---
kind: "section"
citation: "9 C.F.R. § 590.124"
title: "9"
number: "590.124"
heading: "Schedule of operation of official plants."
url: "https://uscodex.org/cfr/9/590.124"
---

# §590.124. Schedule of operation of official plants.


Operating schedules for an official plant shall be subject to approval of the Administrator. The normal operating schedule shall consist of a continuous 8-hour period per day and shall include the time for FSIS inspection program personnel to put on required gear and to walk to a work station, and the time for FSIS inspection program personnel to return from a work station and remove required gear (excluding not to exceed 1 hour for lunch), 5 consecutive days per week, within the administrative workweek, Sunday through Saturday, for each full shift required. Clock hours of daily operations need not be specified in a schedule, although as a condition of continuance of approval of a schedule, the hours of operation must be reasonably uniform from day to day.


## Notes

### Amendments

[48 FR 20683, May 9, 1983, as amended at 76 FR 33980, June 10, 2011]

### Authority

Authority: 21 U.S.C. 1031-1056; 7 CFR 2.18, 2.53.

### Source

Source: 36 FR 9814, May 28, 1971, unless otherwise noted. Redesignated at 42 FR 32514, June 27, 1977 and 46 FR 63203, Dec. 31, 1981. Further redesignated at 63 FR 72353, Dec. 31, 1998.

### Amendments

[48 FR 20683, May 9, 1983, as amended at 76 FR 33980, June 10, 2011]
