US Codex
U.S.C.
Notes

§1132. Acquisition — Inbound Citations

14 U.S.C. § 1132

Cited by 3 provisions in release 119-102.

Citations to 14 U.S.C. § 1132 as a whole

  • In addition to amounts otherwise available, there is appropriated to the Coast Guard for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, $24,593,500,000, to remain available until September 30, 2029, notwithstanding paragraphs (1) and (2) of section 1105(a) and sections 1131, 1132, 1133, and 1156, to use expedited processes to procure or acquire new operational assets and systems, to maintain existing assets and systems, to design, construct, plan, engineer, and improve necessary shore infrastructure, and to enhance operational resilience for monitoring, search and rescue, interdiction, hardening of maritime approaches, and navigational safety, of which—

Citations to §1132(a)(1)

  • (a) The Commandant shall ensure that developmental test and evaluation, operational test and evaluation, life-cycle cost estimates, and the development and demonstration requirements applied by this chapter to acquisition projects and programs are met to confirm that the projects or programs meet the requirements identified in the mission-analysis and affordability assessment prepared under section 1131(a)(2), the operational requirements developed under section 1132(a)(1) and the following development and demonstration objectives:
    (1) To demonstrate that the design, manufacturing, and production solution is based upon a stable, producible, and cost-effective product design.
    (2) To ensure that the product capabilities meet contract specifications, acceptable operational performance requirements, and system security requirements.
    (3) To ensure that the product design is mature enough to commit to full production and deployment.

Citations to §1132(d)(1)

  • (1) The Commandant shall ensure that the Coast Guard conducts developmental tests and evaluations and operational tests and evaluations of a capability or asset and the subsystems of the capability or asset in accordance with the master plan prepared for the capability or asset under section 1132(d)(1).1