§837e. Transmission lines for other electric energy; rates — Inbound Citations

16 U.S.C. § 837e

Cited by 2 provisions in release 119-102.

Citations to 16 U.S.C. § 837e as a whole

  • The provisions of this chapter shall not be applicable to (1) the Canyon Ferry project and (2), except as provided in section 837e of this title, downstream power benefits to which Canada is entitled under the treaty between Canada and the United States relating to the cooperative development of the water resources of the Columbia River Basin, signed at Washington, January 17, 1961, nor to energy or capacity disposed of to Canada in any exchange pursuant to paragraph 1 or 2 of article VIII thereof. Nothing in this chapter shall be construed to modify the geographical preference of power users in the State of Montana which is established by the Hungry Horse Dam Act (Act of June 4, 1944, 58 Stat. 270), as amended.
  • (c) Any contract of the Administrator for the sale or exchange of electric power for use outside the Pacific Northwest shall be subject to limitations and conditions corresponding to those provided in sections 2 and 3 of the Act of August 31, 1964 (16 U.S.C. 837a and 837b) for any contract for the sale, delivery, or exchange of hydroelectric energy or peaking capacity generated within the Pacific Northwest for use outside the Pacific Northwest. In applying such sections for the purposes of this subsection, the term “surplus energy” shall mean electric energy for which there is no market in the Pacific Northwest at any rate established for the disposition of such energy, and the term “surplus peaking capacity” shall mean electric peaking capacity for which there is no demand in the Pacific Northwest at the rate established for the disposition of such capacity. The authority granted, and duties imposed upon, the Secretary by sections 5 and 7 of such Act (16 U.S.C. 837e and 837f) [16 U.S.C. 837d and 837f] shall also apply to the Administrator in connection with resources acquired by the Administrator pursuant to this chapter. The Administrator shall, in making any determination, under any contract executed pursuant to section 839c of this title, of the electric power requirements of any Pacific Northwest customer, which is a non-Federal entity having its own generation, exclude, in addition to hydroelectric generated energy excluded from such requirements pursuant to section 3(d) of such Act (16 U.S.C. 837b(d)), any amount of energy included in the resources of such customer for service to firm loads in the region if (1) such amount was disposed of by such customer outside the region, and (2) as a result of such disposition, the firm energy requirements of such customer or other customers of the Administrator are increased. Such amount of energy shall not be excluded, if the Administrator determines that through reasonable measures such amount of energy could not be conserved or otherwise retained for service to regional loads. The Administrator may sell as replacement for any amount of energy so excluded only energy that would otherwise be surplus.