§824a. Interconnection and coordination of facilities; emergencies; transmission to foreign countries — Inbound Citations

16 U.S.C. § 824a

Cited by 5 provisions in release 119-102.

Citations to 16 U.S.C. § 824a as a whole

  • (1) The Commission, in consultation with the reliability councils established under section 202(a) of the Federal Power Act [16 U.S.C. 824a], the Secretary, and the electric utility industry shall study the opportunities for—
    (A) conservation of energy,
    (B) optimization in the efficiency of use of facilities and resources, and
    (C) increased reliability,
    through pooling arrangements. Not later than 18 months after November 9, 1978, the Commission shall submit a report containing the results of such study to the President and the Congress.

Citations to §824a(a)

Citations to §824a(b)

Citations to §824a(c)

Citations to §824a(e)

  • (b) Notwithstanding any transfer of functions under the first sentence of section 301(b) of the Department of Energy Organization Act [42 U.S.C. 7151(b)], no permit referred to in subsection (a)(1)(B) may be issued unless the Commission has conducted hearings and made the findings required under section 202(e) of the Federal Power Act [16 U.S.C. 824a(e)] and under the applicable execution order respecting the construction, operation, maintenance, or connection at the borders of the United States of facilities for the transmission of electric energy between the United States and a foreign country. Any finding of the Commission under an applicable executive order referred to in this subsection shall be treated for purposes of judicial review as an order issued under section 202(e) of the Federal Power Act.