---
kind: "section"
citation: "7 C.F.R. § 42.123"
title: "7"
number: "42.123"
heading: "Flow diagram for skip lot sampling and inspection."
url: "https://uscodex.org/cfr/7/42.123"
---

# §42.123. Flow diagram for skip lot sampling and inspection.



## Notes

### Source

Source: 41 FR 42639, Sept. 28, 1976, unless otherwise noted. Redesignated at 42 FR 32514, June 27, 1977, and further redesignated at 46 FR 63203, Dec. 31, 1981.

### Authority

Authority: Secs. 203, 205, 60 Stat. 1087, as amended, 1090, as amended (7 U.S.C. 1622, 1624).
