# §130.120. Information summary.

- (a) Each person preparing a comprehensive response plan must include information summaries for the core plan and each response zone meeting the requirements of this section.
- (b) The information summary for the core plan must include all of the following:
  - (1) The name and mailing address of the railroad;
  - (2) A listing and description of each response zone, including county(s) and State(s); and
  - (3) The name or title of the qualified individual(s) and alternate(s) for each response zone, with telephone numbers at which they can be contacted on a 24-hour basis.
- (c) The information summary for each response zone appendix must include all of the following:
  - (1) The name and mailing address of the railroad;
  - (2) A description of the response zone, including county(s) and State(s);
  - (3) The name or title of the qualified individual(s) and alternate(s) for the response zone, with telephone numbers at which they can be contacted on a 24-hour basis;
  - (4) The type(s) of oil expected to be carried; and
  - (5) **Determination of the worst-case discharge and supporting calculations.**
- (d) The information summary should be listed first, before other information in the plan, or clearly identified through the use of tabs or other visual aids.

## Notes

### Source

Source: 84 FR 6948, Feb. 28, 2019, unless otherwise noted.

### Authority

Authority: 33 U.S.C 1321; 49 CFR 1.81 and 1.97.

### Source

Source: Amdt. 130-2, 61 FR 30541, June 17, 1996, unless otherwise noted.