# §299.701. General requirements.


Under the procedures provided in [§ 299.713](/cfr/49/299.713.md), the railroad shall obtain FRA approval of a written inspection, testing, and maintenance program. The program shall provide detailed information, consistent with the requirements set forth in §§ [299.337 through 299.349](/cfr/49/299.337..299.349.md), and [299.445(a)](/cfr/49/299.445.md?p=a), on the inspection, testing, and maintenance procedures necessary for the railroad to safely operate its system. This information shall include a detailed description of—

- (a) Safety inspection procedures, intervals, and criteria;
- (b) Test procedures and intervals;
- (c) Scheduled preventive maintenance intervals;
- (d) Maintenance procedures; and
- (e) **Special testing equipment or measuring devices required to perform safety inspections and tests.**