---
kind: "section"
citation: "9 C.F.R. § 590.149"
title: "9"
number: "590.149"
heading: "Conditions for receiving inspection."
url: "https://uscodex.org/cfr/9/590.149"
---

# §590.149. Conditions for receiving inspection.

- (a) Before receiving Federal inspection, a plant must have developed written sanitation Standard Operating Procedures, in accordance with [part 416](/cfr/9/part416.md) and [§ 591.1(a)](/cfr/9/591.1.md?p=a) of this chapter.
- (b) Before receiving Federal inspection, a plant must conduct a hazard analysis, and develop and implement a HACCP plan, in accordance with [part 417](/cfr/9/part417.md) and [§ 591.1(a)](/cfr/9/591.1.md?p=a) of this chapter. A conditional grant of inspection may be provided for a period not to exceed 90 days, during which period the facility must validate its HACCP plan.
- (c) Before producing new product for distribution in commerce, a plant must conduct a hazard analysis and develop a HACCP plan applicable to that product, in accordance with [§ 417.2](/cfr/9/417.2.md) of this chapter. During a period not to exceed 90 days after the date the new product is produced for distribution in commerce, the plant must validate its HACCP plan, in accordance with [§ 417.4](/cfr/9/417.4.md) of this chapter.

## Notes

### Amendments

[85 FR 68675, Oct. 29, 2020; 85 FR 81340, Dec. 16, 2020]

### Authority

Authority: 21 U.S.C. 1031-1056; 7 CFR 2.18, 2.53.

### Source

Source: 36 FR 9814, May 28, 1971, unless otherwise noted. Redesignated at 42 FR 32514, June 27, 1977 and 46 FR 63203, Dec. 31, 1981. Further redesignated at 63 FR 72353, Dec. 31, 1998.

### Amendments

[85 FR 68675, Oct. 29, 2020; 85 FR 81340, Dec. 16, 2020]
