# §195.9. Outer continental shelf pipelines.


Operators of transportation pipelines on the Outer Continental Shelf must identify on all their respective pipelines the specific points at which operating responsibility transfers to a producing operator. For those instances in which the transfer points are not identifiable by a durable marking, each operator will have until September 15, 1998, to identify the transfer points. If it is not practicable to mark durably a transfer point and the transfer point is located above water, the operator must depict the transfer point on a schematic maintained near the transfer point. If a transfer point is located subsea, the operator must identify the transfer point on a schematic which must be maintained at the nearest upstream facility and provided to PHMSA upon request. For those cases in which adjoining operators have not agreed on a transfer point by September 15, 1998, the Regional Director and the Bureau of Ocean Energy Management, Regulation and Enforcement Regional Supervisor will make a joint determination of the transfer point.


## Notes

### Amendments

[Amdt. 195-127, 91 FR 22060, Apr. 24, 2026]

### Authority

Authority: 30 U.S.C. 185(w)(3), 49 U.S.C. 5103, 60101 et seq., and 49 CFR 1.97.

### Source

Source: Amdt. 195-22, 46 FR 38360, July 27, 1981, unless otherwise noted.

### Amendments

[Amdt. 195-127, 91 FR 22060, Apr. 24, 2026]