US Codex
U.S.C.
Notes

§818. Public lands included in project; reservation of lands from entry — Inbound Citations

16 U.S.C. § 818

Cited by 6 provisions in release 119-102.

Citations to 16 U.S.C. § 818 as a whole

  • In exchange for the conveyance to the United States of tract A, as provided in section 45a–1 of this title, the Secretary is authorized, in his discretion, to patent to the owner of tract A, subject to such terms and conditions as the Secretary may deem necessary, certain lands of approximately equal value described as follows:
  • (c) Where the land described in application (or such an application as adjusted or amended pursuant to subsection (b) or (c) of this section), was on that date withdrawn, reserved, or classified for powersite or power-project purposes, notwithstanding such withdrawal, reservation, or classification the described land shall be deemed vacant, unappropriated, and unreserved within the meaning of the Acts referred to in subsection (a)(1) hereof, and, as such, shall be subject to adjudication or approval pursuant to the terms of this section: Provided, however, That if the described land is included as part of a project licensed under part I of the Federal Power Act of June 10, 1920 (41 Stat. 24), as amended [16 U.S.C. 791a et seq.], or is presently utilized for purposes of generating or transmitting electrical power or for any other project authorized by Act of Congress, the foregoing provision shall not apply and the application shall be adjudicated pursuant to the appropriate Act: Provided further, That where the applicant commenced occupancy of the land after its withdrawal or classification for powersite purposes, the entry shall be made subject to the right of reentry provided the United States by section 24 of the Federal Power Act, as amended [16 U.S.C. 818]: Provided further, That any right of reentry reserved in a patent pursuant to this section shall expire twenty years after the effective date of this Act if at that time the land involved is not subject to a license or an application for a license under part I of the Federal Power Act, as amended, or actually utilized or being developed for a purpose authorized by that Act, as amended [16 U.S.C. 791a et seq.] or other Act of Congress.
  • (b) Geothermal leases for lands withdrawn or acquired in aid of functions of the Department of Agriculture may be issued only with the consent of, and subject to such terms and conditions as may be prescribed by, the head of that Department to insure adequate utilization of the lands for the purposes for which they were withdrawn or acquired. Geothermal leases for lands to which section 818 of title 16 is applicable, may be issued only with the consent of, and subject to, such terms and conditions as the Secretary of Energy may prescribe to insure adequate utilization of such lands for power and related purposes.
  • (d) Where the land described in an allotment application pending before the Department of the Interior on or before December 18, 1971 (or such an application as adjusted or amended pursuant to subsection (b) or (c) of this section), was on that date withdrawn, reserved, or classified for powersite or power-project purposes, notwithstanding such withdrawal, reservation, or classification the described land shall be deemed vacant, unappropriated, and unreserved within the meaning of the Act of May 17, 1906, as amended, and, as such, shall be subject to adjudication or approval pursuant to the terms of this section: Provided, however, That if the described land is included as part of a project licensed under part I of the Federal Power Act of June 10, 1920 (41 Stat. 24), as amended [16 U.S.C. 791a et seq.], or is presently utilized for purposes of generating or transmitting electrical power or for any other project authorized by Act of Congress, the foregoing provision shall not apply and the allotment application shall be adjudicated pursuant to the Act of May 17, 1906, as amended: Provided further, That where the allotment applicant commenced use of the land after its withdrawal or classification for powersite purposes, the allotment shall be made subject to the right of reentry provided the United States by section 24 of the Federal Power Act, as amended [16 U.S.C. 818]: Provided further, That any right of reentry reserved in a certificate of allotment pursuant to this section shall expire twenty years after December 2, 1980, if at that time the allotted land is not subject to a license or an application for a license under part I of the Federal Power Act, as amended [16 U.S.C. 791a et seq.], or actually utilized or being developed for a purpose authorized by that Act, as amended [16 U.S.C. 791a et seq.], or other Act of Congress.
  • (a) The Secretary, with respect to the public lands (including public lands, as defined in section 1702(e) of this title, which are reserved from entry pursuant to section 24 of the Federal Power Act (16 U.S.C. 818)) and, the Secretary of Agriculture, with respect to lands within the National Forest System (except in each case land designated as wilderness), are authorized to grant, issue, or renew rights-of-way over, upon, under, or through such lands for—
    (1) reservoirs, canals, ditches, flumes, laterals, pipes, pipelines, tunnels, and other facilities and systems for the impoundment, storage, transportation, or distribution of water;
    (2) pipelines and other systems for the transportation or distribution of liquids and gases, other than water and other than oil, natural gas, synthetic liquid or gaseous fuels, or any refined product produced therefrom, and for storage and terminal facilities in connection therewith;
    (3) pipelines, slurry and emulsion systems, and conveyor belts for transportation and distribution of solid materials, and facilities for the storage of such materials in connection therewith;
    (4) systems for generation, transmission, and distribution of electric energy, except that the applicant shall also comply with all applicable requirements of the Federal Energy Regulatory Commission under the Federal Power Act, including part 11 thereof (41 Stat. 1063, 16 U.S.C. 791a–825r)).;2
    (5) systems for transmission or reception of radio, television, telephone, telegraph, and other electronic signals, and other means of communication;
    (6) roads, trails, highways, railroads, canals, tunnels, tramways, airways, livestock driveways, or other means of transportation except where such facilities are constructed and maintained in connection with commercial recreation facilities on lands in the National Forest System; or
    (7) such other necessary transportation or other systems or facilities which are in the public interest and which require rights-of-way over, upon, under, or through such lands.
  • (d) With respect to any project or portion thereof that was licensed pursuant to, or granted an exemption from, part I of the Federal Power Act [16 U.S.C. 791a et seq.] which is located on lands subject to a reservation under section 24 of the Federal Power Act [16 U.S.C. 818] and which did not receive a permit, right-of-way or other approval under this section prior to October 24, 1992, no such permit, right-of-way, or other approval shall be required for continued operation, including continued operation pursuant to section 15 of the Federal Power Act [16 U.S.C. 808], of such project unless the Commission determines that such project involves the use of any additional public lands or National Forest lands not subject to such reservation.