the one year period which begins on October 18, 1972. Any application filed within such one year period may be revised from time to time, as may be necessary.
  • (1) In any case where a substantial portion of the funds allotted to a State for the current fiscal year under this subchapter have been obligated under section 1281(g) of this title, or will be so obligated in a timely manner (as determined by the Administrator), and there is construction of any treatment works project without the aid of Federal funds and in accordance with all procedures and all requirements applicable to treatment works projects, except those procedures and requirements which limit construction of projects to those constructed with the aid of previously allotted Federal funds, the Administrator, upon his approval of an application made under this subsection therefor, is authorized to pay the Federal share of the cost of construction of such project when additional funds are allotted to the State under this subchapter if prior to the construction of the project the Administrator approves plans, specifications, and estimates therefor in the same manner as other treatment works projects. The Administrator may not approve an application under this subsection unless an authorization is in effect for the first fiscal year in the period for which the application requests payment and such requested payment for that fiscal year does not exceed the State’s expected allotment from such authorization. The Administrator shall not be required to make such requested payment for any fiscal year—
    (A) to the extent that such payment would exceed such State’s allotment of the amount appropriated for such fiscal year; and
    (B) unless such payment is for a project which, on the basis of an approved funding priority list of such State, is eligible to receive such payment based on the allotment and appropriation for such fiscal year.
    To the extent that sufficient funds are not appropriated to pay the full Federal share with respect to a project for which obligations under the provisions of this subsection have been made, the Administrator shall reduce the Federal share to such amount less than 75 per centum as such appropriations do provide.
  • (2) In determining the allotment for any fiscal year under this subchapter, any treatment works project constructed in accordance with this section and without the aid of Federal funds shall not be considered completed until an application under the provisions of this subsection with respect to such project has been approved by the Administrator, or the availability of funds from which this project is eligible for reimbursement has expired, whichever first occurs.
  • (A) the identification of treatment works necessary to meet the anticipated municipal and industrial waste treatment needs of the area over a twenty-year period, annually updated (including an analysis of alternative waste treatment systems), including any requirements for the acquisition of land for treatment purposes; the necessary waste water collection and urban storm water runoff systems; and a program to provide the necessary financial arrangements for the development of such treatment works, and an identification of open space and recreation opportunities that can be expected to result from improved water quality, including consideration of potential use of lands associated with treatment works and increased access to water-based recreation;
  • (B) the establishment of construction priorities for such treatment works and time schedules for the initiation and completion of all treatment works;
  • (iii) assure that any industrial or commercial wastes discharged into any treatment works in such area meet applicable pretreatment requirements;
  • (B) to manage effectively waste treatment works and related facilities serving such area in conformance with any plan required by subsection (b) of this section;
  • (d) After a waste treatment management agency having the authority required by subsection (c) has been designated under such subsection for an area and a plan for such area has been approved under subsection (b) of this section, the Administrator shall not make any grant for construction of a publicly owned treatment works under section 1281(g)(1) of this title within such area except to such designated agency and for works in conformity with such plan.
  • The Administrator shall annually make a survey to determine the efficiency of the operation and maintenance of treatment works constructed with grants made under this chapter, as compared to the efficiency planned at the time the grant was made. The results of such annual survey shall be included in the report required under section 1375(a) of this title.
  • (a) No grant shall be made for a sewage collection system under this subchapter unless such grant (1) is for replacement or major rehabilitation of an existing collection system and is necessary to the total integrity and performance of the waste treatment works servicing such community, or (2) is for a new collection system in an existing community with sufficient existing or planned capacity adequately to treat such collected sewage and is consistent with section 1281 of this title.
  • (c) No grant shall be made under this subchapter from funds authorized for any fiscal year during the period beginning October 1, 1977, and ending September 30, 1990, for treatment works for control of pollutant discharges from separate storm sewer systems.
  • (a) Subject to the conditions of this section and to such terms and conditions as the Administrator determines to be necessary to carry out the purposes of this subchapter, the Administrator is authorized to guarantee, and to make commitments to guarantee, the principal and interest (including interest accruing between the date of default and the date of the payment in full of the guarantee) of any loan, obligation, or participation therein of any State, municipality, or intermunicipal or interstate agency issued directly and exclusively to the Federal Financing Bank to finance that part of the cost of any grant-eligible project for the construction of publicly owned treatment works not paid for with Federal financial assistance under this subchapter (other than this section), which project the Administrator has determined to be eligible for such financial assistance under this subchapter, including, but not limited to, proj­ects eligible for reimbursement under section 1286 of this title.
  • Notwithstanding any other provision of law, no grant for which application is made after February 1, 1978, shall be made under this subchapter for any treatment works unless only such unmanufactured articles, materials, and supplies as have been mined or produced in the United States, and only such manufactured articles, materials, and supplies as have been manufactured in the United States, substantially all from articles, materials, or supplies mined, produced, or manufactured, as the case may be, in the United States will be used in such treatment works. This section shall not apply in any case where the Administrator determines, based upon those factors the Administrator deems relevant, including the available resources of the agency, it to be inconsistent with the public interest (including multilateral government procurement agreements) or the cost to be unreasonable, or if articles, materials, or supplies of the class or kind to be used or the articles, materials, or supplies from which they are manufactured are not mined, produced, or manufactured, as the case may be, in the United States in sufficient and reasonably available commercial quantities and of a satisfactory quality.
  • Notwithstanding any other provision of this chapter, the determination of the priority to be given each category of projects for construction of publicly owned treatment works within each State shall be made solely by that State, except that if the Administrator, after a public hearing, determines that a specific project will not result in compliance with the enforceable requirements of this chapter, such project shall be removed from the State’s priority list and such State shall submit a revised priority list. These categories shall include, but not be limited to (A) secondary treatment, (B) more stringent treatment, (C) infiltration-in-flow correction, (D) major sewer system rehabilitation, (E) new collector sewers and appurtenances, (F) new interceptors and appurtenances, and (G) correction of combined sewer overflows. Not less than 25 per centum of funds allocated to a State in any fiscal year under this subchapter for construction of publicly owned treatment works in such State shall be obligated for those types of projects referred to in clauses (D), (E), (F), and (G) of this section, if such projects are on such State’s priority list for that year and are otherwise eligible for funding in that fiscal year. It is the policy of Congress that projects for wastewater treatment and management undertaken with Federal financial assistance under this chapter by any State, municipality, or intermunicipal or interstate agency shall be projects which, in the estimation of the State, are designed to achieve optimum water quality management, consistent with the public health and water quality goals and requirements of this chapter.
  • (b) In accordance with the policy set forth in subsection (a) of this section, before the Administrator approves any grant to any State, municipality, or intermunicipal or interstate agency for the erection, building, acquisition, alteration, remodeling, improvement, or extension of any treatment works the Administrator shall determine that the facilities plan of which such treatment works are a part constitutes the most economical and cost-effective combination of treatment works over the life of the project to meet the requirements of this chapter, including, but not limited to, consideration of construction costs, operation, maintenance, and replacement costs.
  • (c) In furtherance of the policy set forth in subsection (a) of this section, the Administrator shall require value engineering review in connection with any treatment works, prior to approval of any grant for the erection, building, acquisition, alteration, remodeling, improvement, or extension of such treatment works, in any case in which the cost of such erection, building, acquisition, alteration, remodeling, improvement, or extension is projected to be in excess of $10,000,000. For purposes of this subsection, the term “value engineering review” means a specialized cost control technique which uses a systematic and creative approach to identify and to focus on unnecessarily high cost in a project in order to arrive at a cost saving without sacrificing the reliability or efficiency of the project.
  • (d) This section applies to projects for waste treatment and management for which no treatment works including a facilities plan for such project have received Federal financial assistance for the preparation of construction plans and specifications under this chapter before December 29, 1981.
  • (A) treatment works to intercept, transport, control, treat, or reuse municipal combined sewer overflows, sanitary sewer overflows, or stormwater;
  • (aa) treatment works to intercept, transport, control, treat, or reuse municipal sewer overflows, sanitary sewer overflows, or stormwater; or
  • (a) Subject to the availability of appropriations, the Administrator shall establish a wastewater efficiency grant pilot program (referred to in this section as the “pilot program”) to award grants to owners or operators of publicly owned treatment works to carry out projects that create or improve waste-to-energy systems.
  • (1) To be eligible to receive a grant under the pilot program, an owner or operator of a treatment works shall submit to the Administrator an application at such time, in such manner, and containing such information as the Administrator may require.
  • (1) Not later than 2 years after receiving a grant under the pilot program and each year thereafter for which amounts are made available for the pilot program under subsection (e), the recipient of the grant shall submit to the Administrator a report describing the impact of that project on the communities within 3 miles of the treatment works.
  • (b) Subject to the availability of appropriations, the Administrator shall establish a clean water infrastructure resilience and sustainability program under which the Administrator shall award grants to eligible entities for the purpose of increasing the resilience of publicly owned treatment works to a natural hazard or cybersecurity vulnerabilities.
  • (c) An eligible entity that receives a grant under the program shall use the grant funds for planning, designing, or constructing projects (on a system-wide or area-wide basis) that increase the resilience of a publicly owned treatment works to a natural hazard or cybersecurity vulnerabilities through—
    (1) the conservation of water;
    (2) the enhancement of water use efficiency;
    (3) the enhancement of wastewater and stormwater management by increasing watershed preservation and protection, including through the use of—
    (A) natural and engineered green infrastructure; and
    (B) reclamation and reuse of wastewater and stormwater, such as aquifer recharge zones;
    (4) the modification or relocation of an existing publicly owned treatment works, conveyance, or discharge system component that is at risk of being significantly impaired or damaged by a natural hazard;
    (5) the development and implementation of projects to increase the resilience of publicly owned treatment works to a natural hazard or cybersecurity vulnerabilities, as applicable; or
    (6) the enhancement of energy efficiency or the use and generation of recovered or renewable energy in the management, treatment, or conveyance of wastewater or stormwater.
  • (4) the modification or relocation of an existing publicly owned treatment works, conveyance, or discharge system component that is at risk of being significantly impaired or damaged by a natural hazard;
  • (5) the development and implementation of projects to increase the resilience of publicly owned treatment works to a natural hazard or cybersecurity vulnerabilities, as applicable; or
  • (4) a description of any recent natural hazard risk of the area where the proposed project is to be located or potential cybersecurity vulnerabilities that have affected the publicly owned treatment works;
  • (5) a description of how the proposed project would improve the performance of the publicly owned treatment works under an anticipated natural hazard or natural hazard risk of the area where the proposed project is to be located or a potential cybersecurity vulnerability, as applicable; and
  • (6) an explanation of how the proposed project is expected to enhance the resilience of the publicly owned treatment works to a natural hazard risk of the area where the proposed project is to be located or a potential cybersecurity vulnerability, as applicable.
  • (a) Subject to the availability of appropriations, not later than 180 days after November 15, 2021, the Administrator shall establish a circuit rider program (referred to in this section as the “circuit rider program”) under which the Administrator shall award grants to qualified nonprofit entities, as determined by the Administrator, to provide assistance to owners and operators of small and medium publicly owned treatment works to carry out the activities described in section 1382(b)(13) of this title.
  • (a) Subject to the availability of appropriations, not later than 180 days after November 15, 2021, the Administrator shall establish an efficiency grant program (referred to in this section as the “efficiency grant program”) under which the Administrator shall award grants to eligible entities for the replacement or repair of equipment that improves water or energy efficiency of small publicly owned treatment works, as identified in an efficiency audit.
  • (1) an owner or operator of a small publicly owned treatment works that serves—
    (A) a population of not more than 10,000 people; or
    (B) a disadvantaged community; or
  • (2) a nonprofit organization that seeks to assist a small publicly owned treatment works described in paragraph (1) to carry out the activities described in subsection (a).
  • (1) Of the amounts made available for grants under this section, to the extent that there are sufficient applications, not less than 15 percent shall be used for grants to publicly owned treatment works that serve fewer than 3,300 people.
  • (A) an owner or operator of a publicly owned treatment works that assists or is seeking to assist low-income or moderate-income individuals with connecting the household of the individual to the publicly owned treatment works; or
  • (B) a nonprofit entity that assists low-income or moderate-income individuals with the costs associated with connecting the household of the individual to a publicly owned treatment works.
  • (b) Subject to the availability of appropriations, the Administrator shall establish a competitive grant program with the purpose of improving general welfare, under which the Administrator awards grants to eligible entities to provide funds to assist qualified individuals in covering the costs incurred by the qualified individual in connecting the household of the qualified individual to a publicly owned treatment works.
  • (A) has an existing program to assist in covering the costs incurred in connecting a household to a publicly owned treatment works; or
  • (A) the qualified individual has connected to the publicly owned treatment works voluntarily; and
  • (B) if the eligible entity is not the owner or operator of the publicly owned treatment works to which the qualified individual has connected, the publicly owned treatment works to which the qualified individual has connected has agreed to the connection.
  • (2) An eligible entity that is an owner or operator of a publicly owned treatment works may reimburse a qualified individual that has already incurred the costs described in subsection (b) by—
    (A) reducing the amount otherwise owed by the qualified individual to the owner or operator for wastewater or other services provided by the owner or operator; or
    (B) providing a direct payment to the qualified individual.
  • (i) eligible entities described in subsection (a)(1)(A) that are owners and operators of publicly owned treatment works that serve fewer than 3,300 people; and
  • (ii) eligible entities described in subsection (a)(1)(B) that provide the assistance described in that subsection in areas that are served by publicly owned treatment works that serve fewer than 3,300 people.
  • (A) not later than July 1, 1977, effluent limitations for point sources, other than publicly owned treatment works, (i) which shall require the application of the best practicable control technology currently available as defined by the Administrator pursuant to section 1314(b) of this title, or (ii) in the case of a discharge into a publicly owned treatment works which meets the requirements of subparagraph (B) of this paragraph, which shall require compliance with any applicable pretreatment requirements and any requirements under section 1317 of this title; and
  • (B) for publicly owned treatment works in existence on July 1, 1977, or approved pursuant to section 1283 of this title prior to June 30, 1974 (for which construction must be completed within four years of approval), effluent limitations based upon secondary treatment as defined by the Administrator pursuant to section 1314(d)(1) of this title; or,
  • (A) for pollutants identified in subparagraphs (C), (D), and (F) of this paragraph, effluent limitations for categories and classes of point sources, other than publicly owned treatment works, which (i) shall require application of the best available technology economically achievable for such category or class, which will result in reasonable further progress toward the national goal of eliminating the discharge of all pollutants, as determined in accordance with regulations issued by the Administrator pursuant to section 1314(b)(2) of this title, which such effluent limitations shall require the elimination of discharges of all pollutants if the Administrator finds, on the basis of information available to him (including information developed pursuant to section 1325 of this title), that such elimination is technologically and economically achievable for a category or class of point sources as determined in accordance with regulations issued by the Administrator pursuant to section 1314(b)(2) of this title, or (ii) in the case of the introduction of a pollutant into a publicly owned treatment works which meets the requirements of subparagraph (B) of this paragraph, shall require compliance with any applicable pretreatment requirements and any other requirement under section 1317 of this title;
  • (E) as expeditiously as practicable but in no case later than three years after the date such limitations are promulgated under section 1314(b) of this title, and in no case later than March 31, 1989, compliance with effluent limitations for categories and classes of point sources, other than publicly owned treatment works, which in the case of pollutants identified pursuant to section 1314(a)(4) of this title shall require application of the best conventional pollutant control technology as determined in accordance with regulations issued by the Administrator pursuant to section 1314(b)(4) of this title; and
  • (h) The Administrator, with the concurrence of the State, may issue a permit under section 1342 of this title which modifies the requirements of subsection (b)(1)(B) of this section with respect to the discharge of any pollutant from a publicly owned treatment works into marine waters, if the applicant demonstrates to the satisfaction of the Administrator that—
    (1) there is an applicable water quality standard specific to the pollutant for which the modification is requested, which has been identified under section 1314(a)(6) of this title;
    (2) the discharge of pollutants in accordance with such modified requirements will not interfere, alone or in combination with pollutants from other sources, with the attainment or maintenance of that water quality which assures protection of public water supplies and the protection and propagation of a balanced, indigenous population of shellfish, fish, and wildlife, and allows recreational activities, in and on the water;
    (3) the applicant has established a system for monitoring the impact of such discharge on a representative sample of aquatic biota, to the extent practicable, and the scope of such monitoring is limited to include only those scientific investigations which are necessary to study the effects of the proposed discharge;
    (4) such modified requirements will not result in any additional requirements on any other point or nonpoint source;
    (5) all applicable pretreatment requirements for sources introducing waste into such treatment works will be enforced;
    (6) in the case of any treatment works serving a population of 50,000 or more, with respect to any toxic pollutant introduced into such works by an industrial discharger for which pollutant there is no applicable pretreatment requirement in effect, sources introducing waste into such works are in compliance with all applicable pretreatment requirements, the applicant will enforce such requirements, and the applicant has in effect a pretreatment program which, in combination with the treatment of discharges from such works, removes the same amount of such pollutant as would be removed if such works were to apply secondary treatment to discharges and if such works had no pretreatment program with respect to such pollutant;
    (7) to the extent practicable, the applicant has established a schedule of activities designed to eliminate the entrance of toxic pollutants from nonindustrial sources into such treatment works;
    (8) there will be no new or substantially increased discharges from the point source of the pollutant to which the modification applies above that volume of discharge specified in the permit;
    (9) the applicant at the time such modification becomes effective will be discharging effluent which has received at least primary or equivalent treatment and which meets the criteria established under section 1314(a)(1) of this title after initial mixing in the waters surrounding or adjacent to the point at which such effluent is discharged.
    For the purposes of this subsection the phrase “the discharge of any pollutant into marine waters” refers to a discharge into deep waters of the territorial sea or the waters of the contiguous zone, or into saline estuarine waters where there is strong tidal movement and other hydrological and geological characteristics which the Administrator determines necessary to allow compliance with paragraph (2) of this subsection, and section 1251(a)(2) of this title. For the purposes of paragraph (9), “primary or equivalent treatment” means treatment by screening, sedimentation, and skimming adequate to remove at least 30 percent of the biological oxygen demanding material and of the suspended solids in the treatment works influent, and disinfection, where appropriate. A municipality which applies secondary treatment shall be eligible to receive a permit pursuant to this subsection which modifies the requirements of subsection (b)(1)(B) of this section with respect to the discharge of any pollutant from any treatment works owned by such municipality into marine waters. No permit issued under this subsection shall authorize the discharge of sewage sludge into marine waters. In order for a permit to be issued under this subsection for the discharge of a pollutant into marine waters, such marine waters must exhibit characteristics assuring that water providing dilution does not contain significant amounts of previously discharged effluent from such treatment works. No permit issued under this subsection shall authorize the discharge of any pollutant into saline estuarine waters which at the time of application do not support a balanced indigenous population of shellfish, fish and wildlife, or allow recreation in and on the waters or which exhibit ambient water quality below applicable water quality standards adopted for the protection of public water supplies, shellfish, fish and wildlife or recreational activities or such other standards necessary to assure support and protection of such uses. The prohibition contained in the preceding sentence shall apply without regard to the presence or absence of a causal relationship between such characteristics and the applicant’s current or proposed discharge. Notwithstanding any other provisions of this subsection, no permit may be issued under this subsection for discharge of a pollutant into the New York Bight Apex consisting of the ocean waters of the Atlantic Ocean westward of 73 degrees 30 minutes west longitude and northward of 40 degrees 10 minutes north latitude.
  • (5) all applicable pretreatment requirements for sources introducing waste into such treatment works will be enforced;
  • (6) in the case of any treatment works serving a population of 50,000 or more, with respect to any toxic pollutant introduced into such works by an industrial discharger for which pollutant there is no applicable pretreatment requirement in effect, sources introducing waste into such works are in compliance with all applicable pretreatment requirements, the applicant will enforce such requirements, and the applicant has in effect a pretreatment program which, in combination with the treatment of discharges from such works, removes the same amount of such pollutant as would be removed if such works were to apply secondary treatment to discharges and if such works had no pretreatment program with respect to such pollutant;
  • (7) to the extent practicable, the applicant has established a schedule of activities designed to eliminate the entrance of toxic pollutants from nonindustrial sources into such treatment works;
  • (1) Where construction is required in order for a planned or existing publicly owned treatment works to achieve limitations under subsection (b)(1)(B) or (b)(1)(C) of this section, but (A) construction cannot be completed within the time required in such subsection, or (B) the United States has failed to make financial assistance under this chapter available in time to achieve such limitations by the time specified in such subsection, the owner or operator of such treatment works may request the Administrator (or if appropriate the State) to issue a permit pursuant to section 1342 of this title or to modify a permit issued pursuant to that section to extend such time for compliance. Any such request shall be filed with the Administrator (or if appropriate the State) within 180 days after February 4, 1987. The Administrator (or if appropriate the State) may grant such request and issue or modify such a permit, which shall contain a schedule of compliance for the publicly owned treatment works based on the earliest date by which such financial assistance will be available from the United States and construction can be completed, but in no event later than July 1, 1988, and shall contain such other terms and conditions, including those necessary to carry out subsections (b) through (g) of section 1281 of this title, section 1317 of this title, and such interim effluent limitations applicable to that treatment works as the Administrator determines are necessary to carry out the provisions of this chapter.
  • (A) Where a point source (other than a publicly owned treatment works) will not achieve the requirements of subsections (b)(1)(A) and (b)(1)(C) of this section and—
    (i) if a permit issued prior to July 1, 1977, to such point source is based upon a discharge into a publicly owned treatment works; or
    (ii) if such point source (other than a publicly owned treatment works) had before July 1, 1977, a contract (enforceable against such point source) to discharge into a publicly owned treatment works; or
    (iii) if either an application made before July 1, 1977, for a construction grant under this chapter for a publicly owned treatment works, or engineering or architectural plans or working drawings made before July 1, 1977, for a publicly owned treatment works, show that such point source was to discharge into such publicly owned treatment works,
    and such publicly owned treatment works is presently unable to accept such discharge without construction, and in the case of a discharge to an existing publicly owned treatment works, such treatment works has an extension pursuant to paragraph (1) of this subsection, the owner or operator of such point source may request the Administrator (or if appropriate the State) to issue or modify such a permit pursuant to such section 1342 of this title to extend such time for compliance. Any such request shall be filed with the Administrator (or if appropriate the State) within 180 days after December 27, 1977, or the filing of a request by the appropriate publicly owned treatment works under paragraph (1) of this subsection, whichever is later. If the Administrator (or if appropriate the State) finds that the owner or operator of such point source has acted in good faith, he may grant such request and issue or modify such a permit, which shall contain a schedule of compliance for the point source to achieve the requirements of subsections (b)(1)(A) and (C) of this section and shall contain such other terms and conditions, including pretreatment and interim effluent limitations and water conservation requirements applicable to that point source, as the Administrator determines are necessary to carry out the provisions of this chapter.
  • (i) if a permit issued prior to July 1, 1977, to such point source is based upon a discharge into a publicly owned treatment works; or
  • (ii) if such point source (other than a publicly owned treatment works) had before July 1, 1977, a contract (enforceable against such point source) to discharge into a publicly owned treatment works; or
  • (iii) if either an application made before July 1, 1977, for a construction grant under this chapter for a publicly owned treatment works, or engineering or architectural plans or working drawings made before July 1, 1977, for a publicly owned treatment works, show that such point source was to discharge into such publicly owned treatment works,
  • (B) No time modification granted by the Administrator (or if appropriate the State) pursuant to paragraph (2)(A) of this subsection shall extend beyond the earliest date practicable for compliance or beyond the date of any extension granted to the appropriate publicly owned treatment works pursuant to paragraph (1) of this subsection, but in no event shall it extend beyond July 1, 1988; and no such time modification shall be granted unless (i) the publicly owned treatment works will be in operation and available to the point source before July 1, 1988, and will meet the requirements of subsections (b)(1)(B) and (C) of this section after receiving the discharge from that point source; and (ii) the point source and the publicly owned treatment works have entered into an enforceable contract requiring the point source to discharge into the publicly owned treatment works, the owner or operator of such point source to pay the costs required under section 1284 of this title, and the publicly owned treatment works to accept the discharge from the point source; and (iii) the permit for such point source requires that point source to meet all requirements under section 1317(a) and (b) of this title during the period of such time modification.
  • (A) subsection (b)(1)(B) under subsection (h) of this section shall be filed not later that1 the 365th day which begins after December 29, 1981, except that a publicly owned treatment works which prior to December 31, 1982, had a contractual arrangement to use a portion of the capacity of an ocean outfall operated by another publicly owned treatment works which has applied for or received modification under subsection (h), may apply for a modification of subsection (h) in its own right not later than 30 days after February 4, 1987, and except as provided in paragraph (5);
  • (H) an inventory and ranking, in order of priority, of needs for construction of waste treatment works required to meet the applicable requirements of sections 1311 and 1312 of this title.
  • (A) identify, in terms of amounts of constituents and chemical, physical, and biological characteristics of pollutants, the degree of effluent reduction attainable through the application of the best practicable control technology currently available for classes and categories of point sources (other than publicly owned treatment works); and
  • (B) specify factors to be taken into account in determining the control measures and practices to be applicable to point sources (other than publicly owned treatment works) within such categories or classes. Factors relating to the assessment of best practicable control technology currently available to comply with subsection (b)(1) of section 1311 of this title shall include consideration of the total cost of application of technology in relation to the effluent reduction benefits to be achieved from such application, and shall also take into account the age of equipment and facilities involved, the process employed, the engineering aspects of the application of various types of control techniques, process changes, non-water quality environmental impact (including energy requirements), and such other factors as the Administrator deems appropriate;
  • (A) identify, in terms of amounts of constituents and chemical, physical, and biological characteristics of pollutants, the degree of effluent reduction attainable through the application of the best control measures and practices achievable including treatment techniques, process and procedure innovations, operating methods, and other alternatives for classes and categories of point sources (other than publicly owned treatment works); and
  • (B) specify factors to be taken into account in determining the best measures and practices available to comply with subsection (b)(2) of section 1311 of this title to be applicable to any point source (other than publicly owned treatment works) within such categories or classes. Factors relating to the assessment of best available technology shall take into account the age of equipment and facilities involved, the process employed, the engineering aspects of the application of various types of control techniques, process changes, the cost of achieving such effluent reduction, non-water quality environmental impact (including energy requirements), and such other factors as the Administrator deems appropriate;
  • (A) identify, in terms of amounts of constituents and chemical, physical, and biological characteristics of pollutants, the degree of effluent reduction attainable through the application of the best conventional pollutant control technology (including measures and practices) for classes and categories of point sources (other than publicly owned treatment works); and
  • (B) specify factors to be taken into account in determining the best conventional pollutant control technology measures and practices to comply with section 1311(b)(2)(E) of this title to be applicable to any point source (other than publicly owned treatment works) within such categories or classes. Factors relating to the assessment of best conventional pollutant control technology (including measures and practices) shall include consideration of the reasonableness of the relationship between the costs of attaining a reduction in effluents and the effluent reduction benefits derived, and the comparison of the cost and level of reduction of such pollutants from the discharge from publicly owned treatment works to the cost and level of reduction of such pollutants from a class or category of industrial sources, and shall take into account the age of equipment and facilities involved, the process employed, the engineering aspects of the application of various types of control techniques, process changes, non-water quality environmental impact (including energy requirements), and such other factors as the Administrator deems appropriate.
  • (1) For the purpose of assisting States in carrying out programs under section 1342 of this title, the Administrator shall publish, within one hundred and twenty days after October 18, 1972, and review at least annually thereafter and, if appropriate, revise guidelines for pretreatment of pollutants which he determines are not susceptible to treatment by publicly owned treatment works. Guidelines under this subsection shall be established to control and prevent the discharge into the navigable waters, the contiguous zone, or the ocean (either directly or through publicly owned treatment works) of any pollutant which interferes with, passes through, or otherwise is incompatible with such works.
  • (2) When publishing guidelines under this subsection, the Administrator shall designate the category or categories of treatment works to which the guidelines shall apply.
  • (1) The Administrator shall, within one hundred and eighty days after October 18, 1972, and from time to time thereafter, publish proposed regulations establishing pretreatment standards for introduction of pollutants into treatment works (as defined in section 1292 of this title) which are publicly owned for those pollutants which are determined not to be susceptible to treatment by such treatment works or which would interfere with the operation of such treatment works. Not later than ninety days after such publication, and after opportunity for public hearing, the Administrator shall promulgate such pretreatment standards. Pretreatment standards under this subsection shall specify a time for compliance not to exceed three years from the date of promulgation and shall be established to prevent the discharge of any pollutant through treatment works (as defined in section 1292 of this title) which are publicly owned, which pollutant interferes with, passes through, or otherwise is incompatible with such works. If, in the case of any toxic pollutant under subsection (a) of this section introduced by a source into a publicly owned treatment works, the treatment by such works removes all or any part of such toxic pollutant and the discharge from such works does not violate that effluent limitation or standard which would be applicable to such toxic pollutant if it were discharged by such source other than through a publicly owned treatment works, and does not prevent sludge use or disposal by such works in accordance with section 1345 of this title, then the pretreatment requirements for the sources actually discharging such toxic pollutant into such publicly owned treatment works may be revised by the owner or operator of such works to reflect the removal of such toxic pollutant by such works.
  • (c) In order to insure that any source introducing pollutants into a publicly owned treatment works, which source would be a new source subject to section 1316 of this title if it were to discharge pollutants, will not cause a violation of the effluent limitations established for any such treatment works, the Administrator shall promulgate pretreatment standards for the category of such sources simultaneously with the promulgation of standards of performance under section 1316 of this title for the equivalent category of new sources. Such pretreatment standards shall prevent the discharge of any pollutant into such treatment works, which pollutant may interfere with, pass through, or otherwise be incompatible with such works.
  • (e) In the case of any existing facility that proposes to comply with the pretreatment standards of subsection (b) of this section by applying an innovative system that meets the requirements of section 1311(k) of this title, the owner or operator of the publicly owned treatment works receiving the treated effluent from such facility may extend the date for compliance with the applicable pretreatment standard established under this section for a period not to exceed 2 years—
    (1) if the Administrator determines that the innovative system has the potential for industrywide application, and
    (2) if the Administrator (or the State in consultation with the Administrator, in any case in which the State has a pretreatment program approved by the Administrator)—
    (A) determines that the proposed extension will not cause the publicly owned treatment works to be in violation of its permit under section 1342 of this title or of section 1345 of this title or to contribute to such a violation, and
    (B) concurs with the proposed extension.
  • (A) determines that the proposed extension will not cause the publicly owned treatment works to be in violation of its permit under section 1342 of this title or of section 1345 of this title or to contribute to such a violation, and
  • (6) Whenever, on the basis of information available to him, the Administrator finds (A) that any person is in violation of section 1311(b)(1)(A) or (C) of this title, (B) that such person cannot meet the requirements for a time extension under section 1311(i)(2) of this title, and (C) that the most expeditious and appropriate means of compliance with this chapter by such person is to discharge into a publicly owned treatment works, then, upon request of such person, the Administrator may issue an order requiring such person to comply with this chapter at the earliest date practicable, but not later than July 1, 1983, by discharging into a publicly owned treatment works if such works concur with such order. Such order shall include a schedule of compliance.
  • (B) negligently introduces into a sewer system or into a publicly owned treatment works any pollutant or hazardous substance which such person knew or reasonably should have known could cause personal injury or property damage or, other than in compliance with all applicable Federal, State, or local requirements or permits, which causes such treatment works to violate any effluent limitation or condition in any permit issued to the treatment works under section 1342 of this title by the Administrator or a State;
  • (B) knowingly introduces into a sewer system or into a publicly owned treatment works any pollutant or hazardous substance which such person knew or reasonably should have known could cause personal injury or property damage or, other than in compliance with all applicable Federal, State, or local requirements or permits, which causes such treatment works to violate any effluent limitation or condition in a permit issued to the treatment works under section 1342 of this title by the Administrator or a State;
  • (f) Whenever, on the basis of any information available to him, the Administrator finds that an owner or operator of any source is introducing a pollutant into a treatment works in violation of subsection (d) of section 1317 of this title, the Administrator may notify the owner or operator of such treatment works and the State of such violation. If the owner or operator of the treatment works does not commence appropriate enforcement action within 30 days of the date of such notification, the Administrator may commence a civil action for appropriate relief, including but not limited to, a permanent or temporary injunction, against the owner or operator of such treatment works. In any such civil action the Administrator shall join the owner or operator of such source as a party to the action. Such action shall be brought in the district court of the United States in the district in which the treatment works is located. Such court shall have jurisdiction to restrain such violation and to require the owner or operator of the treatment works and the owner or operator of the source to take such action as may be necessary to come into compliance with this chapter. Notice of commencement of any such action shall be given to the State. Nothing in this subsection shall be construed to limit or prohibit any other authority the Administrator may have under this chapter.
  • (2) Construction shall not be initiated for facilities for treatment of wastewater at any Federal property or facility after September 30, 1979, if alternative methods for wastewater treatment at such property or facility utilizing innovative treatment processes and techniques, including but not limited to methods utilizing recycle and reuse techniques and land treatment are not utilized, unless the life cycle cost of the alternative treatment works exceeds the life cycle cost of the most cost effective alternative by more than 15 per centum. The Administrator may waive the application of this paragraph in any case where the Administrator determines it to be in the public interest, or that compliance with this paragraph would interfere with the orderly compliance with conditions of a permit issued pursuant to section 1342 of this title.

Citations to §1292(3)

  • (2) such public body has entered into an agreement with the Administrator which guarantees that such treatment works will be properly operated and maintained and will comply with all other requirements of section 1284 of this title and includes a system of charges to assure that each recipient of waste treatment services under such a grant will pay its proportionate share of the cost of operation and maintenance (including replacement); and
  • (3) In addition to any grant made pursuant to paragraph (2) of this subsection, the Administrator is authorized to make a grant to fund all of the costs of the modification or replacement of any facilities constructed with a grant made pursuant to paragraph (2) if the Administrator finds that such facilities have not met design performance specifications unless such failure is attributable to negligence on the part of any person and if such failure has significantly increased capital or operating and maintenance expenditures. In addition, the Administrator is authorized to make a grant to fund all of the costs of the modification or replacement of biodisc equipment (rotating biological contactors) in any publicly owned treatment works if the Administrator finds that such equipment has failed to meet design performance specifications, unless such failure is attributable to negligence on the part of any person, and if such failure has significantly increased capital or operating and maintenance expenditures.
  • (1) Notwithstanding any other provision of this subchapter, the Administrator shall not approve any grant for any treatment works under section 1281(g)(1) of this title after March 1, 1973, unless he shall first have determined that the applicant (A) has adopted or will adopt a system of charges to assure that each recipient of waste treatment services within the applicant’s jurisdiction, as determined by the Administrator, will pay its proportionate share (except as otherwise provided in this paragraph) of the costs of operation and maintenance (including replacement) of any waste treatment services provided by the applicant; and (B) has legal, institutional, managerial, and financial capability to insure adequate construction, operation, and maintenance of treatment works throughout the applicant’s jurisdiction, as determined by the Administrator. In any case where an applicant which, as of December 27, 1977, uses a system of dedicated ad valorem taxes and the Administrator determines that the applicant has a system of charges which results in the distribution of operation and maintenance costs for treatment works within the applicant’s jurisdiction, to each user class, in proportion to the contribution to the total cost of operation and maintenance of such works by each user class (taking into account total waste water loading of such works, the constituent elements of the wastes, and other appropriate factors), and such applicant is otherwise in compliance with clause (A) of this paragraph with respect to each industrial user, then such dedicated ad valorem tax system shall be deemed to be the user charge system meeting the requirements of clause (A) of this paragraph for the residential user class and such small non-residential user classes as defined by the Administrator. In defining small non-residential users, the Administrator shall consider the volume of wastes discharged into the treatment works by such users and the constituent elements of such wastes as well as such other factors as he deems appropriate. A system of user charges which imposes a lower charge for low-income residential users (as defined by the Administrator) shall be deemed to be a user charge system meeting the requirements of clause (A) of this paragraph if the Administrator determines that such system was adopted after public notice and hearing.
  • (a) No grant shall be made for a sewage collection system under this subchapter unless such grant (1) is for replacement or major rehabilitation of an existing collection system and is necessary to the total integrity and performance of the waste treatment works servicing such community, or (2) is for a new collection system in an existing community with sufficient existing or planned capacity adequately to treat such collected sewage and is consistent with section 1281 of this title.
  • (b) In accordance with the policy set forth in subsection (a) of this section, before the Administrator approves any grant to any State, municipality, or intermunicipal or interstate agency for the erection, building, acquisition, alteration, remodeling, improvement, or extension of any treatment works the Administrator shall determine that the facilities plan of which such treatment works are a part constitutes the most economical and cost-effective combination of treatment works over the life of the project to meet the requirements of this chapter, including, but not limited to, consideration of construction costs, operation, maintenance, and replacement costs.
  • (f) Amounts from grants received under this section may be used for engineering, design, construction, and final testing of alternative water source projects designed to meet critical water supply needs. Such amounts may not be used for planning, feasibility studies or for operation, maintenance, replacement, repair, or rehabilitation.
  • (a) Subject to the availability of appropriations, not later than 180 days after November 15, 2021, the Administrator shall establish an efficiency grant program (referred to in this section as the “efficiency grant program”) under which the Administrator shall award grants to eligible entities for the replacement or repair of equipment that improves water or energy efficiency of small publicly owned treatment works, as identified in an efficiency audit.
  • (A) for the construction, repair, or replacement of an individual household decentralized wastewater treatment system; or
  • (4) The costs of removal of oil or a hazardous substance for which the owner or operator of a vessel or onshore or offshore facility is liable under subsection (f) of this section shall include any costs or expenses incurred by the Federal Government or any State government in the restoration or replacement of natural resources damaged or destroyed as a result of a discharge of oil or a hazardous substance in violation of subsection (b) of this section.
  • (D) The term “ballast water exchange” means the replacement of water in a ballast water tank using 1 of the following methods:
    (i) Flow-through exchange, in which ballast water is flushed out by pumping in midocean water at the bottom of the tank if practicable, and continuously overflowing the tank from the top, until 3 full volumes of water have been changed to minimize the number of original organisms remaining in the tank.
    (ii) Empty and refill exchange, in which ballast water taken on in ports, estuarine waters, or territorial waters is pumped out until the pump loses suction, after which the ballast tank is refilled with midocean water.