§2807. Architectural and engineering services and construction design — Inbound Citations
10 U.S.C. § 2807
Cited by 4 provisions in release 119-102.
Citations to 10 U.S.C. § 2807 as a whole
-
(b) In subsection (a)(6), the term “military construction” includes any construction, development, conversion, or extension of any kind which is carried out with respect to any military facility or installation (including any Government-owned or Government-leased industrial facility used for the production of defense articles and any facility to which section 4174 of this title applies), any activity to which section 2807 of this title applies, any activity to which chapter 1803 of this title applies, and advances to the Secretary of Transportation for the construction of defense access roads under section 210 of title 23. Such term does not include any activity to which section 2821 or 2854 of this title applies.
-
(2) Nothing in this section restricts the authority of the Secretary to obtain architectural and engineering services under section 2807 of this title.
Citations to §2807(a)
-
(1) Subject to paragraph (4), each Secretary concerned may use funds available to the Secretary under section 2807(a) or 18233(e) of this title to accelerate the design effort in connection with a military construction project for which the two-phase selection procedures described in subsection (c) are used to select the contractor for both the design and construction portion of the project before the project is specifically authorized by law and before funds are appropriated for the construction portion of the project. Notwithstanding the limitations contained in such sections, use of such funds for the design portion of a military construction project may continue despite the subsequent authorization of the project. The advance notice requirement of section 2807(b) of this title shall continue to apply whenever the estimated cost of the design portion of the project exceeds the amount specified in such section.
Citations to §2807(b)
-
(1) Subject to paragraph (4), each Secretary concerned may use funds available to the Secretary under section 2807(a) or 18233(e) of this title to accelerate the design effort in connection with a military construction project for which the two-phase selection procedures described in subsection (c) are used to select the contractor for both the design and construction portion of the project before the project is specifically authorized by law and before funds are appropriated for the construction portion of the project. Notwithstanding the limitations contained in such sections, use of such funds for the design portion of a military construction project may continue despite the subsequent authorization of the project. The advance notice requirement of section 2807(b) of this title shall continue to apply whenever the estimated cost of the design portion of the project exceeds the amount specified in such section.