US Codex
U.S.C.
Notes

[§460l. Repealed. Pub. L. 113–287, § 7, Dec. 19, 2014, 128 Stat. 3272 — repealed] — Inbound Citations

16 U.S.C. § 460l

Cited by 9 provisions in release 119-102.

Citations to 16 U.S.C. § 460l as a whole

  • (2) Some provisions of the Federal Water Project Recreation Act [16 U.S.C. 460l–12 et seq.] are outdated because of increases in demand for outdoor recreation and changes in the economic climate for recreation managing entities.
  • (7) It is therefore in the best interest of the people of this Nation to amend the Federal Water Project Recreation Act [16 U.S.C. 460l–12 et seq.] to remove outdated restrictions and authorize the Secretary of the Interior to undertake specific measures for the management of Reclamation lands.
  • (b) The expansion or modification of a recreational facility constructed under this part shall not increase the capital repayment responsibilities or operation and maintenance expenses of the beneficiaries of authorized purposes of the associated Reclamation project. The term “beneficiaries” does not include those entities who sign agreements or enter into contracts for recreation facilities pursuant to the Federal Water Project Recreation Act [16 U.S.C. 460l–12 et seq.].
  • (11) The Federal Water Project Recreation Act (16 U.S.C. 460l–12 et seq.).
  • The Secretary shall not require, under section 460d of title 16, and the Federal Water Project Recreation Act [16 U.S.C. 460l–12 et seq.], non-Federal interests to assume operation and maintenance of any recreational facility operated by the Secretary at any water resources project as a condition to the construction of new recreational facilities at such project or any other water resources project.
  • (3) Costs allocated to recreation or fish and wildlife enhancement shall be reimbursed in accordance with the Federal Water Project Recreation Act (79 Stat. 213), as amended [16 U.S.C. 460l–12 et seq.].
  • (4) Costs allocated to the purpose of municipal, industrial, and miscellaneous water service, commercial power, and the portion of recreation and fish and wildlife enhancement costs reimbursable under the Federal Water Project Recreation Act [16 U.S.C. 460l–12 et seq.], shall be repaid within 50 years with interest. The interest rate used shall be determined by the Secretary of the Treasury, taking into consideration average market yields on outstanding marketable obligations of the United States with remaining periods to maturity comparable to the applicable reimbursement period during the month preceding the fiscal year in which the costs are incurred. To the extent that more than one interest rate is determined pursuant to the preceding sentence, the Secretary of the Treasury shall establish an interest rate at the weighted average of the rates so determined.
  • The conservation and development of the fish and wildlife resources and the enhancement of recreation opportunities in connection with the project works authorized pursuant to this subchapter shall be in accordance with the provisions of the Federal Water Project Recreation Act (79 Stat. 213) [16 U.S.C. 460l–12 et seq.], except as provided in section 1522 of this title.
  • Upon completion of each lower basin unit of the project herein or hereafter authorized, or separate feature thereof, the Secretary shall allocate the total costs of constructing said unit or features to (1) commercial power, (2) irrigation, (3) municipal and industrial water supply, (4) flood control, (5) navigation, (6) water quality control, (7) recreation, (8) fish and wildlife, (9) the replenishment of the depletion of Colorado River flows available for use in the United States occasioned by performance of the Water Treaty of 1944 with the United Mexican States (Treaty Series 994; 59 Stat. 1219), and (10) any other purposes authorized under the Federal reclamation laws. Costs of construction, operation, and maintenance allocated to the replenishment of the depletion of Colorado River flows available for use in the United States occasioned by compliance with the Mexican Water Treaty (including losses in transit, evaporation from regulatory reservoirs, and regulatory losses at the Mexican boundary, incurred in the transportation, storage, and delivery of water in discharge of the obligations of that treaty) shall be nonreimbursable: Provided, That the nonreimbursable allocation shall be made on a pro rata basis to be determined by the ratio between the amount of water required to comply with the Mexican Water Treaty and the total amount of water by which the Colorado River is augmented pursuant to the investigations authorized subchapter II of this chapter and any future Congressional authorization. The repayment of costs allocated to recreation and fish and wildlife enhancement shall be in accordance with the provisions of the Federal Water Project Recreation Act (79 Stat. 213) [16 U.S.C. 460l–12 et seq.]: Provided, That all of the separable and joint costs allocated to recreation and fish and wildlife enhancement as a part of the Dixie project, Utah, shall be nonreimbursable. Costs allocated to nonreimbursable purposes shall be nonreturnable under the provisions of this chapter.