US Codex
U.S.C.
Notes

§791a. Short title — Inbound Citations

16 U.S.C. § 791a

Cited by 82 provisions in release 119-102.

Citations to 16 U.S.C. § 791a as a whole

  • (4) the States to the extent required by the Natural Gas Act [15 U.S.C. 717 et seq.] and the Federal Power Act [16 U.S.C. 791a et seq.].
  • The provisions of the Act of March 1, 1872,1 reserving lands for park purposes, the Act of July 10, 1890,1 admitting the State of Wyoming into the Union, the Act of May 7, 1894, entitled “An Act to protect the birds and animals in the Yellowstone National Park and to punish crimes in said park, and for other purposes,”1 the Act of August 25, 1916, entitled “An Act to establish a National Park Service, and for other purposes,”1 and all Acts supplementary to and amendatory of said Acts are made applicable to and extended over the lands added to the park: Provided, That the provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to or extend over such lands.
  • The provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to any lands added to the Yosemite National Park under the authority of section 47a of this title.
  • The provisions of the Federal Power Act, as amended [16 U.S.C. 791a et seq.], shall not apply to any of the lands added to the Yosemite National Park pursuant to the provisions of section 47e of this title.
  • Nothing in this subchapter shall be construed to supersede, repeal, modify, or impair the jurisdiction of the Federal Power Commission under the Federal Power Act (41 Stat. 1063), as amended [16 U.S.C. 791a et seq.], in the lands and waters within the Skagit River Hydroelectric Project, Federal Energy and Regulatory Commission Project 553, including the proposed Copper Creek, High Ross, and Thunder Creek elements of the Project; and the Newhalem Project, Federal Energy and Regulatory Commission Project 2705, within the Ross Lake National Recreation Area; the lands and waters within the Lake Chelan Project, Federal Energy and Regulatory Commission Project 637; the Company Creek small hydroelectric project at Stehekin within the Lake Chelan National Recreation Area; and existing hydrologic monitoring stations necessary for the proper operation of the hydroelectric projects listed herein.
  • The provisions of the Act of March 2, 1899, entitled, “An Act to set aside a portion of certain lands in the State of Washington, now known as the ‘Pacific Forest Reserve,’ as a public park, to be known as the ‘Mount Rainier National Park,’ ” the Act of June 10, 1916, entitled “An Act to accept the cession by the State of Washington of exclusive jurisdiction over the lands embraced within the Mount Rainier National Park, and for other purposes,” the Act of August 25, 1916, entitled “An Act to establish a national park service, and for other purposes,”1 and all Acts supplementary to and amendatory of said Acts are made applicable to and extended over the lands added to the park by section 107 of this title: Provided, That the provisions of the Federal Power Act [16 U.S.C. 791a et seq.], shall not apply to or extend over such lands.
  • The administration, protection, and development of the Big Bend National Park shall be exercised under the direction of the Secretary of the Interior by the National Park Service, subject to the provisions of the Act of August 25, 1916 (39 Stat. 535), entitled “An Act to establish a National Park Service, and for other purposes”,1 as amended: Provided, That the provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to this park.
  • The provisions of the Act of January 26, 1915, entitled “An Act to establish the Rocky Mountain National Park in the State of Colorado, and for other purposes,” and Act of August 25, 1916, entitled “An Act to establish a national–park service, and for other purposes,”1 and all Acts supplementary to and amendatory of said Acts are made applicable to and extended over the lands hereby added to the park: Provided, That the provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to or extend over such lands.
  • The provisions of the Act of August 9, 1916, entitled “An Act to establish the Lassen Volcanic National Park in the Sierra Nevada Mountains in the State of California, and for other purposes,” the Act of August 25, 1916, entitled “An Act to establish a National Park Service, and for other purposes,”1 and all Acts supplementary to and amendatory of said Acts are made applicable to and extended over the lands added to the park by section 201a of this title: Provided, That the provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to or extend over such lands.
  • The provisions of the Federal Power Act [16 U.S.C. 791a et seq.], shall not apply to any lands added to the Lassen Volcanic National Park under the authority of section 204k of this title.
  • The provisions of the Act of August 9, 1916, entitled “An Act to establish the Lassen Volcanic National Park in the Sierra Nevada Mountains in the State of California, and for other purposes,” the Act of August 25, 1916, entitled “An Act to establish a National Park Service, and for other purposes,”1 and all Acts supplementary to and amendatory of said Acts are made applicable to and extended over the lands added to the park: Provided, That the provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to or extend over such lands.
  • The provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to or extend over the land acquired for inclusion in the Lassen Volcanic National Park in accordance with the provisions of this section and section 207 of this title.
  • The provisions of the Act of February 26, 1919, entitled “An Act to establish the Grand Canyon National Park in the State of Arizona,” the Act of August 25, 1916, entitled “An Act to establish a national park service, and for other purposes,”1 and all acts supplementary to and amendatory of said Acts are made applicable to and extended over the lands hereby added to the park: Provided, That the provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to or extend over such lands.
  • The area now within the Lafayette National Park, together with such additions as may hereafter be made thereto, shall be known as the Acadia National Park, under which name the aforesaid national park shall be entitled to receive and to use all moneys heretofore or hereafter appropriated for the Lafayette National Park: Provided, That the provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to or extend to any lands now or hereafter included in said park.
  • The tracts of land on the island of Hawaii and on the island of Maui, in the Territory of Hawaii, hereinafter described, shall be perpetually dedicated and set apart as a public park or pleasure ground for the benefit and enjoyment of the people of the United States, to be known as Hawaii National Park. Said tracts of land are described as follows:
  • The provisions of the Act of August 1, 1916 (39 Stat. 432), entitled “An Act to establish a national park in the Territory of Hawaii”; the Act of August 25, 1916 (39 Stat. 535), entitled “An Act to establish a National Park Service, and for other purposes”;1 the Act of February 27, 1920 (41 Stat. 452), entitled “An Act to authorize the Governor of the Territory of Hawaii to acquire privately owned lands and rights-of-way within the boundaries of the Hawaii National Park”; and all Acts supplementary to and amendatory of said Acts are made applicable to and extended over the lands hereby added to the park: Provided, That the provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to or extend over such lands.
  • The provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to lands included in the Bryce Canyon National Park on June 13, 1930, nor to any lands added to said park under the authority of section 402d of this title.
  • The administration, protection, and development of the aforesaid parks shall be exercised under the direction of the Secretary of the Interior by the National Park Service, subject to the provisions of the Act of August 25, 1916, entitled “An Act to establish a National Park Service, and for other purposes,”1 as amended: Provided, That the provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to these parks: And provided further, That the minimum area to be administered and protected by the National Park Service shall be for the Shenandoah National Park area one hundred and sixty thousand acres and for the Great Smoky Mountains National Park area four hundred thousand acres: Provided further, That no general development of either of these areas shall be undertaken until a major portion of the remainder in such area shall have been accepted by said Secretary.
  • The administration, protection, and development of the aforesaid park shall be exercised under the direction of the Secretary of the Interior by the National Park Service, subject to the provisions of the Act of August 25, 1916, entitled “An Act to establish a National Park Service, and for other purposes,”1 as amended: Provided, That the provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to this park: And provided further, That the minimum area to be administered and protected by the National Park Service shall be, for the said Mammoth Cave National Park, twenty thousand acres: Provided further, That no general development of said area shall be undertaken until a major portion of the remainder in such area, including all the caves thereof, shall have been accepted by said Secretary, and he shall have established a schedule of fees for admission to such caves.
  • The northeast quarter northwest quarter, lot 1, section 7, township 28 south, range 9 west, the southwest quarter northeast quarter, north half southeast quarter, section 5, township 27 south, range 11 west, the west half southwest quarter, section 5, the south half northwest quarter, section 11, township 28 south, range 11 west, the south half southeast quarter and east half southwest quarter, section 35, township 27 south, range 12 west, Willamette Meridian, Coos County, Oregon, formerly a part of the Coos Bay military wagon road grant, subject to valid existing rights and as to lands withdrawn for water-power purposes to all the provisions of the Federal Power Act [16 U.S.C. 791a et seq.], and to the cutting and removal of the merchantable timber on the northeast quarter southwest quarter, section 35, township 27 south, range 12 west, pursuant to a sale thereof heretofore made, are reserved and set apart as public parks and camp sites for recreational purposes and to preserve the rare groves of myrtle trees thereon, such lands to be placed under the care, control, and management of the county court of Coos County, Oregon, in accordance with such rules and regulations as the Secretary of the Interior may prescribe: Provided, That all the expense of such care, control, and management shall be paid by the said county court.
  • The provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to or extend over the land by section 407 of this title or hereafter reserved and dedicated as the Carlsbad Caverns National Park.
  • The administration, protection, and development of the aforesaid park shall be exercised under the direction of the Secretary of the Interior by the National Park Service, subject to the provisions of the Act of August 25, 1916 (39 Stat. 535), entitled “An Act to establish a National Park Service, and for other purposes,”1 as amended: Provided, That the provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to this park.
  • The administration, protection, and development of the aforesaid park shall be exercised under the direction of the Secretary of the Interior by the National Park Service, subject to the provisions of the Act of August 25, 1916 (39 Stat. 535), entitled “An Act to establish a National Park Service, and for other purposes”,1 as amended: Provided, That the provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to this park: Provided further, That nothing in sections 410 to 410c of this title shall be construed to lessen any existing rights of the Seminole Indians which are not in conflict with the purposes for which the Everglades National Park is created.
  • The Federal Energy Regulatory Commission shall not license the construction of any dam, water conduit, reservoir, powerhouse, transmission line, or other project works under the Federal Power Act (41 Stat. 1063) as amended (16 U.S.C. 791a et seq.), on or directly affecting the New River Gorge National River,1 and no department or agency of the United States shall assist by loan, grant, license, or otherwise in the construction of any water resources project that would have a direct and adverse effect on the values for which such river was established, as determined by the Secretary. Nothing contained in the foregoing sentence, however, shall preclude licensing of, or assistance to, developments below or above the New River Gorge National River1 or on any stream tributary thereto which will not invade the area or diminish the scenic, recreation, and fish and wildlife values present in the area on November 10, 1978. No department or agency of the United States shall recommend authorization of any water resources project that would have a direct and adverse effect on the values for which such river was established, as determined by the Secretary, or request appropriations to begin construction on any such project whether heretofore or hereafter authorized, without advising the Secretary in writing of its intention to do so at least sixty days in advance, and without specifically reporting to the Congress in writing at the time it makes its recommendation or request in what respect construction of such project would be in conflict with the purposes of this section and would effect2 the national river and the values to be protected by it under this section.
  • In order to determine the amount to be paid under section 434 of this title the Secretary of the Interior is authorized and directed to negotiate with said Indians to obtain their consent and relinquishment, and when such consent and relinquishment has been obtained and an agreement reached the Secretary of the Interior is further authorized to make payment from said donated fund for the lands relinquished to the enrolled members of the said Agua Caliente Band as authorized by section 434 of this title. The consent and relinquishment of the Indians may be obtained and payment made for the lands in such manner as the Secretary of the Interior may deem advisable. The water rights, dam, pipe lines, canals, and irrigation structures located in sections 2 and 3 of township 5 south, range 4 east, San Bernardino meridian, and also all water and water rights in Palm Canyon, are excepted from this reserve and shall remain under the exclusive control and supervision of the Bureau of Indian Affairs. The provisions of the Federal Power Act [16 U.S.C. 791a et seq.] shall not apply to this monument.
  • The administration, protection, and development of the aforesaid national seashore recreational area shall be exercised under the direction of the Secretary of the Interior by the National Park Service, subject to the provisions of the Act of August 25, 1916 (39 Stat. 535), entitled “An Act to establish a National Park Service, and for other purposes”,1 as amended: Provided, That except as hereinafter provided nothing herein shall be construed to divest the jurisdiction of other agencies of the Government exercised on August 17, 1937, over Federal-owned lands within the area of the said Cape Hatteras National Seashore Recreational Area: Provided further, That the provisions of the Federal Power Act [16 U.S.C. 791a et seq.], shall not apply to this national seashore recreational area: And provided further, That the legal residents of villages referred to in section 459 of this title shall have the right to earn a livelihood by fishing within the boundaries to be designated by the Secretary of the Interior, subject to such rules and regulations as the said Secretary may deem necessary in order to protect the area for recreational use as provided for in sections 459 to 459a–3 of this title: And provided further, That hunting shall be permitted, under such rules and regulations as may be prescribed by the Secretary of the Interior in conformity with the Migratory Bird Treaty Act of July 3, 1918 (40 Stat. 755) [16 U.S.C. 703 et seq.], as follows: (a) Upon the waters of the sounds included within the national seashore recreational area, (b) in the area north of the Currituck County line, (c) on Ocracoke Island, and (d) within not more than two thousand acres of land in the remaining portion of said national seashore recreational area, as shall be designated by the Secretary of the Interior; except on lands and waters included in any existing or future wildlife or migratory bird refuge and adjacent closed waters.
  • (f) The Federal Energy Regulatory Commission shall not license the construction of any dam, water conduit, reservoir, powerhouse, transmission line, or other project works under the Federal Power Act (41 Stat. 1063) as amended (16 U.S.C. 791a et seq.), within or directly affecting the National Area and no department or agency of the United States shall assist by loan, grant, license, or otherwise in the construction of any water resources project that would have a direct and adverse effect on the values for which the National Area was established. Nothing contained in the preceding sentence shall preclude licensing of, or assistance to, developments below or above the National Area or on any stream tributary thereto which will not invade the National Area or unreasonably diminish the scenic, recreation, and fish and wildlife values present in the area on March 7, 1974. No department or agency of the United States shall recommend authorization of any water resources project that would have a direct and adverse effect on the values for which the National Area was established, or request appropriations to begin construction of any such project, whether heretofore or hereafter authorized, without advising the Secretary or the Secretary of the Interior, after jurisdiction over the National Area has been transferred to him under subsection (b) of this section, in writing of its intention so to do at least sixty days in advance, and without specifically reporting to the Congress in writing at the time it makes its recommendations or request in what respect construction of such project would be in conflict with the purposes of this section and would affect the National Area and the values to be protected under this section.
  • (a) Notwithstanding any other provision of law, or any authorization heretofore given pursuant to law, the Federal Energy Regulatory Commission may not license the construction of any dam, water conduit, reservoir, powerhouse, transmission line, or other project work under the Federal Power Act (41 Stat. 1063), as amended (16 U.S.C. 791a et seq.), within the recreation area: Provided, That the provisions of the Federal Power Act (41 Stat. 1063) shall continue to apply to any project (as defined in such Act), and all of the facilities and improvements required or used in connection with the operation and maintenance of said project, in existence within the recreation area which project is already constructed or under construction on December 31, 1975.
  • (i) Notwithstanding any provision of this subchapter, or regulations and management plans undertaken pursuant to its provisions, the Federal Energy Regulatory Commission shall retain its current jurisdiction concerning all aspects of the continued and future operation of hydroelectric facilities, licensed or relicensed under the Federal Power Act (16 U.S.C. 791a et seq.), located within the boundaries of the conservation area.
  • (a) The Federal Energy Regulatory Commission shall not license the construction of any dam, water conduit, reservoir, powerhouse, transmission line, or other project works under the Federal Power Act (16 U.S.C. 791a et seq.), on or directly affecting the recreation area, and no department or agency of the United States shall assist by loan, grant, license, or otherwise in the construction of any water resources project that would have a direct and adverse effect on the values for which such area is established, except where such project is determined by the State of Georgia to be necessary for water supply or water quality enhancement purposes and authorized by the United States Congress. Nothing contained in the foregoing sentence, however, shall preclude licensing of, or assistance to, developments upstream or downstream from the recreation area or on any stream trib­utary thereto which will not invade the recreation area or unreasonably diminish the scenic, recreational, and fish and wildlife values present therein on August 15, 1978. Nothing contained in this subsection shall preclude the upgrading, improvement, expansion or development of facilities or public works for water supply or water quality enhancement purposes if such action would not have a material adverse effect on the values for which the recreation area is established.
  • The Federal Energy Regulatory Commission shall not license the construction of any dam, water conduit, reservoir, powerhouse, transmission line, or other project works under the Federal Power Act (41 Stat. 1063), as amended (16 U.S.C. 791a et seq.), on or directly affecting the Buffalo National River and no department or agency of the United States shall assist by loan, grant, license, or otherwise in the construction of any water resources project that would have a direct and adverse effect on the values for which such river is established, as determined by the Secretary. Nothing contained in the foregoing sentence, however, shall preclude licensing of, or assistance to, developments below or above the Buffalo National River or on any stream tributary thereto which will not invade the area or unreasonably diminish the scenic, recreational, and fish and wildlife values present in the area on March 1, 1972. No department or agency of the United States shall recommend authorization of any water resources project that would have a direct and adverse effect on the values for which such river is established, as determined by the Secretary, nor shall such department or agency request appropriations to begin construction on any such project, whether heretofore or hereafter authorized, without, at least sixty days in advance, (i) advising the Secretary, in writing, of its intention so to do and (ii) reporting to the Committee on Natural Resources of the House of Representatives and the Committee on Energy and Natural Resources of the Senate, respectively, the nature of the project involved and the manner in which such project would conflict with the purposes of this subchapter or would affect the national river and the values to be protected by it under this subchapter.
  • (9) Notwithstanding the Federal Power Act (16 U.S.C. 791a et seq.), the Federal Energy Regulatory Commission may not license the construction of any dam, water conduit, reservoir, powerhouse, transmission line, or other project work in the Scenic Recreation Area, except as may be necessary to comply with the provisions of paragraph (8) with regard to the Bornite Project.
  • In order to preserve the shore lines, rapids, waterfalls, beaches, and other natural features of the region in an unmodified state of nature, no further alteration of the natural water level of any lake or stream within or bordering upon the designated area shall be authorized by any permit, license, lease, or other authorization granted by any official or commission of the United States, which will result in flooding lands of the United States within or immediately adjacent to the Superior National Forest, unless and until specific authority for granting such permit, license, lease, or other authorization shall have first been obtained by special Act from the Congress of the United States covering each such project: Provided, That nothing in this section shall be construed as interfering with the duties of the International Joint Commission created pursuant to the convention concerning the boundary waters between the United States and Canada and concluded between the United States and Great Britain on January 11, 1909, and action taken or to be taken in accordance with provisions of the convention, protocol, and agreement between the United States and Canada, which were signed at Washington on February 24, 1925, for the purpose of regulating the levels of the Lake of the Woods: Provided, That with the written approval and consent of the Forest Service of the Department of Agriculture, reservoirs not exceeding one hundred acres in area may be constructed and maintained for the transportation of logs or in connection with authorized recreational uses of national-forest lands, and maximum water levels not higher than the normal high-water mark may be maintained temporarily where essential strictly for logging purposes, in the streams between lakes by the construction and operation of small temporary dams: Provided, however, That nothing herein shall be construed to prevent the Secretary of Agriculture from listing for homestead entry under the provisions of the Act of June 11, 1906 (34 Stat. 233), any of the above-described lands found by him to be chiefly valuable for agriculture and not needed for public purposes: Provided further, That the provisions of this section shall not apply to any proposed development for water-power purposes for which an application for license was pending under the terms of the Federal Power Act [16 U.S.C. 791a et seq.] on or before January 1, 1928.
  • The Federal Energy Regulatory Commission shall keep the Committee on Energy and Commerce of the United States House of Representatives and the Committee on Energy and Natural Resources of the United States Senate fully and currently informed regarding actions of the Commission with respect to the provisions of Part I of the Federal Power Act [16 U.S.C. 791a et seq.].
  • After October 24, 1992, the Federal Energy Regulatory Commission may not issue an original license under Part I of the Federal Power Act [16 U.S.C. 791a et seq.] (nor an exemption from such Part) for any new hydroelectric power project located within the boundaries of any unit of the National Park System that would have a direct adverse effect on Federal lands within any such unit. Nothing in this section shall be construed as repealing any existing provision of law (or affecting any treaty) explicitly authorizing a hydroelectric power project.
  • (a) Where the Federal Energy Regulatory Commission is required to prepare a draft or final environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 and following) in connection with an application for a license under part I of the Federal Power Act [16 U.S.C. 791a et seq.], the Commission may permit, at the election of the applicant, a contractor, consultant or other person funded by the applicant and chosen by the Commission from among a list of such individuals or companies determined by the Commission to be qualified to do such work, to prepare such statement for the Commission. The contractor shall execute a disclosure statement prepared by the Commission specifying that it has no financial or other interest in the outcome of the project. The Commission shall establish the scope of work and procedures to assure that the contractor, consultant or other person has no financial or other potential conflict of interest in the outcome of the proceeding. Nothing herein shall affect the Commission’s responsibility to comply with the National Environmental Policy Act of 1969.
  • (b) Where an environmental assessment is required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 and following) in connection with an application for a license under part I of the Federal Power Act [16 U.S.C. 791a et seq.], the Commission may permit an applicant, or a contractor, consultant or other person selected by the applicant, to prepare such environmental assessment. The Commission shall institute procedures, including pre-application consultations, to advise potential applicants of studies or other information foreseeably required by the Commission. The Commission may allow the filing of such applicant-prepared environmental assessments as part of the application. Nothing herein shall affect the Commission’s responsibility to comply with the National Environmental Policy Act of 1969.
  • (2) The Commission may recommend to electric utilities that such utilities should voluntarily enter into negotiations where the opportunities referred to in paragraph (1) exist. The Commission shall report annually to the President and the Congress regarding any such recommendations and subsequent actions taken by electric utilities, by the Commission, and by the Secretary under this Act, the Federal Power Act [16 U.S.C. 791a et seq.], and any other provision of law. Such annual reports shall be included in the Commission’s annual report required under the Department of Energy Organization Act [42 U.S.C. 7101 et seq.].
  • (1) Not later than 1 year after November 9, 1978, and from time to time thereafter, the Commission shall, after consultation with representatives of State regulatory authorities, electric utilities, owners of cogeneration facilities and owners of small power production facilities, and after public notice and a reasonable opportunity for interested persons (including State and Federal agencies) to submit oral as well as written data, views, and arguments, prescribe rules under which geothermal small power production facilities of not more than 80 megawatts capacity, qualifying cogeneration facilities, and qualifying small power production facilities are exempted in whole or part from the Federal Power Act [16 U.S.C. 791a et seq.], from the Public Utility Holding Company Act,2 from State laws and regulations respecting the rates, or respecting the financial or organizational regulation, of electric utilities, or from any combination of the foregoing, if the Commission determines such exemption is necessary to encourage cogeneration and small power production.
  • (B) the provisions of section 210, 211, or 212 of the Federal Power Act [16 U.S.C. 824i, 824j, or 824k] or the necessary authorities for enforcement of any such provision under the Federal Power Act [16 U.S.C. 791a et seq.], or
  • (C) any license or permit requirement under part I of the Federal Power Act [16 U.S.C. 791a et seq.] any provision under such Act related to such a license or permit requirement, or the necessary authorities for enforcement of any such requirement.
  • (1) For purposes of enforcement of any rule prescribed by the Commission under subsection (a) with respect to any operations of an electric utility, a qualifying cogeneration facility or a qualifying small power production facility which are subject to the jurisdiction of the Commission under part II of the Federal Power Act [16 U.S.C. 824 et seq.], such rule shall be treated as a rule under the Federal Power Act [16 U.S.C. 791a et seq.]. Nothing in subsection (g) shall apply to so much of the operations of an electric utility, a qualifying cogeneration facility or a qualifying small power production facility as are subject to the jurisdiction of the Commission under part II of the Federal Power Act.
  • (A) The Commission may enforce the requirements of subsection (f) against any State regulatory authority or nonregulated electric utility. For purposes of any such enforcement, the requirements of subsection (f)(1) shall be treated as a rule enforceable under the Federal Power Act [16 U.S.C. 791a et seq.]. For purposes of any such action, a State regulatory authority or nonregulated electric utility shall be treated as a person within the meaning of the Federal Power Act. No enforcement action may be brought by the Commission under this section other than—
    (i) an action against the State regulatory authority or nonregulated electric utility for failure to comply with the requirements of subsection (f)1 or
    (ii) an action under paragraph (1).
  • (1) At the time of issuance of the license or exemption for the project, the Commission finds that the project will not have substantial adverse effects on the environment, including recreation and water quality. Such finding shall be made by the Commission after taking into consideration terms and conditions imposed under either paragraph (3) of this subsection or section 10 of the Federal Power Act [16 U.S.C. 803] (whichever is appropriate as required by that Act [16 U.S.C. 791a et seq.] or the Electric Consumers Protection Act of 1986) and compliance with other environmental requirements applicable to the project.
  • (B) A regulation under subparagraph (A) shall be enforceable in accordance with the provisions of law applicable to enforcement of regulations under the Federal Power Act (16 U.S.C. 791a et seq.).
  • In order to facilitate the development and construction by States and municipalities of water conservation facilities, certain requirements in the Federal Power Act [16 U.S.C. 791a et seq.] are made inapplicable to States and municipalities as provided in this subchapter.
  • The words used in this subchapter shall have the same meanings ascribed to them in the Federal Power Act [16 U.S.C. 791a et seq.].
  • Except as herein provided, the provisions of this subchapter shall not be construed as repealing or affecting any of the provisions of the Federal Power Act [16 U.S.C. 791a et seq.].
  • (a) The administrator, subject to the requirements of the Federal Power Act [16 U.S.C. 791a et seq.], shall keep complete and accurate accounts of operations, including all funds expended and received in connection with transmission and sale of electric energy generated at the Bonneville project, and in the maintenance of such accounts, appropriate obligations shall be established for annual and sick leave of absence as earned. The Administrator shall, after the close of each fiscal year, obtain an independent commercial-type audit of such accounts. The forms, systems, and procedures prescribed by the Comptroller General for the Administrator’s appropriation and fund accounting shall be in accordance with the requirements of the Federal Power Act with respect to accounts of electric operations of public utilities and the regulations of the Federal Energy Regulatory Commission pursuant thereto.
  • (a) The Bureau, subject to the requirements of the Federal Power Act [16 U.S.C. 791a et seq.], shall keep complete and accurate accounts of operations, including all funds expended and received in connection with transmission and sale of electric energy generated at the Fort Peck project.
  • (b) The Federal Energy Regulatory Commission shall include among the licensing conditions, in addition to those deemed necessary and required under the terms of the Federal Power Act [16 U.S.C. 791a et seq.], the following:
    (1) In order to assure that at least 50 per centum of the project power shall be available for sale and distribution primarily for the benefit of the people as consumers, particularly domestic and rural consumers, to whom such power shall be made available at the lowest rates reasonably possible and in such manner as to encourage the widest possible use, the licensee in disposing of 50 per centum of the project power shall give preference and priority to public bodies and nonprofit cooperatives within economic transmission distance. In any case in which project power subject to the preference provisions of this paragraph is sold to utility companies organized and administered for profit, the licensee shall make flexible arrangements and contracts providing for the withdrawal upon reasonable notice and fair terms of enough power to meet the reasonably foreseeable needs of the preference customers.
    (2) The licensee shall make a reasonable portion of the project power subject to the preference provisions of paragraph (1) of this subsection available for use within reasonable economic transmission distance in neighboring States, but this paragraph shall not be construed to require more than 20 per centum of the project power subject to such preference provisions to be made available for use in such States. The licensee shall cooperate with the appropriate agencies in such States to insure compliance with this requirement. In the event of disagreement between the licensee and the power-marketing agencies of any of such States, the Federal Energy Regulatory Commission may, after public hearings, determine and fix the applicable portion of power to be made available and the terms applicable thereto: Provided, That if any such State shall have designated a bargaining agency for the procurement of such power on behalf of such State, the licensee shall deal only with such agency in that State. The arrangements made by the licensee for the sale of power to or in such States shall include observance of the preferences in paragraph (1) of this subsection.
    (3) The licensee shall contract, with the approval of the Governor of the State of New York, pursuant to the procedure established by New York law, to sell to the licensee of Federal Energy Regulatory Commission project 16 for a period ending not later than the final maturity date of the bonds initially issued to finance the project works herein specifically authorized, four hundred and forty-five thousand kilowatts of the remaining project power, which is equivalent to the amount produced by project 16 prior to June 7, 1956, for resale generally to the industries which purchased power produced by project 16 prior to such date, or their successors, in order as nearly as possible to restore low power costs to such industries and for the same general purposes for which power from project 16 was utilized: Provided, That the licensee of project 16 consents to the surrender of its license at the completion of the construction of such project works upon terms agreed to by both licensees and approved by the Federal Energy Regulatory Commission which shall include the following: (a) the licensee of project 16 shall waive and release any claim for compensation or damages from the Power Authority of the State of New York or from the State of New York, except just compensation for tangible property and rights-of-way actually taken, and (b) without limiting the generality of the foregoing, the licensee of project 16 shall waive all claims to compensation or damages based upon loss of or damage to riparian rights, diversionary rights, or other rights relating to the diversion or use of water, whether founded on legislative grant or otherwise.
    (4) The licensee shall, if available on reasonable terms and conditions, acquire by purchase or other agreement, the ownership or use of, or if unable to do so, construct such transmission lines as may be necessary to make the power and energy generated at the project available in wholesale quantities for sale on fair and reasonable terms and conditions to privately owned companies, to the preference customers enumerated in paragraph (1) of this subsection, and to the neighboring States in accordance with paragraph (2) of this subsection.
    (5) In the event project power is sold to any purchaser for resale, contracts for such sale shall include adequate provisions for establishing resale rates, to be approved by the licensee, consistent with paragraphs (1) and (3) of this subsection.
    (6) The licensee, in cooperation with the appropriate agency of the State of New York which is concerned with the development of parks in such State, may construct a scenic drive and park on the American side of the Niagara River, near the Niagara Falls, pursuant to a plan the general outlines of which shall be approved by the Federal Energy Regulatory Commission; and the cost of such drive and park shall be considered a part of the cost of the power project and part of the licensee’s net investment in said project: Provided, That the maximum part of the cost of such drive and park to be borne by the power project and to be considered a part of the licensee’s net investment shall not exceed $15,000,000.
    (7) The licensee shall pay to the United States and include in its net investment in the project herein authorized the United States share of the cost of the construction of the remedial works, including engineering and economic investigations, undertaken in accordance with article II of the treaty between the United States of America and Canada concerning uses of the waters of the Niagara River signed February 27, 1950, whenever such remedial works are constructed.
  • (k) Notwithstanding any other provision of this chapter, all rates or rate schedules for the sale of nonfirm electric power within the United States, but outside the region, shall be established after December 5, 1980, by the Administrator in accordance with the procedures of subsection (i) of this section (other than the first sentence of paragraph (6) thereof) and in accordance with the Bonneville Project Act [16 U.S.C. 832 et seq.], the Flood Control Act of 1944, and the Federal Columbia River Transmission System Act [16 U.S.C. 838 et seq.]. Notwithstanding section 201(f) of the Federal Power Act [16 U.S.C. 824(f)], such rates or rate schedules shall become effective after review by the Federal Energy Regulatory Commission for conformance with the requirements of such Acts and after approval thereof by the Commission. Such review shall be based on the record of proceedings established under subsection (i) of this section. The parties to such proceedings under subsection (i) shall be afforded an opportunity by the Commission for an additional hearing in accordance with the procedures established for ratemaking by the Commission pursuant to the Federal Power Act [16 U.S.C. 791a et seq.].
  • (a) The Federal Energy Regulatory Commission shall not license the construction of any dam, water conduit, reservoir, powerhouse, transmission line, or other project works under the Federal Power Act (41 Stat. 1063), as amended (16 U.S.C. 791a et seq.), on or directly affecting any river which is designated in section 1274 of this title as a component of the national wild and scenic rivers system or which is hereafter designated for inclusion in that system, and no department or agency of the United States shall assist by loan, grant, license, or otherwise in the construction of any water resources project that would have a direct and adverse effect on the values for which such river was established, as determined by the Secretary charged with its administration. Nothing contained in the foregoing sentence, however, shall preclude licensing of, or assistance to, developments below or above a wild, scenic or recreational river area or on any stream tributary thereto which will not invade the area or unreasonably diminish the scenic, recreational, and fish and wildlife values present in the area on the date of designation of a river as a component of the National Wild and Scenic Rivers System. No department or agency of the United States shall recommend authorization of any water resources project that would have a direct and adverse effect on the values for which such river was established, as determined by the Secretary charged with its administration, or request appropriations to begin construction of any such project, whether heretofore or hereafter authorized, without advising the Secretary of the Interior or the Secretary of Agriculture, as the case may be, in writing of its intention so to do at least sixty days in advance, and without specifically reporting to the Congress in writing at the time it makes its recommendation or request in what respect construction of such project would be in conflict with the purposes of this chapter and would affect the component and the values to be protected by it under this chapter. Any license heretofore or hereafter issued by the Federal Energy Regulatory Commission affecting the New River of North Carolina shall continue to be effective only for that portion of the river which is not included in the National Wild and Scenic Rivers System pursuant to section 1273 of this title and no project or undertaking so licensed shall be permitted to invade, inundate or otherwise adversely affect such river segment.
  • (b) The Federal Energy Regulatory Commission shall not license the construction of any dam, water conduit, reservoir, powerhouse, transmission line, or other project works under the Federal Power Act, as amended [16 U.S.C. 791a et seq.], on or directly affecting any river which is listed in section 1276(a) of this title, and no department or agency of the United States shall assist by loan, grant, license, or otherwise in the construction of any water resources project that would have a direct and adverse effect on the values for which such river might be designated, as determined by the Secretary responsible for its study or approval—
    (i) during the ten-year period following October 2, 1968, or for a three complete fiscal year period following any Act of Congress designating any river for potential addition to the national wild and scenic rivers system, whichever is later, unless, prior to the expiration of the relevant period, the Secretary of the Interior and, where national forest lands are involved, the Secretary of Agriculture, on the basis of study, determine that such river should not be included in the national wild and scenic rivers system and notify the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives, in writing, including a copy of the study upon which the determination was made, at least one hundred and eighty days while Congress is in session prior to publishing notice to that effect in the Federal Register: Provided, That if any Act designating any river or rivers for potential addition to the national wild and scenic rivers system provides a period for the study or studies which exceeds such three complete fiscal year period the period provided for in such Act shall be substituted for the three complete fiscal year period in the provisions of this clause (i); and
    (ii) during such interim period from the date a report is due and the time a report is actually submitted to the Congress; and
    (iii) during such additional period thereafter as, in the case of any river the report for which is submitted to the President and the Congress, is necessary for congressional consideration thereof or, in the case of any river recommended to the Secretary of the Interior for inclusion in the national wild and scenic rivers system under section 1273(a)(ii) of this title, is necessary for the Secretary’s consideration thereof, which additional period, however, shall not exceed three years in the first case and one year in the second.
    Nothing contained in the foregoing sentence, however, shall preclude licensing of, or assistance to, developments below or above a potential wild, scenic or recreational river area or on any stream tributary thereto which will not invade the area or diminish the scenic, recreational, and fish and wildlife values present in the potential wild, scenic or recreational river area on the date of designation of a river for study as provided for in section 1276 of this title. No department or agency of the United States shall, during the periods hereinbefore specified, recommend authorization of any water resources project on any such river or request appropriations to begin construction of any such project, whether heretofore or hereafter authorized, without advising the Secretary of the Interior and, where national forest lands are involved, the Secretary of Agriculture in writing of its intention so to do at least sixty days in advance of doing so and without specifically reporting to the Congress in writing at the time it makes its recommendation or request in what respect construction of such project would be in conflict with the purposes of this chapter and would affect the component and the values to be protected by it under this chapter.
  • (2) any authority of the Secretary or of the Commission under any other provision of law (including the Federal Power Act [16 U.S.C. 791a et seq.] and the Natural Gas Act [15 U.S.C. 717 et seq.]) respecting unfair methods of competition or anticompetitive acts or practices.
  • (a) The Commission shall establish, in such manner as the Commission deems appropriate, consistent with the applicable provisions of law, a program to use simple and expeditious licensing procedures under the Federal Power Act [16 U.S.C. 791a et seq.] for small hydroelectric power projects in connection with existing dams.
  • (b) Before issuing any license under the Federal Power Act [16 U.S.C. 791a et seq.] for the construction or operation of any small hydroelectric power project the Commission
    (1) shall assess the safety of existing structures in any proposed project (including possible consequences associated with failure of such structures), and
    (2) shall provide an opportunity for consultation with the Council on Environmental Quality and the Environmental Protection Agency with respect to the environmental effects of such project.
    Nothing in this subsection exempts any such project from any requirement applicable to any such project under the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], the Fish and Wildlife Coordination Act [16 U.S.C. 661 et seq.], the Endangered Species Act [16 U.S.C. 1531 et seq.], or any other provision of Federal law.
  • (d) The Commission may in its discretion (by rule or order) grant an exemption in whole or in part from the requirements (including the licensing requirements) of part I of the Federal Power Act [16 U.S.C. 791a et seq.] to small hydroelectric power projects having a proposed installed capacity of 10,000 kilowatts or less, on a case-by-case basis or on the basis of classes or categories of projects, subject to the same limitations (to ensure protection for fish and wildlife as well as other environmental concerns) as those which are set forth in subsections (c) and (d) of section 30 of the Federal Power Act [16 U.S.C. 823a (c) and (d)] with respect to determinations made and exemptions granted under subsection (b) of such section 30 [16 U.S.C. 823a(b)]; and subsections (c) and (d) of such section 30 shall apply with respect to actions taken and exemptions granted under this subsection. Except as specifically provided in this subsection, the granting of an exemption to a project under this subsection shall in no case have the effect of waiving or limiting the application (to such project) of the second sentence of subsection (b) of this section.
  • (c) Where the land described in application (or such an application as adjusted or amended pursuant to subsection (b) or (c) of this section), was on that date withdrawn, reserved, or classified for powersite or power-project purposes, notwithstanding such withdrawal, reservation, or classification the described land shall be deemed vacant, unappropriated, and unreserved within the meaning of the Acts referred to in subsection (a)(1) hereof, and, as such, shall be subject to adjudication or approval pursuant to the terms of this section: Provided, however, That if the described land is included as part of a project licensed under part I of the Federal Power Act of June 10, 1920 (41 Stat. 24), as amended [16 U.S.C. 791a et seq.], or is presently utilized for purposes of generating or transmitting electrical power or for any other project authorized by Act of Congress, the foregoing provision shall not apply and the application shall be adjudicated pursuant to the appropriate Act: Provided further, That where the applicant commenced occupancy of the land after its withdrawal or classification for powersite purposes, the entry shall be made subject to the right of reentry provided the United States by section 24 of the Federal Power Act, as amended [16 U.S.C. 818]: Provided further, That any right of reentry reserved in a patent pursuant to this section shall expire twenty years after the effective date of this Act if at that time the land involved is not subject to a license or an application for a license under part I of the Federal Power Act, as amended, or actually utilized or being developed for a purpose authorized by that Act, as amended [16 U.S.C. 791a et seq.] or other Act of Congress.
  • Sections 323 to 328 of this title shall not in any manner amend or repeal the provisions of the Federal Water Power Act of June 10, 1920 (41 Stat. 1063), as amended by the Act of August 26, 1935 (49 Stat. 838) [16 U.S.C. 791a et seq.], nor shall any existing statutory authority empowering the Secretary of the Interior to grant rights-of-way over Indian lands be repealed.
  • (a) All public lands belonging to the United States heretofore, now or hereafter withdrawn or reserved for power development or power sites shall be open to entry for location and patent of mining claims and for mining, development, beneficiation, removal, and utilization of the mineral resources of such lands under applicable Federal statutes: Provided, That all power rights to such lands shall be retained by the United States: Provided further, That locations made under this chapter within the revested Oregon and California Railroad and reconveyed Coos Bay Wagon grant lands shall also be subject to the provisions of the Act of April 8, 1948, Public Law 477 (Eightieth Congress, second session): And provided further, That nothing contained herein shall be construed to open for the purposes described in this section any lands (1) which are included in any project operating or being constructed under a license or permit issued under the Federal Power Act [16 U.S.C. 791a et seq.] or other Act of Congress, or (2) which are under examination and survey by a prospective licensee of the Federal Energy Regulatory Commission, if such prospective licensee holds an uncanceled preliminary permit issued under the Federal Power Act authorizing him to conduct such examination and survey with respect to such lands and such permit has not been renewed in the case of such prospective licensee more than once.
  • (a) As soon as practicable, the Secretary of the Army, acting through the Chief of Engineers, shall carry out a national program of inspection of dams for the purpose of protecting human life and property. All dams in the United States shall be inspected by the Secretary except (1) dams under the jurisdiction of the Bureau of Reclamation, the Tennessee Valley Authority, or the International Boundary and Water Commission, (2) dams which have been constructed pursuant to licenses issued under the authority of the Federal Power Act [16 U.S.C. 791a et seq.], (3) dams which have been inspected within the twelve-month period immediately prior to August 8, 1972, by a State agency and which the Governor of such State requests be excluded from inspection, and (4) dams which the Secretary of the Army determines do not pose any threat to human life or property. The Secretary may inspect dams which have been licensed under the Federal Power Act upon request of the Federal Energy Regulatory Commission and dams under the jurisdiction of the International Boundary and Water Commission upon request of such Commission.
  • Every licensee under this chapter who holds a license from the Commission for a utilization or production facility for the generation of commercial electric energy under section 2133 of this title and who transmits such electric energy in interstate commerce or sells it at wholesale in interstate commerce shall be subject to the regulatory provisions of the Federal Power Act [16 U.S.C. 791a et seq.].
  • (A) the investigation, issuance, transfer, renewal, revocation, and enforcement of licenses and permits for the construction, operation, and maintenance of dams, water conduits, reservoirs, powerhouses, transmission lines, or other works for the development and improvement of navigation and for the development and utilization of power across, along, from, or in navigable waters under part I of the Federal Power Act [16 U.S.C. 791a et seq.];
  • (F) the regulation of mergers and securities acquisition under the Federal Power Act [16 U.S.C. 791a et seq.] and Natural Gas Act [15 U.S.C. 717 et seq.].
  • (c) Any function described in section 7172 of this title which relates to the establishment of rates and charges under the Federal Power Act [16 U.S.C. 791a et seq.] or the Natural Gas Act [15 U.S.C. 717 et seq.], may be conducted by rulemaking procedures. Except as provided in subsection (d), the procedures in such a rulemaking proceeding shall assure full consideration of the issues and an opportunity for interested persons to present their views.
  • (B) the concentrations of such pollutant attributable to the increase in emissions from stationary sources which have converted from using natural gas by reason of a natural gas curtailment pursuant to a natural gas curtailment plan in effect pursuant to the Federal Power Act [16 U.S.C. 791a et seq.] over the emissions from such sources before the effective date of such plan,
  • (f) An allowance allocated under this subchapter is a limited authorization to emit sulfur dioxide in accordance with the provisions of this subchapter. Such allowance does not constitute a property right. Nothing in this subchapter or in any other provision of law shall be construed to limit the authority of the United States to terminate or limit such authorization. Nothing in this section relating to allowances shall be construed as affecting the application of, or compliance with, any other provision of this chapter to an affected unit or source, including the provisions related to applicable National Ambient Air Quality Standards and State implementation plans. Nothing in this section shall be construed as requiring a change of any kind in any State law regulating electric utility rates and charges or affecting any State law regarding such State regulation or as limiting State regulation (including any prudency review) under such a State law. Nothing in this section shall be construed as modifying the Federal Power Act [16 U.S.C. 791a et seq.] or as affecting the authority of the Federal Energy Regulatory Commission under that Act. Nothing in this subchapter shall be construed to interfere with or impair any program for competitive bidding for power supply in a State in which such program is established. Allowances, once allocated to a person by the Administrator, may be received, held, and temporarily or permanently transferred in accordance with this subchapter and the regulations of the Administrator without regard to whether or not a permit is in effect under subchapter V or section 7651g of this title with respect to the unit for which such allowance was originally allocated and recorded. Each permit under this subchapter and each permit issued under subchapter V for any affected unit shall provide that the affected unit may not emit an annual tonnage of sulfur dioxide in excess of the allowances held for that unit.
  • (B) is a hydroelectric project constructed, operated, or maintained pursuant to a permit or valid existing right-of-way granted prior to June 10, 1920, or a license granted pursuant to the Federal Power Act (16 U.S.C. 791a et seq.);
  • (A) transmission needs identified, in a transmission expansion plan or otherwise, by the appropriate Transmission Organization (as defined in the Federal Power Act [16 U.S.C. 791a et seq.]), if any, or approved regional reliability organization; and
  • (A) transmission needs identified, in a transmission expansion plan or otherwise, by the appropriate Transmission Organization (as defined in the Federal Power Act [16 U.S.C. 791a et seq.]) if any, or approved regional reliability organization; and
  • (b) In carrying out the Federal Power Act (16 U.S.C. 791a et seq.) and the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2601 et seq.), the Commission shall encourage, as appropriate, the deployment of advanced transmission technologies.
  • (a) Nothing in this part shall limit the authority of the Commission under the Federal Power Act (16 U.S.C. 791a et seq.) to require that jurisdictional rates are just and reasonable, including the ability to deny or approve the pass through of costs, the prevention of cross-subsidization, and the issuance of such rules and regulations as are necessary or appropriate for the protection of utility consumers.
  • (b) Nothing in this part limits the authority of the Commission under the Federal Power Act (16 U.S.C. 791a et seq.) or the Natural Gas Act (15 U.S.C. 717 et seq.).
  • (D) The marketing of capacity pursuant to this subsection, including any marketing by a third party under subparagraph (A), shall be undertaken consistent with the requirements of the Federal Power Act (16 U.S.C. 791a et seq.).
  • The Secretary of the Interior is authorized, under such general regulations as he may prescribe, to contract for the storage of water in said reservoir and for the delivery thereof at such points on the river and on said canal as may be agreed upon, for irrigation and domestic uses, and generation of electrical energy and delivery at the switchboard to States, municipal corporations, political subdivisions, and private corporations of electrical energy generated at said dam, upon charges that will provide revenue which, in addition to other revenue accruing under the reclamation law and under this subchapter, will in his judgment cover all expenses of operation and maintenance incurred by the United States on account of works constructed under this subchapter and the payments to the United States under subdivision (b) of section 617c of this title. Contracts respecting water for irrigation and domestic uses shall be for permanent service and shall conform to paragraph (a) of section 617c of this title. No person shall have or be entitled to have the use for any purpose of the water stored as aforesaid except by contract made as herein stated.
  • The dam and reservoir provided for by section 617 of this title shall be used: First, for river regulation, improvement of navigation, and flood control; second, for irrigation and domestic uses and satisfaction of present perfected rights in pursuance of Article VIII of said Colorado River compact; and third, for power. The title to said dam, reservoir, plant, and incidental works shall forever remain in the United States, and the United States shall, until otherwise provided by Congress, control, manage, and operate the same, except as herein otherwise provided: Provided, however, That the Secretary of the Interior may, in his discretion, enter into contracts of lease of a unit or units of any Government-built plant, with right to generate electrical energy, or alternatively, to enter into contracts of lease for the use of water for the generation of electrical energy as herein provided, in either of which events the provisions of section 617d of this title relating to revenue, term, renewals, determination of conflicting applications, and joint use of transmission lines under contracts for the sale of electrical energy, shall apply.
  • “Political subdivision” or “political subdivisions” as used in this subchapter shall be understood to include any State, irrigation or other district, municipality, or other governmental organization.
  • (c) Also all patents, grants, contracts, concessions, leases, permits, licenses, rights-of-way, or other privileges from the United States or under its authority, necessary or convenient for the use of waters of the Colorado River or its tributaries, or for the generation or transmission of electrical energy generated by means of the waters of said river or its tributaries, whether under this subchapter, the Federal Power Act [16 U.S.C. 791a et seq.], or otherwise, shall be upon the express condition and with the express covenant that the rights of the recipients or holders thereof to waters of the river or its tributaries, for the use of which the same are necessary, convenient, or incidental, and the use of the same shall likewise be subject to and controlled by said Colorado River compact.
  • Part I of the Federal Power Act [16 U.S.C. 791a et seq.] shall not be applicable to the reaches of the main stream of the Colorado River between Hoover Dam and Glen Canyon Dam until and unless otherwise provided by Congress.
  • (d) Where the land described in an allotment application pending before the Department of the Interior on or before December 18, 1971 (or such an application as adjusted or amended pursuant to subsection (b) or (c) of this section), was on that date withdrawn, reserved, or classified for powersite or power-project purposes, notwithstanding such withdrawal, reservation, or classification the described land shall be deemed vacant, unappropriated, and unreserved within the meaning of the Act of May 17, 1906, as amended, and, as such, shall be subject to adjudication or approval pursuant to the terms of this section: Provided, however, That if the described land is included as part of a project licensed under part I of the Federal Power Act of June 10, 1920 (41 Stat. 24), as amended [16 U.S.C. 791a et seq.], or is presently utilized for purposes of generating or transmitting electrical power or for any other project authorized by Act of Congress, the foregoing provision shall not apply and the allotment application shall be adjudicated pursuant to the Act of May 17, 1906, as amended: Provided further, That where the allotment applicant commenced use of the land after its withdrawal or classification for powersite purposes, the allotment shall be made subject to the right of reentry provided the United States by section 24 of the Federal Power Act, as amended [16 U.S.C. 818]: Provided further, That any right of reentry reserved in a certificate of allotment pursuant to this section shall expire twenty years after December 2, 1980, if at that time the allotted land is not subject to a license or an application for a license under part I of the Federal Power Act, as amended [16 U.S.C. 791a et seq.], or actually utilized or being developed for a purpose authorized by that Act, as amended [16 U.S.C. 791a et seq.], or other Act of Congress.
  • (d) With respect to any project or portion thereof that was licensed pursuant to, or granted an exemption from, part I of the Federal Power Act [16 U.S.C. 791a et seq.] which is located on lands subject to a reservation under section 24 of the Federal Power Act [16 U.S.C. 818] and which did not receive a permit, right-of-way or other approval under this section prior to October 24, 1992, no such permit, right-of-way, or other approval shall be required for continued operation, including continued operation pursuant to section 15 of the Federal Power Act [16 U.S.C. 808], of such project unless the Commission determines that such project involves the use of any additional public lands or National Forest lands not subject to such reservation.