---
kind: "section"
citation: "49 C.F.R. § 236.301"
title: "49"
number: "236.301"
heading: "Where signals shall be provided."
url: "https://uscodex.org/cfr/49/236.301"
---

# §236.301. Where signals shall be provided.


Signals shall be provided to govern train movements into and through interlocking limits, except that a signal shall not be required to govern movements over a hand-operated switch into interlocking limits if the switch is provided with an electric lock and a derail at the clearance point, either pipe-connected to the switch or independently locked, electrically. Electric locks installed under this rule must conform to the time and approach locking requirements of [Rule 314](/cfr/49/314.md) (without reference to the 20-mile exceptions), and those of either [Rule 760](/cfr/49/760.md) or [Rule 768](/cfr/49/768.md), as may be appropriate.


## Notes

### Authority

Authority: 49 U.S.C. 20102-20103, 20107, 20133, 20141, 20157, 20301-20303, 20306, 20501-20505, 20701-20703, 21301-21302, 21304; 28 U.S.C. 2461 note; and 49 CFR 1.89.

### Source

Source: 33 FR 19684, Dec. 25, 1968, unless otherwise noted.
