US Codex
U.S.C.
Notes

§1266. Surface effects of underground coal mining operations — Inbound Citations

30 U.S.C. § 1266

Cited by 6 provisions in release 119-102.

Citations to 30 U.S.C. § 1266 as a whole

  • (1) Any action of the Secretary to approve or disapprove a State program or to prepare or promulgate a Federal program pursuant to this chapter shall be subject to judicial review by the United States District Court for the District which includes the capital of the State whose program is at issue. Any action by the Secretary promulgating national rules or regulations including standards pursuant to sections 1251, 1265, 1266, and 1273 of this title shall be subject to judicial review in the United States District Court for the District of Columbia Circuit. Any other action constituting rulemaking by the Secretary shall be subject to judicial review only by the United States District Court for the District in which the surface coal mining operation is located. Any action subject to judicial review under this subsection shall be affirmed unless the court concludes that such action is arbitrary, capricious, or otherwise inconsistent with law. A petition for review of any action subject to judicial review under this subsection shall be filed in the appropriate Court within sixty days from the date of such action, or after such date if the petition is based solely on grounds arising after the sixtieth day. Any such petition may be made by any person who participated in the administrative proceedings and who is aggrieved by the action of the Secretary.
  • (a) The Secretary is authorized to and shall issue separate regulations according to time schedules established in this chapter for anthracite coal surface mines, if such mines are regulated by environmental protection standards of the State in which they are located. Such alternative regulations shall adopt, in each instance, the environmental protection provisions of the State regulatory program in existence on August 3, 1977, in lieu of sections 1265 and 1266 of this title. Provisions of sections 1259 and 1269 of this title are applicable except for specified bond limits and period of revegetation responsibility. All other provisions of this chapter apply and the regulation issued by the Secretary of Interior for each State anthracite regulatory program shall so reflect: Provided, however, That upon amendment of a State’s regulatory program for anthracite mining or regulations thereunder in force in lieu of the above-cited sections of this chapter, the Secretary shall issue such additional regulations as necessary to meet the purposes of this chapter.
  • (A) activities conducted on the surface of lands in connection with a surface coal mine or subject to the requirements of section 1266 of this title surface operations and surface impacts incident to an underground coal mine, the products of which enter commerce or the operations of which directly or indirectly affect interstate commerce. Such activities include excavation for the purpose of obtaining coal including such common methods as contour, strip, auger, mountaintop removal, box cut, open pit, and area mining, the uses of explosives and blasting, and in situ distillation or retorting, leaching or other chemical or physical processing, and the cleaning, concentrating, or other processing or preparation, loading of coal for interstate commerce at or near the mine site: Provided, however, That such activities do not include the extraction of coal incidental to the extraction of other minerals where coal does not exceed 16⅔ per centum of the tonnage of minerals removed for purposes of commercial use or sale or coal explorations subject to section 1262 of this title; and
  • (d) On and after thirty months from August 3, 1977, all surface coal mining operations on Indian lands shall comply with requirements at least as stringent as those imposed by sections 1257, 1258, 1259, 1260, 1265, 1266, 1267, and 1269 of this title and the Secretary shall incorporate the requirements of such provisions in all existing and new leases issued for coal on Indian lands.
  • In order to encourage advances in mining and reclamation practices or to allow post-mining land use for industrial, commercial, residential, or public use (including recreational facilities), the regulatory authority with approval by the Secretary may authorize departures in individual cases on an experimental basis from the environmental protection performance standards promulgated under sections 1265 and 1266 of this title. Such departures may be authorized if (i) the experimental practices are potentially more or at least as environmentally protective, during and after mining operations, as those required by promulgated standards; (ii) the mining operations approved for particular land-use or other purposes are not larger or more numerous than necessary to determine the effectiveness and economic feasibility of the experimental practices; and (iii) the experimental practices do not reduce the protection afforded public health and safety below that provided by promulgated standards.

Citations to §1266(b)(5)

  • (f) The Secretary, with the written concurrence of the Chief of Engineers, shall establish within one hundred and thirty-five days from August 3, 1977, standards and criteria regulating the design, location, construction, operation, maintenance, enlargement, modification, removal, and abandonment of new and existing coal mine waste piles referred to in subsection (b)(13) and section 1266(b)(5) of this title. Such standards and criteria shall conform to the standards and criteria used by the Chief of Engineers to insure that flood control structures are safe and effectively perform their intended function. In addition to engineering and other technical specifications the standards and criteria developed pursuant to this subsection must include provisions for: review and approval of plans and specifications prior to construction, enlargement, modification, removal, or abandonment; performance of periodic inspections during construction; issuance of certificates of approval upon completion of construction; performance of periodic safety inspections; and issuance of notices for required remedial or maintenance work.