---
kind: "section"
citation: "9 C.F.R. § 54.9"
title: "9"
number: "54.9"
heading: "Waiver of requirements for scrapie control pilot projects."
url: "https://uscodex.org/cfr/9/54.9"
---

# §54.9. Waiver of requirements for scrapie control pilot projects.


The Administrator may waive the following requirements of this part for participants in a scrapie control pilot project by recording the requirements waived in the scrapie control pilot project plan:

- (a) The determination that an animal is a high-risk animal, if the scrapie control pilot project plan contains testing or other procedures that indicate that an animal, despite meeting the definition of high-risk animal, is unlikely to spread scrapie; and
- (b) The requirement that high-risk animals must be removed from a flock if the scrapie control pilot project plan contains alternative procedures to prevent the further spread of scrapie without removing high-risk animals from the flock.

## Notes

### Authority

Authority: 7 U.S.C. 8301-8317; 7 CFR 2.22, 2.80, and 371.4.

### Source

Source: 66 FR 43982, Aug. 21, 2001, unless otherwise noted.
