US Codex
U.S.C.
Notes

§796. Definitions — Inbound Citations

16 U.S.C. § 796

Cited by 718 provisions in release 119-102.

Citations to 16 U.S.C. § 796 as a whole

Citations to §796(1)

  • (e) To issue licenses to citizens of the United States, or to any association of such citizens, or to any corporation organized under the laws of the United States or any State thereof, or to any State or municipality for the purpose of constructing, operating, and maintaining dams, water conduits, reservoirs, power houses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization of power across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, or upon any part of the public lands and reservations of the United States (including the Territories), or for the purpose of utilizing the surplus water or water power from any Government dam, except as herein provided: Provided, That licenses shall be issued within any reservation only after a finding by the Commission that the license will not interfere or be inconsistent with the purpose for which such reservation was created or acquired, and shall be subject to and contain such conditions as the Secretary of the department under whose supervision such reservation falls shall deem necessary for the adequate protection and utilization of such reservation:1 The license applicant and any party to the proceeding shall be entitled to a determination on the record, after opportunity for an agency trial-type hearing of no more than 90 days, on any disputed issues of material fact with respect to such conditions. All disputed issues of material fact raised by any party shall be determined in a single trial-type hearing to be conducted by the relevant resource agency in accordance with the regulations promulgated under this subsection and within the time frame established by the Commission for each license proceeding. Within 90 days of August 8, 2005, the Secretaries of the Interior, Commerce, and Agriculture shall establish jointly, by rule, the procedures for such expedited trial-type hearing, including the opportunity to undertake discovery and cross-examine witnesses, in consultation with the Federal Energy Regulatory Commission.2 Provided further, That no license affecting the navigable capacity of any navigable waters of the United States shall be issued until the plans of the dam or other structures affecting the navigation have been approved by the Chief of Engineers and the Secretary of the Army. Whenever the contemplated improvement is, in the judgment of the Commission, desirable and justified in the public interest for the purpose of improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, a finding to that effect shall be made by the Commission and shall become a part of the records of the Commission: Provided further, That in case the Commission shall find that any Government dam may be advantageously used by the United States for public purposes in addition to navigation, no license therefor shall be issued until two years after it shall have reported to Congress the facts and conditions relating thereto, except that this provision shall not apply to any Government dam constructed prior to June 10, 1920: And provided further, That upon the filing of any application for a license which has not been preceded by a preliminary permit under subsection (f) of this section, notice shall be given and published as required by the proviso of said subsection. In deciding whether to issue any license under this subchapter for any project, the Commission, in addition to the power and development purposes for which licenses are issued, shall give equal consideration to the purposes of energy conservation, the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat), the protection of recreational opportunities, and the preservation of other aspects of environmental quality.
  • (g) Upon its own motion to order an investigation of any occupancy of, or evidenced intention to occupy, for the purpose of developing electric power, public lands, reservations, or streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States by any person, corporation, State, or municipality and to issue such order as it may find appropriate, expedient, and in the public interest to conserve and utilize the navigation and water-power resources of the region.
  • (a) All proceeds from any Indian reservation shall be placed to the credit of the Indians of such reservation. All other charges arising from licenses hereunder, except charges fixed by the Commission for the purpose of reimbursing the United States for the costs of administration of this subchapter, shall be paid into the Treasury of the United States, subject to the following distribution: 12½ per centum thereof is hereby appropriated to be paid into the Treasury of the United States and credited to “Miscellaneous receipts”; 50 per centum of the charges arising from licenses hereunder for the occupancy and use of public lands and national forests shall be paid into, reserved, and appropriated as a part of the reclamation fund created by the Act of Congress known as the Reclamation Act, approved June 17, 1902; and 37½ per centum of the charges arising from licenses hereunder for the occupancy and use of national forests and public lands from development within the boundaries of any State shall be paid by the Secretary of the Treasury to such State; and 50 per centum of the charges arising from all other licenses hereunder is reserved and appropriated as a special fund in the Treasury to be expended under the direction of the Secretary of the Army in the maintenance and operation of dams and other navigation structures owned by the United States or in the construction, maintenance, or operation of headwater or other improvements of navigable waters of the United States. The proceeds of charges made by the Commission for the purpose of reimbursing the United States for the costs of the administration of this subchapter shall be paid into the Treasury of the United States and credited to miscellaneous receipts.
  • (1) It shall be unlawful for any person, State, or municipality, for the purpose of developing electric power, to construct, operate, or maintain any dam, water conduit, reservoir, power house, or other works incidental thereto across, along, or in any of the navigable waters of the United States, or upon any part of the public lands or reservations of the United States (including the Territories), or utilize the surplus water or water power from any Government dam, except under and in accordance with the terms of a permit or valid existing right-of-way granted prior to June 10, 1920, or a license granted pursuant to this chapter. Any person, association, corporation, State, or municipality intending to construct a dam or other project works, across, along, over, or in any stream or part thereof, other than those defined in this chapter as navigable waters, and over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States shall before such construction file declaration of such intention with the Commission, whereupon the Commission shall cause immediate investigation of such proposed construction to be made, and if upon investigation it shall find that the interests of interstate or foreign commerce would be affected by such proposed construction, such person, association, corporation, State, or municipality shall not construct, maintain, or operate such dam or other project works until it shall have applied for and shall have received a license under the provisions of this chapter. If the Commission shall not so find, and if no public lands or reservations are affected, permission is granted to construct such dam or other project works in such stream upon compliance with State laws.
  • (d) With respect to projects located in whole or in part on a reservation, a conservation system unit, or the public lands, a State license or exemption from licensing shall be subject to—
    (1) the approval of the Secretary having jurisdiction over such lands; and
    (2) such conditions as the Secretary may prescribe.

Citations to §796(2)

  • (e) To issue licenses to citizens of the United States, or to any association of such citizens, or to any corporation organized under the laws of the United States or any State thereof, or to any State or municipality for the purpose of constructing, operating, and maintaining dams, water conduits, reservoirs, power houses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization of power across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, or upon any part of the public lands and reservations of the United States (including the Territories), or for the purpose of utilizing the surplus water or water power from any Government dam, except as herein provided: Provided, That licenses shall be issued within any reservation only after a finding by the Commission that the license will not interfere or be inconsistent with the purpose for which such reservation was created or acquired, and shall be subject to and contain such conditions as the Secretary of the department under whose supervision such reservation falls shall deem necessary for the adequate protection and utilization of such reservation:1 The license applicant and any party to the proceeding shall be entitled to a determination on the record, after opportunity for an agency trial-type hearing of no more than 90 days, on any disputed issues of material fact with respect to such conditions. All disputed issues of material fact raised by any party shall be determined in a single trial-type hearing to be conducted by the relevant resource agency in accordance with the regulations promulgated under this subsection and within the time frame established by the Commission for each license proceeding. Within 90 days of August 8, 2005, the Secretaries of the Interior, Commerce, and Agriculture shall establish jointly, by rule, the procedures for such expedited trial-type hearing, including the opportunity to undertake discovery and cross-examine witnesses, in consultation with the Federal Energy Regulatory Commission.2 Provided further, That no license affecting the navigable capacity of any navigable waters of the United States shall be issued until the plans of the dam or other structures affecting the navigation have been approved by the Chief of Engineers and the Secretary of the Army. Whenever the contemplated improvement is, in the judgment of the Commission, desirable and justified in the public interest for the purpose of improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, a finding to that effect shall be made by the Commission and shall become a part of the records of the Commission: Provided further, That in case the Commission shall find that any Government dam may be advantageously used by the United States for public purposes in addition to navigation, no license therefor shall be issued until two years after it shall have reported to Congress the facts and conditions relating thereto, except that this provision shall not apply to any Government dam constructed prior to June 10, 1920: And provided further, That upon the filing of any application for a license which has not been preceded by a preliminary permit under subsection (f) of this section, notice shall be given and published as required by the proviso of said subsection. In deciding whether to issue any license under this subchapter for any project, the Commission, in addition to the power and development purposes for which licenses are issued, shall give equal consideration to the purposes of energy conservation, the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat), the protection of recreational opportunities, and the preservation of other aspects of environmental quality.
  • (g) Upon its own motion to order an investigation of any occupancy of, or evidenced intention to occupy, for the purpose of developing electric power, public lands, reservations, or streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States by any person, corporation, State, or municipality and to issue such order as it may find appropriate, expedient, and in the public interest to conserve and utilize the navigation and water-power resources of the region.
  • (1) That the licensee shall pay to the United States reasonable annual charges in an amount to be fixed by the Commission for the purpose of reimbursing the United States for the costs of the administration of this subchapter, including any reasonable and necessary costs incurred by Federal and State fish and wildlife agencies and other natural and cultural resource agencies in connection with studies or other reviews carried out by such agencies for purposes of administering their responsibilities under this subchapter; for recompensing it for the use, occupancy, and enjoyment of its lands or other property; and for the expropriation to the Government of excessive profits until the respective States shall make provision for preventing excessive profits or for the expropriation thereof to themselves, or until the period of amortization as herein provided is reached, and in fixing such charges the Commission shall seek to avoid increasing the price to the consumers of power by such charges, and any such charges may be adjusted from time to time by the Commission as conditions may require: Provided, That, subject to annual appropriations Acts, the portion of such annual charges imposed by the Commission under this subsection to cover the reasonable and necessary costs of such agencies shall be available to such agencies (in addition to other funds appropriated for such purposes) solely for carrying out such studies and reviews and shall remain available until expended: Provided, That when licenses are issued involving the use of Government dams or other structures owned by the United States or tribal lands embraced within Indian reservations the Commission shall, subject to the approval of the Secretary of the Interior in the case of such dams or structures in reclamation projects and, in the case of such tribal lands, subject to the approval of the Indian tribe having jurisdiction of such lands as provided in section 5123 of title 25, fix a reasonable annual charge for the use thereof, and such charges may with like approval be readjusted by the Commission at the end of twenty years after the project is available for service and at periods of not less than ten years thereafter upon notice and opportunity for hearing: Provided further, That licenses for the development, transmission, or distribution of power by States or municipalities shall be issued and enjoyed without charge to the extent such power is sold to the public without profit or is used by such State or municipality for State or municipal purposes, except that as to projects constructed or to be constructed by States or municipalities primarily designed to provide or improve navigation, licenses therefor shall be issued without charge; and that licenses for the development, transmission, or distribution of power for domestic, mining, or other beneficial use in projects of not more than two thousand horsepower installed capacity may be issued without charge, except on tribal lands within Indian reservations; but in no case shall a license be issued free of charge for the development and utilization of power created by any Government dam and that the amount charged therefor in any license shall be such as determined by the Commission: Provided however, That no charge shall be assessed for the use of any Government dam or structure by any licensee if, before January 1, 1985, the Secretary of the Interior has entered into a contract with such licensee that meets each of the following requirements:
    (A) The contract covers one or more projects for which a license was issued by the Commission before January 1, 1985.
    (B) The contract contains provisions specifically providing each of the following:
    (i) A powerplant may be built by the licensee utilizing irrigation facilities constructed by the United States.
    (ii) The powerplant shall remain in the exclusive control, possession, and ownership of the licensee concerned.
    (iii) All revenue from the powerplant and from the use, sale, or disposal of electric energy from the powerplant shall be, and remain, the property of such licensee.
    (C) The contract is an amendatory, supplemental and replacement contract between the United States and: (i) the Quincy-Columbia Basin Irrigation District (Contract No. 14–06–100–6418); (ii) the East Columbia Basin Irrigation District (Contract No. 14–06–100–6419); or, (iii) the South Columbia Basin Irrigation District (Contract No. 14–06–100–6420).
    This paragraph shall apply to any project covered by a contract referred to in this paragraph only during the term of such contract unless otherwise provided by subsequent Act of Congress. In the event an overpayment of any charge due under this section shall be made by a licensee, the Commission is authorized to allow a credit for such overpayment when charges are due for any subsequent period.
  • (i) In issuing licenses for a minor part only of a complete project, or for a complete project of not more than two thousand horsepower installed capacity, the Commission may in its discretion waive such conditions, provisions, and requirements of this subchapter, except the license period of fifty years, as it may deem to be to the public interest to waive under the circumstances: Provided, That the provisions hereof shall not apply to annual charges for use of lands within Indian reservations.
  • (1) It shall be unlawful for any person, State, or municipality, for the purpose of developing electric power, to construct, operate, or maintain any dam, water conduit, reservoir, power house, or other works incidental thereto across, along, or in any of the navigable waters of the United States, or upon any part of the public lands or reservations of the United States (including the Territories), or utilize the surplus water or water power from any Government dam, except under and in accordance with the terms of a permit or valid existing right-of-way granted prior to June 10, 1920, or a license granted pursuant to this chapter. Any person, association, corporation, State, or municipality intending to construct a dam or other project works, across, along, over, or in any stream or part thereof, other than those defined in this chapter as navigable waters, and over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States shall before such construction file declaration of such intention with the Commission, whereupon the Commission shall cause immediate investigation of such proposed construction to be made, and if upon investigation it shall find that the interests of interstate or foreign commerce would be affected by such proposed construction, such person, association, corporation, State, or municipality shall not construct, maintain, or operate such dam or other project works until it shall have applied for and shall have received a license under the provisions of this chapter. If the Commission shall not so find, and if no public lands or reservations are affected, permission is granted to construct such dam or other project works in such stream upon compliance with State laws.
  • (3) Nothing in this chapter shall modify the statutory authority under which units of the national park system are created. Further, the designation of any area of any park, monument, or other unit of the national park system as a wilderness area pursuant to this chapter shall in no manner lower the standards evolved for the use and preservation of such park, monument, or other unit of the national park system in accordance with section 100101(b)(1), chapter 1003, and sections 100751(a), 100752, 100753, and 102101 of title 54, the statutory authority under which the area was created, or any other Act of Congress which might pertain to or affect such area, including, but not limited to, section 796(2) of this title; and chapters 3201 and 3203 of title 54.

Citations to §796(3)

  • A commission is created and established to be known as the Federal Power Commission (hereinafter referred to as the “commission”) which shall be composed of five commissioners who shall be appointed by the President, by and with the advice and consent of the Senate, one of whom shall be designated by the President as chairman and shall be the principal executive officer of the commission. Each chairman, when so designated, shall act as such until the expiration of his term of office.
  • (e) To issue licenses to citizens of the United States, or to any association of such citizens, or to any corporation organized under the laws of the United States or any State thereof, or to any State or municipality for the purpose of constructing, operating, and maintaining dams, water conduits, reservoirs, power houses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization of power across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, or upon any part of the public lands and reservations of the United States (including the Territories), or for the purpose of utilizing the surplus water or water power from any Government dam, except as herein provided: Provided, That licenses shall be issued within any reservation only after a finding by the Commission that the license will not interfere or be inconsistent with the purpose for which such reservation was created or acquired, and shall be subject to and contain such conditions as the Secretary of the department under whose supervision such reservation falls shall deem necessary for the adequate protection and utilization of such reservation:1 The license applicant and any party to the proceeding shall be entitled to a determination on the record, after opportunity for an agency trial-type hearing of no more than 90 days, on any disputed issues of material fact with respect to such conditions. All disputed issues of material fact raised by any party shall be determined in a single trial-type hearing to be conducted by the relevant resource agency in accordance with the regulations promulgated under this subsection and within the time frame established by the Commission for each license proceeding. Within 90 days of August 8, 2005, the Secretaries of the Interior, Commerce, and Agriculture shall establish jointly, by rule, the procedures for such expedited trial-type hearing, including the opportunity to undertake discovery and cross-examine witnesses, in consultation with the Federal Energy Regulatory Commission.2 Provided further, That no license affecting the navigable capacity of any navigable waters of the United States shall be issued until the plans of the dam or other structures affecting the navigation have been approved by the Chief of Engineers and the Secretary of the Army. Whenever the contemplated improvement is, in the judgment of the Commission, desirable and justified in the public interest for the purpose of improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, a finding to that effect shall be made by the Commission and shall become a part of the records of the Commission: Provided further, That in case the Commission shall find that any Government dam may be advantageously used by the United States for public purposes in addition to navigation, no license therefor shall be issued until two years after it shall have reported to Congress the facts and conditions relating thereto, except that this provision shall not apply to any Government dam constructed prior to June 10, 1920: And provided further, That upon the filing of any application for a license which has not been preceded by a preliminary permit under subsection (f) of this section, notice shall be given and published as required by the proviso of said subsection. In deciding whether to issue any license under this subchapter for any project, the Commission, in addition to the power and development purposes for which licenses are issued, shall give equal consideration to the purposes of energy conservation, the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat), the protection of recreational opportunities, and the preservation of other aspects of environmental quality.
  • (f) To issue preliminary permits for the purpose of enabling applicants for a license hereunder to secure the data and to perform the acts required by section 802 of this title: Provided, however, That upon the filing of any application for a preliminary permit by any person, association, or corporation the Commission, before granting such application, shall at once give notice of such application in writing to any State or municipality likely to be interested in or affected by such application; and shall also publish notice of such application once each week for four weeks in a daily or weekly newspaper published in the county or counties in which the project or any part hereof or the lands affected thereby are situated.
  • (g) Upon its own motion to order an investigation of any occupancy of, or evidenced intention to occupy, for the purpose of developing electric power, public lands, reservations, or streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States by any person, corporation, State, or municipality and to issue such order as it may find appropriate, expedient, and in the public interest to conserve and utilize the navigation and water-power resources of the region.
  • As a condition of the license, every licensee under this chapter which is a public-service corporation, or a person, association, or corporation owning or operating any project and developing, transmitting, or distributing power for sale or use in public service, shall abide by such reasonable regulation of the services to be rendered to customers or consumers of power, and of rates and charges of payment therefor, as may from time to time be prescribed by any duly constituted agency of the State in which the service is rendered or the rate charged. That in case of the development, transmission, or distribution, or use in public service of power by any licensee under this chapter or by its customer engaged in public service within a State which has not authorized and empowered a commission or other agency or agencies within said State to regulate and control the services to be rendered by such licensee or by its customer engaged in public service, or the rates and charges of payment therefor, or the amount or character of securities to be issued by any of said parties, it is agreed as a condition of such license that jurisdiction is conferred upon the commission, upon complaint of any person aggrieved or upon its own initiative, to exercise such regulation and control until such time as the State shall have provided a commission or other authority for such regulation and control: Provided, That the jurisdiction of the commission shall cease and determine as to each specific matter of regulation and control prescribed in this section as soon as the State shall have provided a commission or other authority for the regulation and control of that specific matter.
  • When said power or any part thereof shall enter into interstate or foreign commerce the rates charged and the service rendered by any such licensee, or by any subsidiary corporation, the stock of which is owned or controlled directly or indirectly by such licensee, or by any person, corporation, or association purchasing power from such licensee for sale and distribution or use in public service shall be reasonable, nondiscriminatory, and just to the customer and all unreasonable discriminatory and unjust rates or services are prohibited and declared to be unlawful; and whenever any of the States directly concerned has not provided a commission or other authority to enforce the requirements of this section within such State or to regulate and control the amount and character of securities to be issued by any of such parties, or such States are unable to agree through their properly constituted authorities on the services to be rendered, or on the rates or charges of payment therefor, or on the amount or character of securities to be issued by any of said parties, jurisdiction is conferred upon the commission, upon complaint of any person, aggrieved, upon the request of any State concerned, or upon its own initiative to enforce the provisions of this section, to regulate and control so much of the services rendered, and of the rates and charges of payment therefor as constitute interstate or foreign commerce and to regulate the issuance of securities by the parties included within this section, and securities issued by the licensee subject to such regulations shall be allowed only for the bona fide purpose of financing and conducting the business of such licensee.
  • The provisions of this subchapter shall not be construed as affecting any permit or valid existing right-of-way granted prior to June 10, 1920, or as confirming or otherwise affecting any claim, or as affecting any authority heretofore given pursuant to law, but any person, association, corporation, State, or municipality holding or possessing such permit, right-of-way or authority may apply for a license under this chapter, and upon such application the Commission may issue to any such applicant a license in accordance with the provisions of this subchapter and in such case the provisions of this chapter shall apply to such applicant as a licensee under this chapter: Provided, That when application is made for a license under this section for a project or projects already constructed the fair value of said project or projects determined as provided in this section, shall for the purposes of this subchapter and of said license be deemed to be the amount to be allowed as the net investment of the applicant in such project or projects as of the date of such license, or as of the date of such determination, if license has not been issued. Such fair value shall be determined by the Commission after notice and opportunity for hearing.
  • (1) It shall be unlawful for any person, State, or municipality, for the purpose of developing electric power, to construct, operate, or maintain any dam, water conduit, reservoir, power house, or other works incidental thereto across, along, or in any of the navigable waters of the United States, or upon any part of the public lands or reservations of the United States (including the Territories), or utilize the surplus water or water power from any Government dam, except under and in accordance with the terms of a permit or valid existing right-of-way granted prior to June 10, 1920, or a license granted pursuant to this chapter. Any person, association, corporation, State, or municipality intending to construct a dam or other project works, across, along, over, or in any stream or part thereof, other than those defined in this chapter as navigable waters, and over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States shall before such construction file declaration of such intention with the Commission, whereupon the Commission shall cause immediate investigation of such proposed construction to be made, and if upon investigation it shall find that the interests of interstate or foreign commerce would be affected by such proposed construction, such person, association, corporation, State, or municipality shall not construct, maintain, or operate such dam or other project works until it shall have applied for and shall have received a license under the provisions of this chapter. If the Commission shall not so find, and if no public lands or reservations are affected, permission is granted to construct such dam or other project works in such stream upon compliance with State laws.
  • (f) No provision in this subchapter shall apply to, or be deemed to include, the United States, a State or any political subdivision of a State, an electric cooperative that receives financing under the Rural Electrification Act of 1936 (7 U.S.C. 901 et seq.) or that sells less than 4,000,000 megawatt hours of electricity per year, or any agency, authority, or instrumentality of any one or more of the foregoing, or any corporation which is wholly owned, directly or indirectly, by any one or more of the foregoing, or any officer, agent, or employee of any of the foregoing acting as such in the course of his official duty, unless such provision makes specific reference thereto.
  • (d) The Commission shall not authorize the capitalization of the right to be a corporation or of any franchise, permit, or contract for consolidation, merger, or lease in excess of the amount (exclusive of any tax or annual charge) actually paid as the consideration for such right, franchise, permit, or contract.
  • (A) such entity is a Federal power marketing agency; the Tennessee Valley Authority; a State or any political subdivision of a State (or an agency, authority, or instrumentality of a State or a political subdivision); a corporation or association that has ever received a loan for the purposes of providing electric service from the Administrator of the Rural Electrification Administration under the Rural Electrification Act of 1936 [7 U.S.C. 901 et seq.]; a person having an obligation arising under State or local law (exclusive of an obligation arising solely from a contract entered into by such person) to provide electric service to the public; or any corporation or association which is wholly owned, directly or indirectly, by any one or more of the foregoing; and
  • (4) The term “State utility” means a State or any political subdivision of a State, or any agency, authority, or instrumentality of any one or more of the foregoing, or a corporation that is wholly owned, directly or indirectly, by any one or more of the foregoing, competent to carry on the business of developing, transmitting, utilizing, or distributing power.
  • (b) Not later than 180 days after November 15, 2021, the Commission, in consultation with the Secretary of Energy, the North American Electric Reliability Corporation, the Electricity Subsector Coordinating Council, and the National Association of Regulatory Utility Commissioners, shall conduct a study to identify incentive-based, including performance-based, rate treatments for the transmission and sale of electric energy subject to the jurisdiction of the Commission that could be used to encourage—
    (1) investment by public utilities in advanced cybersecurity technology; and
    (2) participation by public utilities in cybersecurity threat information sharing programs.
  • Notwithstanding section 3302 of title 31, beginning in fiscal year 2005 and thereafter, such funds as are received by the Southwestern Power Administration from any State, municipality, corporation, association, firm, district, or individual as advance payment for work that is associated with Southwestern’s transmission facilities, consistent with that authorized in section 825s of this title, shall be credited to this account and be available until expended.
  • Notwithstanding the provisions of section 3302 of title 31, beginning in fiscal year 2008 and thereafter, such funds as are received by the Southeastern Power Administration from any State, municipality, corporation, association, firm, district, or individual as advance payment for work that is associated with Southeastern’s Operations and Maintenance, consistent with that authorized in section 825s of this title, shall be credited to this account and be available until expended.

Citations to §796(4)

  • A commission is created and established to be known as the Federal Power Commission (hereinafter referred to as the “commission”) which shall be composed of five commissioners who shall be appointed by the President, by and with the advice and consent of the Senate, one of whom shall be designated by the President as chairman and shall be the principal executive officer of the commission. Each chairman, when so designated, shall act as such until the expiration of his term of office.
  • (f) To issue preliminary permits for the purpose of enabling applicants for a license hereunder to secure the data and to perform the acts required by section 802 of this title: Provided, however, That upon the filing of any application for a preliminary permit by any person, association, or corporation the Commission, before granting such application, shall at once give notice of such application in writing to any State or municipality likely to be interested in or affected by such application; and shall also publish notice of such application once each week for four weeks in a daily or weekly newspaper published in the county or counties in which the project or any part hereof or the lands affected thereby are situated.
  • (g) Upon its own motion to order an investigation of any occupancy of, or evidenced intention to occupy, for the purpose of developing electric power, public lands, reservations, or streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States by any person, corporation, State, or municipality and to issue such order as it may find appropriate, expedient, and in the public interest to conserve and utilize the navigation and water-power resources of the region.
  • (a) Where the Federal Energy Regulatory Commission is required to prepare a draft or final environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 and following) in connection with an application for a license under part I of the Federal Power Act [16 U.S.C. 791a et seq.], the Commission may permit, at the election of the applicant, a contractor, consultant or other person funded by the applicant and chosen by the Commission from among a list of such individuals or companies determined by the Commission to be qualified to do such work, to prepare such statement for the Commission. The contractor shall execute a disclosure statement prepared by the Commission specifying that it has no financial or other interest in the outcome of the project. The Commission shall establish the scope of work and procedures to assure that the contractor, consultant or other person has no financial or other potential conflict of interest in the outcome of the proceeding. Nothing herein shall affect the Commission’s responsibility to comply with the National Environmental Policy Act of 1969.
  • (b) Where an environmental assessment is required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 and following) in connection with an application for a license under part I of the Federal Power Act [16 U.S.C. 791a et seq.], the Commission may permit an applicant, or a contractor, consultant or other person selected by the applicant, to prepare such environmental assessment. The Commission shall institute procedures, including pre-application consultations, to advise potential applicants of studies or other information foreseeably required by the Commission. The Commission may allow the filing of such applicant-prepared environmental assessments as part of the application. Nothing herein shall affect the Commission’s responsibility to comply with the National Environmental Policy Act of 1969.
  • (1) Any person who is an owner of record of any interest in the property within the bounds of the project.
  • (f) In issuing any licenses under this section except an annual license, the Commission, on its own motion or upon application of any licensee, person, State, municipality, or State commission, after notice to each State commission and licensee affected, and after opportunity for hearing, whenever it finds that in conformity with a comprehensive plan for improving or developing a waterway or waterways for beneficial public uses all or part of any licensed project should no longer be used or adapted for use for power purposes, may license all or part of the project works for nonpower use. A license for nonpower use shall be issued to a new licensee only on the condition that the new licensee shall, before taking possession of the facilities encompassed thereunder, pay such amount and assume such contracts as the United States is required to do, in the manner specified in section 807 of this title. Any license for nonpower use shall be a temporary license. Whenever, in the judgment of the Commission, a State, municipality, interstate agency, or another Federal agency is authorized and willing to assume regulatory supervision of the lands and facilities included under the nonpower license and does so, the Commission shall thereupon terminate the license. Consistent with the provisions of subchapter IV of this chapter, every licensee for nonpower use shall keep such accounts and file such annual and other periodic or special reports concerning the removal, alteration, nonpower use, or other disposition of any project works or parts thereof covered by the nonpower use license as the Commission may by rules and regulations or order prescribe as necessary or appropriate.
  • As a condition of the license, every licensee under this chapter which is a public-service corporation, or a person, association, or corporation owning or operating any project and developing, transmitting, or distributing power for sale or use in public service, shall abide by such reasonable regulation of the services to be rendered to customers or consumers of power, and of rates and charges of payment therefor, as may from time to time be prescribed by any duly constituted agency of the State in which the service is rendered or the rate charged. That in case of the development, transmission, or distribution, or use in public service of power by any licensee under this chapter or by its customer engaged in public service within a State which has not authorized and empowered a commission or other agency or agencies within said State to regulate and control the services to be rendered by such licensee or by its customer engaged in public service, or the rates and charges of payment therefor, or the amount or character of securities to be issued by any of said parties, it is agreed as a condition of such license that jurisdiction is conferred upon the commission, upon complaint of any person aggrieved or upon its own initiative, to exercise such regulation and control until such time as the State shall have provided a commission or other authority for such regulation and control: Provided, That the jurisdiction of the commission shall cease and determine as to each specific matter of regulation and control prescribed in this section as soon as the State shall have provided a commission or other authority for the regulation and control of that specific matter.
  • When said power or any part thereof shall enter into interstate or foreign commerce the rates charged and the service rendered by any such licensee, or by any subsidiary corporation, the stock of which is owned or controlled directly or indirectly by such licensee, or by any person, corporation, or association purchasing power from such licensee for sale and distribution or use in public service shall be reasonable, nondiscriminatory, and just to the customer and all unreasonable discriminatory and unjust rates or services are prohibited and declared to be unlawful; and whenever any of the States directly concerned has not provided a commission or other authority to enforce the requirements of this section within such State or to regulate and control the amount and character of securities to be issued by any of such parties, or such States are unable to agree through their properly constituted authorities on the services to be rendered, or on the rates or charges of payment therefor, or on the amount or character of securities to be issued by any of said parties, jurisdiction is conferred upon the commission, upon complaint of any person, aggrieved, upon the request of any State concerned, or upon its own initiative to enforce the provisions of this section, to regulate and control so much of the services rendered, and of the rates and charges of payment therefor as constitute interstate or foreign commerce and to regulate the issuance of securities by the parties included within this section, and securities issued by the licensee subject to such regulations shall be allowed only for the bona fide purpose of financing and conducting the business of such licensee.
  • The provisions of this subchapter shall not be construed as affecting any permit or valid existing right-of-way granted prior to June 10, 1920, or as confirming or otherwise affecting any claim, or as affecting any authority heretofore given pursuant to law, but any person, association, corporation, State, or municipality holding or possessing such permit, right-of-way or authority may apply for a license under this chapter, and upon such application the Commission may issue to any such applicant a license in accordance with the provisions of this subchapter and in such case the provisions of this chapter shall apply to such applicant as a licensee under this chapter: Provided, That when application is made for a license under this section for a project or projects already constructed the fair value of said project or projects determined as provided in this section, shall for the purposes of this subchapter and of said license be deemed to be the amount to be allowed as the net investment of the applicant in such project or projects as of the date of such license, or as of the date of such determination, if license has not been issued. Such fair value shall be determined by the Commission after notice and opportunity for hearing.
  • (1) It shall be unlawful for any person, State, or municipality, for the purpose of developing electric power, to construct, operate, or maintain any dam, water conduit, reservoir, power house, or other works incidental thereto across, along, or in any of the navigable waters of the United States, or upon any part of the public lands or reservations of the United States (including the Territories), or utilize the surplus water or water power from any Government dam, except under and in accordance with the terms of a permit or valid existing right-of-way granted prior to June 10, 1920, or a license granted pursuant to this chapter. Any person, association, corporation, State, or municipality intending to construct a dam or other project works, across, along, over, or in any stream or part thereof, other than those defined in this chapter as navigable waters, and over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States shall before such construction file declaration of such intention with the Commission, whereupon the Commission shall cause immediate investigation of such proposed construction to be made, and if upon investigation it shall find that the interests of interstate or foreign commerce would be affected by such proposed construction, such person, association, corporation, State, or municipality shall not construct, maintain, or operate such dam or other project works until it shall have applied for and shall have received a license under the provisions of this chapter. If the Commission shall not so find, and if no public lands or reservations are affected, permission is granted to construct such dam or other project works in such stream upon compliance with State laws.
  • (2) No person may commence any significant modification of any project licensed under, or exempted from, this chapter unless such modification is authorized in accordance with terms and conditions of such license or exemption and the applicable requirements of this subchapter. As used in this paragraph, the term “commence” refers to the beginning of physical on-site activity other than surveys or testing.
  • (A) Any person, State, or municipality proposing to construct a qualifying conduit hydropower facility shall file with the Commission a notice of intent to construct such facility. The notice shall include sufficient information to demonstrate that the facility meets the qualifying criteria.
  • (1) Before issuing an order assessing a civil penalty against any person under this section, the Commission shall provide to such person notice of the proposed penalty. Such notice shall, except in the case of a violation of a final order issued under subsection (a), inform such person of his opportunity to elect in writing within 30 days after the date of receipt of such notice to have the procedures of paragraph (3) (in lieu of those of paragraph (2)) apply with respect to such assessment.
  • (B) Any person against whom a penalty is assessed under this paragraph may, within 60 calendar days after the date of the order of the Commission assessing such penalty, institute an action in the United States court of appeals for the appropriate judicial circuit for judicial review of such order in accordance with chapter 7 of title 5. The court shall have jurisdiction to enter a judgment affirming, modifying, or setting aside in whole or in Part,1 the order of the Commission, or the court may remand the proceeding to the Commission for such further action as the court may direct.
  • (5) If any person fails to pay an assessment of a civil penalty after it has become a final and unappealable order under paragraph (2), or after the appropriate district court has entered final judgment in favor of the Commission under paragraph (3), the Commission shall institute an action to recover the amount of such penalty in any appropriate district court of the United States. In such action, the validity and appropriateness of such final assessment order or judgment shall not be subject to review.
  • (1) Whenever any person applies for a license for any project works within any reservation of the United States, and the Secretary of the department under whose supervision such reservation falls (referred to in this subsection as the “Secretary”) deems a condition to such license to be necessary under the first proviso of section 797(e) of this title, the license applicant or any other party to the license proceeding may propose an alternative condition.
  • (d) The term “sale of electric energy at wholesale” when used in this subchapter, means a sale of electric energy to any person for resale.
  • (e) The term “public utility” when used in this subchapter and subchapter III of this chapter means any person who owns or operates facilities subject to the jurisdiction of the Commission under this subchapter (other than facilities subject to such jurisdiction solely by reason of section 824e(e), 824e(f),1 824i, 824j, 824j–1, 824k, 824o, 824o–1, 824p, 824q, 824r, 824s, 824t, 824u, or 824v of this title).
  • (b) Whenever the Commission, upon application of any State commission or of any person engaged in the transmission or sale of electric energy, and after notice to each State commission and public utility affected and after opportunity for hearing, finds such action necessary or appropriate in the public interest it may by order direct a public utility (if the Commission finds that no undue burden will be placed upon such public utility thereby) to establish physical connection of its transmission facilities with the facilities of one or more other persons engaged in the transmission or sale of electric energy, to sell energy to or exchange energy with such persons: Provided, That the Commission shall have no authority to compel the enlargement of generating facilities for such purposes, nor to compel such public utility to sell or exchange energy when to do so would impair its ability to render adequate service to its customers. The Commission may prescribe the terms and conditions of the arrangement to be made between the persons affected by any such order, including the apportionment of cost between them and the compensation or reimbursement reasonably due to any of them.
  • (d) During the continuance of any emergency requiring immediate action, any person or municipality engaged in the transmission or sale of electric energy and not otherwise subject to the jurisdiction of the Commission may make such temporary connections with any public utility subject to the jurisdiction of the Commission or may construct such temporary facilities for the transmission of electric energy in interstate commerce as may be necessary or appropriate to meet such emergency, and shall not become subject to the jurisdiction of the Commission by reason of such temporary connection or temporary construction: Provided, That such temporary connection shall be discontinued or such temporary construction removed or otherwise disposed of upon the termination of such emergency: Provided further, That upon approval of the Commission permanent connections for emergency use only may be made hereunder.
  • (e) After six months from August 26, 1935, no person shall transmit any electric energy from the United States to a foreign country without first having secured an order of the Commission authorizing it to do so. The Commission shall issue such order upon application unless, after opportunity for hearing, it finds that the proposed transmission would impair the sufficiency of electric supply within the United States or would impede or tend to impede the coordination in the public interest of facilities subject to the jurisdiction of the Commission. The Commission may by its order grant such application in whole or in part, with such modifications and upon such terms and conditions as the Commission may find necessary or appropriate, and may from time to time, after opportunity for hearing and for good cause shown, make such supplemental orders in the premises as it may find necessary or appropriate.
  • (f) The ownership or operation of facilities for the transmission or sale at wholesale of electric energy which is (a) generated within a State and transmitted from the State across an international boundary and not thereafter transmitted into any other State, or (b) generated in a foreign country and transmitted across an international boundary into a State and not thereafter transmitted into any other State, shall not make a person a public utility subject to regulation as such under other provisions of this subchapter. The State within which any such facilities are located may regulate any such transaction insofar as such State regulation does not conflict with the exercise of the Commission’s powers under or relating to subsection (e).
  • (B) provide that all persons served directly or indirectly by such public utility will be treated, without undue prejudice or disadvantage.
  • (a) The Commission may, on its own motion, and shall, on application of any person or governmental entity, after public notice and notice to the Governor of the affected State and after affording an opportunity for public hearing, exempt electric utilities, in whole or in part, from any provision of State law, or from any State rule or regulation, which prohibits or prevents the voluntary coordination of electric utilities, including any agreement for central dispatch, if the Commission determines that such voluntary coordination is designed to obtain economical utilization of facilities and resources in any area. No such exemption may be granted if the Commission finds that such provision of State law, or rule or regulation—
    (1) is required by any authority of Federal law, or
    (2) is designed to protect public health, safety, or welfare, or the environment or conserve energy or is designed to mitigate the effects of emergencies resulting from fuel shortages.
  • (b) The Secretary, in consultation with the Commission, may, from time to time, request the reliability councils established under section 202(a) of the Federal Power Act [16 U.S.C. 824a(a) of this title] or other appropriate persons (including Federal agencies) to examine and report to him concerning any electric utility reliability issue. The Secretary shall report to the Congress (in its annual report or in the report required under subsection (a) if appropriate) the results of any examination under the preceding sentence.
  • (a) Not later than 1 year after November 9, 1978, the Commission shall prescribe, and from time to time thereafter revise, such rules as it determines necessary to encourage cogeneration and small power production, and to encourage geothermal small power production facilities of not more than 80 megawatts capacity, which rules require electric utilities to offer to—
    (2) purchase electric energy from such facilities.
    Such rules shall be prescribed, after consultation with representatives of Federal and State regulatory agencies having ratemaking authority for electric utilities, and after public notice and a reasonable opportunity for interested persons (including State and Federal agencies) to submit oral as well as written data, views, and arguments. Such rules shall include provisions respecting minimum reliability of qualifying cogeneration facilities and qualifying small power production facilities (including reliability of such facilities during emergencies) and rules respecting reliability of electric energy service to be available to such facilities from electric utilities during emergencies. Such rules may not authorize a qualifying cogeneration facility or qualifying small power production facility to make any sale for purposes other than resale.
  • (1) Not later than 1 year after November 9, 1978, and from time to time thereafter, the Commission shall, after consultation with representatives of State regulatory authorities, electric utilities, owners of cogeneration facilities and owners of small power production facilities, and after public notice and a reasonable opportunity for interested persons (including State and Federal agencies) to submit oral as well as written data, views, and arguments, prescribe rules under which geothermal small power production facilities of not more than 80 megawatts capacity, qualifying cogeneration facilities, and qualifying small power production facilities are exempted in whole or part from the Federal Power Act [16 U.S.C. 791a et seq.], from the Public Utility Holding Company Act,2 from State laws and regulations respecting the rates, or respecting the financial or organizational regulation, of electric utilities, or from any combination of the foregoing, if the Commission determines such exemption is necessary to encourage cogeneration and small power production.
  • (2) Any person (including the Secretary) may bring an action against any electric utility, qualifying small power producer, or qualifying cogenerator to enforce any requirement established by a State regulatory authority or nonregulated electric utility pursuant to subsection (f). Any such action shall be brought only in the manner, and under the requirements, as provided under section 2633 of this title with respect to an action to which section 2633 of this title applies.
  • (A) The Commission may enforce the requirements of subsection (f) against any State regulatory authority or nonregulated electric utility. For purposes of any such enforcement, the requirements of subsection (f)(1) shall be treated as a rule enforceable under the Federal Power Act [16 U.S.C. 791a et seq.]. For purposes of any such action, a State regulatory authority or nonregulated electric utility shall be treated as a person within the meaning of the Federal Power Act. No enforcement action may be brought by the Commission under this section other than—
    (i) an action against the State regulatory authority or nonregulated electric utility for failure to comply with the requirements of subsection (f)1 or
    (ii) an action under paragraph (1).
  • (4) At any time after the Commission makes a finding under paragraph (3) relieving an electric utility of its obligation to purchase electric energy, a qualifying cogeneration facility, a qualifying small power production facility, a State agency, or any other affected person may apply to the Commission for an order reinstating the electric utility’s obligation to purchase electric energy under this section. Such application shall set forth the factual basis upon which the application is based and describe why the conditions set forth in subparagraph (A), (B), or (C) of paragraph (1) of this subsection are no longer met. After notice, including sufficient notice to potentially affected utilities, and opportunity for comment, the Commission shall issue an order within 90 days of such application reinstating the electric utility’s obligation to purchase electric energy under this section if the Commission finds that the conditions set forth in subparagraphs (A), (B) or (C) of paragraph (1) which relieved the obligation to purchase, are no longer met.
  • (1) The property interest acquired by the Secretary under this section (whether by eminent domain or other purchase) shall be transferred by the Secretary to the holder of a permit referred to in subsection (b) if such holder has made payment to the Secretary of the entire costs of the acquisition of such property interest, including administrative costs. The Secretary may accept, and expend, for purposes of such acquisition, amounts from any such person before acquiring a property interest to be transferred to such person under this section.
  • (B) merge or consolidate, directly or indirectly, its facilities subject to the jurisdiction of the Commission, or any part thereof, with the facilities of any other person, or any part thereof, that are subject to the jurisdiction of the Commission and have a value in excess of $10,000,000, by any means whatsoever;
  • (3) Upon receipt of an application for such approval the Commission shall give reasonable notice in writing to the Governor and State commission of each of the States in which the physical property affected, or any part thereof, is situated, and to such other persons as it may deem advisable.
  • (A) Not later than 180 days after September 28, 2018, the Commission shall promulgate a rule requiring any public utility that is seeking to merge or consolidate, directly or indirectly, its facilities subject to the jurisdiction of the Commission, or any part thereof, with those of any other person, to notify the Commission of such transaction not later than 30 days after the date on which the transaction is consummated if—
    (i) the facilities, or any part thereof, to be acquired are of a value in excess of $1,000,000; and
    (ii) such public utility is not required to secure an order of the Commission under paragraph (1)(B).
  • (a) No public utility shall issue any security, or assume any obligation or liability as guarantor, indorser, surety, or otherwise in respect of any security of another person, unless and until, and then only to the extent that, upon application by the public utility, the Commission by order authorizes such issue or assumption of liability. The Commission shall make such order only if it finds that such issue or assumption (a) is for some lawful object, within the corporate purposes of the applicant and compatible with the public interest, which is necessary or appropriate for or consistent with the proper performance by the applicant of service as a public utility and which will not impair its ability to perform that service, and (b) is reasonably necessary or appropriate for such purposes. The provisions of this section shall be effective six months after August 26, 1935.
  • (b) No public utility shall, with respect to any transmission or sale subject to the jurisdiction of the Commission, (1) make or grant any undue preference or advantage to any person or subject any person to any undue prejudice or disadvantage, or (2) maintain any unreasonable difference in rates, charges, service, facilities, or in any other respect, either as between localities or as between classes of service.
  • (e) Whenever any such new schedule is filed the Commission shall have authority, either upon complaint or upon its own initiative without complaint, at once, and, if it so orders, without answer or formal pleading by the public utility, but upon reasonable notice, to enter upon a hearing concerning the lawfulness of such rate, charge, classification, or service; and, pending such hearing and the decision thereon, the Commission, upon filing with such schedules and delivering to the public utility affected thereby a statement in writing of its reasons for such suspension, may suspend the operation of such schedule and defer the use of such rate, charge, classification, or service, but not for a longer period than five months beyond the time when it would otherwise go into effect; and after full hearings, either completed before or after the rate, charge, classification, or service goes into effect, the Commission may make such orders with reference thereto as would be proper in a proceeding initiated after it had become effective. If the proceeding has not been concluded and an order made at the expiration of such five months, the proposed change of rate, charge, classification, or service shall go into effect at the end of such period, but in case of a proposed increased rate or charge, the Commission may by order require the interested public utility or public utilities to keep accurate account in detail of all amounts received by reason of such increase, specifying by whom and in whose behalf such amounts are paid, and upon completion of the hearing and decision may by further order require such public utility or public utilities to refund, with interest, to the persons in whose behalf such amounts were paid, such portion of such increased rates or charges as by its decision shall be found not justified. At any hearing involving a rate or charge sought to be increased, the burden of proof to show that the increased rate or charge is just and reasonable shall be upon the public utility, and the Commission shall give to the hearing and decision of such questions preference over other questions pending before it and decide the same as speedily as possible.
  • (2) If, pursuant to this subsection, a person seeks a rehearing under section 825l(a) of this title, and the Commission fails to act on the merits of the rehearing request by the date that is 30 days after the date of the rehearing request because the Commissioners are divided two against two, as a result of vacancy, incapacity, or recusal on the Commission, or if the Commission lacks a quorum, such person may appeal under section 825l(b) of this title.
  • (b) Whenever the Commission institutes a proceeding under this section, the Commission shall establish a refund effective date. In the case of a proceeding instituted on complaint, the refund effective date shall not be earlier than the date of the filing of such complaint nor later than 5 months after the filing of such complaint. In the case of a proceeding instituted by the Commission on its own motion, the refund effective date shall not be earlier than the date of the publication by the Commission of notice of its intention to initiate such proceeding nor later than 5 months after the publication date. Upon institution of a proceeding under this section, the Commission shall give to the decision of such proceeding the same preference as provided under section 824d of this title and otherwise act as speedily as possible. If no final decision is rendered by the conclusion of the 180-day period commencing upon initiation of a proceeding pursuant to this section, the Commission shall state the reasons why it has failed to do so and shall state its best estimate as to when it reasonably expects to make such decision. In any proceeding under this section, the burden of proof to show that any rate, charge, classification, rule, regulation, practice, or contract is unjust, unreasonable, unduly discriminatory, or preferential shall be upon the Commission or the complainant. At the conclusion of any proceeding under this section, the Commission may order refunds of any amounts paid, for the period subsequent to the refund effective date through a date fifteen months after such refund effective date, in excess of those which would have been paid under the just and reasonable rate, charge, classification, rule, regulation, practice, or contract which the Commission orders to be thereafter observed and in force: Provided, That if the proceeding is not concluded within fifteen months after the refund effective date and if the Commission determines at the conclusion of the proceeding that the proceeding was not resolved within the fifteen-month period primarily because of dilatory behavior by the public utility, the Commission may order refunds of any or all amounts paid for the period subsequent to the refund effective date and prior to the conclusion of the proceeding. The refunds shall be made, with interest, to those persons who have paid those rates or charges which are the subject of the proceeding.
  • (a) The Commission may refer any matter arising in the administration of this subchapter to a board to be composed of a member or members, as determined by the Commission, from the State or each of the States affected or to be affected by such matter. Any such board shall be vested with the same power and be subject to the same duties and liabilities as in the case of a member of the Commission when designated by the Commission to hold any hearings. The action of such board shall have such force and effect and its proceedings shall be conducted in such manner as the Commission shall by regulations prescribe. The board shall be appointed by the Commission from persons nominated by the State commission of each State affected or by the Governor of such State if there is no State commission. Each State affected shall be entitled to the same number of representatives on the board unless the nominating power of such State waives such right. The Commission shall have discretion to reject the nominee from any State, but shall thereupon invite a new nomination from that State. The members of a board shall receive such allowances for expenses as the Commission shall provide. The Commission may, when in its discretion sufficient reason exists therefor, revoke any reference to such a board.
  • (a) Any electric utility, Federal power marketing agency, or any other person generating electric energy for sale for resale, may apply to the Commission for an order under this subsection requiring a transmitting utility to provide transmission services (including any enlargement of transmission capacity necessary to provide such services) to the applicant. Upon receipt of such application, after public notice and notice to each affected State regulatory authority, each affected electric utility, and each affected Federal power marketing agency, and after affording an opportunity for an evidentiary hearing, the Commission may issue such order if it finds that such order meets the requirements of section 824k of this title, and would otherwise be in the public interest. No order may be issued under this subsection unless the applicant has made a request for transmission services to the transmitting utility that would be the subject of such order at least 60 days prior to its filing of an application for such order.
  • (1) No provision of section 824i, 824j, 824m of this title, or this section shall be treated as requiring any person to utilize the authority of any such section in lieu of any other authority of law. Except as provided in section 824i, 824j, 824m of this title, or this section, such sections shall not be construed as limiting or impairing any authority of the Commission under any other provision of law.
  • (1) No order under section 824i or 824j of this title requiring the Tennessee Valley Authority (hereinafter in this subsection referred to as the “TVA”) to take any action shall take effect for 60 days following the date of issuance of the order. Within 60 days following the issuance by the Commission of any order under section 824i or of section 824j of this title requiring the TVA to enter into any contract for the sale or delivery of power, the Commission may on its own motion initiate, or upon petition of any aggrieved person shall initiate, an evidentiary hearing to determine whether or not such sale or delivery would result in violation of the third sentence of section 15d(a) of the Tennessee Valley Authority Act of 1933 (16 U.S.C. 831n–4), hereinafter in this subsection referred to as the TVA Act [16 U.S.C. 831 et seq.].
  • (3) Any determination under paragraph (1) shall be reviewable only in the appropriate court of the United States upon petition filed by any aggrieved person or municipality within 60 days after such determination, and such court shall have jurisdiction to grant appropriate relief. Any applicant who applied for and obtained the order under section 824i or 824j of this title, and any electric utility or other entity subject to such order shall have the right to intervene in any such proceeding in such court. Except for review by such court (and any appeal or other review by an appellate court of the United States), no court shall have jurisdiction to consider any action brought by any person to enjoin the carrying out of any order of the Commission under section 824i or section 824j of this title requiring the TVA to take any action on the grounds that such action requires a specific authorization of the Congress pursuant to the third sentence of section 15d(a) of the TVA Act [16 U.S.C. 831n–4(a)].
  • (A) such entity is a Federal power marketing agency; the Tennessee Valley Authority; a State or any political subdivision of a State (or an agency, authority, or instrumentality of a State or a political subdivision); a corporation or association that has ever received a loan for the purposes of providing electric service from the Administrator of the Rural Electrification Administration under the Rural Electrification Act of 1936 [7 U.S.C. 901 et seq.]; a person having an obligation arising under State or local law (exclusive of an obligation arising solely from a contract entered into by such person) to provide electric service to the public; or any corporation or association which is wholly owned, directly or indirectly, by any one or more of the foregoing; and
  • (a) Whenever any electric utility, Federal power marketing agency, or any other person generating electric energy for sale for resale makes a good faith request to a transmitting utility to provide wholesale transmission services and requests specific rates and charges, and other terms and conditions, unless the transmitting utility agrees to provide such services at rates, charges, terms and conditions acceptable to such person, the transmitting utility shall, within 60 days of its receipt of the request, or other mutually agreed upon period, provide such person with a detailed written explanation, with specific reference to the facts and circumstances of the request, stating (1) the transmitting utility’s basis for the proposed rates, charges, terms, and conditions for such services, and (2) its analysis of any physical or other constraints affecting the provision of such services.
  • (c) Following the issuance of a Commission rule under subsection (b)(2), any person may submit an application to the Commission for certification as the Electric Reliability Organization. The Commission may certify one such ERO if the Commission determines that such ERO—
    (1) has the ability to develop and enforce, subject to subsection (e)(2), reliability standards that provide for an adequate level of reliability of the bulk-power system; and
    (2) has established rules that—
    (A) assure its independence of the users and owners and operators of the bulk-power system, while assuring fair stakeholder representation in the selection of its directors and balanced decisionmaking in any ERO committee or subordinate organizational structure;
    (B) allocate equitably reasonable dues, fees, and other charges among end users for all activities under this section;
    (C) provide fair and impartial procedures for enforcement of reliability standards through the imposition of penalties in accordance with subsection (e) (including limitations on activities, functions, or operations, or other appropriate sanctions);
    (D) provide for reasonable notice and opportunity for public comment, due process, openness, and balance of interests in developing reliability standards and otherwise exercising its duties; and
    (E) provide for taking, after certification, appropriate steps to gain recognition in Canada and Mexico.
  • (6) Nothing in this section shall require a person or entity in possession of critical electric infrastructure information to share such information with Federal, State, political subdivision, or tribal authorities, or any other person or entity.
  • (11) Notwithstanding section 825l(b) of this title, with respect to a petition filed by a person to which an order under this section applies, any determination by the Commission or the Secretary concerning the designation of critical electric infrastructure information under this subsection shall be subject to review under chapter 7 of title 5, except that such review shall be brought in the district court of the United States in the district in which the complainant resides, or has his principal place of business, or in the District of Columbia. In such a case the court shall examine in camera the contents of documents or electronic communications that are the subject of the determination under review to determine whether such documents or any part thereof were improperly designated or not designated as critical electric infrastructure information.
  • (C) the manner of service of notice of the permit application on interested persons.
  • (d) In any proceeding before the Commission under subsection (b), the Commission shall afford each State in which a transmission facility covered by the permit is or will be located, each affected Federal agency and Indian tribe, private property owners, and other interested persons, a reasonable opportunity to present their views and recommendations with respect to the need for and impact of a facility covered by the permit.
  • (g) Nothing in this section precludes any person from constructing or modifying any transmission facility in accordance with State law.
  • (a) In this section, the term “electric utility or person” means an electric utility or person that—
    (1) as of August 8, 2005, holds firm transmission rights pursuant to contract or by reason of ownership of transmission facilities; and
    (2) is located—
    (A) in the Pacific Northwest, as that region is defined in section 839a of this title; or
    (B) in that portion of a State included in the geographic area proposed for a regional transmission organization in Commission Docket Number RT01–35 on the date on which that docket was opened.
  • (b) Nothing in this chapter confers on the Commission the authority to require an electric utility or person to convert to tradable or financial rights—
    (1) firm transmission rights described in subsection (a); or
    (2) firm transmission rights obtained by exercising contract or tariff rights associated with the firm transmission rights described in subsection (a).
  • (1) Except as provided in paragraph (2), no person shall be subject to any civil penalty under this section with respect to any violation occurring more than 3 years before the date on which the person is provided notice of the proposed penalty under section 825o–1 of this title.
  • No entity (including an entity described in section 824(f) of this title) shall willfully and knowingly report any information relating to the price of electricity sold at wholesale or the availability of transmission capacity, which information the person or any other entity knew to be false at the time of the reporting, to a Federal agency with intent to fraudulently affect the data being compiled by the Federal agency.
  • (a) Every licensee and public utility shall make, keep, and preserve for such periods, such accounts, records of cost-accounting procedures, correspondence, memoranda, papers, books, and other records as the Commission may by rules and regulations prescribe as necessary or appropriate for purposes of the administration of this chapter, including accounts, records, and memoranda of the generation, transmission, distribution, delivery, or sale of electric energy, the furnishing of services or facilities in connection therewith, and receipts and expenditures with respect to any of the foregoing: Provided, however, That nothing in this chapter shall relieve any public utility from keeping any accounts, memoranda, or records which such public utility may be required to keep by or under authority of the laws of any State. The Commission may prescribe a system of accounts to be kept by licensees and public utilities and may classify such licensees and public utilities and prescribe a system of accounts for each class. The Commission, after notice and opportunity for hearing, may determine by order the accounts in which particular outlays and receipts shall be entered, charged, or credited. The burden of proof to justify every accounting entry questioned by the Commission shall be on the person making, authorizing, or requiring such entry, and the Commission may suspend a charge or credit pending submission of satisfactory proof in support thereof.
  • (c) The books, accounts, memoranda, and records of any person who controls, directly or indirectly, a licensee or public utility subject to the jurisdiction of the Commission, and of any other company controlled by such person, insofar as they relate to transactions with or the business of such licensee or public utility, shall be subject to examination on the order of the Commission.
  • (a) Every licensee and every public utility shall file with the Commission such annual and other periodic or special reports as the Commission may by rules and regulations or order prescribe as necessary or appropriate to assist the Commission in the proper administration of this chapter. The Commission may prescribe the manner and form in which such reports shall be made, and require from such persons specific answers to all questions upon which the Commission may need information. The Commission may require that such reports shall include, among other things, full information as to assets and liabilities, capitalization, net investment, and reduction thereof, gross receipts, interest due and paid, depreciation, and other reserves, cost of project and other facilities, cost of maintenance and operation of the project and other facilities, cost of renewals and replacement of the project works and other facilities, depreciation, generation, transmission, distribution, delivery, use, and sale of electric energy. The Commission may require any such person to make adequate provision for currently determining such costs and other facts. Such reports shall be made under oath unless the Commission otherwise specifies.
  • (b) It shall be unlawful for any person willfully to hinder, delay, or obstruct the making, filing, or keeping of any information, document, report, memorandum, record, or account required to be made, filed, or kept under this chapter or any rule, regulation, or order thereunder.
  • (1) After 6 months from August 26, 1935, it shall be unlawful for any person to hold the position of officer or director of more than one public utility or to hold the position of officer or director of a public utility and the position of officer or director of any bank, trust company, banking association, or firm that is authorized by law to underwrite or participate in the marketing of securities of a public utility, or officer or director of any company supplying electrical equipment to such public utility, unless the holding of such positions shall have been authorized by order of the Commission, upon due showing in form and manner prescribed by the Commission, that neither public nor private interests will be adversely affected thereby. The Commission shall not grant any such authorization in respect of such positions held on August 26, 1935, unless application for such authorization is filed with the Commission within sixty days after that date.
  • (A) In the circumstances described in subparagraph (B), paragraph (1) shall not apply to a person that holds or proposes to hold the positions of—
    (i) officer or director of a public utility; and
    (ii) officer or director of a bank, trust company, banking association, or firm authorized by law to underwrite or participate in the marketing of securities of a public utility.
  • (i) a person described in subparagraph (A) does not participate in any deliberations or decisions of the public utility regarding the selection of a bank, trust company, banking association, or firm to underwrite or participate in the marketing of securities of the public utility, if the person serves as an officer or director of a bank, trust company, banking association, or firm that is under consideration in the deliberation process;
  • (ii) the bank, trust company, banking association, or firm of which the person is an officer or director does not engage in the underwriting of, or participate in the marketing of, securities of the public utility of which the person holds the position of officer or director;
  • (iii) the public utility for which the person serves or proposes to serve as an officer or director selects underwriters by competitive procedures; or
  • (iv) the issuance of securities of the public utility for which the person serves or proposes to serve as an officer or director has been approved by all Federal and State regulatory agencies having jurisdiction over the issuance.
  • (1) On or before April 30 of each year, any person, who, during the calendar year preceding the filing date under this subsection, was an officer or director of a public utility and who held, during such calendar year, the position of officer, director, partner, appointee, or representative of any other entity listed in paragraph (2) shall file with the Commission, in such form and manner as the Commission shall by rule prescribe, a written statement concerning such positions held by such person. Such statement shall be available to the public.
  • Any person, electric utility, State, municipality, or State commission complaining of anything done or omitted to be done by any licensee, transmitting utility, or public utility in contravention of the provisions of this chapter may apply to the Commission by petition which shall briefly state the facts, whereupon a statement of the complaint thus made shall be forwarded by the Commission to such licensee, transmitting utility, or public utility, who shall be called upon to satisfy the complaint or to answer the same in writing within a reasonable time to be specified by the Commission. If such licensee, transmitting utility, or public utility shall not satisfy the complaint within the time specified or there shall appear to be any reasonable ground for investigating such complaint, it shall be the duty of the Commission to investigate the matters complained of in such manner and by such means as it shall find proper.
  • (a) The Commission may investigate any facts, conditions, practices, or matters which it may find necessary or proper in order to determine whether any person, electric utility, transmitting utility, or other entity has violated or is about to violate any provision of this chapter or any rule, regulation, or order thereunder, or to aid in the enforcement of the provisions of this chapter or in prescribing rules or regulations thereunder, or in obtaining information to serve as a basis for recommending further legislation concerning the matters to which this chapter relates, or in obtaining information about the sale of electric energy at wholesale in interstate commerce and the transmission of electric energy in interstate commerce. The Commission may permit any person, electric utility, transmitting utility, or other entity to file with it a statement in writing under oath or otherwise, as it shall determine, as to any or all facts and circumstances concerning a matter which may be the subject of investigation. The Commission, in its discretion, may publish or make available to State commissions information concerning any such subject.
  • (c) In case of contumacy by, or refusal to obey a subpena issued to, any person, the Commission may invoke the aid of any court of the United States within the jurisdiction of which such investigation or proceeding is carried on, or where such person resides or carries on business, in requiring the attendance and testimony of witnesses and the production of books, papers, correspondence, memoranda, contracts, agreements, and other records. Such court may issue an order requiring such person to appear before the Commission or member or officer designated by the Commission, there to produce records, if so ordered, or to give testimony touching the matter under investigation or in question; and any failure to obey such order of the court may be punished by such court as a contempt thereof. All process in any such case may be served in the judicial district whereof such person is an inhabitant or wherever he may be found or may be doing business. Any person who willfully shall fail or refuse to attend and testify or to answer any lawful inquiry or to produce books, papers, correspondence, memoranda, contracts, agreements, or other records, if in his or its power so to do, in obedience to the subpena of the Commission, shall be guilty of a misdemeanor and, upon conviction, shall be subject to a fine of not more than $1,000 or to imprisonment for a term of not more than one year, or both.
  • (d) The testimony of any witness may be taken, at the instance of a party, in any proceeding or investigation pending before the Commission, by deposition, at any time after the proceeding is at issue. The Commission may also order testimony to be taken by deposition in any proceeding or investigation pending before it, at any stage of such proceeding or investigation. Such depositions may be taken before any person authorized to administer oaths not being of counsel or attorney to either of the parties, nor interested in the proceeding or investigation. Reasonable notice must first be given in writing by the party or his attorney proposing to take such deposition to the opposite party or his attorney of record, as either may be nearest, which notice shall state the name of the witness and the time and place of the taking of his deposition. Any person may be compelled to appear and depose, and to produce documentary evidence, in the same manner as witnesses may be compelled to appear and testify and produce documentary evidence before the Commission, as hereinbefore provided. Such testimony shall be reduced to writing by the person taking the deposition, or under his direction, and shall, after it has been reduced to writing, be subscribed by the deponent.
  • (e) If a witness whose testimony may be desired to be taken by deposition be in a foreign country, the deposition may be taken before an officer or person designated by the Commission, or agreed upon by the parties by stipulation in writing to be filed with the Commission. All depositions must be promptly filed with the Commission.
  • (f) Witnesses whose depositions are taken as authorized in this chapter, and the person or officer taking the same, shall be entitled to the same fees as are paid for like services in the courts of the United States.
  • (a) Hearings under this chapter may be held before the Commission, any member or members thereof or any representative of the Commission designated by it, and appropriate records thereof shall be kept. In any proceeding before it, the Commission, in accordance with such rules and regulations as it may prescribe, may admit as a party any interested State, State commission, municipality, or any representative of interested consumers or security holders, or any competitor of a party to such proceeding, or any other person whose participation in the proceeding may be in the public interest.
  • The Commission shall have power to perform any and all acts, and to prescribe, issue, make, amend, and rescind such orders, rules, and regulations as it may find necessary or appropriate to carry out the provisions of this chapter. Among other things, such rules and regulations may define accounting, technical, and trade terms used in this chapter; and may prescribe the form or forms of all statements, declarations, applications, and reports to be filed with the Commission, the information which they shall contain, and the time within which they shall be filed. Unless a different date is specified therein, rules and regulations of the Commission shall be effective thirty days after publication in the manner which the Commission shall prescribe. Orders of the Commission shall be effective on the date and in the manner which the Commission shall prescribe. For the purposes of its rules and regulations, the Commission may classify persons and matters within its jurisdiction and prescribe different requirements for different classes of persons or matters. All rules and regulations of the Commission shall be filed with its secretary and shall be kept open in convenient form for public inspection and examination during reasonable business hours.
  • (a) Any person, electric utility, State, municipality, or State commission aggrieved by an order issued by the Commission in a proceeding under this chapter to which such person, electric utility, State, municipality, or State commission is a party may apply for a rehearing within thirty days after the issuance of such order. The application for rehearing shall set forth specifically the ground or grounds upon which such application is based. Upon such application the Commission shall have power to grant or deny rehearing or to abrogate or modify its order without further hearing. Unless the Commission acts upon the application for rehearing within thirty days after it is filed, such application may be deemed to have been denied. No proceeding to review any order of the Commission shall be brought by any entity unless such entity shall have made application to the Commission for a rehearing thereon. Until the record in a proceeding shall have been filed in a court of appeals, as provided in subsection (b), the Commission may at any time, upon reasonable notice and in such manner as it shall deem proper, modify or set aside, in whole or in part, any finding or order made or issued by it under the provisions of this chapter.
  • (a) Whenever it shall appear to the Commission that any person is engaged or about to engage in any acts or practices which constitute or will constitute a violation of the provisions of this chapter, or of any rule, regulation, or order thereunder, it may in its discretion bring an action in the proper District Court of the United States or the United States courts of any Territory or other place subject to the jurisdiction of the United States, to enjoin such acts or practices and to enforce compliance with this chapter or any rule, regulation, or order thereunder, and upon a proper showing a permanent or temporary injunction or decree or restraining order shall be granted without bond. The Commission may transmit such evidence as may be available concerning such acts or practices to the Attorney General, who, in his discretion, may institute the necessary criminal proceedings under this chapter.
  • (b) Upon application of the Commission the district courts of the United States and the United States courts of any Territory or other place subject to the jurisdiction of the United States shall have jurisdiction to issue writs of mandamus commanding any person to comply with the provisions of this chapter or any rule, regulation, or order of the Commission thereunder.
  • (b) The forfeitures provided for in this chapter shall be payable into the Treasury of the United States and shall be recoverable in a civil suit in the name of the United States, brought in the district where the person is an inhabitant or has his principal place of business, or if a licensee or public utility, in any district in which such licensee or public utility transacts business. It shall be the duty of the various United States attorneys, under the direction of the Attorney General of the United States, to prosecute for the recovery of forfeitures under this chapter. The costs and expenses of such prosecution shall be paid from the appropriations for the expenses of the courts of the United States.
  • (a) Any person who willfully and knowingly does or causes or suffers to be done any act, matter, or thing in this chapter prohibited or declared to be unlawful, or who willfully and knowingly omits or fails to do any act, matter, or thing in this chapter required to be done, or willfully and knowingly causes or suffers such omission or failure, shall, upon conviction thereof, be punished by a fine of not more than $1,000,000 or by imprisonment for not more than 5 years, or both.
  • (b) Any person who willfully and knowingly violates any rule, regulation, restriction, condition, or order made or imposed by the Commission under authority of this chapter, or any rule or regulation imposed by the Secretary of the Army under authority of subchapter I of this chapter shall, in addition to any other penalties provided by law, be punished upon conviction thereof by a fine of not exceeding $25,000 for each and every day during which such offense occurs.
  • (a) It shall be unlawful for any person to violate any provision of subchapter II or any rule or order issued under any such provision.
  • (b) Any person who violates any provision of subchapter II or any provision of any rule or order thereunder shall be subject to a civil penalty of not more than $1,000,000 for each day that such violation continues. Such penalty shall be assessed by the Commission, after notice and opportunity for public hearing, in accordance with the same provisions as are applicable under section 823b(d) of this title in the case of civil penalties assessed under section 823b of this title. In determining the amount of a proposed penalty, the Commission shall take into consideration the seriousness of the violation and the efforts of such person to remedy the violation in a timely manner.
  • (1) The Director shall coordinate assistance to the public with respect to authorities exercised by the Commission. The Director shall also coordinate assistance available to persons intervening or participating or proposing to intervene or participate in proceedings before the Commission.
  • (2) The Commission may, under rules promulgated by it, provide compensation for reasonable attorney’s fees, expert witness fees, and other costs of intervening or participating in any proceeding before the Commission to any person whose intervention or participation substantially contributed to the approval, in whole or in part, of a position advocated by such person. Such compensation may be paid only if the Commission has determined that—
    (A) the proceeding is significant, and
    (B) such person’s intervention or participation in such proceeding without receipt of compensation constitutes a significant financial hardship to him.
  • (B) such person’s intervention or participation in such proceeding without receipt of compensation constitutes a significant financial hardship to him.
  • If any provision of this chapter, or the application of such provision to any person or circumstance, shall be held invalid, the remainder of the chapter, and the application of such provision to persons or circumstances other than those as to which it is held invalid, shall not be affected thereby.

Citations to §796(5)

  • A commission is created and established to be known as the Federal Power Commission (hereinafter referred to as the “commission”) which shall be composed of five commissioners who shall be appointed by the President, by and with the advice and consent of the Senate, one of whom shall be designated by the President as chairman and shall be the principal executive officer of the commission. Each chairman, when so designated, shall act as such until the expiration of his term of office.
  • (b) To determine the actual legitimate original cost of and the net investment in a licensed project, and to aid the Commission in such determinations, each licensee shall, upon oath, within a reasonable period of time to be fixed by the Commission, after the construction of the original project or any addition thereto or betterment thereof, file with the Commission in such detail as the Commission may require, a statement in duplicate showing the actual legitimate original cost of construction of such project addition, or betterment, and of the price paid for water rights, rights-of-way, lands, or interest in lands. The licensee shall grant to the Commission or to its duly authorized agent or agents, at all reasonable times, free access to such project, addition, or betterment, and to all maps, profiles, contracts, reports of engineers, accounts, books, records, and all other papers and documents relating thereto. The statement of actual legitimate original cost of said project, and revisions thereof as determined by the Commission, shall be filed with the Secretary of the Treasury.
  • Licenses under this subchapter shall be issued for a period not exceeding fifty years. Each such license shall be conditioned upon acceptance by the licensee of all of the terms and conditions of this chapter and such further conditions, if any, as the Commission shall prescribe in conformity with this chapter, which said terms and conditions and the acceptance thereof shall be expressed in said license. Licenses may be revoked only for the reasons and in the manner prescribed under the provisions of this chapter, and may be altered or surrendered only upon mutual agreement between the licensee and the Commission after thirty days’ public notice.
  • (c) Whenever, after notice and opportunity for hearing, the Commission determines that the United States should exercise its right upon or after the expiration of any license to take over any project or projects for public purposes, the Commission shall not issue a new license to the original licensee or to a new licensee but shall submit its recommendation to Congress together with such information as it may consider appropriate.
  • No voluntary transfer of any license, or of the rights thereunder granted, shall be made without the written approval of the commission; and any successor or assign of the rights of such licensee, whether by voluntary transfer, judicial sale, foreclosure sale, or otherwise, shall be subject to all the conditions of the license under which such rights are held by such licensee and also subject to all the provisions and conditions of this chapter to the same extent as though such successor or assign were the original licensee under this chapter: Provided, That a mortgage or trust deed or judicial sales made thereunder or under tax sales shall not be deemed voluntary transfers within the meaning of this section.
  • (c) That the licensee shall maintain the project works in a condition of repair adequate for the purposes of navigation and for the efficient operation of said works in the development and transmission of power, shall make all necessary renewals and replacements, shall establish and maintain adequate depreciation reserves for such purposes, shall so maintain, and operate said works as not to impair navigation, and shall conform to such rules and regulations as the Commission may from time to time prescribe for the protection of life, health, and property. Each licensee hereunder shall be liable for all damages occasioned to the property of others by the construction, maintenance, or operation of the project works or of the works appurtenant or accessory thereto, constructed under the license and in no event shall the United States be liable therefor.
  • (d) That after the first twenty years of operation, out of surplus earned thereafter, if any, accumulated in excess of a specified reasonable rate of return upon the net investment of a licensee in any project or projects under license, the licensee shall establish and maintain amortization reserves, which reserves shall, in the discretion of the Commission, be held until the termination of the license or be applied from time to time in reduction of the net investment. Such specified rate of return and the proportion of such surplus earnings to be paid into and held in such reserves shall be set forth in the license. For any new license issued under section 808 of this title, the amortization reserves under this subsection shall be maintained on and after the effective date of such new license.
  • (1) That the licensee shall pay to the United States reasonable annual charges in an amount to be fixed by the Commission for the purpose of reimbursing the United States for the costs of the administration of this subchapter, including any reasonable and necessary costs incurred by Federal and State fish and wildlife agencies and other natural and cultural resource agencies in connection with studies or other reviews carried out by such agencies for purposes of administering their responsibilities under this subchapter; for recompensing it for the use, occupancy, and enjoyment of its lands or other property; and for the expropriation to the Government of excessive profits until the respective States shall make provision for preventing excessive profits or for the expropriation thereof to themselves, or until the period of amortization as herein provided is reached, and in fixing such charges the Commission shall seek to avoid increasing the price to the consumers of power by such charges, and any such charges may be adjusted from time to time by the Commission as conditions may require: Provided, That, subject to annual appropriations Acts, the portion of such annual charges imposed by the Commission under this subsection to cover the reasonable and necessary costs of such agencies shall be available to such agencies (in addition to other funds appropriated for such purposes) solely for carrying out such studies and reviews and shall remain available until expended: Provided, That when licenses are issued involving the use of Government dams or other structures owned by the United States or tribal lands embraced within Indian reservations the Commission shall, subject to the approval of the Secretary of the Interior in the case of such dams or structures in reclamation projects and, in the case of such tribal lands, subject to the approval of the Indian tribe having jurisdiction of such lands as provided in section 5123 of title 25, fix a reasonable annual charge for the use thereof, and such charges may with like approval be readjusted by the Commission at the end of twenty years after the project is available for service and at periods of not less than ten years thereafter upon notice and opportunity for hearing: Provided further, That licenses for the development, transmission, or distribution of power by States or municipalities shall be issued and enjoyed without charge to the extent such power is sold to the public without profit or is used by such State or municipality for State or municipal purposes, except that as to projects constructed or to be constructed by States or municipalities primarily designed to provide or improve navigation, licenses therefor shall be issued without charge; and that licenses for the development, transmission, or distribution of power for domestic, mining, or other beneficial use in projects of not more than two thousand horsepower installed capacity may be issued without charge, except on tribal lands within Indian reservations; but in no case shall a license be issued free of charge for the development and utilization of power created by any Government dam and that the amount charged therefor in any license shall be such as determined by the Commission: Provided however, That no charge shall be assessed for the use of any Government dam or structure by any licensee if, before January 1, 1985, the Secretary of the Interior has entered into a contract with such licensee that meets each of the following requirements:
    (A) The contract covers one or more projects for which a license was issued by the Commission before January 1, 1985.
    (B) The contract contains provisions specifically providing each of the following:
    (i) A powerplant may be built by the licensee utilizing irrigation facilities constructed by the United States.
    (ii) The powerplant shall remain in the exclusive control, possession, and ownership of the licensee concerned.
    (iii) All revenue from the powerplant and from the use, sale, or disposal of electric energy from the powerplant shall be, and remain, the property of such licensee.
    (C) The contract is an amendatory, supplemental and replacement contract between the United States and: (i) the Quincy-Columbia Basin Irrigation District (Contract No. 14–06–100–6418); (ii) the East Columbia Basin Irrigation District (Contract No. 14–06–100–6419); or, (iii) the South Columbia Basin Irrigation District (Contract No. 14–06–100–6420).
    This paragraph shall apply to any project covered by a contract referred to in this paragraph only during the term of such contract unless otherwise provided by subsequent Act of Congress. In the event an overpayment of any charge due under this section shall be made by a licensee, the Commission is authorized to allow a credit for such overpayment when charges are due for any subsequent period.
  • (i) A powerplant may be built by the licensee utilizing irrigation facilities constructed by the United States.
  • (ii) The powerplant shall remain in the exclusive control, possession, and ownership of the licensee concerned.
  • (iii) All revenue from the powerplant and from the use, sale, or disposal of electric energy from the powerplant shall be, and remain, the property of such licensee.
  • (f) That whenever any licensee hereunder is directly benefited by the construction work of another licensee, a permittee, or of the United States of a storage reservoir or other headwater improvement, the Commission shall require as a condition of the license that the licensee so benefited shall reimburse the owner of such reservoir or other improvements for such part of the annual charges for interest, maintenance, and depreciation thereon as the Commission may deem equitable. The proportion of such charges to be paid by any licensee shall be determined by the Commission. The licensees or permittees affected shall pay to the United States the cost of making such determination as fixed by the Commission.
    Whenever such reservoir or other improvement is constructed by the United States the Commission shall assess similar charges against any licensee directly benefited thereby, and any amount so assessed shall be paid into the Treasury of the United States, to be reserved and appropriated as a part of the special fund for headwater improvements as provided in section 810 of this title.
    Whenever any power project not under license is benefited by the construction work of a licensee or permittee, the United States or any agency thereof, the Commission, after notice to the owner or owners of such unlicensed project, shall determine and fix a reasonable and equitable annual charge to be paid to the licensee or permittee on account of such benefits, or to the United States if it be the owner of such headwater improvement.
  • If the dam or other project works are to be constructed across, along, or in any of the navigable waters of the United States, the commission may, insofar as it deems the same reasonably necessary to promote the present and future needs of navigation and consistent with a reasonable investment cost to the licensee, include in the license any one or more of the following provisions or requirements:
  • (a) That such licensee shall, to the extent necessary to preserve and improve navigation facilities, construct, in whole or in part, without expense to the United States, in connection with such dam, a lock or locks, booms, sluices, or other structures for navigation purposes, in accordance with plans and specifications approved by the Chief of Engineers and the Secretary of the Army and made part of such license.
  • (b) That in case such structures for navigation purposes are not made a part of the original construction at the expense of the licensee, then whenever the United States shall desire to complete such navigation facilities the licensee shall convey to the United States, free of cost, such of its land and its rights-of-way and such right of passage through its dams or other structures, and permit such control of pools as may be required to complete such navigation facilities.
  • (c) That such licensee shall furnish free of cost to the United States power for the operation of such navigation facilities, whether constructed by the licensee or by the United States.
  • Whenever application is filed for a project hereunder involving navigable waters of the United States, and the commission shall find upon investigation that the needs of navigation require the construction of a lock or locks or other navigation structures, and that such structures cannot, consistent with a reasonable investment cost to the applicant, be provided in the manner specified in subsection (a) of section 804 of this title, the commission may grant the application with the provision to be expressed in the license that the licensee will install the necessary navigation structures if the Government fails to make provision therefor within a time to be fixed in the license and cause a report upon such project to be prepared, with estimates of cost of the power development and of the navigation structures, and shall submit such report to Congress with such recommendations as it deems appropriate concerning the participation of the United States in the cost of construction of such navigation structures.
  • The licensee shall commence the construction of the project works within the time fixed in the license, which shall not be more than two years from the date thereof, shall thereafter in good faith and with due diligence prosecute such construction, and shall within the time fixed in the license complete and put into operation such part of the ultimate development as the commission shall deem necessary to supply the reasonable needs of the then available market, and shall from time to time thereafter construct such portion of the balance of such development as the commission may direct, so as to supply adequately the reasonable market demands until such development shall have been completed. The periods for the commencement of construction may be extended for not more than 8 additional years, and the period for the completion of construction carried on in good faith and with reasonable diligence may be extended by the commission when not incompatible with the public interests. In case the licensee shall not commence actual construction of the project works, or of any specified part thereof, within the time prescribed in the license or as extended by the commission, then, after due notice given, the license shall, as to such project works or part thereof, be terminated upon written order of the commission. In case the construction of the project works, or of any specified part thereof, has been begun but not completed within the time prescribed in the license, or as extended by the commission, then the Attorney General, upon the request of the commission, shall institute proceedings in equity in the district court of the United States for the district in which any part of the project is situated for the revocation of said license, the sale of the works constructed, and such other equitable relief as the case may demand, as provided for in section 820 of this title.
  • (a) Upon not less than two years’ notice in writing from the commission the United States shall have the right upon or after the expiration of any license to take over and thereafter to maintain and operate any project or projects as defined in section 796 of this title, and covered in whole or in part by the license, or the right to take over upon mutual agreement with the licensee all property owned and held by the licensee then valuable and serviceable in the development, transmission, or distribution of power and which is then dependent for its usefulness upon the continuance of the license, together with any lock or locks or other aids to navigation constructed at the expense of the licensee, upon the condition that before taking possession it shall pay the net investment of the licensee in the project or projects taken, not to exceed the fair value of the property taken, plus such reasonable damages, if any, to property of the licensee valuable, serviceable, and dependent as above set forth but not taken, as may be caused by the severance therefrom of property taken, and shall assume all contracts entered into by the licensee with the approval of the Commission. The net investment of the licensee in the project or projects so taken and the amount of such severance damages, if any, shall be determined by the Commission after notice and opportunity for hearing. Such net investment shall not include or be affected by the value of any lands, rights-of-way, or other property of the United States licensed by the Commission under this chapter, by the license or by good will, going value, or prospective revenues; nor shall the values allowed for water rights, rights-of-way, lands, or interest in lands be in excess of the actual reasonable cost thereof at the time of acquisition by the licensee: Provided, That the right of the United States or any State or municipality to take over, maintain, and operate any project licensed under this chapter at any time by condemnation proceedings upon payment of just compensation is expressly reserved.
  • (1) If the United States does not, at the expiration of the existing license, exercise its right to take over, maintain, and operate any project or projects of the licensee, as provided in section 807 of this title, the commission is authorized to issue a new license to the existing licensee upon such terms and conditions as may be authorized or required under the then existing laws and regulations, or to issue a new license under said terms and conditions to a new licensee, which license may cover any project or projects covered by the existing license, and shall be issued on the condition that the new licensee shall, before taking possession of such project or projects, pay such amount, and assume such contracts as the United States is required to do in the manner specified in section 807 of this title: Provided, That in the event the United States does not exercise the right to take over or does not issue a license to a new licensee, or issue a new license to the existing licensee, upon reasonable terms, then the commission shall issue from year to year an annual license to the then licensee under the terms and conditions of the existing license until the property is taken over or a new license is issued as aforesaid.
  • (3) In the case of an application by the existing licensee, the Commission shall also take into consideration each of the following:
    (A) The existing licensee’s record of compliance with the terms and conditions of the existing license.
    (B) The actions taken by the existing licensee related to the project which affect the public.
  • (A) The existing licensee’s record of compliance with the terms and conditions of the existing license.
  • (B) The actions taken by the existing licensee related to the project which affect the public.
  • (1) Each existing licensee shall notify the Commission whether the licensee intends to file an application for a new license or not. Such notice shall be submitted at least 5 years before the expiration of the existing license.
  • (2) At the time notice is provided under paragraph (1), the existing licensee shall make each of the following reasonably available to the public for inspection at the offices of such licensee: current maps, drawings, data, and such other information as the Commission shall, by rule, require regarding the construction and operation of the licensed project. Such information shall include, to the greatest extent practicable pertinent energy conservation, recreation, fish and wildlife, and other environmental information. Copies of the information shall be made available at reasonable costs of reproduction. Within 180 days after October 16, 1986, the Commission shall promulgate regulations regarding the information to be provided under this paragraph.
  • (3) Promptly following receipt of notice under paragraph (1), the Commission shall provide public notice of whether an existing licensee intends to file or not to file an application for a new license. The Commission shall also promptly notify the National Marine Fisheries Service and the United States Fish and Wildlife Service, and the appropriate State fish and wildlife agencies.
  • (2) The time periods specified in this subsection and in subsection (b) shall be adjusted, in a manner that achieves the objectives of this section, by the Commission by rule or order with respect to existing licensees who, by reason of the expiration dates of their licenses, are unable to comply with a specified time period.
  • (2) When the Commission issues a new license (pursuant to this section) to an applicant which is not the existing licensee of the project and finds that it is not feasible for the new licensee to utilize the energy from such project without provision by the existing licensee of reasonable services, including transmission services, the Commission shall give notice to the existing licensee and the new licensee to immediately enter into negotiations for such services and the costs demonstrated by the existing licensee as being related to the provision of such services. It is the intent of the Congress that such negotiations be carried out in good faith and that a timely agreement be reached between the parties in order to facilitate the transfer of the license by the date established when the Commission issued the new license. If such parties do not notify the Commission that within the time established by the Commission in such notice (and if appropriate, in the judgment of the Commission, one 45-day extension thereof), a mutually satisfactory arrangement for such services that is consistent with the provisions of this chapter has been executed, the Commission shall order the existing licensee to file (pursuant to section 824d of this title) with the Commission a tariff, subject to refund, ensuring such services beginning on the date of transfer of the project and including just and reasonable rates and reasonable terms and conditions. After notice and opportunity for a hearing, the Commission shall issue a final order adopting or modifying such tariff for such services at just and reasonable rates in accordance with section 824d of this title and in accordance with reasonable terms and conditions. The Commission, in issuing such order, shall ensure the services necessary for the full and efficient utilization and benefits for the license term of the electric energy from the project by the new licensee in accordance with the license and this subchapter, except that in issuing such order the Commission
    (A) shall not compel the existing licensee to enlarge generating facilities, transmit electric energy other than to the distribution system (providing service to customers) of the new licensee identified as of the date one day preceding the date of license award, or require the acquisition of new facilities, including the upgrading of existing facilities other than any reasonable enhancement or improvement of existing facilities controlled by the existing licensee (including any acquisition related to such enhancement or improvement) necessary to carry out the purposes of this paragraph;
    (B) shall not adversely affect the continuity and reliability of service to the customers of the existing licensee;
    (C) shall not adversely affect the operational integrity of the transmission and electric systems of the existing licensee;
    (D) shall not cause any reasonably quantifiable increase in the jurisdictional rates of the existing licensee; and
    (E) shall not order any entity other than the existing licensee to provide transmission or other services.
    Such order shall be for such period as the Commission deems appropriate, not to exceed the term of the license. At any time, the Commission, upon its own motion or upon a petition by the existing or new licensee and after notice and opportunity for a hearing, may modify, extend, or terminate such order.
  • (A) shall not compel the existing licensee to enlarge generating facilities, transmit electric energy other than to the distribution system (providing service to customers) of the new licensee identified as of the date one day preceding the date of license award, or require the acquisition of new facilities, including the upgrading of existing facilities other than any reasonable enhancement or improvement of existing facilities controlled by the existing licensee (including any acquisition related to such enhancement or improvement) necessary to carry out the purposes of this paragraph;
  • (B) shall not adversely affect the continuity and reliability of service to the customers of the existing licensee;
  • (C) shall not adversely affect the operational integrity of the transmission and electric systems of the existing licensee;
  • (D) shall not cause any reasonably quantifiable increase in the jurisdictional rates of the existing licensee; and
  • (E) shall not order any entity other than the existing licensee to provide transmission or other services.
  • (f) In issuing any licenses under this section except an annual license, the Commission, on its own motion or upon application of any licensee, person, State, municipality, or State commission, after notice to each State commission and licensee affected, and after opportunity for hearing, whenever it finds that in conformity with a comprehensive plan for improving or developing a waterway or waterways for beneficial public uses all or part of any licensed project should no longer be used or adapted for use for power purposes, may license all or part of the project works for nonpower use. A license for nonpower use shall be issued to a new licensee only on the condition that the new licensee shall, before taking possession of the facilities encompassed thereunder, pay such amount and assume such contracts as the United States is required to do, in the manner specified in section 807 of this title. Any license for nonpower use shall be a temporary license. Whenever, in the judgment of the Commission, a State, municipality, interstate agency, or another Federal agency is authorized and willing to assume regulatory supervision of the lands and facilities included under the nonpower license and does so, the Commission shall thereupon terminate the license. Consistent with the provisions of subchapter IV of this chapter, every licensee for nonpower use shall keep such accounts and file such annual and other periodic or special reports concerning the removal, alteration, nonpower use, or other disposition of any project works or parts thereof covered by the nonpower use license as the Commission may by rules and regulations or order prescribe as necessary or appropriate.
  • When in the opinion of the President of the United States, evidenced by a written order addressed to the holder of any license under this chapter, the safety of the United States demands it, the United States shall have the right to enter upon and take possession of any project or part thereof, constructed, maintained, or operated under said license, for the purpose of manufacturing nitrates, explosives, or munitions of war, or for any other purpose involving the safety of the United States, to retain possession, management, and control thereof for such length of time as may appear to the President to be necessary to accomplish said purposes, and then to restore possession and control to the party or parties entitled thereto; and in the event that the United States shall exercise such right it shall pay to the party or parties entitled thereto just and fair compensation for the use of said property as may be fixed by the commission upon the basis of a reasonable profit in time of peace, and the cost of restoring said property to as good condition as existed at the time of the taking over thereof, less the reasonable value of any improvements that may be made thereto by the United States and which are valuable and serviceable to the licensee.
  • (b) In case of delinquency on the part of any licensee in the payment of annual charges a penalty of 5 per centum of the total amount so delinquent may be added to the total charges which shall apply for the first month or part of month so delinquent with an additional penalty of 3 per centum for each subsequent month until the total of the charges and penalties are paid or until the license is canceled and the charges and penalties satisfied in accordance with law.
  • The Commission shall require the construction, maintenance, and operation by a licensee at its own expense of such lights and signals as may be directed by the Secretary of the Department in which the Coast Guard is operating, and such fishways as may be prescribed by the Secretary of the Interior or the Secretary of Commerce, as appropriate. The license applicant and any party to the proceeding shall be entitled to a determination on the record, after opportunity for an agency trial-type hearing of no more than 90 days, on any disputed issues of material fact with respect to such fishways. All disputed issues of material fact raised by any party shall be determined in a single trial-type hearing to be conducted by the relevant resource agency in accordance with the regulations promulgated under this subsection1 and within the time frame established by the Commission for each license proceeding. Within 90 days of August 8, 2005, the Secretaries of the Interior, Commerce, and Agriculture shall establish jointly, by rule, the procedures for such expedited trial-type hearing, including the opportunity to undertake discovery and cross-examine witnesses, in consultation with the Federal Energy Regulatory Commission. The operation of any navigation facilities which may be constructed as a part of or in connection with any dam or diversion structure built under the provisions of this chapter, whether at the expense of a licensee hereunder or of the United States, shall at all times be controlled by such reasonable rules and regulations in the interest of navigation, including the control of the level of the pool caused by such dam or diversion structure as may be made from time to time by the Secretary of the Army; and for willful failure to comply with any such rule or regulation such licensee shall be deemed guilty of a misdemeanor, and upon conviction thereof shall be punished as provided in section 825o of this title.
  • As a condition of the license, every licensee under this chapter which is a public-service corporation, or a person, association, or corporation owning or operating any project and developing, transmitting, or distributing power for sale or use in public service, shall abide by such reasonable regulation of the services to be rendered to customers or consumers of power, and of rates and charges of payment therefor, as may from time to time be prescribed by any duly constituted agency of the State in which the service is rendered or the rate charged. That in case of the development, transmission, or distribution, or use in public service of power by any licensee under this chapter or by its customer engaged in public service within a State which has not authorized and empowered a commission or other agency or agencies within said State to regulate and control the services to be rendered by such licensee or by its customer engaged in public service, or the rates and charges of payment therefor, or the amount or character of securities to be issued by any of said parties, it is agreed as a condition of such license that jurisdiction is conferred upon the commission, upon complaint of any person aggrieved or upon its own initiative, to exercise such regulation and control until such time as the State shall have provided a commission or other authority for such regulation and control: Provided, That the jurisdiction of the commission shall cease and determine as to each specific matter of regulation and control prescribed in this section as soon as the State shall have provided a commission or other authority for the regulation and control of that specific matter.
  • When said power or any part thereof shall enter into interstate or foreign commerce the rates charged and the service rendered by any such licensee, or by any subsidiary corporation, the stock of which is owned or controlled directly or indirectly by such licensee, or by any person, corporation, or association purchasing power from such licensee for sale and distribution or use in public service shall be reasonable, nondiscriminatory, and just to the customer and all unreasonable discriminatory and unjust rates or services are prohibited and declared to be unlawful; and whenever any of the States directly concerned has not provided a commission or other authority to enforce the requirements of this section within such State or to regulate and control the amount and character of securities to be issued by any of such parties, or such States are unable to agree through their properly constituted authorities on the services to be rendered, or on the rates or charges of payment therefor, or on the amount or character of securities to be issued by any of said parties, jurisdiction is conferred upon the commission, upon complaint of any person, aggrieved, upon the request of any State concerned, or upon its own initiative to enforce the provisions of this section, to regulate and control so much of the services rendered, and of the rates and charges of payment therefor as constitute interstate or foreign commerce and to regulate the issuance of securities by the parties included within this section, and securities issued by the licensee subject to such regulations shall be allowed only for the bona fide purpose of financing and conducting the business of such licensee.
  • When any licensee cannot acquire by contract or pledges an unimproved dam site or the right to use or damage the lands or property of others necessary to the construction, maintenance, or operation of any dam, reservoir, diversion structure, or the works appurtenant or accessory thereto, in conjunction with any improvement which in the judgment of the commission is desirable and justified in the public interest for the purpose of improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, it may acquire the same by the exercise of the right of eminent domain in the district court of the United States for the district in which such land or other property may be located, or in the State courts. The practice and procedure in any action or proceeding for that purpose in the district court of the United States shall conform as nearly as may be with the practice and procedure in similar action or proceeding in the courts of the State where the property is situated: Provided, That United States district courts shall only have jurisdiction of cases when the amount claimed by the owner of the property to be condemned exceeds $3,0001 Provided further, That no licensee may use the right of eminent domain under this section to acquire any lands or other property that, prior to October 24, 1992, were owned by a State or political subdivision thereof and were part of or included within any public park, recreation area or wildlife refuge established under State or local law. In the case of lands or other property that are owned by a State or political subdivision and are part of or included within a public park, recreation area or wildlife refuge established under State or local law on or after October 24, 1992, no licensee may use the right of eminent domain under this section to acquire such lands or property unless there has been a public hearing held in the affected community and a finding by the Commission, after due consideration of expressed public views and the recommendations of the State or political subdivision that owns the lands or property, that the license will not interfere or be inconsistent with the purposes for which such lands or property are owned.
  • Whenever the public interest requires or justifies the execution by the licensee of contracts for the sale and delivery of power for periods extending beyond the date of termination of the license, such contracts may be entered into upon the joint approval of the commission and of the public-service commission or other similar authority in the State in which the sale or delivery of power is made, or if sold or delivered in a State which has no such public-service commission, then upon the approval of the commission, and thereafter, in the event of failure to issue a new license to the original licensee at the termination of the license, the United States or the new licensee, as the case may be, shall assume and fulfill all such contracts.
  • The provisions of this subchapter shall not be construed as affecting any permit or valid existing right-of-way granted prior to June 10, 1920, or as confirming or otherwise affecting any claim, or as affecting any authority heretofore given pursuant to law, but any person, association, corporation, State, or municipality holding or possessing such permit, right-of-way or authority may apply for a license under this chapter, and upon such application the Commission may issue to any such applicant a license in accordance with the provisions of this subchapter and in such case the provisions of this chapter shall apply to such applicant as a licensee under this chapter: Provided, That when application is made for a license under this section for a project or projects already constructed the fair value of said project or projects determined as provided in this section, shall for the purposes of this subchapter and of said license be deemed to be the amount to be allowed as the net investment of the applicant in such project or projects as of the date of such license, or as of the date of such determination, if license has not been issued. Such fair value shall be determined by the Commission after notice and opportunity for hearing.
  • Any lands of the United States included in any proposed project under the provisions of this subchapter shall from the date of filing of application therefor be reserved from entry, location, or other disposal under the laws of the United States until otherwise directed by the Commission or by Congress. Notice that such application has been made, together with the date of filing thereof and a description of the lands of the United States affected thereby, shall be filed in the local land office for the district in which such lands are located. Whenever the Commission shall determine that the value of any lands of the United States so applied for, or heretofore or hereafter reserved or classified as power sites, will not be injured or destroyed for the purposes of power development by location, entry, or selection under the public-land laws, the Secretary of the Interior, upon notice of such determination, shall declare such lands open to location, entry, or selection, for such purpose or purposes and under such restrictions as the Commission may determine, subject to and with a reservation of the right of the United States or its permittees or licensees to enter upon, occupy, and use any part or all of said lands necessary, in the judgment of the Commission, for the purposes of this subchapter, which right shall be expressly reserved in every patent issued for such lands; and no claim or right to compensation shall accrue from the occupation or use of any of said lands for said purposes. The United States or any licensee for any such lands hereunder may enter thereupon for the purposes of this subchapter, upon payment of any damages to crops, buildings, or other improvements caused thereby to the owner thereof, or upon giving a good and sufficient bond to the United States for the use and benefit of the owner to secure the payment of such damages as may be determined and fixed in an action brought upon the bond in a court of competent jurisdiction, said bond to be in the form prescribed by the Commission: Provided, That locations, entries, selections, or filings heretofore made for lands reserved as water-power sites, or in connection with water-power development, or electrical transmission may proceed to approval or patent under and subject to the limitations and conditions in this section contained: Provided further, That before any lands applied for, or heretofore or hereafter reserved, or classified as power sites, are declared open to location, entry, or selection by the Secretary of the Interior, notice of intention to make such declaration shall be given to the Governor of the State within which such lands are located, and such State shall have ninety days from the date of such notice within which to file, under any statute or regulation applicable thereto, an application for the reservation to the State, or any political subdivision thereof, of any lands required as a right-of-way for a public highway or as a source of materials for the construction and maintenance of such highways, and a copy of such application shall be filed with the Federal Power Commission; and any location, entry, or selection of such lands, or subsequent patent thereof, shall be subject to any rights granted the State pursuant to such application.
  • The Attorney General may, on request of the commission or of the Secretary of the Army, institute proceedings in equity in the district court of the United States in the district in which any project or part thereof is situated for the purpose of revoking for violation of its terms any permit or license issued hereunder, or for the purpose of remedying or correcting by injunction, mandamus, or other process any act of commission or omission in violation of the provisions of this chapter or of any lawful regulation or order promulgated hereunder. The district courts shall have jurisdiction over all of the above-mentioned proceedings and shall have power to issue and execute all necessary process and to make and enforce all writs, orders and decrees to compel compliance with the lawful orders and regulations of the commission and of the Secretary of the Army, and to compel the performance of any condition imposed under the provisions of this chapter. In the event a decree revoking a license is entered, the court is empowered to sell the whole or any part of the project or projects under license, to wind up the business of such licensee conducted in connection with such project or projects, to distribute the proceeds to the parties entitled to the same, and to make and enforce such further orders and decrees as equity and justice may require. At such sale or sales the vendee shall take the rights and privileges belonging to the licensee and shall perform the duties of such licensee and assume all outstanding obligations and liabilities of the licensee which the court may deem equitable in the premises; and at such sale or sales the United States may become a purchaser, but it shall not be required to pay a greater amount than it would be required to pay under the provisions of section 807 of this title at the termination of the license.
  • The right to alter, amend, or repeal this chapter is expressly reserved; but no such alteration, amendment, or repeal shall affect any license theretofore issued under the provisions of this chapter or the rights of any licensee thereunder.
  • (b) After notice and opportunity for an evidentiary hearing, the Commission may also issue an order revoking any license issued under this subchapter or any exemption granted from any requirement of this subchapter where any licensee or exemptee is found by the Commission:
    (1) to have knowingly violated a final order issued under subsection (a) after completion of judicial review (or the opportunity for judicial review); and
    (2) to have been given reasonable time to comply fully with such order prior to commencing any revocation proceeding.
    In any such proceeding, the order issued under subsection (a) shall be subject to de novo review by the Commission. No order shall be issued under this subsection until after the Commission has taken into consideration the nature and seriousness of the violation and the efforts of the licensee to remedy the violation.
  • (c) Any licensee, permittee, or exemptee who violates or fails or refuses to comply with any rule or regulation under this subchapter, any term, or condition of a license, permit, or exemption under this subchapter, or any order issued under subsection (a) shall be subject to a civil penalty in an amount not to exceed $10,000 for each day that such violation or failure or refusal continues. Such penalty shall be assessed by the Commission after notice and opportunity for public hearing. In determining the amount of a proposed penalty, the Commission shall take into consideration the nature and seriousness of the violation, failure, or refusal and the efforts of the licensee to remedy the violation, failure, or refusal in a timely manner. No civil penalty shall be assessed where revocation is ordered.
  • (4) The Commission may compromise, modify, or remit, with or without conditions, any civil penalty which may be imposed under this subsection, taking into consideration the nature and seriousness of the violation and the efforts of the licensee to remedy the violation in a timely manner at any time prior to a final decision by the court of appeals under paragraph (2) or by the district court under paragraph (3).
  • (A) the construction, maintenance, and operation by a licensee at its own expense of such lights and signals as may be directed by the Secretary of the Department in which the Coast Guard is operating, and such fishways as may be prescribed by the Secretary of the Interior or the Secretary of Commerce, as appropriate;
  • (c) In the case of nonqualifying project works that would be a qualifying project works but for the fact that the project has been licensed (or exempted from licensing) by the Commission prior to November 9, 2000, the licensee of such project may in its discretion elect to make the project subject to licensing and regulation by the State of Alaska under this section.
  • (2) transfer a license in part to one or more nonmunicipal entities as co-licensees with a municipality, if the municipality retains majority ownership of the project for which the license was issued.
  • (1) project-related investments by the licensee under the new license; and
  • (2) project-related investments by the licensee over the term of the existing license.
  • (1) investments by the licensee to implement the new license under this subchapter, including investments relating to redevelopment, new construction, new capacity, efficiency, modernization, rehabilitation or replacement of major equipment, safety improvements, or environmental, recreation, or other protection, mitigation, or enhancement measures required or authorized by the new license; and
  • (2) investments by the licensee over the term of the existing license (including any terms under annual licenses) that—
    (A) resulted in redevelopment, new construction, new capacity, efficiency, modernization, rehabilitation or replacement of major equipment, safety improvements, or environmental, recreation, or other protection, mitigation, or enhancement measures conducted over the term of the existing license; and
    (B) were not expressly considered by the Commission as contributing to the length of the existing license term in any order establishing or extending the existing license term.
  • (c) At the request of the licensee, the Commission shall make a determination as to whether any planned, ongoing, or completed investment meets the criteria under subsection (b)(2). Any determination under this subsection shall be issued within 60 days following receipt of the licensee’s request. When issuing its determination under this subsection, the Commission shall not assess the incremental number of years that the investment may add to the new license term. All such assessment shall occur only as provided in subsection (a).
  • (a) Every licensee and public utility shall make, keep, and preserve for such periods, such accounts, records of cost-accounting procedures, correspondence, memoranda, papers, books, and other records as the Commission may by rules and regulations prescribe as necessary or appropriate for purposes of the administration of this chapter, including accounts, records, and memoranda of the generation, transmission, distribution, delivery, or sale of electric energy, the furnishing of services or facilities in connection therewith, and receipts and expenditures with respect to any of the foregoing: Provided, however, That nothing in this chapter shall relieve any public utility from keeping any accounts, memoranda, or records which such public utility may be required to keep by or under authority of the laws of any State. The Commission may prescribe a system of accounts to be kept by licensees and public utilities and may classify such licensees and public utilities and prescribe a system of accounts for each class. The Commission, after notice and opportunity for hearing, may determine by order the accounts in which particular outlays and receipts shall be entered, charged, or credited. The burden of proof to justify every accounting entry questioned by the Commission shall be on the person making, authorizing, or requiring such entry, and the Commission may suspend a charge or credit pending submission of satisfactory proof in support thereof.
  • (b) The Commission shall at all times have access to and the right to inspect and examine all accounts, records, and memoranda of licensees and public utilities, and it shall be the duty of such licensees and public utilities to furnish to the Commission, within such reasonable time as the Commission may order, any information with respect thereto which the Commission may by order require, including copies of maps, contracts, reports of engineers, and other data, records, and papers, and to grant to all agents of the Commission free access to its property and its accounts, records, and memoranda when requested so to do. No member, officer, or employee of the Commission shall divulge any fact or information which may come to his knowledge during the course of examination of books or other accounts, as hereinbefore provided, except insofar as he may be directed by the Commission or by a court.
  • (c) The books, accounts, memoranda, and records of any person who controls, directly or indirectly, a licensee or public utility subject to the jurisdiction of the Commission, and of any other company controlled by such person, insofar as they relate to transactions with or the business of such licensee or public utility, shall be subject to examination on the order of the Commission.
  • (a) The Commission may, after hearing, require licensees and public utilities to carry a proper and adequate depreciation account in accordance with such rules, regulations, and forms of account as the Commission may prescribe. The Commission may, from time to time, ascertain and determine, and by order fix, the proper and adequate rates of depreciation of the several classes of property of each licensee and public utility. Each licensee and public utility shall conform its depreciation accounts to the rates so ascertained, determined, and fixed. The licensees and public utilities subject to the jurisdiction of the Commission shall not charge to operating expenses any depreciation charges on classes of property other than those prescribed by the Commission, or charge with respect to any class of property a percentage of depreciation other than that prescribed therefor by the Commission. No such licensee or public utility shall in any case include in any form under its operating or other expenses any depreciation or other charge or expenditure included elsewhere as a depreciation charge or otherwise under its operating or other expenses. Nothing in this section shall limit the power of a State commission to determine in the exercise of its jurisdiction, with respect to any public utility, the percentage rate of depreciation to be allowed, as to any class of property of such public utility, or the composite depreciation rate, for the purpose of determining rates or charges.
  • (a) Every licensee and every public utility shall file with the Commission such annual and other periodic or special reports as the Commission may by rules and regulations or order prescribe as necessary or appropriate to assist the Commission in the proper administration of this chapter. The Commission may prescribe the manner and form in which such reports shall be made, and require from such persons specific answers to all questions upon which the Commission may need information. The Commission may require that such reports shall include, among other things, full information as to assets and liabilities, capitalization, net investment, and reduction thereof, gross receipts, interest due and paid, depreciation, and other reserves, cost of project and other facilities, cost of maintenance and operation of the project and other facilities, cost of renewals and replacement of the project works and other facilities, depreciation, generation, transmission, distribution, delivery, use, and sale of electric energy. The Commission may require any such person to make adequate provision for currently determining such costs and other facts. Such reports shall be made under oath unless the Commission otherwise specifies.
  • Any person, electric utility, State, municipality, or State commission complaining of anything done or omitted to be done by any licensee, transmitting utility, or public utility in contravention of the provisions of this chapter may apply to the Commission by petition which shall briefly state the facts, whereupon a statement of the complaint thus made shall be forwarded by the Commission to such licensee, transmitting utility, or public utility, who shall be called upon to satisfy the complaint or to answer the same in writing within a reasonable time to be specified by the Commission. If such licensee, transmitting utility, or public utility shall not satisfy the complaint within the time specified or there shall appear to be any reasonable ground for investigating such complaint, it shall be the duty of the Commission to investigate the matters complained of in such manner and by such means as it shall find proper.
  • (b) Any party to a proceeding under this chapter aggrieved by an order issued by the Commission in such proceeding may obtain a review of such order in the United States court of appeals for any circuit wherein the licensee or public utility to which the order relates is located or has its principal place of business, or in the United States Court of Appeals for the District of Columbia, by filing in such court, within sixty days after the order of the Commission upon the application for rehearing, a written petition praying that the order of the Commission be modified or set aside in whole or in part. A copy of such petition shall forthwith be transmitted by the clerk of the court to any member of the Commission and thereupon the Commission shall file with the court the record upon which the order complained of was entered, as provided in section 2112 of title 28. Upon the filing of such petition such court shall have jurisdiction, which upon the filing of the record with it shall be exclusive, to affirm, modify, or set aside such order in whole or in part. No objection to the order of the Commission shall be considered by the court unless such objection shall have been urged before the Commission in the application for rehearing unless there is reasonable ground for failure so to do. The finding of the Commission as to the facts, if supported by substantial evidence, shall be conclusive. If any party shall apply to the court for leave to adduce additional evidence, and shall show to the satisfaction of the court that such additional evidence is material and that there were reasonable grounds for failure to adduce such evidence in the proceedings before the Commission, the court may order such additional evidence to be taken before the Commission and to be adduced upon the hearing in such manner and upon such terms and conditions as to the court may seem proper. The Commission may modify its findings as to the facts by reason of the additional evidence so taken, and it shall file with the court such modified or new findings which, if supported by substantial evidence, shall be conclusive, and its recommendation, if any, for the modification or setting aside of the original order. The judgment and decree of the court, affirming, modifying, or setting aside, in whole or in part, any such order of the Commission, shall be final, subject to review by the Supreme Court of the United States upon certiorari or certification as provided in section 1254 of title 28.
  • (a) Any licensee or public utility which willfully fails, within the time prescribed by the Commission, to comply with any order of the Commission, to file any report required under this chapter or any rule or regulation of the Commission thereunder, to submit any information or document required by the Commission in the course of an investigation conducted under this chapter, or to appear by an officer or agent at any hearing or investigation in response to a subpena issued under this chapter, shall forfeit to the United States an amount not exceeding $1,000 to be fixed by the Commission after notice and opportunity for hearing. The imposition or payment of any such forfeiture shall not bar or affect any penalty prescribed in this chapter but such forfeiture shall be in addition to any such penalty.
  • (b) The forfeitures provided for in this chapter shall be payable into the Treasury of the United States and shall be recoverable in a civil suit in the name of the United States, brought in the district where the person is an inhabitant or has his principal place of business, or if a licensee or public utility, in any district in which such licensee or public utility transacts business. It shall be the duty of the various United States attorneys, under the direction of the Attorney General of the United States, to prosecute for the recovery of forfeitures under this chapter. The costs and expenses of such prosecution shall be paid from the appropriations for the expenses of the courts of the United States.

Citations to §796(6)

  • (c) To cooperate with the executive departments and other agencies of State or National Governments in such investigations; and for such purpose the several departments and agencies of the National Government are authorized and directed upon the request of the Commission, to furnish such records, papers, and information in their possession as may be requested by the Commission, and temporarily to detail to the Commission such officers or experts as may be necessary in such investigations.
  • (e) To issue licenses to citizens of the United States, or to any association of such citizens, or to any corporation organized under the laws of the United States or any State thereof, or to any State or municipality for the purpose of constructing, operating, and maintaining dams, water conduits, reservoirs, power houses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization of power across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, or upon any part of the public lands and reservations of the United States (including the Territories), or for the purpose of utilizing the surplus water or water power from any Government dam, except as herein provided: Provided, That licenses shall be issued within any reservation only after a finding by the Commission that the license will not interfere or be inconsistent with the purpose for which such reservation was created or acquired, and shall be subject to and contain such conditions as the Secretary of the department under whose supervision such reservation falls shall deem necessary for the adequate protection and utilization of such reservation:1 The license applicant and any party to the proceeding shall be entitled to a determination on the record, after opportunity for an agency trial-type hearing of no more than 90 days, on any disputed issues of material fact with respect to such conditions. All disputed issues of material fact raised by any party shall be determined in a single trial-type hearing to be conducted by the relevant resource agency in accordance with the regulations promulgated under this subsection and within the time frame established by the Commission for each license proceeding. Within 90 days of August 8, 2005, the Secretaries of the Interior, Commerce, and Agriculture shall establish jointly, by rule, the procedures for such expedited trial-type hearing, including the opportunity to undertake discovery and cross-examine witnesses, in consultation with the Federal Energy Regulatory Commission.2 Provided further, That no license affecting the navigable capacity of any navigable waters of the United States shall be issued until the plans of the dam or other structures affecting the navigation have been approved by the Chief of Engineers and the Secretary of the Army. Whenever the contemplated improvement is, in the judgment of the Commission, desirable and justified in the public interest for the purpose of improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, a finding to that effect shall be made by the Commission and shall become a part of the records of the Commission: Provided further, That in case the Commission shall find that any Government dam may be advantageously used by the United States for public purposes in addition to navigation, no license therefor shall be issued until two years after it shall have reported to Congress the facts and conditions relating thereto, except that this provision shall not apply to any Government dam constructed prior to June 10, 1920: And provided further, That upon the filing of any application for a license which has not been preceded by a preliminary permit under subsection (f) of this section, notice shall be given and published as required by the proviso of said subsection. In deciding whether to issue any license under this subchapter for any project, the Commission, in addition to the power and development purposes for which licenses are issued, shall give equal consideration to the purposes of energy conservation, the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat), the protection of recreational opportunities, and the preservation of other aspects of environmental quality.
  • (f) To issue preliminary permits for the purpose of enabling applicants for a license hereunder to secure the data and to perform the acts required by section 802 of this title: Provided, however, That upon the filing of any application for a preliminary permit by any person, association, or corporation the Commission, before granting such application, shall at once give notice of such application in writing to any State or municipality likely to be interested in or affected by such application; and shall also publish notice of such application once each week for four weeks in a daily or weekly newspaper published in the county or counties in which the project or any part hereof or the lands affected thereby are situated.
  • (g) Upon its own motion to order an investigation of any occupancy of, or evidenced intention to occupy, for the purpose of developing electric power, public lands, reservations, or streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States by any person, corporation, State, or municipality and to issue such order as it may find appropriate, expedient, and in the public interest to conserve and utilize the navigation and water-power resources of the region.
  • (2) Satisfactory evidence that the applicant has complied with the requirements of the laws of the State or States within which the proposed project is to be located with respect to bed and banks and to the appropriation, diversion, and use of water for power purposes and with respect to the right to engage in the business of developing, transmitting and distributing power, and in any other business necessary to effect the purposes of a license under this chapter.
  • (2) Any Federal, State, municipal or other local governmental agency likely to be interested in or affected by such application.
  • (ii) the State in which the facility is or will be located.
  • (B) The recommendations of Federal and State agencies exercising administration over flood control, navigation, irrigation, recreation, cultural and other relevant resources of the State in which the project is located, and the recommendations (including fish and wildlife recommendations) of Indian tribes affected by the project.
  • (C) In the case of a State or municipal applicant, or an applicant which is primarily engaged in the generation or sale of electric power (other than electric power solely from cogeneration facilities or small power production facilities), the electricity consumption efficiency improvement program of the applicant, including its plans, performance and capabilities for encouraging or assisting its customers to conserve electricity cost-effectively, taking into account the published policies, restrictions, and requirements of relevant State regulatory authorities applicable to such applicant.
  • (1) That the licensee shall pay to the United States reasonable annual charges in an amount to be fixed by the Commission for the purpose of reimbursing the United States for the costs of the administration of this subchapter, including any reasonable and necessary costs incurred by Federal and State fish and wildlife agencies and other natural and cultural resource agencies in connection with studies or other reviews carried out by such agencies for purposes of administering their responsibilities under this subchapter; for recompensing it for the use, occupancy, and enjoyment of its lands or other property; and for the expropriation to the Government of excessive profits until the respective States shall make provision for preventing excessive profits or for the expropriation thereof to themselves, or until the period of amortization as herein provided is reached, and in fixing such charges the Commission shall seek to avoid increasing the price to the consumers of power by such charges, and any such charges may be adjusted from time to time by the Commission as conditions may require: Provided, That, subject to annual appropriations Acts, the portion of such annual charges imposed by the Commission under this subsection to cover the reasonable and necessary costs of such agencies shall be available to such agencies (in addition to other funds appropriated for such purposes) solely for carrying out such studies and reviews and shall remain available until expended: Provided, That when licenses are issued involving the use of Government dams or other structures owned by the United States or tribal lands embraced within Indian reservations the Commission shall, subject to the approval of the Secretary of the Interior in the case of such dams or structures in reclamation projects and, in the case of such tribal lands, subject to the approval of the Indian tribe having jurisdiction of such lands as provided in section 5123 of title 25, fix a reasonable annual charge for the use thereof, and such charges may with like approval be readjusted by the Commission at the end of twenty years after the project is available for service and at periods of not less than ten years thereafter upon notice and opportunity for hearing: Provided further, That licenses for the development, transmission, or distribution of power by States or municipalities shall be issued and enjoyed without charge to the extent such power is sold to the public without profit or is used by such State or municipality for State or municipal purposes, except that as to projects constructed or to be constructed by States or municipalities primarily designed to provide or improve navigation, licenses therefor shall be issued without charge; and that licenses for the development, transmission, or distribution of power for domestic, mining, or other beneficial use in projects of not more than two thousand horsepower installed capacity may be issued without charge, except on tribal lands within Indian reservations; but in no case shall a license be issued free of charge for the development and utilization of power created by any Government dam and that the amount charged therefor in any license shall be such as determined by the Commission: Provided however, That no charge shall be assessed for the use of any Government dam or structure by any licensee if, before January 1, 1985, the Secretary of the Interior has entered into a contract with such licensee that meets each of the following requirements:
    (A) The contract covers one or more projects for which a license was issued by the Commission before January 1, 1985.
    (B) The contract contains provisions specifically providing each of the following:
    (i) A powerplant may be built by the licensee utilizing irrigation facilities constructed by the United States.
    (ii) The powerplant shall remain in the exclusive control, possession, and ownership of the licensee concerned.
    (iii) All revenue from the powerplant and from the use, sale, or disposal of electric energy from the powerplant shall be, and remain, the property of such licensee.
    (C) The contract is an amendatory, supplemental and replacement contract between the United States and: (i) the Quincy-Columbia Basin Irrigation District (Contract No. 14–06–100–6418); (ii) the East Columbia Basin Irrigation District (Contract No. 14–06–100–6419); or, (iii) the South Columbia Basin Irrigation District (Contract No. 14–06–100–6420).
    This paragraph shall apply to any project covered by a contract referred to in this paragraph only during the term of such contract unless otherwise provided by subsequent Act of Congress. In the event an overpayment of any charge due under this section shall be made by a licensee, the Commission is authorized to allow a credit for such overpayment when charges are due for any subsequent period.
  • (1) That in order to adequately and equitably protect, mitigate damages to, and enhance, fish and wildlife (including related spawning grounds and habitat) affected by the development, operation, and management of the project, each license issued under this subchapter shall include conditions for such protection, mitigation, and enhancement. Subject to paragraph (2), such conditions shall be based on recommendations received pursuant to the Fish and Wildlife Coordination Act (16 U.S.C. 661 et seq.) from the National Marine Fisheries Service, the United States Fish and Wildlife Service, and State fish and wildlife agencies.
  • (a) Upon not less than two years’ notice in writing from the commission the United States shall have the right upon or after the expiration of any license to take over and thereafter to maintain and operate any project or projects as defined in section 796 of this title, and covered in whole or in part by the license, or the right to take over upon mutual agreement with the licensee all property owned and held by the licensee then valuable and serviceable in the development, transmission, or distribution of power and which is then dependent for its usefulness upon the continuance of the license, together with any lock or locks or other aids to navigation constructed at the expense of the licensee, upon the condition that before taking possession it shall pay the net investment of the licensee in the project or projects taken, not to exceed the fair value of the property taken, plus such reasonable damages, if any, to property of the licensee valuable, serviceable, and dependent as above set forth but not taken, as may be caused by the severance therefrom of property taken, and shall assume all contracts entered into by the licensee with the approval of the Commission. The net investment of the licensee in the project or projects so taken and the amount of such severance damages, if any, shall be determined by the Commission after notice and opportunity for hearing. Such net investment shall not include or be affected by the value of any lands, rights-of-way, or other property of the United States licensed by the Commission under this chapter, by the license or by good will, going value, or prospective revenues; nor shall the values allowed for water rights, rights-of-way, lands, or interest in lands be in excess of the actual reasonable cost thereof at the time of acquisition by the licensee: Provided, That the right of the United States or any State or municipality to take over, maintain, and operate any project licensed under this chapter at any time by condemnation proceedings upon payment of just compensation is expressly reserved.
  • (3) Promptly following receipt of notice under paragraph (1), the Commission shall provide public notice of whether an existing licensee intends to file or not to file an application for a new license. The Commission shall also promptly notify the National Marine Fisheries Service and the United States Fish and Wildlife Service, and the appropriate State fish and wildlife agencies.
  • (f) In issuing any licenses under this section except an annual license, the Commission, on its own motion or upon application of any licensee, person, State, municipality, or State commission, after notice to each State commission and licensee affected, and after opportunity for hearing, whenever it finds that in conformity with a comprehensive plan for improving or developing a waterway or waterways for beneficial public uses all or part of any licensed project should no longer be used or adapted for use for power purposes, may license all or part of the project works for nonpower use. A license for nonpower use shall be issued to a new licensee only on the condition that the new licensee shall, before taking possession of the facilities encompassed thereunder, pay such amount and assume such contracts as the United States is required to do, in the manner specified in section 807 of this title. Any license for nonpower use shall be a temporary license. Whenever, in the judgment of the Commission, a State, municipality, interstate agency, or another Federal agency is authorized and willing to assume regulatory supervision of the lands and facilities included under the nonpower license and does so, the Commission shall thereupon terminate the license. Consistent with the provisions of subchapter IV of this chapter, every licensee for nonpower use shall keep such accounts and file such annual and other periodic or special reports concerning the removal, alteration, nonpower use, or other disposition of any project works or parts thereof covered by the nonpower use license as the Commission may by rules and regulations or order prescribe as necessary or appropriate.
  • (a) All proceeds from any Indian reservation shall be placed to the credit of the Indians of such reservation. All other charges arising from licenses hereunder, except charges fixed by the Commission for the purpose of reimbursing the United States for the costs of administration of this subchapter, shall be paid into the Treasury of the United States, subject to the following distribution: 12½ per centum thereof is hereby appropriated to be paid into the Treasury of the United States and credited to “Miscellaneous receipts”; 50 per centum of the charges arising from licenses hereunder for the occupancy and use of public lands and national forests shall be paid into, reserved, and appropriated as a part of the reclamation fund created by the Act of Congress known as the Reclamation Act, approved June 17, 1902; and 37½ per centum of the charges arising from licenses hereunder for the occupancy and use of national forests and public lands from development within the boundaries of any State shall be paid by the Secretary of the Treasury to such State; and 50 per centum of the charges arising from all other licenses hereunder is reserved and appropriated as a special fund in the Treasury to be expended under the direction of the Secretary of the Army in the maintenance and operation of dams and other navigation structures owned by the United States or in the construction, maintenance, or operation of headwater or other improvements of navigable waters of the United States. The proceeds of charges made by the Commission for the purpose of reimbursing the United States for the costs of the administration of this subchapter shall be paid into the Treasury of the United States and credited to miscellaneous receipts.
  • As a condition of the license, every licensee under this chapter which is a public-service corporation, or a person, association, or corporation owning or operating any project and developing, transmitting, or distributing power for sale or use in public service, shall abide by such reasonable regulation of the services to be rendered to customers or consumers of power, and of rates and charges of payment therefor, as may from time to time be prescribed by any duly constituted agency of the State in which the service is rendered or the rate charged. That in case of the development, transmission, or distribution, or use in public service of power by any licensee under this chapter or by its customer engaged in public service within a State which has not authorized and empowered a commission or other agency or agencies within said State to regulate and control the services to be rendered by such licensee or by its customer engaged in public service, or the rates and charges of payment therefor, or the amount or character of securities to be issued by any of said parties, it is agreed as a condition of such license that jurisdiction is conferred upon the commission, upon complaint of any person aggrieved or upon its own initiative, to exercise such regulation and control until such time as the State shall have provided a commission or other authority for such regulation and control: Provided, That the jurisdiction of the commission shall cease and determine as to each specific matter of regulation and control prescribed in this section as soon as the State shall have provided a commission or other authority for the regulation and control of that specific matter.
  • When said power or any part thereof shall enter into interstate or foreign commerce the rates charged and the service rendered by any such licensee, or by any subsidiary corporation, the stock of which is owned or controlled directly or indirectly by such licensee, or by any person, corporation, or association purchasing power from such licensee for sale and distribution or use in public service shall be reasonable, nondiscriminatory, and just to the customer and all unreasonable discriminatory and unjust rates or services are prohibited and declared to be unlawful; and whenever any of the States directly concerned has not provided a commission or other authority to enforce the requirements of this section within such State or to regulate and control the amount and character of securities to be issued by any of such parties, or such States are unable to agree through their properly constituted authorities on the services to be rendered, or on the rates or charges of payment therefor, or on the amount or character of securities to be issued by any of said parties, jurisdiction is conferred upon the commission, upon complaint of any person, aggrieved, upon the request of any State concerned, or upon its own initiative to enforce the provisions of this section, to regulate and control so much of the services rendered, and of the rates and charges of payment therefor as constitute interstate or foreign commerce and to regulate the issuance of securities by the parties included within this section, and securities issued by the licensee subject to such regulations shall be allowed only for the bona fide purpose of financing and conducting the business of such licensee.
  • When any licensee cannot acquire by contract or pledges an unimproved dam site or the right to use or damage the lands or property of others necessary to the construction, maintenance, or operation of any dam, reservoir, diversion structure, or the works appurtenant or accessory thereto, in conjunction with any improvement which in the judgment of the commission is desirable and justified in the public interest for the purpose of improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, it may acquire the same by the exercise of the right of eminent domain in the district court of the United States for the district in which such land or other property may be located, or in the State courts. The practice and procedure in any action or proceeding for that purpose in the district court of the United States shall conform as nearly as may be with the practice and procedure in similar action or proceeding in the courts of the State where the property is situated: Provided, That United States district courts shall only have jurisdiction of cases when the amount claimed by the owner of the property to be condemned exceeds $3,0001 Provided further, That no licensee may use the right of eminent domain under this section to acquire any lands or other property that, prior to October 24, 1992, were owned by a State or political subdivision thereof and were part of or included within any public park, recreation area or wildlife refuge established under State or local law. In the case of lands or other property that are owned by a State or political subdivision and are part of or included within a public park, recreation area or wildlife refuge established under State or local law on or after October 24, 1992, no licensee may use the right of eminent domain under this section to acquire such lands or property unless there has been a public hearing held in the affected community and a finding by the Commission, after due consideration of expressed public views and the recommendations of the State or political subdivision that owns the lands or property, that the license will not interfere or be inconsistent with the purposes for which such lands or property are owned.
  • Whenever the public interest requires or justifies the execution by the licensee of contracts for the sale and delivery of power for periods extending beyond the date of termination of the license, such contracts may be entered into upon the joint approval of the commission and of the public-service commission or other similar authority in the State in which the sale or delivery of power is made, or if sold or delivered in a State which has no such public-service commission, then upon the approval of the commission, and thereafter, in the event of failure to issue a new license to the original licensee at the termination of the license, the United States or the new licensee, as the case may be, shall assume and fulfill all such contracts.
  • The provisions of this subchapter shall not be construed as affecting any permit or valid existing right-of-way granted prior to June 10, 1920, or as confirming or otherwise affecting any claim, or as affecting any authority heretofore given pursuant to law, but any person, association, corporation, State, or municipality holding or possessing such permit, right-of-way or authority may apply for a license under this chapter, and upon such application the Commission may issue to any such applicant a license in accordance with the provisions of this subchapter and in such case the provisions of this chapter shall apply to such applicant as a licensee under this chapter: Provided, That when application is made for a license under this section for a project or projects already constructed the fair value of said project or projects determined as provided in this section, shall for the purposes of this subchapter and of said license be deemed to be the amount to be allowed as the net investment of the applicant in such project or projects as of the date of such license, or as of the date of such determination, if license has not been issued. Such fair value shall be determined by the Commission after notice and opportunity for hearing.
  • (1) It shall be unlawful for any person, State, or municipality, for the purpose of developing electric power, to construct, operate, or maintain any dam, water conduit, reservoir, power house, or other works incidental thereto across, along, or in any of the navigable waters of the United States, or upon any part of the public lands or reservations of the United States (including the Territories), or utilize the surplus water or water power from any Government dam, except under and in accordance with the terms of a permit or valid existing right-of-way granted prior to June 10, 1920, or a license granted pursuant to this chapter. Any person, association, corporation, State, or municipality intending to construct a dam or other project works, across, along, over, or in any stream or part thereof, other than those defined in this chapter as navigable waters, and over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States shall before such construction file declaration of such intention with the Commission, whereupon the Commission shall cause immediate investigation of such proposed construction to be made, and if upon investigation it shall find that the interests of interstate or foreign commerce would be affected by such proposed construction, such person, association, corporation, State, or municipality shall not construct, maintain, or operate such dam or other project works until it shall have applied for and shall have received a license under the provisions of this chapter. If the Commission shall not so find, and if no public lands or reservations are affected, permission is granted to construct such dam or other project works in such stream upon compliance with State laws.
  • Any lands of the United States included in any proposed project under the provisions of this subchapter shall from the date of filing of application therefor be reserved from entry, location, or other disposal under the laws of the United States until otherwise directed by the Commission or by Congress. Notice that such application has been made, together with the date of filing thereof and a description of the lands of the United States affected thereby, shall be filed in the local land office for the district in which such lands are located. Whenever the Commission shall determine that the value of any lands of the United States so applied for, or heretofore or hereafter reserved or classified as power sites, will not be injured or destroyed for the purposes of power development by location, entry, or selection under the public-land laws, the Secretary of the Interior, upon notice of such determination, shall declare such lands open to location, entry, or selection, for such purpose or purposes and under such restrictions as the Commission may determine, subject to and with a reservation of the right of the United States or its permittees or licensees to enter upon, occupy, and use any part or all of said lands necessary, in the judgment of the Commission, for the purposes of this subchapter, which right shall be expressly reserved in every patent issued for such lands; and no claim or right to compensation shall accrue from the occupation or use of any of said lands for said purposes. The United States or any licensee for any such lands hereunder may enter thereupon for the purposes of this subchapter, upon payment of any damages to crops, buildings, or other improvements caused thereby to the owner thereof, or upon giving a good and sufficient bond to the United States for the use and benefit of the owner to secure the payment of such damages as may be determined and fixed in an action brought upon the bond in a court of competent jurisdiction, said bond to be in the form prescribed by the Commission: Provided, That locations, entries, selections, or filings heretofore made for lands reserved as water-power sites, or in connection with water-power development, or electrical transmission may proceed to approval or patent under and subject to the limitations and conditions in this section contained: Provided further, That before any lands applied for, or heretofore or hereafter reserved, or classified as power sites, are declared open to location, entry, or selection by the Secretary of the Interior, notice of intention to make such declaration shall be given to the Governor of the State within which such lands are located, and such State shall have ninety days from the date of such notice within which to file, under any statute or regulation applicable thereto, an application for the reservation to the State, or any political subdivision thereof, of any lands required as a right-of-way for a public highway or as a source of materials for the construction and maintenance of such highways, and a copy of such application shall be filed with the Federal Power Commission; and any location, entry, or selection of such lands, or subsequent patent thereof, shall be subject to any rights granted the State pursuant to such application.
  • All Acts or parts of Acts inconsistent with this chapter are repealed: Provided, That nothing contained herein shall be held or construed to modify or repeal any of the provisions of the Act of Congress approved December 19, 1913, granting certain rights-of-way to the city and county of San Francisco, in the State of California.
  • (A) Any person, State, or municipality proposing to construct a qualifying conduit hydropower facility shall file with the Commission a notice of intent to construct such facility. The notice shall include sufficient information to demonstrate that the facility meets the qualifying criteria.
  • (c) In making the determination under subsection (b) the Commission shall consult with the United States Fish and Wildlife Service1 National Marine Fisheries Service1 and the State agency exercising administration over the fish and wildlife resources of the State in which the facility is or will be located, in the manner provided by the Fish and Wildlife Coordination Act (16 U.S.C. 661, et seq.), and shall include in any such exemption—
    (1) such terms and conditions as the Fish and Wildlife Service1 National Marine Fisheries Service1 and the State agency each determine are appropriate to prevent loss of, or damage to, such resources and to otherwise carry out the purposes of such Act, and
    (2) such terms and conditions as the Commission deems appropriate to insure that such facility continues to comply with the provisions of this section and terms and conditions included in any such exemption.
  • (1) such terms and conditions as the Fish and Wildlife Service1 National Marine Fisheries Service1 and the State agency each determine are appropriate to prevent loss of, or damage to, such resources and to otherwise carry out the purposes of such Act, and
  • (a) Notwithstanding sections 797(e) and 817 of this title, the Commission shall discontinue exercising licensing and regulatory authority under this subchapter over qualifying project works in the State of Alaska, effective on the date on which the Commission certifies that the State of Alaska has in place a regulatory program for water-power development that—
    (1) protects the public interest, the purposes listed in paragraph (2), and the environment to the same extent provided by licensing and regulation by the Commission under this subchapter and other applicable Federal laws, including the Endangered Species Act (16 U.S.C. 1531 et seq.) and the Fish and Wildlife Coordination Act (16 U.S.C. 661 et seq.);
    (2) gives equal consideration to the purposes of—
    (A) energy conservation;
    (B) the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat);
    (C) the protection of recreational opportunities;
    (D) the preservation of other aspects of environmental quality;
    (E) the interests of Alaska Natives; and
    (F) other beneficial public uses, including irrigation, flood control, water supply, and navigation; and
    (3) requires, as a condition of a license for any project works
    (A) the construction, maintenance, and operation by a licensee at its own expense of such lights and signals as may be directed by the Secretary of the Department in which the Coast Guard is operating, and such fishways as may be prescribed by the Secretary of the Interior or the Secretary of Commerce, as appropriate;
    (B) the operation of any navigation facilities which may be constructed as part of any project to be controlled at all times by such reasonable rules and regulations as may be made by the Secretary of the Army; and
    (C) except as provided in subsection (j), conditions for the protection, mitigation, and enhancement of fish and wildlife based on recommendations received pursuant to the Fish and Wildlife Coordination Act (16 U.S.C. 661 et seq.) from the National Marine Fisheries Service, the United States Fish and Wildlife Service, and State fish and wildlife agencies.
  • (C) except as provided in subsection (j), conditions for the protection, mitigation, and enhancement of fish and wildlife based on recommendations received pursuant to the Fish and Wildlife Coordination Act (16 U.S.C. 661 et seq.) from the National Marine Fisheries Service, the United States Fish and Wildlife Service, and State fish and wildlife agencies.
  • (4) that are located entirely within the boundaries of the State of Alaska; and
  • (c) In the case of nonqualifying project works that would be a qualifying project works but for the fact that the project has been licensed (or exempted from licensing) by the Commission prior to November 9, 2000, the licensee of such project may in its discretion elect to make the project subject to licensing and regulation by the State of Alaska under this section.
  • (d) With respect to projects located in whole or in part on a reservation, a conservation system unit, or the public lands, a State license or exemption from licensing shall be subject to—
    (1) the approval of the Secretary having jurisdiction over such lands; and
    (2) such conditions as the Secretary may prescribe.
  • (e) The Commission shall consult with the Secretary of the Interior, the Secretary of Agriculture, and the Secretary of Commerce before certifying the State of Alaska’s regulatory program.
  • (g) The State of Alaska shall notify the Commission not later than 30 days after making any significant modification to its regulatory program. The Commission shall periodically review the State’s program to ensure compliance with the provisions of this section.
  • (h) Notwithstanding subsection (a), the Commission shall reassert its licensing and regulatory authority under this subchapter if the Commission finds that the State of Alaska has not complied with one or more of the requirements of this section.
  • (1) Upon application by the Governor of the State of Alaska, the Commission shall within 30 days commence a review of the State of Alaska’s regulatory program for water-power development to determine whether it complies with the requirements of subsection (a).
  • (2) The Commission’s review required by paragraph (1) shall be completed within 1 year of initiation, and the Commission shall within 30 days thereafter issue a final order determining whether or not the State of Alaska’s regulatory program for water-power development complies with the requirements of subsection (a).
  • (3) If the Commission fails to issue a final order in accordance with paragraph (2) the State of Alaska’s regulatory program for water-power development shall be deemed to be in compliance with subsection (a).
  • (j) If the State of Alaska determines that a recommendation under subsection (a)(3)(C) is inconsistent with paragraphs (1) and (2) of subsection (a), the State of Alaska may decline to adopt all or part of the recommendations in accordance with the procedures established under section 803(j)(2) of this title.
  • (A) In establishing the expedited process under this section, the Commission shall convene an interagency task force, with appropriate Federal and State agencies and Indian tribes represented, to coordinate the regulatory processes associated with the authorizations required to construct and operate a qualifying facility.
  • (B) The task force shall develop procedures that are consistent with subsection (e)(1)(E) to seek to ensure that, for projects licensed pursuant to this section, the Commission and appropriate Federal and State agencies and Indian tribes shall exercise their authorities in a manner that, to the extent practicable, will not result in any material change to the storage, release, or flow operations of the associated nonpowered dam existing at the time an applicant files its license application.
  • (3) In establishing the expedited process under this section, the Commission shall convene an interagency task force, with appropriate Federal and State agencies and Indian tribes represented, to coordinate the regulatory processes associated with the authorizations required to construct and operate closed-loop pumped storage projects.
  • (2) In granting an exception under paragraph (1), the Commission shall consult with the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the State agency exercising administration over the fish and wildlife resources of the State in which the closed-loop pumped storage project is or will be located, in the manner provided by the Fish and Wildlife Coordination Act (16 U.S.C. 661 et seq.).
  • (A) such terms and conditions as the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the State agency described in paragraph (2) each determine are appropriate to prevent loss of, or damage to, fish and wildlife resources and to otherwise carry out the purposes of the Fish and Wildlife Coordination Act; and
  • (1) The provisions of this subchapter shall apply to the transmission of electric energy in interstate commerce and to the sale of electric energy at wholesale in interstate commerce, but except as provided in paragraph (2) shall not apply to any other sale of electric energy or deprive a State or State commission of its lawful authority now exercised over the exportation of hydroelectric energy which is transmitted across a State line. The Commission shall have jurisdiction over all facilities for such transmission or sale of electric energy, but shall not have jurisdiction, except as specifically provided in this subchapter and subchapter III of this chapter, over facilities used for the generation of electric energy or over facilities used in local distribution or only for the transmission of electric energy in intrastate commerce, or over facilities for the transmission of electric energy consumed wholly by the transmitter.
  • (c) For the purpose of this subchapter, electric energy shall be held to be transmitted in interstate commerce if transmitted from a State and consumed at any point outside thereof; but only insofar as such transmission takes place within the United States.
  • (f) No provision in this subchapter shall apply to, or be deemed to include, the United States, a State or any political subdivision of a State, an electric cooperative that receives financing under the Rural Electrification Act of 1936 (7 U.S.C. 901 et seq.) or that sells less than 4,000,000 megawatt hours of electricity per year, or any agency, authority, or instrumentality of any one or more of the foregoing, or any corporation which is wholly owned, directly or indirectly, by any one or more of the foregoing, or any officer, agent, or employee of any of the foregoing acting as such in the course of his official duty, unless such provision makes specific reference thereto.
  • (A) an electric utility company subject to its regulatory authority under State law,
  • (3) Any United States district court located in the State in which the State commission referred to in paragraph (1) is located shall have jurisdiction to enforce compliance with this subsection.
  • (A) preempt applicable State law concerning the provision of records and other information; or
  • (a) For the purpose of assuring an abundant supply of electric energy throughout the United States with the greatest possible economy and with regard to the proper utilization and conservation of natural resources, the Commission is empowered and directed to divide the country into regional districts for the voluntary interconnection and coordination of facilities for the generation, transmission, and sale of electric energy, and it may at any time thereafter, upon its own motion or upon application, make such modifications thereof as in its judgment will promote the public interest. Each such district shall embrace an area which, in the judgment of the Commission, can economically be served by such interconnection and coordinated electric facilities. It shall be the duty of the Commission to promote and encourage such interconnection and coordination within each such district and between such districts. Before establishing any such district and fixing or modifying the boundaries thereof the Commission shall give notice to the State commission of each State situated wholly or in part within such district, and shall afford each such State commission reasonable opportunity to present its views and recommendations, and shall receive and consider such views and recommendations.
  • (2) With respect to an order issued under this subsection that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation, the Commission shall ensure that such order requires generation, delivery, interchange, or transmission of electric energy only during hours necessary to meet the emergency and serve the public interest, and, to the maximum extent practicable, is consistent with any applicable Federal, State, or local environmental law or regulation and minimizes any adverse environmental impacts.
  • (3) To the extent any omission or action taken by a party, that is necessary to comply with an order issued under this subsection, including any omission or action taken to voluntarily comply with such order, results in noncompliance with, or causes such party to not comply with, any Federal, State, or local environmental law or regulation, such omission or action shall not be considered a violation of such environmental law or regulation, or subject such party to any requirement, civil or criminal liability, or a citizen suit under such environmental law or regulation.
  • (A) An order issued under this subsection that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation shall expire not later than 90 days after it is issued. The Commission may renew or reissue such order pursuant to paragraphs (1) and (2) for subsequent periods, not to exceed 90 days for each period, as the Commission determines necessary to meet the emergency and serve the public interest.
  • (f) The ownership or operation of facilities for the transmission or sale at wholesale of electric energy which is (a) generated within a State and transmitted from the State across an international boundary and not thereafter transmitted into any other State, or (b) generated in a foreign country and transmitted across an international boundary into a State and not thereafter transmitted into any other State, shall not make a person a public utility subject to regulation as such under other provisions of this subchapter. The State within which any such facilities are located may regulate any such transaction insofar as such State regulation does not conflict with the exercise of the Commission’s powers under or relating to subsection (e).
  • (1) report promptly to the Commission and any appropriate State regulatory authorities any anticipated shortage of electric energy or capacity which would affect such utility’s capability of serving its wholesale customers,
  • (2) submit to the Commission, and to any appropriate State regulatory authority, and periodically revise, contingency plans respecting—
    (A) shortages of electric energy or capacity, and
    (B) circumstances which may result in such shortages, and
  • (a) The Commission may, on its own motion, and shall, on application of any person or governmental entity, after public notice and notice to the Governor of the affected State and after affording an opportunity for public hearing, exempt electric utilities, in whole or in part, from any provision of State law, or from any State rule or regulation, which prohibits or prevents the voluntary coordination of electric utilities, including any agreement for central dispatch, if the Commission determines that such voluntary coordination is designed to obtain economical utilization of facilities and resources in any area. No such exemption may be granted if the Commission finds that such provision of State law, or rule or regulation—
    (1) is required by any authority of Federal law, or
    (2) is designed to protect public health, safety, or welfare, or the environment or conserve energy or is designed to mitigate the effects of emergencies resulting from fuel shortages.
  • (a) Not later than 1 year after November 9, 1978, the Commission shall prescribe, and from time to time thereafter revise, such rules as it determines necessary to encourage cogeneration and small power production, and to encourage geothermal small power production facilities of not more than 80 megawatts capacity, which rules require electric utilities to offer to—
    (2) purchase electric energy from such facilities.
    Such rules shall be prescribed, after consultation with representatives of Federal and State regulatory agencies having ratemaking authority for electric utilities, and after public notice and a reasonable opportunity for interested persons (including State and Federal agencies) to submit oral as well as written data, views, and arguments. Such rules shall include provisions respecting minimum reliability of qualifying cogeneration facilities and qualifying small power production facilities (including reliability of such facilities during emergencies) and rules respecting reliability of electric energy service to be available to such facilities from electric utilities during emergencies. Such rules may not authorize a qualifying cogeneration facility or qualifying small power production facility to make any sale for purposes other than resale.
  • (1) Not later than 1 year after November 9, 1978, and from time to time thereafter, the Commission shall, after consultation with representatives of State regulatory authorities, electric utilities, owners of cogeneration facilities and owners of small power production facilities, and after public notice and a reasonable opportunity for interested persons (including State and Federal agencies) to submit oral as well as written data, views, and arguments, prescribe rules under which geothermal small power production facilities of not more than 80 megawatts capacity, qualifying cogeneration facilities, and qualifying small power production facilities are exempted in whole or part from the Federal Power Act [16 U.S.C. 791a et seq.], from the Public Utility Holding Company Act,2 from State laws and regulations respecting the rates, or respecting the financial or organizational regulation, of electric utilities, or from any combination of the foregoing, if the Commission determines such exemption is necessary to encourage cogeneration and small power production.
  • (2) No qualifying small power production facility (other than a qualifying small power production facility which is an eligible solar, wind, waste, or geothermal facility as defined in section 3(17)(E) of the Federal Power Act [16 U.S.C. 796(17)(E)]) which has a power production capacity which, together with any other facilities located at the same site (as determined by the Commission), exceeds 30 megawatts, or 80 megawatts for a qualifying small power production facility using geothermal energy as the primary energy source, may be exempted under rules under paragraph (1) from any provision of law or regulation referred to in paragraph (1), except that any qualifying small power production facility which produces electric energy solely by the use of biomass as a primary energy source, may be exempted by the Commission under such rules from the Public Utility Holding Company Act2 and from State laws and regulations referred to in such paragraph (1).
  • (A) any State law or regulation in effect in a State pursuant to subsection (f),
  • (1) Beginning on or before the date one year after any rule is prescribed by the Commission under subsection (a) or revised under such subsection, each State regulatory authority shall, after notice and opportunity for public hearing, implement such rule (or revised rule) for each electric utility for which it has ratemaking authority.
  • (1) Judicial review may be obtained respecting any proceeding conducted by a State regulatory authority or nonregulated electric utility for purposes of implementing any requirement of a rule under subsection (a) in the same manner, and under the same requirements, as judicial review may be obtained under section 2633 of this title in the case of a proceeding to which section 2633 of this title applies.
  • (2) Any person (including the Secretary) may bring an action against any electric utility, qualifying small power producer, or qualifying cogenerator to enforce any requirement established by a State regulatory authority or nonregulated electric utility pursuant to subsection (f). Any such action shall be brought only in the manner, and under the requirements, as provided under section 2633 of this title with respect to an action to which section 2633 of this title applies.
  • (A) The Commission may enforce the requirements of subsection (f) against any State regulatory authority or nonregulated electric utility. For purposes of any such enforcement, the requirements of subsection (f)(1) shall be treated as a rule enforceable under the Federal Power Act [16 U.S.C. 791a et seq.]. For purposes of any such action, a State regulatory authority or nonregulated electric utility shall be treated as a person within the meaning of the Federal Power Act. No enforcement action may be brought by the Commission under this section other than—
    (i) an action against the State regulatory authority or nonregulated electric utility for failure to comply with the requirements of subsection (f)1 or
    (ii) an action under paragraph (1).
  • (i) an action against the State regulatory authority or nonregulated electric utility for failure to comply with the requirements of subsection (f)1 or
  • (B) Any electric utility, qualifying cogenerator, or qualifying small power producer may petition the Commission to enforce the requirements of subsection (f) as provided in subparagraph (A) of this paragraph. If the Commission does not initiate an enforcement action under subparagraph (A) against a State regulatory authority or nonregulated electric utility within 60 days following the date on which a petition is filed under this subparagraph with respect to such authority, the petitioner may bring an action in the appropriate United States district court to require such State regulatory authority or nonregulated electric utility to comply with such requirements, and such court may issue such injunctive or other relief as may be appropriate. The Commission may intervene as a matter of right in any such action.
  • (A) Any segment of a natural watercourse which is included in (or designated for potential inclusion in) a State or national wild and scenic river system.
  • (B) Any segment of a natural watercourse which the State has determined, in accordance with applicable State law, to possess unique natural, recreational, cultural, or scenic attributes which would be adversely affected by hydroelectric development.
  • (4) At any time after the Commission makes a finding under paragraph (3) relieving an electric utility of its obligation to purchase electric energy, a qualifying cogeneration facility, a qualifying small power production facility, a State agency, or any other affected person may apply to the Commission for an order reinstating the electric utility’s obligation to purchase electric energy under this section. Such application shall set forth the factual basis upon which the application is based and describe why the conditions set forth in subparagraph (A), (B), or (C) of paragraph (1) of this subsection are no longer met. After notice, including sufficient notice to potentially affected utilities, and opportunity for comment, the Commission shall issue an order within 90 days of such application reinstating the electric utility’s obligation to purchase electric energy under this section if the Commission finds that the conditions set forth in subparagraphs (A), (B) or (C) of paragraph (1) which relieved the obligation to purchase, are no longer met.
  • (B) the electric utility is not required by State law to sell electric energy in its service territory.
  • (6) Nothing in this subsection affects the rights or remedies of any party under any contract or obligation, in effect or pending approval before the appropriate State regulatory authority or non-regulated electric utility on August 8, 2005, to purchase electric energy or capacity from or to sell electric energy or capacity to a qualifying cogeneration facility or qualifying small power production facility under this Act (including the right to recover costs of purchasing electric energy or capacity).
  • (ii) the electrical, thermal, and chemical output of the cogeneration facility is used fundamentally for industrial, commercial, or institutional purposes and is not intended fundamentally for sale to an electric utility, taking into account technological, efficiency, economic, and variable thermal energy requirements, as well as State laws applicable to sales of electric energy from a qualifying facility to its host facility; and
  • (a) The Secretary may acquire rights-of-way by purchase, including eminent domain, through North Dakota, South Dakota, and Nebraska for transmission facilities for the seasonal diversity exchange of electric power to and from Canada if he determines—
    (1) after opportunity for public hearing—
    (A) that the exchange is in the public interest and would further the purposes referred to in section 2611(1) and (2) of this title and that the acquisition of such rights-of-way and the construction and operation of such transmission facilities for such purposes is otherwise in the public interest,
    (B) that a permit has been issued in accordance with subsection (b) for such construction, operation, maintenance, and connection of the facilities at the border for the transmission of electric energy between the United States and Canada as is necessary for such exchange of electric power, and
    (C) that each affected State has approved the portion of the transmission route located in each State in accordance with applicable State law, or if there is no such applicable State law in such State, the Governor has approved such portion; and
    (2) after consultation with the Secretary of the Interior and the heads of other affected Federal agencies, that the Secretary of the Interior and the heads of such,1 other agencies concur in writing in the location of such portion of the transmission facilities as crosses Federal land under the jurisdiction of such Secretary or such other Federal agency, as the case may be.
    The Secretary shall provide to any State such cooperation and technical assistance as the State may request and as he determines appropriate in the selection of a transmission route. If the transmission route approved by any State does not appear to be feasible and in the public interest, the Secretary shall encourage such State to review such route and to develop a route that is feasible and in the public interest. Any exercise by the Secretary of the power of eminent domain under this section shall be in accordance with other applicable provisions of Federal law. The Secretary shall provide public notice of his intention to acquire any right-of-way before exercising such power of eminent domain with respect to such right-of-way.
  • (C) that each affected State has approved the portion of the transmission route located in each State in accordance with applicable State law, or if there is no such applicable State law in such State, the Governor has approved such portion; and
  • (c) The Secretary may not acquire any rights-of-day2 under this section unless he determines that the holder or holders of a permit referred to in subsection (a)(1)(B) are unable to acquire such rights-of-way under State condemnation authority, or after reasonable opportunity for negotiation, without unreasonably delaying construction, taking into consideration the impact of such delay on completion of the facilities in a timely fashion.
  • (f) The provisions of this section shall not extend to a public utility organized and operating in a State under the laws of which its security issues are regulated by a State commission.
  • (a) Whenever the Commission, after a hearing held upon its own motion or upon complaint, shall find that any rate, charge, or classification, demanded, observed, charged, or collected by any public utility for any transmission or sale subject to the jurisdiction of the Commission, or that any rule, regulation, practice, or contract affecting such rate, charge, or classification is unjust, unreasonable, unduly discriminatory or preferential, the Commission shall determine the just and reasonable rate, charge, classification, rule, regulation, practice, or contract to be thereafter observed and in force, and shall fix the same by order. Any complaint or motion of the Commission to initiate a proceeding under this section shall state the change or changes to be made in the rate, charge, classification, rule, regulation, practice, or contract then in force, and the reasons for any proposed change or changes therein. If, after review of any motion or complaint and answer, the Commission shall decide to hold a hearing, it shall fix by order the time and place of such hearing and shall specify the issues to be adjudicated.
  • (b) Whenever the Commission institutes a proceeding under this section, the Commission shall establish a refund effective date. In the case of a proceeding instituted on complaint, the refund effective date shall not be earlier than the date of the filing of such complaint nor later than 5 months after the filing of such complaint. In the case of a proceeding instituted by the Commission on its own motion, the refund effective date shall not be earlier than the date of the publication by the Commission of notice of its intention to initiate such proceeding nor later than 5 months after the publication date. Upon institution of a proceeding under this section, the Commission shall give to the decision of such proceeding the same preference as provided under section 824d of this title and otherwise act as speedily as possible. If no final decision is rendered by the conclusion of the 180-day period commencing upon initiation of a proceeding pursuant to this section, the Commission shall state the reasons why it has failed to do so and shall state its best estimate as to when it reasonably expects to make such decision. In any proceeding under this section, the burden of proof to show that any rate, charge, classification, rule, regulation, practice, or contract is unjust, unreasonable, unduly discriminatory, or preferential shall be upon the Commission or the complainant. At the conclusion of any proceeding under this section, the Commission may order refunds of any amounts paid, for the period subsequent to the refund effective date through a date fifteen months after such refund effective date, in excess of those which would have been paid under the just and reasonable rate, charge, classification, rule, regulation, practice, or contract which the Commission orders to be thereafter observed and in force: Provided, That if the proceeding is not concluded within fifteen months after the refund effective date and if the Commission determines at the conclusion of the proceeding that the proceeding was not resolved within the fifteen-month period primarily because of dilatory behavior by the public utility, the Commission may order refunds of any or all amounts paid for the period subsequent to the refund effective date and prior to the conclusion of the proceeding. The refunds shall be made, with interest, to those persons who have paid those rates or charges which are the subject of the proceeding.
  • (a) The Commission may refer any matter arising in the administration of this subchapter to a board to be composed of a member or members, as determined by the Commission, from the State or each of the States affected or to be affected by such matter. Any such board shall be vested with the same power and be subject to the same duties and liabilities as in the case of a member of the Commission when designated by the Commission to hold any hearings. The action of such board shall have such force and effect and its proceedings shall be conducted in such manner as the Commission shall by regulations prescribe. The board shall be appointed by the Commission from persons nominated by the State commission of each State affected or by the Governor of such State if there is no State commission. Each State affected shall be entitled to the same number of representatives on the board unless the nominating power of such State waives such right. The Commission shall have discretion to reject the nominee from any State, but shall thereupon invite a new nomination from that State. The members of a board shall receive such allowances for expenses as the Commission shall provide. The Commission may, when in its discretion sufficient reason exists therefor, revoke any reference to such a board.
  • (c) The Commission shall make available to the several State commissions such information and reports as may be of assistance in State regulation of public utilities. Whenever the Commission can do so without prejudice to the efficient and proper conduct of its affairs, it may upon request from a State make available to such State as witnesses any of its trained rate, valuation, or other experts, subject to reimbursement to the Commission by such State of the compensation and traveling expenses of such witnesses. All sums collected hereunder shall be credited to the appropriation from which the amounts were expended in carrying out the provisions of this subsection.
  • (2) Any State regulatory authority may apply to the Commission for an order for any action referred to in subparagraph (A), (B), (C), or (D) of paragraph (1). No such order may be issued by the Commission with respect to a Federal power marketing agency upon application of a State regulatory authority.
  • (1) issue notice to each affected State regulatory authority, each affected electric utility, each affected Federal power marketing agency, each affected owner or operator of a cogeneration facility or of a small power production facility, and to the public.1
  • (a) Any electric utility, Federal power marketing agency, or any other person generating electric energy for sale for resale, may apply to the Commission for an order under this subsection requiring a transmitting utility to provide transmission services (including any enlargement of transmission capacity necessary to provide such services) to the applicant. Upon receipt of such application, after public notice and notice to each affected State regulatory authority, each affected electric utility, and each affected Federal power marketing agency, and after affording an opportunity for an evidentiary hearing, the Commission may issue such order if it finds that such order meets the requirements of section 824k of this title, and would otherwise be in the public interest. No order may be issued under this subsection unless the applicant has made a request for transmission services to the transmitting utility that would be the subject of such order at least 60 days prior to its filing of an application for such order.
  • (1) Any transmitting utility ordered under subsection (a) or (b) to provide transmission services may apply to the Commission for an order permitting such transmitting utility to cease providing all, or any portion of, such services. After public notice, notice to each affected State regulatory authority, each affected Federal power marketing agency, each affected transmitting utility, and each affected electric utility, and after an opportunity for an evidentiary hearing, the Commission shall issue an order terminating or modifying the order issued under subsection (a) or (b), if the transmitting utility providing such transmission services has demonstrated, and the Commission has found, that—
    (A) due to changed circumstances, the requirements applicable, under this section and section 824k of this title, to the issuance of an order under subsection (a) or (b) are no longer met, or1
    (B) any transmission capacity of the utility providing transmission services under such order which was, at the time such order was issued, in excess of the capacity necessary to serve its own customers is no longer in excess of the capacity necessary for such purposes, or
    (C) the ordered transmission services require enlargement of transmission capacity and the transmitting utility subject to the order has failed, after making a good faith effort, to obtain the necessary approvals or property rights under applicable Federal, State, and local laws.
    No order shall be issued under this subsection pursuant to a finding under subparagraph (A) unless the Commission finds that such order is in the public interest.
  • (C) the ordered transmission services require enlargement of transmission capacity and the transmitting utility subject to the order has failed, after making a good faith effort, to obtain the necessary approvals or property rights under applicable Federal, State, and local laws.
  • (i) The Commission may not require a State or municipality to take action under this section that would violate a private activity bond rule for purposes of section 141 of title 26.
  • (d) If the Commission does not issue any order applied for under section 824i or 824j of this title, the Commission shall, by order, deny such application and state the reasons for such denial.
  • (g) No order may be issued under this chapter which is inconsistent with any State law which governs the retail marketing areas of electric utilities.
  • (h) No order issued under this chapter shall be conditioned upon or require the transmission of electric energy:
    (1) directly to an ultimate consumer, or
    (2) to, or for the benefit of, an entity if such electric energy would be sold by such entity directly to an ultimate consumer, unless:
    (A) such entity is a Federal power marketing agency; the Tennessee Valley Authority; a State or any political subdivision of a State (or an agency, authority, or instrumentality of a State or a political subdivision); a corporation or association that has ever received a loan for the purposes of providing electric service from the Administrator of the Rural Electrification Administration under the Rural Electrification Act of 1936 [7 U.S.C. 901 et seq.]; a person having an obligation arising under State or local law (exclusive of an obligation arising solely from a contract entered into by such person) to provide electric service to the public; or any corporation or association which is wholly owned, directly or indirectly, by any one or more of the foregoing; and
    (B) such entity was providing electric service to such ultimate consumer on October 24, 1992, or would utilize transmission or distribution facilities that it owns or controls to deliver all such electric energy to such electric consumer.
    Nothing in this subsection shall affect any authority of any State or local government under State law concerning the transmission of electric energy directly to an ultimate consumer.
  • (A) such entity is a Federal power marketing agency; the Tennessee Valley Authority; a State or any political subdivision of a State (or an agency, authority, or instrumentality of a State or a political subdivision); a corporation or association that has ever received a loan for the purposes of providing electric service from the Administrator of the Rural Electrification Administration under the Rural Electrification Act of 1936 [7 U.S.C. 901 et seq.]; a person having an obligation arising under State or local law (exclusive of an obligation arising solely from a contract entered into by such person) to provide electric service to the public; or any corporation or association which is wholly owned, directly or indirectly, by any one or more of the foregoing; and
  • (I) give notice in the Federal Register and state in such notice the written explanation of the reasons why the specific terms and conditions for transmission services are not being offered or are being proposed;
  • (b) Not later than 1 year after October 24, 1992, the Commission shall promulgate a rule requiring that information be submitted annually to the Commission by transmitting utilities which is adequate to inform potential transmission customers, State regulatory authorities, and the public of potentially available transmission capacity and known constraints.
  • (3) Nothing in this section shall be construed to preempt any authority of any State to take action to ensure the safety, adequacy, and reliability of electric service within that State, as long as such action is not inconsistent with any reliability standard, except that the State of New York may establish rules that result in greater reliability within that State, as long as such action does not result in lesser reliability outside the State than that provided by the reliability standards.
  • (4) Within 90 days of the application of the Electric Reliability Organization or other affected party, and after notice and opportunity for comment, the Commission shall issue a final order determining whether a State action is inconsistent with a reliability standard, taking into consideration any recommendation of the ERO.
  • (5) The Commission, after consultation with the ERO and the State taking action, may stay the effectiveness of any State action, pending the Commission’s issuance of a final order.
  • (j) The Commission shall establish a regional advisory body on the petition of at least two-thirds of the States within a region that have more than one-half of their electric load served within the region. A regional advisory body shall be composed of one member from each participating State in the region, appointed by the Governor of each State, and may include representatives of agencies, States, and provinces outside the United States. A regional advisory body may provide advice to the Electric Reliability Organization, a regional entity, or the Commission regarding the governance of an existing or proposed regional entity within the same region, whether a standard proposed to apply within the region is just, reasonable, not unduly discriminatory or preferential, and in the public interest, whether fees proposed to be assessed within the region are just, reasonable, not unduly discriminatory or preferential, and in the public interest and any other responsibilities requested by the Commission. The Commission may give deference to the advice of any such regional advisory body if that body is organized on an Interconnection-wide basis.
  • (B) shall not be made available by any Federal, State, political subdivision or tribal authority pursuant to any Federal, State, political subdivision or tribal law requiring public disclosure of information or records.
  • (i) Federal, State, political subdivision, and tribal authorities;
  • (6) Nothing in this section shall require a person or entity in possession of critical electric infrastructure information to share such information with Federal, State, political subdivision, or tribal authorities, or any other person or entity.
  • (3) No cause of action shall lie or be maintained in any Federal or State court for the sharing or receipt of information under, and that is conducted in accordance with, subsection (d).
  • (A) a State in which the transmission facilities are to be constructed or modified does not have authority to—
    (i) approve the siting of the facilities; or
    (ii) consider the interstate benefits or interregional benefits expected to be achieved by the proposed construction or modification of transmission facilities in the State;
  • (ii) consider the interstate benefits or interregional benefits expected to be achieved by the proposed construction or modification of transmission facilities in the State;
  • (B) the applicant for a permit is a transmitting utility under this chapter but does not qualify to apply for a permit or siting approval for the proposed project in a State because the applicant does not serve end-use customers in the State; or
  • (d) In any proceeding before the Commission under subsection (b), the Commission shall afford each State in which a transmission facility covered by the permit is or will be located, each affected Federal agency and Indian tribe, private property owners, and other interested persons, a reasonable opportunity to present their views and recommendations with respect to the need for and impact of a facility covered by the permit.
  • (1) In the case of a permit under subsection (b) for electric transmission facilities to be located on property other than property owned by the United States or a State, if the permit holder cannot acquire by contract, or is unable to agree with the owner of the property to the compensation to be paid for, the necessary right-of-way to construct or modify, and operate and maintain, the transmission facilities and, in the determination of the Commission, the permit holder has made good faith efforts to engage with landowners and other stakeholders early in the applicable permitting process, the permit holder may acquire the right-of-way by the exercise of the right of eminent domain in the district court of the United States for the district in which the property concerned is located, or in the appropriate court of the State in which the property is located.
  • (3) The practice and procedure in any action or proceeding under this subsection in the district court of the United States shall conform as nearly as practicable to the practice and procedure in a similar action or proceeding in the courts of the State in which the property is located.
  • (g) Nothing in this section precludes any person from constructing or modifying any transmission facility in accordance with State law.
  • (3) To the maximum extent practicable under applicable Federal law, the Secretary shall coordinate the Federal authorization and review process under this subsection with any Indian tribes, multistate entities, and State agencies that are responsible for conducting any separate permitting and environmental reviews of the facility, to ensure timely and efficient review and permit decisions.
  • (A) As head of the lead agency, the Secretary, in consultation with agencies responsible for Federal authorizations and, as appropriate, with Indian tribes, multistate entities, and State agencies that are willing to coordinate their own separate permitting and environmental reviews with the Federal authorization and environmental reviews, shall establish prompt and binding intermediate milestones and ultimate deadlines for the review of, and Federal authorization decisions relating to, the proposed facility.
  • (A) If any agency has denied a Federal authorization required for a transmission facility, or has failed to act by the deadline established by the Secretary pursuant to this section for deciding whether to issue the authorization, the applicant or any State in which the facility would be located may file an appeal with the President, who shall, in consultation with the affected agency, review the denial or failure to take action on the pending application.
  • (ii) Interested Indian tribes, multistate entities, and State agencies may enter the memorandum of understanding.
  • (4) The Commission shall have no authority to issue a permit for the construction or modification of an electric transmission facility within a State that is a party to a compact, unless the Secretary determines that the members of the compact are in disagreement after the later of—
    (A) the date that is 1 year after the date on which the relevant application for the facility was filed; and
    (B) the date that is 1 year after the date on which the relevant national interest electric transmission corridor was designated by the Secretary under subsection (a).
  • (1) The term “distribution utility” means an electric utility that has a service obligation to end-users or to a State utility or electric cooperative that, directly or indirectly, through one or more additional State utilities or electric cooperatives, provides electric service to end-users.
  • (3) The term “service obligation” means a requirement applicable to, or the exercise of authority granted to, an electric utility under Federal, State, or local law or under long-term contracts to provide electric service to end-users or to a distribution utility.
  • (4) The term “State utility” means a State or any political subdivision of a State, or any agency, authority, or instrumentality of any one or more of the foregoing, or a corporation that is wholly owned, directly or indirectly, by any one or more of the foregoing, competent to carry on the business of developing, transmitting, utilizing, or distributing power.
  • (e) Nothing in this chapter relieves a load-serving entity from any obligation under State or local law to build transmission or distribution facilities adequate to meet the service obligations of the load-serving entity.
  • (B) in that portion of a State included in the geographic area proposed for a regional transmission organization in Commission Docket Number RT01–35 on the date on which that docket was opened.
  • (b) The Commission shall request each State to nominate a representative for the appropriate regional joint board, and shall designate a member of the Commission to chair and participate as a member of each such board.
  • (a) Every licensee and public utility shall make, keep, and preserve for such periods, such accounts, records of cost-accounting procedures, correspondence, memoranda, papers, books, and other records as the Commission may by rules and regulations prescribe as necessary or appropriate for purposes of the administration of this chapter, including accounts, records, and memoranda of the generation, transmission, distribution, delivery, or sale of electric energy, the furnishing of services or facilities in connection therewith, and receipts and expenditures with respect to any of the foregoing: Provided, however, That nothing in this chapter shall relieve any public utility from keeping any accounts, memoranda, or records which such public utility may be required to keep by or under authority of the laws of any State. The Commission may prescribe a system of accounts to be kept by licensees and public utilities and may classify such licensees and public utilities and prescribe a system of accounts for each class. The Commission, after notice and opportunity for hearing, may determine by order the accounts in which particular outlays and receipts shall be entered, charged, or credited. The burden of proof to justify every accounting entry questioned by the Commission shall be on the person making, authorizing, or requiring such entry, and the Commission may suspend a charge or credit pending submission of satisfactory proof in support thereof.
  • (iv) the issuance of securities of the public utility for which the person serves or proposes to serve as an officer or director has been approved by all Federal and State regulatory agencies having jurisdiction over the issuance.
  • Any person, electric utility, State, municipality, or State commission complaining of anything done or omitted to be done by any licensee, transmitting utility, or public utility in contravention of the provisions of this chapter may apply to the Commission by petition which shall briefly state the facts, whereupon a statement of the complaint thus made shall be forwarded by the Commission to such licensee, transmitting utility, or public utility, who shall be called upon to satisfy the complaint or to answer the same in writing within a reasonable time to be specified by the Commission. If such licensee, transmitting utility, or public utility shall not satisfy the complaint within the time specified or there shall appear to be any reasonable ground for investigating such complaint, it shall be the duty of the Commission to investigate the matters complained of in such manner and by such means as it shall find proper.
  • (d) The testimony of any witness may be taken, at the instance of a party, in any proceeding or investigation pending before the Commission, by deposition, at any time after the proceeding is at issue. The Commission may also order testimony to be taken by deposition in any proceeding or investigation pending before it, at any stage of such proceeding or investigation. Such depositions may be taken before any person authorized to administer oaths not being of counsel or attorney to either of the parties, nor interested in the proceeding or investigation. Reasonable notice must first be given in writing by the party or his attorney proposing to take such deposition to the opposite party or his attorney of record, as either may be nearest, which notice shall state the name of the witness and the time and place of the taking of his deposition. Any person may be compelled to appear and depose, and to produce documentary evidence, in the same manner as witnesses may be compelled to appear and testify and produce documentary evidence before the Commission, as hereinbefore provided. Such testimony shall be reduced to writing by the person taking the deposition, or under his direction, and shall, after it has been reduced to writing, be subscribed by the deponent.
  • (a) Hearings under this chapter may be held before the Commission, any member or members thereof or any representative of the Commission designated by it, and appropriate records thereof shall be kept. In any proceeding before it, the Commission, in accordance with such rules and regulations as it may prescribe, may admit as a party any interested State, State commission, municipality, or any representative of interested consumers or security holders, or any competitor of a party to such proceeding, or any other person whose participation in the proceeding may be in the public interest.
  • In order to secure information necessary or appropriate as a basis for recommending legislation, the Commission is authorized and directed to conduct investigations regarding the generation, transmission, distribution, and sale of electric energy, however produced, throughout the United States and its possessions, whether or not otherwise subject to the jurisdiction of the Commission, including the generation, transmission, distribution, and sale of electric energy by any agency, authority, or instrumentality of the United States, or of any State or municipality or other political subdivision of a State. It shall, so far as practicable, secure and keep current information regarding the ownership, operation, management, and control of all facilities for such generation, transmission, distribution, and sale; the capacity and output thereof and the relationship between the two; the cost of generation, transmission, and distribution; the rates, charges, and contracts in respect of the sale of electric energy and its service to residential, rural, commercial, and industrial consumers and other purchasers by private and public agencies; and the relation of any or all such facts to the development of navigation, industry, commerce, and the national defense. The Commission shall report to Congress the results of investigations made under authority of this section.
  • (a) Any person, electric utility, State, municipality, or State commission aggrieved by an order issued by the Commission in a proceeding under this chapter to which such person, electric utility, State, municipality, or State commission is a party may apply for a rehearing within thirty days after the issuance of such order. The application for rehearing shall set forth specifically the ground or grounds upon which such application is based. Upon such application the Commission shall have power to grant or deny rehearing or to abrogate or modify its order without further hearing. Unless the Commission acts upon the application for rehearing within thirty days after it is filed, such application may be deemed to have been denied. No proceeding to review any order of the Commission shall be brought by any entity unless such entity shall have made application to the Commission for a rehearing thereon. Until the record in a proceeding shall have been filed in a court of appeals, as provided in subsection (b), the Commission may at any time, upon reasonable notice and in such manner as it shall deem proper, modify or set aside, in whole or in part, any finding or order made or issued by it under the provisions of this chapter.
  • Notwithstanding section 3302 of title 31, beginning in fiscal year 2005 and thereafter, such funds as are received by the Southwestern Power Administration from any State, municipality, corporation, association, firm, district, or individual as advance payment for work that is associated with Southwestern’s transmission facilities, consistent with that authorized in section 825s of this title, shall be credited to this account and be available until expended.
  • Notwithstanding the provisions of section 3302 of title 31, beginning in fiscal year 2008 and thereafter, such funds as are received by the Southeastern Power Administration from any State, municipality, corporation, association, firm, district, or individual as advance payment for work that is associated with Southeastern’s Operations and Maintenance, consistent with that authorized in section 825s of this title, shall be credited to this account and be available until expended.
  • The Administrator of General Services or his successor in interest is authorized to reduce the rate of interest to 2½ per centum on all power bonds held by such Agency issued by States, public authorities, counties, municipalities, and other subdivisions of State governments for power projects financed by the Public Works Administration.
  • Section 807 of this title pertaining to the taking over by the United States of any project upon or after the expiration of a license, and sections 825 and 825a of this title requiring certain records and accounting procedures and section 797(b) of this title requiring the preparation and filing of the statement of actual legitimate original cost of a project, shall not be applicable to any project owned by a State or municipality, and such rights and requirements shall not exist under any license heretofore or hereafter granted to any State or municipality. The Secretary of Energy in determining the amount of annual charges applicable to any such project may determine the annual charges with reference to the actual cost of services incurred by the Secretary with respect to the project.

Citations to §796(7)

  • (e) To issue licenses to citizens of the United States, or to any association of such citizens, or to any corporation organized under the laws of the United States or any State thereof, or to any State or municipality for the purpose of constructing, operating, and maintaining dams, water conduits, reservoirs, power houses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization of power across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, or upon any part of the public lands and reservations of the United States (including the Territories), or for the purpose of utilizing the surplus water or water power from any Government dam, except as herein provided: Provided, That licenses shall be issued within any reservation only after a finding by the Commission that the license will not interfere or be inconsistent with the purpose for which such reservation was created or acquired, and shall be subject to and contain such conditions as the Secretary of the department under whose supervision such reservation falls shall deem necessary for the adequate protection and utilization of such reservation:1 The license applicant and any party to the proceeding shall be entitled to a determination on the record, after opportunity for an agency trial-type hearing of no more than 90 days, on any disputed issues of material fact with respect to such conditions. All disputed issues of material fact raised by any party shall be determined in a single trial-type hearing to be conducted by the relevant resource agency in accordance with the regulations promulgated under this subsection and within the time frame established by the Commission for each license proceeding. Within 90 days of August 8, 2005, the Secretaries of the Interior, Commerce, and Agriculture shall establish jointly, by rule, the procedures for such expedited trial-type hearing, including the opportunity to undertake discovery and cross-examine witnesses, in consultation with the Federal Energy Regulatory Commission.2 Provided further, That no license affecting the navigable capacity of any navigable waters of the United States shall be issued until the plans of the dam or other structures affecting the navigation have been approved by the Chief of Engineers and the Secretary of the Army. Whenever the contemplated improvement is, in the judgment of the Commission, desirable and justified in the public interest for the purpose of improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, a finding to that effect shall be made by the Commission and shall become a part of the records of the Commission: Provided further, That in case the Commission shall find that any Government dam may be advantageously used by the United States for public purposes in addition to navigation, no license therefor shall be issued until two years after it shall have reported to Congress the facts and conditions relating thereto, except that this provision shall not apply to any Government dam constructed prior to June 10, 1920: And provided further, That upon the filing of any application for a license which has not been preceded by a preliminary permit under subsection (f) of this section, notice shall be given and published as required by the proviso of said subsection. In deciding whether to issue any license under this subchapter for any project, the Commission, in addition to the power and development purposes for which licenses are issued, shall give equal consideration to the purposes of energy conservation, the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat), the protection of recreational opportunities, and the preservation of other aspects of environmental quality.
  • (f) To issue preliminary permits for the purpose of enabling applicants for a license hereunder to secure the data and to perform the acts required by section 802 of this title: Provided, however, That upon the filing of any application for a preliminary permit by any person, association, or corporation the Commission, before granting such application, shall at once give notice of such application in writing to any State or municipality likely to be interested in or affected by such application; and shall also publish notice of such application once each week for four weeks in a daily or weekly newspaper published in the county or counties in which the project or any part hereof or the lands affected thereby are situated.
  • (g) Upon its own motion to order an investigation of any occupancy of, or evidenced intention to occupy, for the purpose of developing electric power, public lands, reservations, or streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States by any person, corporation, State, or municipality and to issue such order as it may find appropriate, expedient, and in the public interest to conserve and utilize the navigation and water-power resources of the region.
  • (a) In issuing preliminary permits hereunder or original licenses where no preliminary permit has been issued, the Commission shall give preference to applications therefor by States, Indian tribes, and municipalities, provided the plans for the same are deemed by the Commission equally well adapted, or shall within a reasonable time to be fixed by the Commission be made equally well adapted, to conserve and utilize in the public interest the water resources of the region; and as between other applicants, the Commission may give preference to the applicant the plans of which it finds and determines are best adapted to develop, conserve, and utilize in the public interest the water resources of the region, if it be satisfied as to the ability of the applicant to carry out such plans.
  • (1) That the licensee shall pay to the United States reasonable annual charges in an amount to be fixed by the Commission for the purpose of reimbursing the United States for the costs of the administration of this subchapter, including any reasonable and necessary costs incurred by Federal and State fish and wildlife agencies and other natural and cultural resource agencies in connection with studies or other reviews carried out by such agencies for purposes of administering their responsibilities under this subchapter; for recompensing it for the use, occupancy, and enjoyment of its lands or other property; and for the expropriation to the Government of excessive profits until the respective States shall make provision for preventing excessive profits or for the expropriation thereof to themselves, or until the period of amortization as herein provided is reached, and in fixing such charges the Commission shall seek to avoid increasing the price to the consumers of power by such charges, and any such charges may be adjusted from time to time by the Commission as conditions may require: Provided, That, subject to annual appropriations Acts, the portion of such annual charges imposed by the Commission under this subsection to cover the reasonable and necessary costs of such agencies shall be available to such agencies (in addition to other funds appropriated for such purposes) solely for carrying out such studies and reviews and shall remain available until expended: Provided, That when licenses are issued involving the use of Government dams or other structures owned by the United States or tribal lands embraced within Indian reservations the Commission shall, subject to the approval of the Secretary of the Interior in the case of such dams or structures in reclamation projects and, in the case of such tribal lands, subject to the approval of the Indian tribe having jurisdiction of such lands as provided in section 5123 of title 25, fix a reasonable annual charge for the use thereof, and such charges may with like approval be readjusted by the Commission at the end of twenty years after the project is available for service and at periods of not less than ten years thereafter upon notice and opportunity for hearing: Provided further, That licenses for the development, transmission, or distribution of power by States or municipalities shall be issued and enjoyed without charge to the extent such power is sold to the public without profit or is used by such State or municipality for State or municipal purposes, except that as to projects constructed or to be constructed by States or municipalities primarily designed to provide or improve navigation, licenses therefor shall be issued without charge; and that licenses for the development, transmission, or distribution of power for domestic, mining, or other beneficial use in projects of not more than two thousand horsepower installed capacity may be issued without charge, except on tribal lands within Indian reservations; but in no case shall a license be issued free of charge for the development and utilization of power created by any Government dam and that the amount charged therefor in any license shall be such as determined by the Commission: Provided however, That no charge shall be assessed for the use of any Government dam or structure by any licensee if, before January 1, 1985, the Secretary of the Interior has entered into a contract with such licensee that meets each of the following requirements:
    (A) The contract covers one or more projects for which a license was issued by the Commission before January 1, 1985.
    (B) The contract contains provisions specifically providing each of the following:
    (i) A powerplant may be built by the licensee utilizing irrigation facilities constructed by the United States.
    (ii) The powerplant shall remain in the exclusive control, possession, and ownership of the licensee concerned.
    (iii) All revenue from the powerplant and from the use, sale, or disposal of electric energy from the powerplant shall be, and remain, the property of such licensee.
    (C) The contract is an amendatory, supplemental and replacement contract between the United States and: (i) the Quincy-Columbia Basin Irrigation District (Contract No. 14–06–100–6418); (ii) the East Columbia Basin Irrigation District (Contract No. 14–06–100–6419); or, (iii) the South Columbia Basin Irrigation District (Contract No. 14–06–100–6420).
    This paragraph shall apply to any project covered by a contract referred to in this paragraph only during the term of such contract unless otherwise provided by subsequent Act of Congress. In the event an overpayment of any charge due under this section shall be made by a licensee, the Commission is authorized to allow a credit for such overpayment when charges are due for any subsequent period.
  • (a) Upon not less than two years’ notice in writing from the commission the United States shall have the right upon or after the expiration of any license to take over and thereafter to maintain and operate any project or projects as defined in section 796 of this title, and covered in whole or in part by the license, or the right to take over upon mutual agreement with the licensee all property owned and held by the licensee then valuable and serviceable in the development, transmission, or distribution of power and which is then dependent for its usefulness upon the continuance of the license, together with any lock or locks or other aids to navigation constructed at the expense of the licensee, upon the condition that before taking possession it shall pay the net investment of the licensee in the project or projects taken, not to exceed the fair value of the property taken, plus such reasonable damages, if any, to property of the licensee valuable, serviceable, and dependent as above set forth but not taken, as may be caused by the severance therefrom of property taken, and shall assume all contracts entered into by the licensee with the approval of the Commission. The net investment of the licensee in the project or projects so taken and the amount of such severance damages, if any, shall be determined by the Commission after notice and opportunity for hearing. Such net investment shall not include or be affected by the value of any lands, rights-of-way, or other property of the United States licensed by the Commission under this chapter, by the license or by good will, going value, or prospective revenues; nor shall the values allowed for water rights, rights-of-way, lands, or interest in lands be in excess of the actual reasonable cost thereof at the time of acquisition by the licensee: Provided, That the right of the United States or any State or municipality to take over, maintain, and operate any project licensed under this chapter at any time by condemnation proceedings upon payment of just compensation is expressly reserved.
  • (f) In issuing any licenses under this section except an annual license, the Commission, on its own motion or upon application of any licensee, person, State, municipality, or State commission, after notice to each State commission and licensee affected, and after opportunity for hearing, whenever it finds that in conformity with a comprehensive plan for improving or developing a waterway or waterways for beneficial public uses all or part of any licensed project should no longer be used or adapted for use for power purposes, may license all or part of the project works for nonpower use. A license for nonpower use shall be issued to a new licensee only on the condition that the new licensee shall, before taking possession of the facilities encompassed thereunder, pay such amount and assume such contracts as the United States is required to do, in the manner specified in section 807 of this title. Any license for nonpower use shall be a temporary license. Whenever, in the judgment of the Commission, a State, municipality, interstate agency, or another Federal agency is authorized and willing to assume regulatory supervision of the lands and facilities included under the nonpower license and does so, the Commission shall thereupon terminate the license. Consistent with the provisions of subchapter IV of this chapter, every licensee for nonpower use shall keep such accounts and file such annual and other periodic or special reports concerning the removal, alteration, nonpower use, or other disposition of any project works or parts thereof covered by the nonpower use license as the Commission may by rules and regulations or order prescribe as necessary or appropriate.
  • The provisions of this subchapter shall not be construed as affecting any permit or valid existing right-of-way granted prior to June 10, 1920, or as confirming or otherwise affecting any claim, or as affecting any authority heretofore given pursuant to law, but any person, association, corporation, State, or municipality holding or possessing such permit, right-of-way or authority may apply for a license under this chapter, and upon such application the Commission may issue to any such applicant a license in accordance with the provisions of this subchapter and in such case the provisions of this chapter shall apply to such applicant as a licensee under this chapter: Provided, That when application is made for a license under this section for a project or projects already constructed the fair value of said project or projects determined as provided in this section, shall for the purposes of this subchapter and of said license be deemed to be the amount to be allowed as the net investment of the applicant in such project or projects as of the date of such license, or as of the date of such determination, if license has not been issued. Such fair value shall be determined by the Commission after notice and opportunity for hearing.
  • (1) It shall be unlawful for any person, State, or municipality, for the purpose of developing electric power, to construct, operate, or maintain any dam, water conduit, reservoir, power house, or other works incidental thereto across, along, or in any of the navigable waters of the United States, or upon any part of the public lands or reservations of the United States (including the Territories), or utilize the surplus water or water power from any Government dam, except under and in accordance with the terms of a permit or valid existing right-of-way granted prior to June 10, 1920, or a license granted pursuant to this chapter. Any person, association, corporation, State, or municipality intending to construct a dam or other project works, across, along, over, or in any stream or part thereof, other than those defined in this chapter as navigable waters, and over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States shall before such construction file declaration of such intention with the Commission, whereupon the Commission shall cause immediate investigation of such proposed construction to be made, and if upon investigation it shall find that the interests of interstate or foreign commerce would be affected by such proposed construction, such person, association, corporation, State, or municipality shall not construct, maintain, or operate such dam or other project works until it shall have applied for and shall have received a license under the provisions of this chapter. If the Commission shall not so find, and if no public lands or reservations are affected, permission is granted to construct such dam or other project works in such stream upon compliance with State laws.
  • (A) Any person, State, or municipality proposing to construct a qualifying conduit hydropower facility shall file with the Commission a notice of intent to construct such facility. The notice shall include sufficient information to demonstrate that the facility meets the qualifying criteria.
  • (d) Notwithstanding section 798 of this title, and regardless of whether the holder of a preliminary permit for a closed-loop pumped storage project claimed municipal preference under section 800(a) of this title when obtaining the permit, on request by a municipality, the Commission may, to facilitate development of a closed-loop pumped storage project
    (1) add entities as joint permittees following issuance of a preliminary permit; and
    (2) transfer a license in part to one or more nonmunicipal entities as co-licensees with a municipality, if the municipality retains majority ownership of the project for which the license was issued.
  • (2) transfer a license in part to one or more nonmunicipal entities as co-licensees with a municipality, if the municipality retains majority ownership of the project for which the license was issued.
  • (d) During the continuance of any emergency requiring immediate action, any person or municipality engaged in the transmission or sale of electric energy and not otherwise subject to the jurisdiction of the Commission may make such temporary connections with any public utility subject to the jurisdiction of the Commission or may construct such temporary facilities for the transmission of electric energy in interstate commerce as may be necessary or appropriate to meet such emergency, and shall not become subject to the jurisdiction of the Commission by reason of such temporary connection or temporary construction: Provided, That such temporary connection shall be discontinued or such temporary construction removed or otherwise disposed of upon the termination of such emergency: Provided further, That upon approval of the Commission permanent connections for emergency use only may be made hereunder.
  • (i) The Commission may not require a State or municipality to take action under this section that would violate a private activity bond rule for purposes of section 141 of title 26.
  • (3) Any determination under paragraph (1) shall be reviewable only in the appropriate court of the United States upon petition filed by any aggrieved person or municipality within 60 days after such determination, and such court shall have jurisdiction to grant appropriate relief. Any applicant who applied for and obtained the order under section 824i or 824j of this title, and any electric utility or other entity subject to such order shall have the right to intervene in any such proceeding in such court. Except for review by such court (and any appeal or other review by an appellate court of the United States), no court shall have jurisdiction to consider any action brought by any person to enjoin the carrying out of any order of the Commission under section 824i or section 824j of this title requiring the TVA to take any action on the grounds that such action requires a specific authorization of the Congress pursuant to the third sentence of section 15d(a) of the TVA Act [16 U.S.C. 831n–4(a)].
  • Any person, electric utility, State, municipality, or State commission complaining of anything done or omitted to be done by any licensee, transmitting utility, or public utility in contravention of the provisions of this chapter may apply to the Commission by petition which shall briefly state the facts, whereupon a statement of the complaint thus made shall be forwarded by the Commission to such licensee, transmitting utility, or public utility, who shall be called upon to satisfy the complaint or to answer the same in writing within a reasonable time to be specified by the Commission. If such licensee, transmitting utility, or public utility shall not satisfy the complaint within the time specified or there shall appear to be any reasonable ground for investigating such complaint, it shall be the duty of the Commission to investigate the matters complained of in such manner and by such means as it shall find proper.
  • (a) Hearings under this chapter may be held before the Commission, any member or members thereof or any representative of the Commission designated by it, and appropriate records thereof shall be kept. In any proceeding before it, the Commission, in accordance with such rules and regulations as it may prescribe, may admit as a party any interested State, State commission, municipality, or any representative of interested consumers or security holders, or any competitor of a party to such proceeding, or any other person whose participation in the proceeding may be in the public interest.
  • In order to secure information necessary or appropriate as a basis for recommending legislation, the Commission is authorized and directed to conduct investigations regarding the generation, transmission, distribution, and sale of electric energy, however produced, throughout the United States and its possessions, whether or not otherwise subject to the jurisdiction of the Commission, including the generation, transmission, distribution, and sale of electric energy by any agency, authority, or instrumentality of the United States, or of any State or municipality or other political subdivision of a State. It shall, so far as practicable, secure and keep current information regarding the ownership, operation, management, and control of all facilities for such generation, transmission, distribution, and sale; the capacity and output thereof and the relationship between the two; the cost of generation, transmission, and distribution; the rates, charges, and contracts in respect of the sale of electric energy and its service to residential, rural, commercial, and industrial consumers and other purchasers by private and public agencies; and the relation of any or all such facts to the development of navigation, industry, commerce, and the national defense. The Commission shall report to Congress the results of investigations made under authority of this section.
  • (a) Any person, electric utility, State, municipality, or State commission aggrieved by an order issued by the Commission in a proceeding under this chapter to which such person, electric utility, State, municipality, or State commission is a party may apply for a rehearing within thirty days after the issuance of such order. The application for rehearing shall set forth specifically the ground or grounds upon which such application is based. Upon such application the Commission shall have power to grant or deny rehearing or to abrogate or modify its order without further hearing. Unless the Commission acts upon the application for rehearing within thirty days after it is filed, such application may be deemed to have been denied. No proceeding to review any order of the Commission shall be brought by any entity unless such entity shall have made application to the Commission for a rehearing thereon. Until the record in a proceeding shall have been filed in a court of appeals, as provided in subsection (b), the Commission may at any time, upon reasonable notice and in such manner as it shall deem proper, modify or set aside, in whole or in part, any finding or order made or issued by it under the provisions of this chapter.
  • Notwithstanding section 3302 of title 31, beginning in fiscal year 2005 and thereafter, such funds as are received by the Southwestern Power Administration from any State, municipality, corporation, association, firm, district, or individual as advance payment for work that is associated with Southwestern’s transmission facilities, consistent with that authorized in section 825s of this title, shall be credited to this account and be available until expended.
  • Notwithstanding the provisions of section 3302 of title 31, beginning in fiscal year 2008 and thereafter, such funds as are received by the Southeastern Power Administration from any State, municipality, corporation, association, firm, district, or individual as advance payment for work that is associated with Southeastern’s Operations and Maintenance, consistent with that authorized in section 825s of this title, shall be credited to this account and be available until expended.
  • The Administrator of General Services or his successor in interest is authorized to reduce the rate of interest to 2½ per centum on all power bonds held by such Agency issued by States, public authorities, counties, municipalities, and other subdivisions of State governments for power projects financed by the Public Works Administration.
  • In order to facilitate the development and construction by States and municipalities of water conservation facilities, certain requirements in the Federal Power Act [16 U.S.C. 791a et seq.] are made inapplicable to States and municipalities as provided in this subchapter.
  • Section 807 of this title pertaining to the taking over by the United States of any project upon or after the expiration of a license, and sections 825 and 825a of this title requiring certain records and accounting procedures and section 797(b) of this title requiring the preparation and filing of the statement of actual legitimate original cost of a project, shall not be applicable to any project owned by a State or municipality, and such rights and requirements shall not exist under any license heretofore or hereafter granted to any State or municipality. The Secretary of Energy in determining the amount of annual charges applicable to any such project may determine the annual charges with reference to the actual cost of services incurred by the Secretary with respect to the project.

Citations to §796(8)

  • (e) To issue licenses to citizens of the United States, or to any association of such citizens, or to any corporation organized under the laws of the United States or any State thereof, or to any State or municipality for the purpose of constructing, operating, and maintaining dams, water conduits, reservoirs, power houses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization of power across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, or upon any part of the public lands and reservations of the United States (including the Territories), or for the purpose of utilizing the surplus water or water power from any Government dam, except as herein provided: Provided, That licenses shall be issued within any reservation only after a finding by the Commission that the license will not interfere or be inconsistent with the purpose for which such reservation was created or acquired, and shall be subject to and contain such conditions as the Secretary of the department under whose supervision such reservation falls shall deem necessary for the adequate protection and utilization of such reservation:1 The license applicant and any party to the proceeding shall be entitled to a determination on the record, after opportunity for an agency trial-type hearing of no more than 90 days, on any disputed issues of material fact with respect to such conditions. All disputed issues of material fact raised by any party shall be determined in a single trial-type hearing to be conducted by the relevant resource agency in accordance with the regulations promulgated under this subsection and within the time frame established by the Commission for each license proceeding. Within 90 days of August 8, 2005, the Secretaries of the Interior, Commerce, and Agriculture shall establish jointly, by rule, the procedures for such expedited trial-type hearing, including the opportunity to undertake discovery and cross-examine witnesses, in consultation with the Federal Energy Regulatory Commission.2 Provided further, That no license affecting the navigable capacity of any navigable waters of the United States shall be issued until the plans of the dam or other structures affecting the navigation have been approved by the Chief of Engineers and the Secretary of the Army. Whenever the contemplated improvement is, in the judgment of the Commission, desirable and justified in the public interest for the purpose of improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, a finding to that effect shall be made by the Commission and shall become a part of the records of the Commission: Provided further, That in case the Commission shall find that any Government dam may be advantageously used by the United States for public purposes in addition to navigation, no license therefor shall be issued until two years after it shall have reported to Congress the facts and conditions relating thereto, except that this provision shall not apply to any Government dam constructed prior to June 10, 1920: And provided further, That upon the filing of any application for a license which has not been preceded by a preliminary permit under subsection (f) of this section, notice shall be given and published as required by the proviso of said subsection. In deciding whether to issue any license under this subchapter for any project, the Commission, in addition to the power and development purposes for which licenses are issued, shall give equal consideration to the purposes of energy conservation, the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat), the protection of recreational opportunities, and the preservation of other aspects of environmental quality.
  • If the dam or other project works are to be constructed across, along, or in any of the navigable waters of the United States, the commission may, insofar as it deems the same reasonably necessary to promote the present and future needs of navigation and consistent with a reasonable investment cost to the licensee, include in the license any one or more of the following provisions or requirements:
  • Whenever application is filed for a project hereunder involving navigable waters of the United States, and the commission shall find upon investigation that the needs of navigation require the construction of a lock or locks or other navigation structures, and that such structures cannot, consistent with a reasonable investment cost to the applicant, be provided in the manner specified in subsection (a) of section 804 of this title, the commission may grant the application with the provision to be expressed in the license that the licensee will install the necessary navigation structures if the Government fails to make provision therefor within a time to be fixed in the license and cause a report upon such project to be prepared, with estimates of cost of the power development and of the navigation structures, and shall submit such report to Congress with such recommendations as it deems appropriate concerning the participation of the United States in the cost of construction of such navigation structures.
  • (a) All proceeds from any Indian reservation shall be placed to the credit of the Indians of such reservation. All other charges arising from licenses hereunder, except charges fixed by the Commission for the purpose of reimbursing the United States for the costs of administration of this subchapter, shall be paid into the Treasury of the United States, subject to the following distribution: 12½ per centum thereof is hereby appropriated to be paid into the Treasury of the United States and credited to “Miscellaneous receipts”; 50 per centum of the charges arising from licenses hereunder for the occupancy and use of public lands and national forests shall be paid into, reserved, and appropriated as a part of the reclamation fund created by the Act of Congress known as the Reclamation Act, approved June 17, 1902; and 37½ per centum of the charges arising from licenses hereunder for the occupancy and use of national forests and public lands from development within the boundaries of any State shall be paid by the Secretary of the Treasury to such State; and 50 per centum of the charges arising from all other licenses hereunder is reserved and appropriated as a special fund in the Treasury to be expended under the direction of the Secretary of the Army in the maintenance and operation of dams and other navigation structures owned by the United States or in the construction, maintenance, or operation of headwater or other improvements of navigable waters of the United States. The proceeds of charges made by the Commission for the purpose of reimbursing the United States for the costs of the administration of this subchapter shall be paid into the Treasury of the United States and credited to miscellaneous receipts.
  • (1) It shall be unlawful for any person, State, or municipality, for the purpose of developing electric power, to construct, operate, or maintain any dam, water conduit, reservoir, power house, or other works incidental thereto across, along, or in any of the navigable waters of the United States, or upon any part of the public lands or reservations of the United States (including the Territories), or utilize the surplus water or water power from any Government dam, except under and in accordance with the terms of a permit or valid existing right-of-way granted prior to June 10, 1920, or a license granted pursuant to this chapter. Any person, association, corporation, State, or municipality intending to construct a dam or other project works, across, along, over, or in any stream or part thereof, other than those defined in this chapter as navigable waters, and over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States shall before such construction file declaration of such intention with the Commission, whereupon the Commission shall cause immediate investigation of such proposed construction to be made, and if upon investigation it shall find that the interests of interstate or foreign commerce would be affected by such proposed construction, such person, association, corporation, State, or municipality shall not construct, maintain, or operate such dam or other project works until it shall have applied for and shall have received a license under the provisions of this chapter. If the Commission shall not so find, and if no public lands or reservations are affected, permission is granted to construct such dam or other project works in such stream upon compliance with State laws.

Citations to §796(9)

  • (1) That the licensee shall pay to the United States reasonable annual charges in an amount to be fixed by the Commission for the purpose of reimbursing the United States for the costs of the administration of this subchapter, including any reasonable and necessary costs incurred by Federal and State fish and wildlife agencies and other natural and cultural resource agencies in connection with studies or other reviews carried out by such agencies for purposes of administering their responsibilities under this subchapter; for recompensing it for the use, occupancy, and enjoyment of its lands or other property; and for the expropriation to the Government of excessive profits until the respective States shall make provision for preventing excessive profits or for the expropriation thereof to themselves, or until the period of amortization as herein provided is reached, and in fixing such charges the Commission shall seek to avoid increasing the price to the consumers of power by such charges, and any such charges may be adjusted from time to time by the Commission as conditions may require: Provided, That, subject to annual appropriations Acts, the portion of such annual charges imposed by the Commission under this subsection to cover the reasonable and necessary costs of such agencies shall be available to such agencies (in addition to other funds appropriated for such purposes) solely for carrying out such studies and reviews and shall remain available until expended: Provided, That when licenses are issued involving the use of Government dams or other structures owned by the United States or tribal lands embraced within Indian reservations the Commission shall, subject to the approval of the Secretary of the Interior in the case of such dams or structures in reclamation projects and, in the case of such tribal lands, subject to the approval of the Indian tribe having jurisdiction of such lands as provided in section 5123 of title 25, fix a reasonable annual charge for the use thereof, and such charges may with like approval be readjusted by the Commission at the end of twenty years after the project is available for service and at periods of not less than ten years thereafter upon notice and opportunity for hearing: Provided further, That licenses for the development, transmission, or distribution of power by States or municipalities shall be issued and enjoyed without charge to the extent such power is sold to the public without profit or is used by such State or municipality for State or municipal purposes, except that as to projects constructed or to be constructed by States or municipalities primarily designed to provide or improve navigation, licenses therefor shall be issued without charge; and that licenses for the development, transmission, or distribution of power for domestic, mining, or other beneficial use in projects of not more than two thousand horsepower installed capacity may be issued without charge, except on tribal lands within Indian reservations; but in no case shall a license be issued free of charge for the development and utilization of power created by any Government dam and that the amount charged therefor in any license shall be such as determined by the Commission: Provided however, That no charge shall be assessed for the use of any Government dam or structure by any licensee if, before January 1, 1985, the Secretary of the Interior has entered into a contract with such licensee that meets each of the following requirements:
    (A) The contract covers one or more projects for which a license was issued by the Commission before January 1, 1985.
    (B) The contract contains provisions specifically providing each of the following:
    (i) A powerplant may be built by the licensee utilizing irrigation facilities constructed by the United States.
    (ii) The powerplant shall remain in the exclusive control, possession, and ownership of the licensee concerned.
    (iii) All revenue from the powerplant and from the use, sale, or disposal of electric energy from the powerplant shall be, and remain, the property of such licensee.
    (C) The contract is an amendatory, supplemental and replacement contract between the United States and: (i) the Quincy-Columbia Basin Irrigation District (Contract No. 14–06–100–6418); (ii) the East Columbia Basin Irrigation District (Contract No. 14–06–100–6419); or, (iii) the South Columbia Basin Irrigation District (Contract No. 14–06–100–6420).
    This paragraph shall apply to any project covered by a contract referred to in this paragraph only during the term of such contract unless otherwise provided by subsequent Act of Congress. In the event an overpayment of any charge due under this section shall be made by a licensee, the Commission is authorized to allow a credit for such overpayment when charges are due for any subsequent period.

Citations to §796(10)

  • (a) To make investigations and to collect and record data concerning the utilization of the water resources of any region to be developed, the water-power industry and its relation to other industries and to interstate or foreign commerce, and concerning the location, capacity, development costs, and relation to markets of power sites, and whether the power from Government dams can be advantageously used by the United States for its public purposes, and what is a fair value of such power, to the extent the Commission may deem necessary or useful for the purposes of this chapter.
  • (e) To issue licenses to citizens of the United States, or to any association of such citizens, or to any corporation organized under the laws of the United States or any State thereof, or to any State or municipality for the purpose of constructing, operating, and maintaining dams, water conduits, reservoirs, power houses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization of power across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, or upon any part of the public lands and reservations of the United States (including the Territories), or for the purpose of utilizing the surplus water or water power from any Government dam, except as herein provided: Provided, That licenses shall be issued within any reservation only after a finding by the Commission that the license will not interfere or be inconsistent with the purpose for which such reservation was created or acquired, and shall be subject to and contain such conditions as the Secretary of the department under whose supervision such reservation falls shall deem necessary for the adequate protection and utilization of such reservation:1 The license applicant and any party to the proceeding shall be entitled to a determination on the record, after opportunity for an agency trial-type hearing of no more than 90 days, on any disputed issues of material fact with respect to such conditions. All disputed issues of material fact raised by any party shall be determined in a single trial-type hearing to be conducted by the relevant resource agency in accordance with the regulations promulgated under this subsection and within the time frame established by the Commission for each license proceeding. Within 90 days of August 8, 2005, the Secretaries of the Interior, Commerce, and Agriculture shall establish jointly, by rule, the procedures for such expedited trial-type hearing, including the opportunity to undertake discovery and cross-examine witnesses, in consultation with the Federal Energy Regulatory Commission.2 Provided further, That no license affecting the navigable capacity of any navigable waters of the United States shall be issued until the plans of the dam or other structures affecting the navigation have been approved by the Chief of Engineers and the Secretary of the Army. Whenever the contemplated improvement is, in the judgment of the Commission, desirable and justified in the public interest for the purpose of improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, a finding to that effect shall be made by the Commission and shall become a part of the records of the Commission: Provided further, That in case the Commission shall find that any Government dam may be advantageously used by the United States for public purposes in addition to navigation, no license therefor shall be issued until two years after it shall have reported to Congress the facts and conditions relating thereto, except that this provision shall not apply to any Government dam constructed prior to June 10, 1920: And provided further, That upon the filing of any application for a license which has not been preceded by a preliminary permit under subsection (f) of this section, notice shall be given and published as required by the proviso of said subsection. In deciding whether to issue any license under this subchapter for any project, the Commission, in addition to the power and development purposes for which licenses are issued, shall give equal consideration to the purposes of energy conservation, the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat), the protection of recreational opportunities, and the preservation of other aspects of environmental quality.
  • (1) That the licensee shall pay to the United States reasonable annual charges in an amount to be fixed by the Commission for the purpose of reimbursing the United States for the costs of the administration of this subchapter, including any reasonable and necessary costs incurred by Federal and State fish and wildlife agencies and other natural and cultural resource agencies in connection with studies or other reviews carried out by such agencies for purposes of administering their responsibilities under this subchapter; for recompensing it for the use, occupancy, and enjoyment of its lands or other property; and for the expropriation to the Government of excessive profits until the respective States shall make provision for preventing excessive profits or for the expropriation thereof to themselves, or until the period of amortization as herein provided is reached, and in fixing such charges the Commission shall seek to avoid increasing the price to the consumers of power by such charges, and any such charges may be adjusted from time to time by the Commission as conditions may require: Provided, That, subject to annual appropriations Acts, the portion of such annual charges imposed by the Commission under this subsection to cover the reasonable and necessary costs of such agencies shall be available to such agencies (in addition to other funds appropriated for such purposes) solely for carrying out such studies and reviews and shall remain available until expended: Provided, That when licenses are issued involving the use of Government dams or other structures owned by the United States or tribal lands embraced within Indian reservations the Commission shall, subject to the approval of the Secretary of the Interior in the case of such dams or structures in reclamation projects and, in the case of such tribal lands, subject to the approval of the Indian tribe having jurisdiction of such lands as provided in section 5123 of title 25, fix a reasonable annual charge for the use thereof, and such charges may with like approval be readjusted by the Commission at the end of twenty years after the project is available for service and at periods of not less than ten years thereafter upon notice and opportunity for hearing: Provided further, That licenses for the development, transmission, or distribution of power by States or municipalities shall be issued and enjoyed without charge to the extent such power is sold to the public without profit or is used by such State or municipality for State or municipal purposes, except that as to projects constructed or to be constructed by States or municipalities primarily designed to provide or improve navigation, licenses therefor shall be issued without charge; and that licenses for the development, transmission, or distribution of power for domestic, mining, or other beneficial use in projects of not more than two thousand horsepower installed capacity may be issued without charge, except on tribal lands within Indian reservations; but in no case shall a license be issued free of charge for the development and utilization of power created by any Government dam and that the amount charged therefor in any license shall be such as determined by the Commission: Provided however, That no charge shall be assessed for the use of any Government dam or structure by any licensee if, before January 1, 1985, the Secretary of the Interior has entered into a contract with such licensee that meets each of the following requirements:
    (A) The contract covers one or more projects for which a license was issued by the Commission before January 1, 1985.
    (B) The contract contains provisions specifically providing each of the following:
    (i) A powerplant may be built by the licensee utilizing irrigation facilities constructed by the United States.
    (ii) The powerplant shall remain in the exclusive control, possession, and ownership of the licensee concerned.
    (iii) All revenue from the powerplant and from the use, sale, or disposal of electric energy from the powerplant shall be, and remain, the property of such licensee.
    (C) The contract is an amendatory, supplemental and replacement contract between the United States and: (i) the Quincy-Columbia Basin Irrigation District (Contract No. 14–06–100–6418); (ii) the East Columbia Basin Irrigation District (Contract No. 14–06–100–6419); or, (iii) the South Columbia Basin Irrigation District (Contract No. 14–06–100–6420).
    This paragraph shall apply to any project covered by a contract referred to in this paragraph only during the term of such contract unless otherwise provided by subsequent Act of Congress. In the event an overpayment of any charge due under this section shall be made by a licensee, the Commission is authorized to allow a credit for such overpayment when charges are due for any subsequent period.
  • (2) In the case of licenses involving the use of Government dams or other structures owned by the United States, the charges fixed (or readjusted) by the Commission under paragraph (1) for the use of such dams or structures shall not exceed 1 mill per kilowatt-hour for the first 40 gigawatt-hours of energy a project produces in any year, 1½ mills per kilowatt-hour for over 40 up to and including 80 gigawatt-hours in any year, and 2 mills per kilowatt-hour for any energy the project produces over 80 gigawatt-hours in any year. Except as provided in subsection (f), such charge shall be the only charge assessed by any agency of the United States for the use of such dams or structures.
  • (i) did not fix a specific charge for the use of the Government dam or structure involved; and
  • (1) It shall be unlawful for any person, State, or municipality, for the purpose of developing electric power, to construct, operate, or maintain any dam, water conduit, reservoir, power house, or other works incidental thereto across, along, or in any of the navigable waters of the United States, or upon any part of the public lands or reservations of the United States (including the Territories), or utilize the surplus water or water power from any Government dam, except under and in accordance with the terms of a permit or valid existing right-of-way granted prior to June 10, 1920, or a license granted pursuant to this chapter. Any person, association, corporation, State, or municipality intending to construct a dam or other project works, across, along, over, or in any stream or part thereof, other than those defined in this chapter as navigable waters, and over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States shall before such construction file declaration of such intention with the Commission, whereupon the Commission shall cause immediate investigation of such proposed construction to be made, and if upon investigation it shall find that the interests of interstate or foreign commerce would be affected by such proposed construction, such person, association, corporation, State, or municipality shall not construct, maintain, or operate such dam or other project works until it shall have applied for and shall have received a license under the provisions of this chapter. If the Commission shall not so find, and if no public lands or reservations are affected, permission is granted to construct such dam or other project works in such stream upon compliance with State laws.
  • (j) Except for a hydroelectric project located at a Government dam (as defined in section 3(10) of the Federal Power Act [16 U.S.C. 796(10)]) at which non-Federal hydroelectric development is permissible, this section shall not apply to any hydroelectric project which impounds or diverts the water of a natural watercourse by means of a new dam or diversion unless the project meets each of the following requirements:
    (1) At the time of issuance of the license or exemption for the project, the Commission finds that the project will not have substantial adverse effects on the environment, including recreation and water quality. Such finding shall be made by the Commission after taking into consideration terms and conditions imposed under either paragraph (3) of this subsection or section 10 of the Federal Power Act [16 U.S.C. 803] (whichever is appropriate as required by that Act [16 U.S.C. 791a et seq.] or the Electric Consumers Protection Act of 1986) and compliance with other environmental requirements applicable to the project.
    (2) At the time the application for a license or exemption for the project is accepted by the Commission (in accordance with the Commission’s regulations and procedures in effect on January 1, 1986, including those relating to environmental consultation), such project is not located on either of the following:
    (A) Any segment of a natural watercourse which is included in (or designated for potential inclusion in) a State or national wild and scenic river system.
    (B) Any segment of a natural watercourse which the State has determined, in accordance with applicable State law, to possess unique natural, recreational, cultural, or scenic attributes which would be adversely affected by hydroelectric development.
    (3) The project meets the terms and conditions set by fish and wildlife agencies under the same procedures as provided for under section 30(c) of the Federal Power Act [16 U.S.C. 823a(c)].

Citations to §796(11)

  • (b) To determine the actual legitimate original cost of and the net investment in a licensed project, and to aid the Commission in such determinations, each licensee shall, upon oath, within a reasonable period of time to be fixed by the Commission, after the construction of the original project or any addition thereto or betterment thereof, file with the Commission in such detail as the Commission may require, a statement in duplicate showing the actual legitimate original cost of construction of such project addition, or betterment, and of the price paid for water rights, rights-of-way, lands, or interest in lands. The licensee shall grant to the Commission or to its duly authorized agent or agents, at all reasonable times, free access to such project, addition, or betterment, and to all maps, profiles, contracts, reports of engineers, accounts, books, records, and all other papers and documents relating thereto. The statement of actual legitimate original cost of said project, and revisions thereof as determined by the Commission, shall be filed with the Secretary of the Treasury.
  • (e) To issue licenses to citizens of the United States, or to any association of such citizens, or to any corporation organized under the laws of the United States or any State thereof, or to any State or municipality for the purpose of constructing, operating, and maintaining dams, water conduits, reservoirs, power houses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization of power across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, or upon any part of the public lands and reservations of the United States (including the Territories), or for the purpose of utilizing the surplus water or water power from any Government dam, except as herein provided: Provided, That licenses shall be issued within any reservation only after a finding by the Commission that the license will not interfere or be inconsistent with the purpose for which such reservation was created or acquired, and shall be subject to and contain such conditions as the Secretary of the department under whose supervision such reservation falls shall deem necessary for the adequate protection and utilization of such reservation:1 The license applicant and any party to the proceeding shall be entitled to a determination on the record, after opportunity for an agency trial-type hearing of no more than 90 days, on any disputed issues of material fact with respect to such conditions. All disputed issues of material fact raised by any party shall be determined in a single trial-type hearing to be conducted by the relevant resource agency in accordance with the regulations promulgated under this subsection and within the time frame established by the Commission for each license proceeding. Within 90 days of August 8, 2005, the Secretaries of the Interior, Commerce, and Agriculture shall establish jointly, by rule, the procedures for such expedited trial-type hearing, including the opportunity to undertake discovery and cross-examine witnesses, in consultation with the Federal Energy Regulatory Commission.2 Provided further, That no license affecting the navigable capacity of any navigable waters of the United States shall be issued until the plans of the dam or other structures affecting the navigation have been approved by the Chief of Engineers and the Secretary of the Army. Whenever the contemplated improvement is, in the judgment of the Commission, desirable and justified in the public interest for the purpose of improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, a finding to that effect shall be made by the Commission and shall become a part of the records of the Commission: Provided further, That in case the Commission shall find that any Government dam may be advantageously used by the United States for public purposes in addition to navigation, no license therefor shall be issued until two years after it shall have reported to Congress the facts and conditions relating thereto, except that this provision shall not apply to any Government dam constructed prior to June 10, 1920: And provided further, That upon the filing of any application for a license which has not been preceded by a preliminary permit under subsection (f) of this section, notice shall be given and published as required by the proviso of said subsection. In deciding whether to issue any license under this subchapter for any project, the Commission, in addition to the power and development purposes for which licenses are issued, shall give equal consideration to the purposes of energy conservation, the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat), the protection of recreational opportunities, and the preservation of other aspects of environmental quality.
  • (f) To issue preliminary permits for the purpose of enabling applicants for a license hereunder to secure the data and to perform the acts required by section 802 of this title: Provided, however, That upon the filing of any application for a preliminary permit by any person, association, or corporation the Commission, before granting such application, shall at once give notice of such application in writing to any State or municipality likely to be interested in or affected by such application; and shall also publish notice of such application once each week for four weeks in a daily or weekly newspaper published in the county or counties in which the project or any part hereof or the lands affected thereby are situated.
  • After October 24, 1992, the Federal Energy Regulatory Commission may not issue an original license under Part I of the Federal Power Act [16 U.S.C. 791a et seq.] (nor an exemption from such Part) for any new hydroelectric power project located within the boundaries of any unit of the National Park System that would have a direct adverse effect on Federal lands within any such unit. Nothing in this section shall be construed as repealing any existing provision of law (or affecting any treaty) explicitly authorizing a hydroelectric power project.
  • (a) Where the Federal Energy Regulatory Commission is required to prepare a draft or final environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 and following) in connection with an application for a license under part I of the Federal Power Act [16 U.S.C. 791a et seq.], the Commission may permit, at the election of the applicant, a contractor, consultant or other person funded by the applicant and chosen by the Commission from among a list of such individuals or companies determined by the Commission to be qualified to do such work, to prepare such statement for the Commission. The contractor shall execute a disclosure statement prepared by the Commission specifying that it has no financial or other interest in the outcome of the project. The Commission shall establish the scope of work and procedures to assure that the contractor, consultant or other person has no financial or other potential conflict of interest in the outcome of the proceeding. Nothing herein shall affect the Commission’s responsibility to comply with the National Environmental Policy Act of 1969.
  • (b) Whenever, in the judgment of the Commission, the development of any water resources for public purposes should be undertaken by the United States itself, the Commission shall not approve any application for any project affecting such development, but shall cause to be made such examinations, surveys, reports, plans, and estimates of the cost of the proposed development as it may find necessary, and shall submit its findings to Congress with such recommendations as it may find appropriate concerning such development.
  • (c) Whenever, after notice and opportunity for hearing, the Commission determines that the United States should exercise its right upon or after the expiration of any license to take over any project or projects for public purposes, the Commission shall not issue a new license to the original licensee or to a new licensee but shall submit its recommendation to Congress together with such information as it may consider appropriate.
  • (1) Such maps, plans, specifications, and estimates of cost as may be required for a full understanding of the proposed project. Such maps, plans, and specifications when approved by the commission shall be made a part of the license; and thereafter no change shall be made in said maps, plans, or specifications until such changes shall have been approved and made a part of such license by the commission.
  • (2) Satisfactory evidence that the applicant has complied with the requirements of the laws of the State or States within which the proposed project is to be located with respect to bed and banks and to the appropriation, diversion, and use of water for power purposes and with respect to the right to engage in the business of developing, transmitting and distributing power, and in any other business necessary to effect the purposes of a license under this chapter.
  • (1) Any person who is an owner of record of any interest in the property within the bounds of the project.
  • (1) That the project adopted, including the maps, plans, and specifications, shall be such as in the judgment of the Commission will be best adapted to a comprehensive plan for improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, for the improvement and utilization of water-power development, for the adequate protection, mitigation, and enhancement of fish and wildlife (including related spawning grounds and habitat), and for other beneficial public uses, including irrigation, flood control, water supply, and recreational and other purposes referred to in section 797(e) of this title1 if necessary in order to secure such plan the Commission shall have authority to require the modification of any project and of the plans and specifications of the project works before approval.
  • (2) In order to ensure that the project adopted will be best adapted to the comprehensive plan described in paragraph (1), the Commission shall consider each of the following:
    (A) The extent to which the project is consistent with a comprehensive plan (where one exists) for improving, developing, or conserving a waterway or waterways affected by the project that is prepared by—
    (i) an agency established pursuant to Federal law that has the authority to prepare such a plan; or
    (ii) the State in which the facility is or will be located.
    (B) The recommendations of Federal and State agencies exercising administration over flood control, navigation, irrigation, recreation, cultural and other relevant resources of the State in which the project is located, and the recommendations (including fish and wildlife recommendations) of Indian tribes affected by the project.
    (C) In the case of a State or municipal applicant, or an applicant which is primarily engaged in the generation or sale of electric power (other than electric power solely from cogeneration facilities or small power production facilities), the electricity consumption efficiency improvement program of the applicant, including its plans, performance and capabilities for encouraging or assisting its customers to conserve electricity cost-effectively, taking into account the published policies, restrictions, and requirements of relevant State regulatory authorities applicable to such applicant.
  • (A) The extent to which the project is consistent with a comprehensive plan (where one exists) for improving, developing, or conserving a waterway or waterways affected by the project that is prepared by—
    (i) an agency established pursuant to Federal law that has the authority to prepare such a plan; or
    (ii) the State in which the facility is or will be located.
  • (B) The recommendations of Federal and State agencies exercising administration over flood control, navigation, irrigation, recreation, cultural and other relevant resources of the State in which the project is located, and the recommendations (including fish and wildlife recommendations) of Indian tribes affected by the project.
  • (d) That after the first twenty years of operation, out of surplus earned thereafter, if any, accumulated in excess of a specified reasonable rate of return upon the net investment of a licensee in any project or projects under license, the licensee shall establish and maintain amortization reserves, which reserves shall, in the discretion of the Commission, be held until the termination of the license or be applied from time to time in reduction of the net investment. Such specified rate of return and the proportion of such surplus earnings to be paid into and held in such reserves shall be set forth in the license. For any new license issued under section 808 of this title, the amortization reserves under this subsection shall be maintained on and after the effective date of such new license.
  • (1) That the licensee shall pay to the United States reasonable annual charges in an amount to be fixed by the Commission for the purpose of reimbursing the United States for the costs of the administration of this subchapter, including any reasonable and necessary costs incurred by Federal and State fish and wildlife agencies and other natural and cultural resource agencies in connection with studies or other reviews carried out by such agencies for purposes of administering their responsibilities under this subchapter; for recompensing it for the use, occupancy, and enjoyment of its lands or other property; and for the expropriation to the Government of excessive profits until the respective States shall make provision for preventing excessive profits or for the expropriation thereof to themselves, or until the period of amortization as herein provided is reached, and in fixing such charges the Commission shall seek to avoid increasing the price to the consumers of power by such charges, and any such charges may be adjusted from time to time by the Commission as conditions may require: Provided, That, subject to annual appropriations Acts, the portion of such annual charges imposed by the Commission under this subsection to cover the reasonable and necessary costs of such agencies shall be available to such agencies (in addition to other funds appropriated for such purposes) solely for carrying out such studies and reviews and shall remain available until expended: Provided, That when licenses are issued involving the use of Government dams or other structures owned by the United States or tribal lands embraced within Indian reservations the Commission shall, subject to the approval of the Secretary of the Interior in the case of such dams or structures in reclamation projects and, in the case of such tribal lands, subject to the approval of the Indian tribe having jurisdiction of such lands as provided in section 5123 of title 25, fix a reasonable annual charge for the use thereof, and such charges may with like approval be readjusted by the Commission at the end of twenty years after the project is available for service and at periods of not less than ten years thereafter upon notice and opportunity for hearing: Provided further, That licenses for the development, transmission, or distribution of power by States or municipalities shall be issued and enjoyed without charge to the extent such power is sold to the public without profit or is used by such State or municipality for State or municipal purposes, except that as to projects constructed or to be constructed by States or municipalities primarily designed to provide or improve navigation, licenses therefor shall be issued without charge; and that licenses for the development, transmission, or distribution of power for domestic, mining, or other beneficial use in projects of not more than two thousand horsepower installed capacity may be issued without charge, except on tribal lands within Indian reservations; but in no case shall a license be issued free of charge for the development and utilization of power created by any Government dam and that the amount charged therefor in any license shall be such as determined by the Commission: Provided however, That no charge shall be assessed for the use of any Government dam or structure by any licensee if, before January 1, 1985, the Secretary of the Interior has entered into a contract with such licensee that meets each of the following requirements:
    (A) The contract covers one or more projects for which a license was issued by the Commission before January 1, 1985.
    (B) The contract contains provisions specifically providing each of the following:
    (i) A powerplant may be built by the licensee utilizing irrigation facilities constructed by the United States.
    (ii) The powerplant shall remain in the exclusive control, possession, and ownership of the licensee concerned.
    (iii) All revenue from the powerplant and from the use, sale, or disposal of electric energy from the powerplant shall be, and remain, the property of such licensee.
    (C) The contract is an amendatory, supplemental and replacement contract between the United States and: (i) the Quincy-Columbia Basin Irrigation District (Contract No. 14–06–100–6418); (ii) the East Columbia Basin Irrigation District (Contract No. 14–06–100–6419); or, (iii) the South Columbia Basin Irrigation District (Contract No. 14–06–100–6420).
    This paragraph shall apply to any project covered by a contract referred to in this paragraph only during the term of such contract unless otherwise provided by subsequent Act of Congress. In the event an overpayment of any charge due under this section shall be made by a licensee, the Commission is authorized to allow a credit for such overpayment when charges are due for any subsequent period.
  • (A) The contract covers one or more projects for which a license was issued by the Commission before January 1, 1985.
  • (2) In the case of licenses involving the use of Government dams or other structures owned by the United States, the charges fixed (or readjusted) by the Commission under paragraph (1) for the use of such dams or structures shall not exceed 1 mill per kilowatt-hour for the first 40 gigawatt-hours of energy a project produces in any year, 1½ mills per kilowatt-hour for over 40 up to and including 80 gigawatt-hours in any year, and 2 mills per kilowatt-hour for any energy the project produces over 80 gigawatt-hours in any year. Except as provided in subsection (f), such charge shall be the only charge assessed by any agency of the United States for the use of such dams or structures.
  • (f) That whenever any licensee hereunder is directly benefited by the construction work of another licensee, a permittee, or of the United States of a storage reservoir or other headwater improvement, the Commission shall require as a condition of the license that the licensee so benefited shall reimburse the owner of such reservoir or other improvements for such part of the annual charges for interest, maintenance, and depreciation thereon as the Commission may deem equitable. The proportion of such charges to be paid by any licensee shall be determined by the Commission. The licensees or permittees affected shall pay to the United States the cost of making such determination as fixed by the Commission.
    Whenever such reservoir or other improvement is constructed by the United States the Commission shall assess similar charges against any licensee directly benefited thereby, and any amount so assessed shall be paid into the Treasury of the United States, to be reserved and appropriated as a part of the special fund for headwater improvements as provided in section 810 of this title.
    Whenever any power project not under license is benefited by the construction work of a licensee or permittee, the United States or any agency thereof, the Commission, after notice to the owner or owners of such unlicensed project, shall determine and fix a reasonable and equitable annual charge to be paid to the licensee or permittee on account of such benefits, or to the United States if it be the owner of such headwater improvement.
  • (2) That conduct under the license that: (A) results in the contravention of the policies expressed in the antitrust laws; and (B) is not otherwise justified by the public interest considering regulatory policies expressed in other applicable law (including but not limited to those contained in subchapter II of this chapter) shall be prevented or adequately minimized by means of conditions included in the license prior to its issuance. In the event it is impossible to prevent or adequately minimize the contravention, the Commission shall refuse to issue any license to the applicant for the project and, in the case of an existing project, shall take appropriate action to provide thereafter for the operation and maintenance of the affected project and for the issuing of a new license in accordance with section 808 of this title.
  • (i) In issuing licenses for a minor part only of a complete project, or for a complete project of not more than two thousand horsepower installed capacity, the Commission may in its discretion waive such conditions, provisions, and requirements of this subchapter, except the license period of fifty years, as it may deem to be to the public interest to waive under the circumstances: Provided, That the provisions hereof shall not apply to annual charges for use of lands within Indian reservations.
  • (1) That in order to adequately and equitably protect, mitigate damages to, and enhance, fish and wildlife (including related spawning grounds and habitat) affected by the development, operation, and management of the project, each license issued under this subchapter shall include conditions for such protection, mitigation, and enhancement. Subject to paragraph (2), such conditions shall be based on recommendations received pursuant to the Fish and Wildlife Coordination Act (16 U.S.C. 661 et seq.) from the National Marine Fisheries Service, the United States Fish and Wildlife Service, and State fish and wildlife agencies.
  • Whenever application is filed for a project hereunder involving navigable waters of the United States, and the commission shall find upon investigation that the needs of navigation require the construction of a lock or locks or other navigation structures, and that such structures cannot, consistent with a reasonable investment cost to the applicant, be provided in the manner specified in subsection (a) of section 804 of this title, the commission may grant the application with the provision to be expressed in the license that the licensee will install the necessary navigation structures if the Government fails to make provision therefor within a time to be fixed in the license and cause a report upon such project to be prepared, with estimates of cost of the power development and of the navigation structures, and shall submit such report to Congress with such recommendations as it deems appropriate concerning the participation of the United States in the cost of construction of such navigation structures.
  • The licensee shall commence the construction of the project works within the time fixed in the license, which shall not be more than two years from the date thereof, shall thereafter in good faith and with due diligence prosecute such construction, and shall within the time fixed in the license complete and put into operation such part of the ultimate development as the commission shall deem necessary to supply the reasonable needs of the then available market, and shall from time to time thereafter construct such portion of the balance of such development as the commission may direct, so as to supply adequately the reasonable market demands until such development shall have been completed. The periods for the commencement of construction may be extended for not more than 8 additional years, and the period for the completion of construction carried on in good faith and with reasonable diligence may be extended by the commission when not incompatible with the public interests. In case the licensee shall not commence actual construction of the project works, or of any specified part thereof, within the time prescribed in the license or as extended by the commission, then, after due notice given, the license shall, as to such project works or part thereof, be terminated upon written order of the commission. In case the construction of the project works, or of any specified part thereof, has been begun but not completed within the time prescribed in the license, or as extended by the commission, then the Attorney General, upon the request of the commission, shall institute proceedings in equity in the district court of the United States for the district in which any part of the project is situated for the revocation of said license, the sale of the works constructed, and such other equitable relief as the case may demand, as provided for in section 820 of this title.
  • (a) Upon not less than two years’ notice in writing from the commission the United States shall have the right upon or after the expiration of any license to take over and thereafter to maintain and operate any project or projects as defined in section 796 of this title, and covered in whole or in part by the license, or the right to take over upon mutual agreement with the licensee all property owned and held by the licensee then valuable and serviceable in the development, transmission, or distribution of power and which is then dependent for its usefulness upon the continuance of the license, together with any lock or locks or other aids to navigation constructed at the expense of the licensee, upon the condition that before taking possession it shall pay the net investment of the licensee in the project or projects taken, not to exceed the fair value of the property taken, plus such reasonable damages, if any, to property of the licensee valuable, serviceable, and dependent as above set forth but not taken, as may be caused by the severance therefrom of property taken, and shall assume all contracts entered into by the licensee with the approval of the Commission. The net investment of the licensee in the project or projects so taken and the amount of such severance damages, if any, shall be determined by the Commission after notice and opportunity for hearing. Such net investment shall not include or be affected by the value of any lands, rights-of-way, or other property of the United States licensed by the Commission under this chapter, by the license or by good will, going value, or prospective revenues; nor shall the values allowed for water rights, rights-of-way, lands, or interest in lands be in excess of the actual reasonable cost thereof at the time of acquisition by the licensee: Provided, That the right of the United States or any State or municipality to take over, maintain, and operate any project licensed under this chapter at any time by condemnation proceedings upon payment of just compensation is expressly reserved.
  • (b) In any relicensing proceeding before the Commission any Federal department or agency may timely recommend, pursuant to such rules as the Commission shall prescribe, that the United States exercise its right to take over any project or projects. Thereafter, the Commission, if its1 does not itself recommend such action pursuant to the provisions of section 800(c) of this title, shall upon motion of such department or agency stay the effective date of any order issuing a license, except an order issuing an annual license in accordance with the proviso of section 808(a) of this title, for two years after the date of issuance of such order, after which period the stay shall terminate, unless terminated earlier upon motion of the department or agency requesting the stay or by action of Congress. The Commission shall notify the Congress of any stay granted pursuant to this subsection.
  • (1) If the United States does not, at the expiration of the existing license, exercise its right to take over, maintain, and operate any project or projects of the licensee, as provided in section 807 of this title, the commission is authorized to issue a new license to the existing licensee upon such terms and conditions as may be authorized or required under the then existing laws and regulations, or to issue a new license under said terms and conditions to a new licensee, which license may cover any project or projects covered by the existing license, and shall be issued on the condition that the new licensee shall, before taking possession of such project or projects, pay such amount, and assume such contracts as the United States is required to do in the manner specified in section 807 of this title: Provided, That in the event the United States does not exercise the right to take over or does not issue a license to a new licensee, or issue a new license to the existing licensee, upon reasonable terms, then the commission shall issue from year to year an annual license to the then licensee under the terms and conditions of the existing license until the property is taken over or a new license is issued as aforesaid.
  • (2) Any new license issued under this section shall be issued to the applicant having the final proposal which the Commission determines is best adapted to serve the public interest, except that in making this determination the Commission shall ensure that insignificant differences with regard to subparagraphs (A) through (G) of this paragraph between competing applications are not determinative and shall not result in the transfer of a project. In making a determination under this section (whether or not more than one application is submitted for the project), the Commission shall, in addition to the requirements of section 803 of this title, consider (and explain such consideration in writing) each of the following:
    (A) The plans and abilities of the applicant to comply with (i) the articles, terms, and conditions of any license issued to it and (ii) other applicable provisions of this subchapter.
    (B) The plans of the applicant to manage, operate, and maintain the project safely.
    (C) The plans and abilities of the applicant to operate and maintain the project in a manner most likely to provide efficient and reliable electric service.
    (D) The need of the applicant over the short and long term for the electricity generated by the project or projects to serve its customers, including, among other relevant considerations, the reasonable costs and reasonable availability of alternative sources of power, taking into consideration conservation and other relevant factors and taking into consideration the effect on the provider (including its customers) of the alternative source of power, the effect on the applicant’s operating and load characteristics, the effect on communities served or to be served by the project, and in the case of an applicant using power for the applicant’s own industrial facility and related operations, the effect on the operation and efficiency of such facility or related operations, its workers, and the related community. In the case of an applicant that is an Indian tribe applying for a license for a project located on the tribal reservation, a statement of the need of such tribe for electricity generated by the project to foster the purposes of the reservation may be included.
    (E) The existing and planned transmission services of the applicant, taking into consideration system reliability, costs, and other applicable economic and technical factors.
    (F) Whether the plans of the applicant will be achieved, to the greatest extent possible, in a cost effective manner.
    (G) Such other factors as the Commission may deem relevant, except that the terms and conditions in the license for the protection, mitigation, or enhancement of fish and wildlife resources affected by the development, operation, and management of the project shall be determined in accordance with section 803 of this title, and the plans of an applicant concerning fish and wildlife shall not be subject to a comparative evaluation under this subsection.
  • (B) The plans of the applicant to manage, operate, and maintain the project safely.
  • (C) The plans and abilities of the applicant to operate and maintain the project in a manner most likely to provide efficient and reliable electric service.
  • (D) The need of the applicant over the short and long term for the electricity generated by the project or projects to serve its customers, including, among other relevant considerations, the reasonable costs and reasonable availability of alternative sources of power, taking into consideration conservation and other relevant factors and taking into consideration the effect on the provider (including its customers) of the alternative source of power, the effect on the applicant’s operating and load characteristics, the effect on communities served or to be served by the project, and in the case of an applicant using power for the applicant’s own industrial facility and related operations, the effect on the operation and efficiency of such facility or related operations, its workers, and the related community. In the case of an applicant that is an Indian tribe applying for a license for a project located on the tribal reservation, a statement of the need of such tribe for electricity generated by the project to foster the purposes of the reservation may be included.
  • (G) Such other factors as the Commission may deem relevant, except that the terms and conditions in the license for the protection, mitigation, or enhancement of fish and wildlife resources affected by the development, operation, and management of the project shall be determined in accordance with section 803 of this title, and the plans of an applicant concerning fish and wildlife shall not be subject to a comparative evaluation under this subsection.
  • (B) The actions taken by the existing licensee related to the project which affect the public.
  • (2) At the time notice is provided under paragraph (1), the existing licensee shall make each of the following reasonably available to the public for inspection at the offices of such licensee: current maps, drawings, data, and such other information as the Commission shall, by rule, require regarding the construction and operation of the licensed project. Such information shall include, to the greatest extent practicable pertinent energy conservation, recreation, fish and wildlife, and other environmental information. Copies of the information shall be made available at reasonable costs of reproduction. Within 180 days after October 16, 1986, the Commission shall promulgate regulations regarding the information to be provided under this paragraph.
  • (4) The Commission shall require the applicant to identify any Federal or Indian lands included in the project boundary, together with a statement of the annual fees paid as required by this subchapter for such lands, and to provide such additional information as the Commission deems appropriate to carry out the Commission’s responsibilities under this section.
  • (1) In evaluating applications for new licenses pursuant to this section, the Commission shall not consider whether an applicant has adequate transmission facilities with regard to the project.
  • (2) When the Commission issues a new license (pursuant to this section) to an applicant which is not the existing licensee of the project and finds that it is not feasible for the new licensee to utilize the energy from such project without provision by the existing licensee of reasonable services, including transmission services, the Commission shall give notice to the existing licensee and the new licensee to immediately enter into negotiations for such services and the costs demonstrated by the existing licensee as being related to the provision of such services. It is the intent of the Congress that such negotiations be carried out in good faith and that a timely agreement be reached between the parties in order to facilitate the transfer of the license by the date established when the Commission issued the new license. If such parties do not notify the Commission that within the time established by the Commission in such notice (and if appropriate, in the judgment of the Commission, one 45-day extension thereof), a mutually satisfactory arrangement for such services that is consistent with the provisions of this chapter has been executed, the Commission shall order the existing licensee to file (pursuant to section 824d of this title) with the Commission a tariff, subject to refund, ensuring such services beginning on the date of transfer of the project and including just and reasonable rates and reasonable terms and conditions. After notice and opportunity for a hearing, the Commission shall issue a final order adopting or modifying such tariff for such services at just and reasonable rates in accordance with section 824d of this title and in accordance with reasonable terms and conditions. The Commission, in issuing such order, shall ensure the services necessary for the full and efficient utilization and benefits for the license term of the electric energy from the project by the new licensee in accordance with the license and this subchapter, except that in issuing such order the Commission
    (A) shall not compel the existing licensee to enlarge generating facilities, transmit electric energy other than to the distribution system (providing service to customers) of the new licensee identified as of the date one day preceding the date of license award, or require the acquisition of new facilities, including the upgrading of existing facilities other than any reasonable enhancement or improvement of existing facilities controlled by the existing licensee (including any acquisition related to such enhancement or improvement) necessary to carry out the purposes of this paragraph;
    (B) shall not adversely affect the continuity and reliability of service to the customers of the existing licensee;
    (C) shall not adversely affect the operational integrity of the transmission and electric systems of the existing licensee;
    (D) shall not cause any reasonably quantifiable increase in the jurisdictional rates of the existing licensee; and
    (E) shall not order any entity other than the existing licensee to provide transmission or other services.
    Such order shall be for such period as the Commission deems appropriate, not to exceed the term of the license. At any time, the Commission, upon its own motion or upon a petition by the existing or new licensee and after notice and opportunity for a hearing, may modify, extend, or terminate such order.
  • (f) In issuing any licenses under this section except an annual license, the Commission, on its own motion or upon application of any licensee, person, State, municipality, or State commission, after notice to each State commission and licensee affected, and after opportunity for hearing, whenever it finds that in conformity with a comprehensive plan for improving or developing a waterway or waterways for beneficial public uses all or part of any licensed project should no longer be used or adapted for use for power purposes, may license all or part of the project works for nonpower use. A license for nonpower use shall be issued to a new licensee only on the condition that the new licensee shall, before taking possession of the facilities encompassed thereunder, pay such amount and assume such contracts as the United States is required to do, in the manner specified in section 807 of this title. Any license for nonpower use shall be a temporary license. Whenever, in the judgment of the Commission, a State, municipality, interstate agency, or another Federal agency is authorized and willing to assume regulatory supervision of the lands and facilities included under the nonpower license and does so, the Commission shall thereupon terminate the license. Consistent with the provisions of subchapter IV of this chapter, every licensee for nonpower use shall keep such accounts and file such annual and other periodic or special reports concerning the removal, alteration, nonpower use, or other disposition of any project works or parts thereof covered by the nonpower use license as the Commission may by rules and regulations or order prescribe as necessary or appropriate.
  • When in the opinion of the President of the United States, evidenced by a written order addressed to the holder of any license under this chapter, the safety of the United States demands it, the United States shall have the right to enter upon and take possession of any project or part thereof, constructed, maintained, or operated under said license, for the purpose of manufacturing nitrates, explosives, or munitions of war, or for any other purpose involving the safety of the United States, to retain possession, management, and control thereof for such length of time as may appear to the President to be necessary to accomplish said purposes, and then to restore possession and control to the party or parties entitled thereto; and in the event that the United States shall exercise such right it shall pay to the party or parties entitled thereto just and fair compensation for the use of said property as may be fixed by the commission upon the basis of a reasonable profit in time of peace, and the cost of restoring said property to as good condition as existed at the time of the taking over thereof, less the reasonable value of any improvements that may be made thereto by the United States and which are valuable and serviceable to the licensee.
  • As a condition of the license, every licensee under this chapter which is a public-service corporation, or a person, association, or corporation owning or operating any project and developing, transmitting, or distributing power for sale or use in public service, shall abide by such reasonable regulation of the services to be rendered to customers or consumers of power, and of rates and charges of payment therefor, as may from time to time be prescribed by any duly constituted agency of the State in which the service is rendered or the rate charged. That in case of the development, transmission, or distribution, or use in public service of power by any licensee under this chapter or by its customer engaged in public service within a State which has not authorized and empowered a commission or other agency or agencies within said State to regulate and control the services to be rendered by such licensee or by its customer engaged in public service, or the rates and charges of payment therefor, or the amount or character of securities to be issued by any of said parties, it is agreed as a condition of such license that jurisdiction is conferred upon the commission, upon complaint of any person aggrieved or upon its own initiative, to exercise such regulation and control until such time as the State shall have provided a commission or other authority for such regulation and control: Provided, That the jurisdiction of the commission shall cease and determine as to each specific matter of regulation and control prescribed in this section as soon as the State shall have provided a commission or other authority for the regulation and control of that specific matter.
  • When said power or any part thereof shall enter into interstate or foreign commerce the rates charged and the service rendered by any such licensee, or by any subsidiary corporation, the stock of which is owned or controlled directly or indirectly by such licensee, or by any person, corporation, or association purchasing power from such licensee for sale and distribution or use in public service shall be reasonable, nondiscriminatory, and just to the customer and all unreasonable discriminatory and unjust rates or services are prohibited and declared to be unlawful; and whenever any of the States directly concerned has not provided a commission or other authority to enforce the requirements of this section within such State or to regulate and control the amount and character of securities to be issued by any of such parties, or such States are unable to agree through their properly constituted authorities on the services to be rendered, or on the rates or charges of payment therefor, or on the amount or character of securities to be issued by any of said parties, jurisdiction is conferred upon the commission, upon complaint of any person, aggrieved, upon the request of any State concerned, or upon its own initiative to enforce the provisions of this section, to regulate and control so much of the services rendered, and of the rates and charges of payment therefor as constitute interstate or foreign commerce and to regulate the issuance of securities by the parties included within this section, and securities issued by the licensee subject to such regulations shall be allowed only for the bona fide purpose of financing and conducting the business of such licensee.
  • The provisions of this subchapter shall not be construed as affecting any permit or valid existing right-of-way granted prior to June 10, 1920, or as confirming or otherwise affecting any claim, or as affecting any authority heretofore given pursuant to law, but any person, association, corporation, State, or municipality holding or possessing such permit, right-of-way or authority may apply for a license under this chapter, and upon such application the Commission may issue to any such applicant a license in accordance with the provisions of this subchapter and in such case the provisions of this chapter shall apply to such applicant as a licensee under this chapter: Provided, That when application is made for a license under this section for a project or projects already constructed the fair value of said project or projects determined as provided in this section, shall for the purposes of this subchapter and of said license be deemed to be the amount to be allowed as the net investment of the applicant in such project or projects as of the date of such license, or as of the date of such determination, if license has not been issued. Such fair value shall be determined by the Commission after notice and opportunity for hearing.
  • (2) No person may commence any significant modification of any project licensed under, or exempted from, this chapter unless such modification is authorized in accordance with terms and conditions of such license or exemption and the applicable requirements of this subchapter. As used in this paragraph, the term “commence” refers to the beginning of physical on-site activity other than surveys or testing.
  • Any lands of the United States included in any proposed project under the provisions of this subchapter shall from the date of filing of application therefor be reserved from entry, location, or other disposal under the laws of the United States until otherwise directed by the Commission or by Congress. Notice that such application has been made, together with the date of filing thereof and a description of the lands of the United States affected thereby, shall be filed in the local land office for the district in which such lands are located. Whenever the Commission shall determine that the value of any lands of the United States so applied for, or heretofore or hereafter reserved or classified as power sites, will not be injured or destroyed for the purposes of power development by location, entry, or selection under the public-land laws, the Secretary of the Interior, upon notice of such determination, shall declare such lands open to location, entry, or selection, for such purpose or purposes and under such restrictions as the Commission may determine, subject to and with a reservation of the right of the United States or its permittees or licensees to enter upon, occupy, and use any part or all of said lands necessary, in the judgment of the Commission, for the purposes of this subchapter, which right shall be expressly reserved in every patent issued for such lands; and no claim or right to compensation shall accrue from the occupation or use of any of said lands for said purposes. The United States or any licensee for any such lands hereunder may enter thereupon for the purposes of this subchapter, upon payment of any damages to crops, buildings, or other improvements caused thereby to the owner thereof, or upon giving a good and sufficient bond to the United States for the use and benefit of the owner to secure the payment of such damages as may be determined and fixed in an action brought upon the bond in a court of competent jurisdiction, said bond to be in the form prescribed by the Commission: Provided, That locations, entries, selections, or filings heretofore made for lands reserved as water-power sites, or in connection with water-power development, or electrical transmission may proceed to approval or patent under and subject to the limitations and conditions in this section contained: Provided further, That before any lands applied for, or heretofore or hereafter reserved, or classified as power sites, are declared open to location, entry, or selection by the Secretary of the Interior, notice of intention to make such declaration shall be given to the Governor of the State within which such lands are located, and such State shall have ninety days from the date of such notice within which to file, under any statute or regulation applicable thereto, an application for the reservation to the State, or any political subdivision thereof, of any lands required as a right-of-way for a public highway or as a source of materials for the construction and maintenance of such highways, and a copy of such application shall be filed with the Federal Power Commission; and any location, entry, or selection of such lands, or subsequent patent thereof, shall be subject to any rights granted the State pursuant to such application.
  • The Attorney General may, on request of the commission or of the Secretary of the Army, institute proceedings in equity in the district court of the United States in the district in which any project or part thereof is situated for the purpose of revoking for violation of its terms any permit or license issued hereunder, or for the purpose of remedying or correcting by injunction, mandamus, or other process any act of commission or omission in violation of the provisions of this chapter or of any lawful regulation or order promulgated hereunder. The district courts shall have jurisdiction over all of the above-mentioned proceedings and shall have power to issue and execute all necessary process and to make and enforce all writs, orders and decrees to compel compliance with the lawful orders and regulations of the commission and of the Secretary of the Army, and to compel the performance of any condition imposed under the provisions of this chapter. In the event a decree revoking a license is entered, the court is empowered to sell the whole or any part of the project or projects under license, to wind up the business of such licensee conducted in connection with such project or projects, to distribute the proceeds to the parties entitled to the same, and to make and enforce such further orders and decrees as equity and justice may require. At such sale or sales the vendee shall take the rights and privileges belonging to the licensee and shall perform the duties of such licensee and assume all outstanding obligations and liabilities of the licensee which the court may deem equitable in the premises; and at such sale or sales the United States may become a purchaser, but it shall not be required to pay a greater amount than it would be required to pay under the provisions of section 807 of this title at the termination of the license.
  • (e) The Commission, in addition to the requirements of section 803(e) of this title, shall establish fees which shall be paid by an applicant for a license or exemption for a project that is required to meet terms and conditions set by fish and wildlife agencies under subsection (c). Such fees shall be adequate to reimburse the fish and wildlife agencies referred to in subsection (c) for any reasonable costs incurred in connection with any studies or other reviews carried out by such agencies for purposes of compliance with this section. The fees shall, subject to annual appropriations Acts, be transferred to such agencies by the Commission for use solely for purposes of carrying out such studies and shall remain available until expended.
  • (B) the operation of any navigation facilities which may be constructed as part of any project to be controlled at all times by such reasonable rules and regulations as may be made by the Secretary of the Army; and
  • (1) that are not part of a project licensed under this part or exempted from licensing under this subchapter or section 2705 of this title prior to November 9, 2000;
  • (3) that are part of a project that has a power production capacity of 5,000 kilowatts or less;
  • (c) In the case of nonqualifying project works that would be a qualifying project works but for the fact that the project has been licensed (or exempted from licensing) by the Commission prior to November 9, 2000, the licensee of such project may in its discretion elect to make the project subject to licensing and regulation by the State of Alaska under this section.
  • (d) With respect to projects located in whole or in part on a reservation, a conservation system unit, or the public lands, a State license or exemption from licensing shall be subject to—
    (1) the approval of the Secretary having jurisdiction over such lands; and
    (2) such conditions as the Secretary may prescribe.
  • (B) The task force shall develop procedures that are consistent with subsection (e)(1)(E) to seek to ensure that, for projects licensed pursuant to this section, the Commission and appropriate Federal and State agencies and Indian tribes shall exercise their authorities in a manner that, to the extent practicable, will not result in any material change to the storage, release, or flow operations of the associated nonpowered dam existing at the time an applicant files its license application.
  • (2) any authority of the Commission to issue an exemption to a small hydroelectric power project under the Public Utility Regulatory Policies Act of 1978.
  • (1) As provided in this section, the Commission may issue and amend licenses, as appropriate, for closed-loop pumped storage projects.
  • (2) Not later than 180 days after October 23, 2018, the Commission shall issue a rule establishing an expedited process for issuing and amending licenses for closed-loop pumped storage projects under this section.
  • (3) In establishing the expedited process under this section, the Commission shall convene an interagency task force, with appropriate Federal and State agencies and Indian tribes represented, to coordinate the regulatory processes associated with the authorizations required to construct and operate closed-loop pumped storage projects.
  • (b) Before issuing any license for a closed-loop pumped storage project, the Commission shall assess the safety of existing dams and other structures related to the project (including possible consequences associated with failure of such structures).
  • (1) In issuing or amending a license for a closed-loop pumped storage project pursuant to the expedited process established under this section, the Commission may grant an exception from any other requirement of this subchapter with respect to any part of the closed-loop pumped storage project (not including any dam or other impoundment).
  • (2) In granting an exception under paragraph (1), the Commission shall consult with the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the State agency exercising administration over the fish and wildlife resources of the State in which the closed-loop pumped storage project is or will be located, in the manner provided by the Fish and Wildlife Coordination Act (16 U.S.C. 661 et seq.).
  • (B) such terms and conditions as the Commission deems appropriate to ensure that such closed-loop pumped storage project continues to comply with the provisions of this section and terms and conditions included in any such exception.
  • (4) The Commission, in addition to the requirements of section 803(e) of this title, shall establish fees which shall be paid by an applicant for a license for a closed-loop pumped storage project that is required to meet terms and conditions set by fish and wildlife agencies under paragraph (3). Such fees shall be adequate to reimburse the fish and wildlife agencies referred to in paragraph (3) for any reasonable costs incurred in connection with any studies or other reviews carried out by such agencies for purposes of compliance with this section. The fees shall, subject to annual appropriations Acts, be transferred to such agencies by the Commission for use solely for purposes of carrying out such studies and shall remain available until expended.
  • (d) Notwithstanding section 798 of this title, and regardless of whether the holder of a preliminary permit for a closed-loop pumped storage project claimed municipal preference under section 800(a) of this title when obtaining the permit, on request by a municipality, the Commission may, to facilitate development of a closed-loop pumped storage project
    (1) add entities as joint permittees following issuance of a preliminary permit; and
    (2) transfer a license in part to one or more nonmunicipal entities as co-licensees with a municipality, if the municipality retains majority ownership of the project for which the license was issued.
  • (2) transfer a license in part to one or more nonmunicipal entities as co-licensees with a municipality, if the municipality retains majority ownership of the project for which the license was issued.
  • (e) Interagency cooperation in the preparation of environmental documents under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to an application for a license for a closed-loop pumped storage project submitted pursuant to this section, and interagency communications relating to licensing process coordination pursuant to this section, shall not—
    (1) be considered to be ex parte communications under Commission rules; or
    (2) preclude an agency from participating in a licensing proceeding under this subchapter, providing that any agency participating as a party in a licensing proceeding under this subchapter shall, to the extent practicable, demonstrate a separation of staff cooperating with the Commission under the National Environmental Policy Act1 (42 U.S.C. 4321 et seq.) and staff participating in the applicable proceeding under this subchapter.
  • (1) Not later than 6 months after October 23, 2018, the Commission shall hold a workshop to explore potential opportunities for development of closed-loop pumped storage projects at abandoned mine sites.
  • (2) Not later than 1 year after October 23, 2018, the Commission shall issue guidance to assist applicants for licenses or preliminary permits for closed-loop pumped storage projects at abandoned mine sites.
  • (1) The Commission shall establish criteria that a pumped storage project shall meet in order to qualify as a closed-loop pumped storage project eligible for the expedited process established under this section.
  • (2) In establishing the criteria under paragraph (1), the Commission shall include criteria requiring that the pumped storage project
    (A) cause little to no change to existing surface and ground water flows and uses; and
    (B) is unlikely to adversely affect species listed as a threatened species or endangered species under the Endangered Species Act of 1973 [16 U.S.C. 1531 et seq.].
  • (h) Nothing in this section affects any authority of the Commission to license a closed-loop pumped storage project under this subchapter.
  • (1) project-related investments by the licensee under the new license; and
  • (2) project-related investments by the licensee over the term of the existing license.
  • (j) Except for a hydroelectric project located at a Government dam (as defined in section 3(10) of the Federal Power Act [16 U.S.C. 796(10)]) at which non-Federal hydroelectric development is permissible, this section shall not apply to any hydroelectric project which impounds or diverts the water of a natural watercourse by means of a new dam or diversion unless the project meets each of the following requirements:
    (1) At the time of issuance of the license or exemption for the project, the Commission finds that the project will not have substantial adverse effects on the environment, including recreation and water quality. Such finding shall be made by the Commission after taking into consideration terms and conditions imposed under either paragraph (3) of this subsection or section 10 of the Federal Power Act [16 U.S.C. 803] (whichever is appropriate as required by that Act [16 U.S.C. 791a et seq.] or the Electric Consumers Protection Act of 1986) and compliance with other environmental requirements applicable to the project.
    (2) At the time the application for a license or exemption for the project is accepted by the Commission (in accordance with the Commission’s regulations and procedures in effect on January 1, 1986, including those relating to environmental consultation), such project is not located on either of the following:
    (A) Any segment of a natural watercourse which is included in (or designated for potential inclusion in) a State or national wild and scenic river system.
    (B) Any segment of a natural watercourse which the State has determined, in accordance with applicable State law, to possess unique natural, recreational, cultural, or scenic attributes which would be adversely affected by hydroelectric development.
    (3) The project meets the terms and conditions set by fish and wildlife agencies under the same procedures as provided for under section 30(c) of the Federal Power Act [16 U.S.C. 823a(c)].
  • (1) At the time of issuance of the license or exemption for the project, the Commission finds that the project will not have substantial adverse effects on the environment, including recreation and water quality. Such finding shall be made by the Commission after taking into consideration terms and conditions imposed under either paragraph (3) of this subsection or section 10 of the Federal Power Act [16 U.S.C. 803] (whichever is appropriate as required by that Act [16 U.S.C. 791a et seq.] or the Electric Consumers Protection Act of 1986) and compliance with other environmental requirements applicable to the project.
  • (2) At the time the application for a license or exemption for the project is accepted by the Commission (in accordance with the Commission’s regulations and procedures in effect on January 1, 1986, including those relating to environmental consultation), such project is not located on either of the following:
    (A) Any segment of a natural watercourse which is included in (or designated for potential inclusion in) a State or national wild and scenic river system.
    (B) Any segment of a natural watercourse which the State has determined, in accordance with applicable State law, to possess unique natural, recreational, cultural, or scenic attributes which would be adversely affected by hydroelectric development.
  • (3) The project meets the terms and conditions set by fish and wildlife agencies under the same procedures as provided for under section 30(c) of the Federal Power Act [16 U.S.C. 823a(c)].
  • (k) For purposes of this section, the term “new dam or diversion” means a dam or diversion which requires, for purposes of installing any hydroelectric power project, any construction, or enlargement of any impoundment or diversion structure (other than repairs or reconstruction or the addition of flashboards or similar adjustable devices)3
  • (B) the applicant for a permit is a transmitting utility under this chapter but does not qualify to apply for a permit or siting approval for the proposed project in a State because the applicant does not serve end-use customers in the State; or
  • (A) As lead agency head, the Secretary, in consultation with the affected agencies, shall prepare a single environmental review document, which shall be used as the basis for all decisions on the proposed project under Federal law.
  • (a) Every licensee and every public utility shall file with the Commission such annual and other periodic or special reports as the Commission may by rules and regulations or order prescribe as necessary or appropriate to assist the Commission in the proper administration of this chapter. The Commission may prescribe the manner and form in which such reports shall be made, and require from such persons specific answers to all questions upon which the Commission may need information. The Commission may require that such reports shall include, among other things, full information as to assets and liabilities, capitalization, net investment, and reduction thereof, gross receipts, interest due and paid, depreciation, and other reserves, cost of project and other facilities, cost of maintenance and operation of the project and other facilities, cost of renewals and replacement of the project works and other facilities, depreciation, generation, transmission, distribution, delivery, use, and sale of electric energy. The Commission may require any such person to make adequate provision for currently determining such costs and other facts. Such reports shall be made under oath unless the Commission otherwise specifies.
  • Electric power and energy generated at reservoir projects under the control of the Department of the Army and in the opinion of the Secretary of the Army not required in the operation of such projects shall be delivered to the Secretary of Energy who shall transmit and dispose of such power and energy in such manner as to encourage the most widespread use thereof at the lowest possible rates to consumers consistent with sound business principles, the rate schedules to become effective upon confirmation and approval by the Secretary of Energy. Rate schedules shall be drawn having regard to the recovery (upon the basis of the application of such rate schedules to the capacity of the electric facilities of the projects) of the cost of producing and transmitting such electric energy, including the amortization of the capital investment allocated to power over a reasonable period of years. Preference in the sale of such power and energy shall be given to public bodies and cooperatives. The Secretary of Energy is authorized, from funds to be appropriated by the Congress, to construct or acquire, by purchase or other agreement, only such transmission lines and related facilities as may be necessary in order to make the power and energy generated at said projects available in wholesale quantities for sale on fair and reasonable terms and conditions to facilities owned by the Federal Government, public bodies, cooperatives, and privately owned companies. All moneys received from such sales shall be deposited in the Treasury of the United States as miscellaneous receipts.
  • No power revenues on any project shall be distributed as profits, before or after retirement of the project debt, and nothing contained in any previous appropriation Act shall be deemed to have authorized such distribution: Provided, That the application of such revenues to the cost of operation, maintenance, and debt service of the irrigation system of the project, or to other purposes in aid of such irrigation system, shall not be construed to be such a distribution.
  • The Administrator of General Services or his successor in interest is authorized to reduce the rate of interest to 2½ per centum on all power bonds held by such Agency issued by States, public authorities, counties, municipalities, and other subdivisions of State governments for power projects financed by the Public Works Administration.
  • Section 807 of this title pertaining to the taking over by the United States of any project upon or after the expiration of a license, and sections 825 and 825a of this title requiring certain records and accounting procedures and section 797(b) of this title requiring the preparation and filing of the statement of actual legitimate original cost of a project, shall not be applicable to any project owned by a State or municipality, and such rights and requirements shall not exist under any license heretofore or hereafter granted to any State or municipality. The Secretary of Energy in determining the amount of annual charges applicable to any such project may determine the annual charges with reference to the actual cost of services incurred by the Secretary with respect to the project.

Citations to §796(12)

  • (e) To issue licenses to citizens of the United States, or to any association of such citizens, or to any corporation organized under the laws of the United States or any State thereof, or to any State or municipality for the purpose of constructing, operating, and maintaining dams, water conduits, reservoirs, power houses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization of power across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, or upon any part of the public lands and reservations of the United States (including the Territories), or for the purpose of utilizing the surplus water or water power from any Government dam, except as herein provided: Provided, That licenses shall be issued within any reservation only after a finding by the Commission that the license will not interfere or be inconsistent with the purpose for which such reservation was created or acquired, and shall be subject to and contain such conditions as the Secretary of the department under whose supervision such reservation falls shall deem necessary for the adequate protection and utilization of such reservation:1 The license applicant and any party to the proceeding shall be entitled to a determination on the record, after opportunity for an agency trial-type hearing of no more than 90 days, on any disputed issues of material fact with respect to such conditions. All disputed issues of material fact raised by any party shall be determined in a single trial-type hearing to be conducted by the relevant resource agency in accordance with the regulations promulgated under this subsection and within the time frame established by the Commission for each license proceeding. Within 90 days of August 8, 2005, the Secretaries of the Interior, Commerce, and Agriculture shall establish jointly, by rule, the procedures for such expedited trial-type hearing, including the opportunity to undertake discovery and cross-examine witnesses, in consultation with the Federal Energy Regulatory Commission.2 Provided further, That no license affecting the navigable capacity of any navigable waters of the United States shall be issued until the plans of the dam or other structures affecting the navigation have been approved by the Chief of Engineers and the Secretary of the Army. Whenever the contemplated improvement is, in the judgment of the Commission, desirable and justified in the public interest for the purpose of improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, a finding to that effect shall be made by the Commission and shall become a part of the records of the Commission: Provided further, That in case the Commission shall find that any Government dam may be advantageously used by the United States for public purposes in addition to navigation, no license therefor shall be issued until two years after it shall have reported to Congress the facts and conditions relating thereto, except that this provision shall not apply to any Government dam constructed prior to June 10, 1920: And provided further, That upon the filing of any application for a license which has not been preceded by a preliminary permit under subsection (f) of this section, notice shall be given and published as required by the proviso of said subsection. In deciding whether to issue any license under this subchapter for any project, the Commission, in addition to the power and development purposes for which licenses are issued, shall give equal consideration to the purposes of energy conservation, the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat), the protection of recreational opportunities, and the preservation of other aspects of environmental quality.
  • (1) That the project adopted, including the maps, plans, and specifications, shall be such as in the judgment of the Commission will be best adapted to a comprehensive plan for improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, for the improvement and utilization of water-power development, for the adequate protection, mitigation, and enhancement of fish and wildlife (including related spawning grounds and habitat), and for other beneficial public uses, including irrigation, flood control, water supply, and recreational and other purposes referred to in section 797(e) of this title1 if necessary in order to secure such plan the Commission shall have authority to require the modification of any project and of the plans and specifications of the project works before approval.
  • (b) That except when emergency shall require for the protection of navigation, life, health, or property, no substantial alteration or addition not in conformity with the approved plans shall be made to any dam or other project works constructed hereunder of an installed capacity in excess of two thousand horsepower without the prior approval of the Commission; and any emergency alteration or addition so made shall thereafter be subject to such modification and change as the Commission may direct.
  • (c) That the licensee shall maintain the project works in a condition of repair adequate for the purposes of navigation and for the efficient operation of said works in the development and transmission of power, shall make all necessary renewals and replacements, shall establish and maintain adequate depreciation reserves for such purposes, shall so maintain, and operate said works as not to impair navigation, and shall conform to such rules and regulations as the Commission may from time to time prescribe for the protection of life, health, and property. Each licensee hereunder shall be liable for all damages occasioned to the property of others by the construction, maintenance, or operation of the project works or of the works appurtenant or accessory thereto, constructed under the license and in no event shall the United States be liable therefor.
  • If the dam or other project works are to be constructed across, along, or in any of the navigable waters of the United States, the commission may, insofar as it deems the same reasonably necessary to promote the present and future needs of navigation and consistent with a reasonable investment cost to the licensee, include in the license any one or more of the following provisions or requirements:
  • The licensee shall commence the construction of the project works within the time fixed in the license, which shall not be more than two years from the date thereof, shall thereafter in good faith and with due diligence prosecute such construction, and shall within the time fixed in the license complete and put into operation such part of the ultimate development as the commission shall deem necessary to supply the reasonable needs of the then available market, and shall from time to time thereafter construct such portion of the balance of such development as the commission may direct, so as to supply adequately the reasonable market demands until such development shall have been completed. The periods for the commencement of construction may be extended for not more than 8 additional years, and the period for the completion of construction carried on in good faith and with reasonable diligence may be extended by the commission when not incompatible with the public interests. In case the licensee shall not commence actual construction of the project works, or of any specified part thereof, within the time prescribed in the license or as extended by the commission, then, after due notice given, the license shall, as to such project works or part thereof, be terminated upon written order of the commission. In case the construction of the project works, or of any specified part thereof, has been begun but not completed within the time prescribed in the license, or as extended by the commission, then the Attorney General, upon the request of the commission, shall institute proceedings in equity in the district court of the United States for the district in which any part of the project is situated for the revocation of said license, the sale of the works constructed, and such other equitable relief as the case may demand, as provided for in section 820 of this title.
  • (f) In issuing any licenses under this section except an annual license, the Commission, on its own motion or upon application of any licensee, person, State, municipality, or State commission, after notice to each State commission and licensee affected, and after opportunity for hearing, whenever it finds that in conformity with a comprehensive plan for improving or developing a waterway or waterways for beneficial public uses all or part of any licensed project should no longer be used or adapted for use for power purposes, may license all or part of the project works for nonpower use. A license for nonpower use shall be issued to a new licensee only on the condition that the new licensee shall, before taking possession of the facilities encompassed thereunder, pay such amount and assume such contracts as the United States is required to do, in the manner specified in section 807 of this title. Any license for nonpower use shall be a temporary license. Whenever, in the judgment of the Commission, a State, municipality, interstate agency, or another Federal agency is authorized and willing to assume regulatory supervision of the lands and facilities included under the nonpower license and does so, the Commission shall thereupon terminate the license. Consistent with the provisions of subchapter IV of this chapter, every licensee for nonpower use shall keep such accounts and file such annual and other periodic or special reports concerning the removal, alteration, nonpower use, or other disposition of any project works or parts thereof covered by the nonpower use license as the Commission may by rules and regulations or order prescribe as necessary or appropriate.
  • (1) It shall be unlawful for any person, State, or municipality, for the purpose of developing electric power, to construct, operate, or maintain any dam, water conduit, reservoir, power house, or other works incidental thereto across, along, or in any of the navigable waters of the United States, or upon any part of the public lands or reservations of the United States (including the Territories), or utilize the surplus water or water power from any Government dam, except under and in accordance with the terms of a permit or valid existing right-of-way granted prior to June 10, 1920, or a license granted pursuant to this chapter. Any person, association, corporation, State, or municipality intending to construct a dam or other project works, across, along, over, or in any stream or part thereof, other than those defined in this chapter as navigable waters, and over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States shall before such construction file declaration of such intention with the Commission, whereupon the Commission shall cause immediate investigation of such proposed construction to be made, and if upon investigation it shall find that the interests of interstate or foreign commerce would be affected by such proposed construction, such person, association, corporation, State, or municipality shall not construct, maintain, or operate such dam or other project works until it shall have applied for and shall have received a license under the provisions of this chapter. If the Commission shall not so find, and if no public lands or reservations are affected, permission is granted to construct such dam or other project works in such stream upon compliance with State laws.
  • (a) Notwithstanding sections 797(e) and 817 of this title, the Commission shall discontinue exercising licensing and regulatory authority under this subchapter over qualifying project works in the State of Alaska, effective on the date on which the Commission certifies that the State of Alaska has in place a regulatory program for water-power development that—
    (1) protects the public interest, the purposes listed in paragraph (2), and the environment to the same extent provided by licensing and regulation by the Commission under this subchapter and other applicable Federal laws, including the Endangered Species Act (16 U.S.C. 1531 et seq.) and the Fish and Wildlife Coordination Act (16 U.S.C. 661 et seq.);
    (2) gives equal consideration to the purposes of—
    (A) energy conservation;
    (B) the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat);
    (C) the protection of recreational opportunities;
    (D) the preservation of other aspects of environmental quality;
    (E) the interests of Alaska Natives; and
    (F) other beneficial public uses, including irrigation, flood control, water supply, and navigation; and
    (3) requires, as a condition of a license for any project works
    (A) the construction, maintenance, and operation by a licensee at its own expense of such lights and signals as may be directed by the Secretary of the Department in which the Coast Guard is operating, and such fishways as may be prescribed by the Secretary of the Interior or the Secretary of Commerce, as appropriate;
    (B) the operation of any navigation facilities which may be constructed as part of any project to be controlled at all times by such reasonable rules and regulations as may be made by the Secretary of the Army; and
    (C) except as provided in subsection (j), conditions for the protection, mitigation, and enhancement of fish and wildlife based on recommendations received pursuant to the Fish and Wildlife Coordination Act (16 U.S.C. 661 et seq.) from the National Marine Fisheries Service, the United States Fish and Wildlife Service, and State fish and wildlife agencies.
  • (3) requires, as a condition of a license for any project works
    (A) the construction, maintenance, and operation by a licensee at its own expense of such lights and signals as may be directed by the Secretary of the Department in which the Coast Guard is operating, and such fishways as may be prescribed by the Secretary of the Interior or the Secretary of Commerce, as appropriate;
    (B) the operation of any navigation facilities which may be constructed as part of any project to be controlled at all times by such reasonable rules and regulations as may be made by the Secretary of the Army; and
    (C) except as provided in subsection (j), conditions for the protection, mitigation, and enhancement of fish and wildlife based on recommendations received pursuant to the Fish and Wildlife Coordination Act (16 U.S.C. 661 et seq.) from the National Marine Fisheries Service, the United States Fish and Wildlife Service, and State fish and wildlife agencies.
  • (b) For purposes of this section, the term “qualifying project works” means project works
    (1) that are not part of a project licensed under this part or exempted from licensing under this subchapter or section 2705 of this title prior to November 9, 2000;
    (2) for which a preliminary permit, a license application, or an application for an exemption from licensing has not been accepted for filing by the Commission prior to November 9, 2000 (unless such application is withdrawn at the election of the applicant);
    (3) that are part of a project that has a power production capacity of 5,000 kilowatts or less;
    (4) that are located entirely within the boundaries of the State of Alaska; and
    (5) that are not located in whole or in part on any Indian reservation, a conservation system unit (as defined in section 3102(4) of this title), or segment of a river designated for study for addition to the Wild and Scenic Rivers System.
  • (c) In the case of nonqualifying project works that would be a qualifying project works but for the fact that the project has been licensed (or exempted from licensing) by the Commission prior to November 9, 2000, the licensee of such project may in its discretion elect to make the project subject to licensing and regulation by the State of Alaska under this section.
  • (1) Whenever any person applies for a license for any project works within any reservation of the United States, and the Secretary of the department under whose supervision such reservation falls (referred to in this subsection as the “Secretary”) deems a condition to such license to be necessary under the first proviso of section 797(e) of this title, the license applicant or any other party to the license proceeding may propose an alternative condition.
  • (ii) result in improved operation of the project works for electricity production.
  • (ii) result in improved operation of the project works for electricity production.
  • (a) Every licensee and every public utility shall file with the Commission such annual and other periodic or special reports as the Commission may by rules and regulations or order prescribe as necessary or appropriate to assist the Commission in the proper administration of this chapter. The Commission may prescribe the manner and form in which such reports shall be made, and require from such persons specific answers to all questions upon which the Commission may need information. The Commission may require that such reports shall include, among other things, full information as to assets and liabilities, capitalization, net investment, and reduction thereof, gross receipts, interest due and paid, depreciation, and other reserves, cost of project and other facilities, cost of maintenance and operation of the project and other facilities, cost of renewals and replacement of the project works and other facilities, depreciation, generation, transmission, distribution, delivery, use, and sale of electric energy. The Commission may require any such person to make adequate provision for currently determining such costs and other facts. Such reports shall be made under oath unless the Commission otherwise specifies.

Citations to §796(15)

  • (f) In issuing any licenses under this section except an annual license, the Commission, on its own motion or upon application of any licensee, person, State, municipality, or State commission, after notice to each State commission and licensee affected, and after opportunity for hearing, whenever it finds that in conformity with a comprehensive plan for improving or developing a waterway or waterways for beneficial public uses all or part of any licensed project should no longer be used or adapted for use for power purposes, may license all or part of the project works for nonpower use. A license for nonpower use shall be issued to a new licensee only on the condition that the new licensee shall, before taking possession of the facilities encompassed thereunder, pay such amount and assume such contracts as the United States is required to do, in the manner specified in section 807 of this title. Any license for nonpower use shall be a temporary license. Whenever, in the judgment of the Commission, a State, municipality, interstate agency, or another Federal agency is authorized and willing to assume regulatory supervision of the lands and facilities included under the nonpower license and does so, the Commission shall thereupon terminate the license. Consistent with the provisions of subchapter IV of this chapter, every licensee for nonpower use shall keep such accounts and file such annual and other periodic or special reports concerning the removal, alteration, nonpower use, or other disposition of any project works or parts thereof covered by the nonpower use license as the Commission may by rules and regulations or order prescribe as necessary or appropriate.
  • (1) The provisions of this subchapter shall apply to the transmission of electric energy in interstate commerce and to the sale of electric energy at wholesale in interstate commerce, but except as provided in paragraph (2) shall not apply to any other sale of electric energy or deprive a State or State commission of its lawful authority now exercised over the exportation of hydroelectric energy which is transmitted across a State line. The Commission shall have jurisdiction over all facilities for such transmission or sale of electric energy, but shall not have jurisdiction, except as specifically provided in this subchapter and subchapter III of this chapter, over facilities used for the generation of electric energy or over facilities used in local distribution or only for the transmission of electric energy in intrastate commerce, or over facilities for the transmission of electric energy consumed wholly by the transmitter.
  • (1) Upon written order of a State commission, a State commission may examine the books, accounts, memoranda, contracts, and records of—
    (A) an electric utility company subject to its regulatory authority under State law,
    (B) any exempt wholesale generator selling energy at wholesale to such electric utility, and
    (C) any electric utility company, or holding company thereof, which is an associate company or affiliate of an exempt wholesale generator which sells electric energy to an electric utility company referred to in subparagraph (A),
    wherever located, if such examination is required for the effective discharge of the State commission’s regulatory responsibilities affecting the provision of electric service.
  • (2) Where a State commission issues an order pursuant to paragraph (1), the State commission shall not publicly disclose trade secrets or sensitive commercial information.
  • (3) Any United States district court located in the State in which the State commission referred to in paragraph (1) is located shall have jurisdiction to enforce compliance with this subsection.
  • (a) For the purpose of assuring an abundant supply of electric energy throughout the United States with the greatest possible economy and with regard to the proper utilization and conservation of natural resources, the Commission is empowered and directed to divide the country into regional districts for the voluntary interconnection and coordination of facilities for the generation, transmission, and sale of electric energy, and it may at any time thereafter, upon its own motion or upon application, make such modifications thereof as in its judgment will promote the public interest. Each such district shall embrace an area which, in the judgment of the Commission, can economically be served by such interconnection and coordinated electric facilities. It shall be the duty of the Commission to promote and encourage such interconnection and coordination within each such district and between such districts. Before establishing any such district and fixing or modifying the boundaries thereof the Commission shall give notice to the State commission of each State situated wholly or in part within such district, and shall afford each such State commission reasonable opportunity to present its views and recommendations, and shall receive and consider such views and recommendations.
  • (b) Whenever the Commission, upon application of any State commission or of any person engaged in the transmission or sale of electric energy, and after notice to each State commission and public utility affected and after opportunity for hearing, finds such action necessary or appropriate in the public interest it may by order direct a public utility (if the Commission finds that no undue burden will be placed upon such public utility thereby) to establish physical connection of its transmission facilities with the facilities of one or more other persons engaged in the transmission or sale of electric energy, to sell energy to or exchange energy with such persons: Provided, That the Commission shall have no authority to compel the enlargement of generating facilities for such purposes, nor to compel such public utility to sell or exchange energy when to do so would impair its ability to render adequate service to its customers. The Commission may prescribe the terms and conditions of the arrangement to be made between the persons affected by any such order, including the apportionment of cost between them and the compensation or reimbursement reasonably due to any of them.
  • (3) Upon receipt of an application for such approval the Commission shall give reasonable notice in writing to the Governor and State commission of each of the States in which the physical property affected, or any part thereof, is situated, and to such other persons as it may deem advisable.
  • (f) The provisions of this section shall not extend to a public utility organized and operating in a State under the laws of which its security issues are regulated by a State commission.
  • (d) The Commission upon its own motion, or upon the request of any State commission whenever it can do so without prejudice to the efficient and proper conduct of its affairs, may investigate and determine the cost of the production or transmission of electric energy by means of facilities under the jurisdiction of the Commission in cases where the Commission has no authority to establish a rate governing the sale of such energy.
  • Whenever the Commission, upon complaint of a State commission, after notice to each State commission and public utility affected and after opportunity for hearing, shall find that any interstate service of any public utility is inadequate or insufficient, the Commission shall determine the proper, adequate, or sufficient service to be furnished, and shall fix the same by its order, rule, or regulation: Provided, That the Commission shall have no authority to compel the enlargement of generating facilities for such purposes, nor to compel the public utility to sell or exchange energy when to do so would impair its ability to render adequate service to its customers.
  • (a) The Commission may refer any matter arising in the administration of this subchapter to a board to be composed of a member or members, as determined by the Commission, from the State or each of the States affected or to be affected by such matter. Any such board shall be vested with the same power and be subject to the same duties and liabilities as in the case of a member of the Commission when designated by the Commission to hold any hearings. The action of such board shall have such force and effect and its proceedings shall be conducted in such manner as the Commission shall by regulations prescribe. The board shall be appointed by the Commission from persons nominated by the State commission of each State affected or by the Governor of such State if there is no State commission. Each State affected shall be entitled to the same number of representatives on the board unless the nominating power of such State waives such right. The Commission shall have discretion to reject the nominee from any State, but shall thereupon invite a new nomination from that State. The members of a board shall receive such allowances for expenses as the Commission shall provide. The Commission may, when in its discretion sufficient reason exists therefor, revoke any reference to such a board.
  • (b) The Commission may confer with any State commission regarding the relationship between rate structures, costs, accounts, charges, practices, classifications, and regulations of public utilities subject to the jurisdiction of such State commission and of the Commission; and the Commission is authorized, under such rules and regulations as it shall prescribe, to hold joint hearings with any State commission in connection with any matter with respect to which the Commission is authorized to act. The Commission is authorized in the administration of this chapter to avail itself of such cooperation, services, records, and facilities as may be afforded by any State commission.
  • (c) The Commission shall make available to the several State commissions such information and reports as may be of assistance in State regulation of public utilities. Whenever the Commission can do so without prejudice to the efficient and proper conduct of its affairs, it may upon request from a State make available to such State as witnesses any of its trained rate, valuation, or other experts, subject to reimbursement to the Commission by such State of the compensation and traveling expenses of such witnesses. All sums collected hereunder shall be credited to the appropriation from which the amounts were expended in carrying out the provisions of this subsection.
  • (4) In exercising their respective authorities under this subsection, the Commission and the Secretary shall take into consideration the role of State commissions in reviewing the prudence and cost of investments, determining the rates and terms of conditions for electric services, and ensuring the safety and reliability of the bulk-power system and distribution facilities within their respective jurisdictions.
  • (C) a State commission or other entity that has authority to approve the siting of the facilities—
    (i) has not made a determination on an application seeking approval pursuant to applicable law by the date that is 1 year after the later of—
    (I) the date on which the application was filed; and
    (II) the date on which the relevant national interest electric transmission corridor was designated by the Secretary under subsection (a);
    (ii) has conditioned its approval in such a manner that the proposed construction or modification will not significantly reduce transmission capacity constraints or congestion in interstate commerce or is not economically feasible; or
    (iii) has denied an application seeking approval pursuant to applicable law;
  • (2) The Commission may prescribe such rules as the Commission determines necessary and appropriate to carry out the purposes of this section. The rules shall provide for the dissemination, on a timely basis, of information about the availability and prices of wholesale electric energy and transmission service to the Commission, State commissions, buyers and sellers of wholesale electric energy, users of transmission services, and the public.
  • (a) The Commission may, after hearing, require licensees and public utilities to carry a proper and adequate depreciation account in accordance with such rules, regulations, and forms of account as the Commission may prescribe. The Commission may, from time to time, ascertain and determine, and by order fix, the proper and adequate rates of depreciation of the several classes of property of each licensee and public utility. Each licensee and public utility shall conform its depreciation accounts to the rates so ascertained, determined, and fixed. The licensees and public utilities subject to the jurisdiction of the Commission shall not charge to operating expenses any depreciation charges on classes of property other than those prescribed by the Commission, or charge with respect to any class of property a percentage of depreciation other than that prescribed therefor by the Commission. No such licensee or public utility shall in any case include in any form under its operating or other expenses any depreciation or other charge or expenditure included elsewhere as a depreciation charge or otherwise under its operating or other expenses. Nothing in this section shall limit the power of a State commission to determine in the exercise of its jurisdiction, with respect to any public utility, the percentage rate of depreciation to be allowed, as to any class of property of such public utility, or the composite depreciation rate, for the purpose of determining rates or charges.
  • (b) The Commission, before prescribing any rules or requirements as to accounts, records, or memoranda, or as to depreciation rates, shall notify each State commission having jurisdiction with respect to any public utility involved, and shall give reasonable opportunity to each such commission to present its views, and shall receive and consider such views and recommendations.
  • Any person, electric utility, State, municipality, or State commission complaining of anything done or omitted to be done by any licensee, transmitting utility, or public utility in contravention of the provisions of this chapter may apply to the Commission by petition which shall briefly state the facts, whereupon a statement of the complaint thus made shall be forwarded by the Commission to such licensee, transmitting utility, or public utility, who shall be called upon to satisfy the complaint or to answer the same in writing within a reasonable time to be specified by the Commission. If such licensee, transmitting utility, or public utility shall not satisfy the complaint within the time specified or there shall appear to be any reasonable ground for investigating such complaint, it shall be the duty of the Commission to investigate the matters complained of in such manner and by such means as it shall find proper.
  • (a) The Commission may investigate any facts, conditions, practices, or matters which it may find necessary or proper in order to determine whether any person, electric utility, transmitting utility, or other entity has violated or is about to violate any provision of this chapter or any rule, regulation, or order thereunder, or to aid in the enforcement of the provisions of this chapter or in prescribing rules or regulations thereunder, or in obtaining information to serve as a basis for recommending further legislation concerning the matters to which this chapter relates, or in obtaining information about the sale of electric energy at wholesale in interstate commerce and the transmission of electric energy in interstate commerce. The Commission may permit any person, electric utility, transmitting utility, or other entity to file with it a statement in writing under oath or otherwise, as it shall determine, as to any or all facts and circumstances concerning a matter which may be the subject of investigation. The Commission, in its discretion, may publish or make available to State commissions information concerning any such subject.
  • (a) Hearings under this chapter may be held before the Commission, any member or members thereof or any representative of the Commission designated by it, and appropriate records thereof shall be kept. In any proceeding before it, the Commission, in accordance with such rules and regulations as it may prescribe, may admit as a party any interested State, State commission, municipality, or any representative of interested consumers or security holders, or any competitor of a party to such proceeding, or any other person whose participation in the proceeding may be in the public interest.
  • (a) Any person, electric utility, State, municipality, or State commission aggrieved by an order issued by the Commission in a proceeding under this chapter to which such person, electric utility, State, municipality, or State commission is a party may apply for a rehearing within thirty days after the issuance of such order. The application for rehearing shall set forth specifically the ground or grounds upon which such application is based. Upon such application the Commission shall have power to grant or deny rehearing or to abrogate or modify its order without further hearing. Unless the Commission acts upon the application for rehearing within thirty days after it is filed, such application may be deemed to have been denied. No proceeding to review any order of the Commission shall be brought by any entity unless such entity shall have made application to the Commission for a rehearing thereon. Until the record in a proceeding shall have been filed in a court of appeals, as provided in subsection (b), the Commission may at any time, upon reasonable notice and in such manner as it shall deem proper, modify or set aside, in whole or in part, any finding or order made or issued by it under the provisions of this chapter.

Citations to §796(16)

  • As a condition of the license, every licensee under this chapter which is a public-service corporation, or a person, association, or corporation owning or operating any project and developing, transmitting, or distributing power for sale or use in public service, shall abide by such reasonable regulation of the services to be rendered to customers or consumers of power, and of rates and charges of payment therefor, as may from time to time be prescribed by any duly constituted agency of the State in which the service is rendered or the rate charged. That in case of the development, transmission, or distribution, or use in public service of power by any licensee under this chapter or by its customer engaged in public service within a State which has not authorized and empowered a commission or other agency or agencies within said State to regulate and control the services to be rendered by such licensee or by its customer engaged in public service, or the rates and charges of payment therefor, or the amount or character of securities to be issued by any of said parties, it is agreed as a condition of such license that jurisdiction is conferred upon the commission, upon complaint of any person aggrieved or upon its own initiative, to exercise such regulation and control until such time as the State shall have provided a commission or other authority for such regulation and control: Provided, That the jurisdiction of the commission shall cease and determine as to each specific matter of regulation and control prescribed in this section as soon as the State shall have provided a commission or other authority for the regulation and control of that specific matter.
  • When said power or any part thereof shall enter into interstate or foreign commerce the rates charged and the service rendered by any such licensee, or by any subsidiary corporation, the stock of which is owned or controlled directly or indirectly by such licensee, or by any person, corporation, or association purchasing power from such licensee for sale and distribution or use in public service shall be reasonable, nondiscriminatory, and just to the customer and all unreasonable discriminatory and unjust rates or services are prohibited and declared to be unlawful; and whenever any of the States directly concerned has not provided a commission or other authority to enforce the requirements of this section within such State or to regulate and control the amount and character of securities to be issued by any of such parties, or such States are unable to agree through their properly constituted authorities on the services to be rendered, or on the rates or charges of payment therefor, or on the amount or character of securities to be issued by any of said parties, jurisdiction is conferred upon the commission, upon complaint of any person, aggrieved, upon the request of any State concerned, or upon its own initiative to enforce the provisions of this section, to regulate and control so much of the services rendered, and of the rates and charges of payment therefor as constitute interstate or foreign commerce and to regulate the issuance of securities by the parties included within this section, and securities issued by the licensee subject to such regulations shall be allowed only for the bona fide purpose of financing and conducting the business of such licensee.
  • (C) purchase, acquire, or take any security with a value in excess of $10,000,000 of any other public utility; or
  • (2) No holding company in a holding company system that includes a transmitting utility or an electric utility shall purchase, acquire, or take any security with a value in excess of $10,000,000 of, or, by any means whatsoever, directly or indirectly, merge or consolidate with, a transmitting utility, an electric utility company, or a holding company in a holding company system that includes a transmitting utility, or an electric utility company, with a value in excess of $10,000,000 without first having secured an order of the Commission authorizing it to do so.
  • (a) No public utility shall issue any security, or assume any obligation or liability as guarantor, indorser, surety, or otherwise in respect of any security of another person, unless and until, and then only to the extent that, upon application by the public utility, the Commission by order authorizes such issue or assumption of liability. The Commission shall make such order only if it finds that such issue or assumption (a) is for some lawful object, within the corporate purposes of the applicant and compatible with the public interest, which is necessary or appropriate for or consistent with the proper performance by the applicant of service as a public utility and which will not impair its ability to perform that service, and (b) is reasonably necessary or appropriate for such purposes. The provisions of this section shall be effective six months after August 26, 1935.
  • (b) The Commission, after opportunity for hearing, may grant any application under this section in whole or in part, and with such modifications and upon such terms and conditions as it may find necessary or appropriate, and may from time to time, after opportunity for hearing and for good cause shown, make such supplemental orders in the premises as it may find necessary or appropriate, and may by any such supplemental order modify the provisions of any previous order as to the particular purposes, uses, and extent to which, or the conditions under which, any security so theretofore authorized or the proceeds thereof may be applied, subject always to the requirements of subsection (a) of this section.
  • (c) No public utility shall, without the consent of the Commission, apply any security or any proceeds thereof to any purpose not specified in the Commission’s order, or supplemental order, or to any purpose in excess of the amount allowed for such purpose in such order, or otherwise in contravention of such order.
  • (e) Subsection (a) shall not apply to the issue or renewal of, or assumption of liability on, a note or draft maturing not more than one year after the date of such issue, renewal, or assumption of liability, and aggregating (together with all other then outstanding notes and drafts of a maturity of one year or less on which such public utility is primarily or secondarily liable) not more than 5 per centum of the par value of the other securities of the public utility then outstanding. In the case of securities having no par value, the par value for the purpose of this subsection shall be the fair market value as of the date of issue. Within ten days after any such issue, renewal, or assumption of liability, the public utility shall file with the Commission a certificate of notification, in such form as may be prescribed by the Commission, setting forth such matters as the Commission shall by regulation require.
  • (f) The provisions of this section shall not extend to a public utility organized and operating in a State under the laws of which its security issues are regulated by a State commission.
  • (g) Nothing in this section shall be construed to imply any guarantee or obligation on the part of the United States in respect of any securities to which the provisions of this section relate.
  • (h) Any public utility whose security issues are approved by the Commission under this section may file with the Securities and Exchange Commission duplicate copies of reports filed with the Federal Power Commission in lieu of the reports, information, and documents required under sections 77g, 78l, and 78m of title 15.
  • (2) The term “critical electric infrastructure” means a system or asset of the bulk-power system, whether physical or virtual, the incapacity or destruction of which would negatively affect national security, economic security, public health or safety, or any combination of such matters.
  • (3) The term “critical electric infrastructure information” means information related to critical electric infrastructure, or proposed critical electrical infrastructure, generated by or provided to the Commission or other Federal agency, other than classified national security information, that is designated as critical electric infrastructure information by the Commission or the Secretary pursuant to subsection (d). Such term includes information that qualifies as critical energy infrastructure information under the Commission’s regulations.
  • (7) The term “grid security emergency” means the occurrence or imminent danger of—
    (i) a malicious act using electronic communication or an electromagnetic pulse, or a geomagnetic storm event, that could disrupt the operation of those electronic devices or communications networks, including hardware, software, and data, that are essential to the reliability of critical electric infrastructure or of defense critical electric infrastructure; and
    (ii) disruption of the operation of such devices or networks, with significant adverse effects on the reliability of critical electric infrastructure or of defense critical electric infrastructure, as a result of such act or event; or
    (i) a direct physical attack on critical electric infrastructure or on defense critical electric infrastructure; and
    (ii) significant adverse effects on the reliability of critical electric infrastructure or of defense critical electric infrastructure as a result of such physical attack.
  • (1) Whenever the President issues and provides to the Secretary a written directive or determination identifying a grid security emergency, the Secretary may, with or without notice, hearing, or report, issue such orders for emergency measures as are necessary in the judgment of the Secretary to protect or restore the reliability of critical electric infrastructure or of defense critical electric infrastructure during such emergency. As soon as practicable but not later than 180 days after December 4, 2015, the Secretary shall, after notice and opportunity for comment, establish rules of procedure that ensure that such authority can be exercised expeditiously.
  • (3) Before issuing an order for emergency measures under paragraph (1), the Secretary shall, to the extent practicable in light of the nature of the grid security emergency and the urgency of the need for action, consult with appropriate governmental authorities in Canada and Mexico, entities described in paragraph (4), the Electricity Sub-sector Coordinating Council, the Commission, and other appropriate Federal agencies regarding implementation of such emergency measures.
  • (B) The Secretary may reissue an order for emergency measures issued under paragraph (1) for subsequent periods, not to exceed 15 days for each such period, provided that the President, for each such period, issues and provides to the Secretary a written directive or determination that the grid security emergency identified under paragraph (1) continues to exist or that the emergency measure continues to be required.
  • (7) The Secretary, and other appropriate Federal agencies, shall, to the extent practicable and consistent with their obligations to protect classified information, provide temporary access to classified information related to a grid security emergency for which emergency measures are issued under paragraph (1) to key personnel of any entity subject to such emergency measures to enable optimum communication between the entity and the Secretary and other appropriate Federal agencies regarding the grid security emergency.
  • (10) The Commission or the Secretary, as appropriate, shall remove the designation of critical electric infrastructure information, in whole or in part, from a document or electronic communication if the Commission or the Secretary, as appropriate, determines that the unauthorized disclosure of such information could no longer be used to impair the security or reliability of the bulk-power system or distribution facilities.
  • (e) The Secretary shall facilitate and, to the extent practicable, expedite the acquisition of adequate security clearances by key personnel of any entity subject to the requirements of this section, to enable optimum communication with Federal agencies regarding threats to the security of the critical electric infrastructure. The Secretary, the Commission, and other appropriate Federal agencies shall, to the extent practicable and consistent with their obligations to protect classified and critical electric infrastructure information, share timely actionable information regarding grid security with appropriate key personnel of owners, operators, and users of the critical electric infrastructure.
  • (C) the energy independence or energy security of the United States would be served by the designation;
  • (E) the designation would enhance national defense and homeland security;
  • (1) The term “advanced cybersecurity technology” means any technology, operational capability, or service, including computer hardware, software, or a related asset, that enhances the security posture of public utilities through improvements in the ability to protect against, detect, respond to, or recover from a cybersecurity threat (as defined in section 650 of title 6).
  • (1) defense critical electric infrastructure (as defined in section 824o–1(a) of this title) and other facilities subject to the jurisdiction of the Commission that are critical to public safety, national defense, or homeland security, as determined by the Commission in consultation with—
    (A) the Secretary of Energy;
    (B) the Secretary of Homeland Security; and
    (C) other appropriate Federal agencies; and
  • (B) the Secretary of Homeland Security; and
  • (1) Rules described in subsection (a)(2), if adopted, shall exempt from disclosure information the Commission determines would, if disclosed, be detrimental to the operation of an effective market or jeopardize system security.
  • (a) The Commission shall convene joint boards on a regional basis pursuant to section 824h of this title to study the issue of security constrained economic dispatch for the various market regions. The Commission shall designate the appropriate regions to be covered by each such joint board for purposes of this section.
  • (c) The sole authority of each joint board convened under this section shall be to consider issues relevant to what constitutes “security constrained economic dispatch” and how such a mode of operating an electric energy system affects or enhances the reliability and affordability of service to customers in the region concerned and to make recommendations to the Commission regarding such issues.
  • (a) It shall be unlawful for any officer or director of any public utility to receive for his own benefit, directly or indirectly, any money or thing of value in respect of the negotiation, hypothecation, or sale by such public utility of any security issued or to be issued by such public utility, or to share in any of the proceeds thereof, or to participate in the making or paying of any dividends of such public utility from any funds properly included in capital account.
  • (1) After 6 months from August 26, 1935, it shall be unlawful for any person to hold the position of officer or director of more than one public utility or to hold the position of officer or director of a public utility and the position of officer or director of any bank, trust company, banking association, or firm that is authorized by law to underwrite or participate in the marketing of securities of a public utility, or officer or director of any company supplying electrical equipment to such public utility, unless the holding of such positions shall have been authorized by order of the Commission, upon due showing in form and manner prescribed by the Commission, that neither public nor private interests will be adversely affected thereby. The Commission shall not grant any such authorization in respect of such positions held on August 26, 1935, unless application for such authorization is filed with the Commission within sixty days after that date.
  • (ii) officer or director of a bank, trust company, banking association, or firm authorized by law to underwrite or participate in the marketing of securities of a public utility.
  • (i) a person described in subparagraph (A) does not participate in any deliberations or decisions of the public utility regarding the selection of a bank, trust company, banking association, or firm to underwrite or participate in the marketing of securities of the public utility, if the person serves as an officer or director of a bank, trust company, banking association, or firm that is under consideration in the deliberation process;
  • (ii) the bank, trust company, banking association, or firm of which the person is an officer or director does not engage in the underwriting of, or participate in the marketing of, securities of the public utility of which the person holds the position of officer or director;
  • (iv) the issuance of securities of the public utility for which the person serves or proposes to serve as an officer or director has been approved by all Federal and State regulatory agencies having jurisdiction over the issuance.
  • (B) any company, firm, or organization which is authorized by law to underwrite or participate in the marketing of securities of a public utility;
  • (a) Hearings under this chapter may be held before the Commission, any member or members thereof or any representative of the Commission designated by it, and appropriate records thereof shall be kept. In any proceeding before it, the Commission, in accordance with such rules and regulations as it may prescribe, may admit as a party any interested State, State commission, municipality, or any representative of interested consumers or security holders, or any competitor of a party to such proceeding, or any other person whose participation in the proceeding may be in the public interest.

Citations to §796(17)

Citations to §796(17)(A)

Citations to §796(17)(B)

Citations to §796(17)(C)

Citations to §796(17)(D)

Citations to §796(17)(E)

Citations to §796(18)(A)

Citations to §796(18)(B)

Citations to §796(18)(C)

Citations to §796(19)

Citations to §796(21)

Citations to §796(22)

Citations to §796(22)(A)

Citations to §796(23)

Citations to §796(24)

  • (a) An order under section 824j of this title shall require the transmitting utility subject to the order to provide wholesale transmission services at rates, charges, terms, and conditions which permit the recovery by such utility of all the costs incurred in connection with the transmission services and necessary associated services, including, but not limited to, an appropriate share, if any, of legitimate, verifiable and economic costs, including taking into account any benefits to the transmission system of providing the transmission service, and the costs of any enlargement of transmission facilities. Such rates, charges, terms, and conditions shall promote the economically efficient transmission and generation of electricity and shall be just and reasonable, and not unduly discriminatory or preferential. Rates, charges, terms, and conditions for transmission services provided pursuant to an order under section 824j of this title shall ensure that, to the extent practicable, costs incurred in providing the wholesale transmission services, and properly allocable to the provision of such services, are recovered from the applicant for such order and not from a transmitting utility’s existing wholesale, retail, and transmission customers.
  • (a) Whenever any electric utility, Federal power marketing agency, or any other person generating electric energy for sale for resale makes a good faith request to a transmitting utility to provide wholesale transmission services and requests specific rates and charges, and other terms and conditions, unless the transmitting utility agrees to provide such services at rates, charges, terms and conditions acceptable to such person, the transmitting utility shall, within 60 days of its receipt of the request, or other mutually agreed upon period, provide such person with a detailed written explanation, with specific reference to the facts and circumstances of the request, stating (1) the transmitting utility’s basis for the proposed rates, charges, terms, and conditions for such services, and (2) its analysis of any physical or other constraints affecting the provision of such services.

Citations to §796(25)

Citations to §796(26)

Citations to §796(27)

Citations to §796(28)

  • (6) The term “transmission organization” means a Regional Transmission Organization, Independent System Operator, independent transmission provider, or other transmission organization finally approved by the Commission for the operation of transmission facilities.
  • (f) Nothing in this section shall provide a basis for abrogating any contract or service agreement for firm transmission service or rights in effect as of August 8, 2005. If an ISO in the Western Interconnection had allocated financial transmission rights prior to August 8, 2005, but had not done so with respect to one or more load-serving entities’ firm transmission rights held under contracts to which the preceding sentence applies (or held by reason of ownership or future ownership of transmission facilities), such load-serving entities may not be required, without their consent, to convert such firm transmission rights to tradable or financial rights, except where the load-serving entity has voluntarily joined the ISO as a participating transmission owner (or its successor) in accordance with the ISO tariff.

Citations to §796(29)