---
kind: "section"
citation: "10 U.S.C. § 6123"
title: "10"
title_heading: "Armed Forces"
number: "6123"
heading: "Acceleration of depleted uranium manufacturing processes"
release: "119-102"
date: "2026-07-12"
url: "https://uscodex.org/usc/10/6123"
units:
  - "Subtitle A — General Military Law"
  - "Part VI — Elements of Department of Defense and Other Matters"
  - "Subpart B — Atomic Energy Defense"
  - "Chapter 602 — Nuclear Weapons Stockpile Matters"
  - "Subchapter I — Stockpile Stewardship and Weapons Production"
---

# §6123. Acceleration of depleted uranium manufacturing processes

- (a) **Acceleration of Manufacturing.—** The [Administrator](/usc/10/2700.md?p=3) shall require the nuclear security enterprise to accelerate the modernization of manufacturing processes for depleted uranium by 2030 so that the nuclear security enterprise—
  - (1) demonstrates bulk cold hearth melting of depleted uranium alloys to augment existing capabilities on an operational basis for war [reserve](/usc/10/101.md?p=c-6) [components](/usc/10/3011.md?p=13);
  - (2) manufactures, on a repeatable and ongoing basis, war [reserve](/usc/10/101.md?p=c-6) depleted uranium alloy [components](/usc/10/3011.md?p=13) using net shape casting;
  - (3) demonstrates, if possible, a production [facility](/usc/10/2700.md?p=2) to conduct routine operations for manufacturing depleted uranium alloy [components](/usc/10/3011.md?p=13) outside of the current perimeter security fencing of the Y-12 [National Security](/usc/10/801.md?p=16) Complex, Oak Ridge, Tennessee; and
  - (4) has available high purity depleted uranium for the production of war [reserve](/usc/10/101.md?p=c-6) [components](/usc/10/3011.md?p=13).
- (b) **Annual Briefing.—** Not later than March 31, 2023, and annually thereafter through 2030, the [Administrator](/usc/10/2700.md?p=3) shall provide to the [congressional defense committees](/usc/10/101.md?p=a-16) a briefing on—
  - (1) progress made in carrying out [subsection (a)](#a);
  - (2) the cost of activities conducted under such subsection during the preceding fiscal year; and
  - (3) the ability of the nuclear security enterprise to convert depleted uranium fluoride hexafluoride to depleted uranium tetrafluoride.

## Source credit

(Added Pub. L. 119–60, div. C, title XXXI, § 3111(a), Dec. 18, 2025, 139 Stat. 1359.)

## Notes

### Editorial Notes

### Prior Provisions

Provisions similar to those in this section were contained in section 3121 of Pub. L. 117–263, which was set out as a note under section 2532 of Title 50, War and National Defense, prior to repeal by Pub. L. 119–60, § 3111(b)(11).
