---
kind: "section"
citation: "48 C.F.R. § 3405.202"
title: "48"
number: "3405.202"
heading: "Exceptions."
url: "https://uscodex.org/cfr/48/3405.202"
---

# §3405.202. Exceptions.

- (a)
  - (15) **FSA—** Issuance of a synopsis is not required when the firm to be solicited has previously provided a module for the system under a contract that contained cost, schedule, and performance goals and the contractor met those goals.

## Notes

### Authority

Authority: 5 U.S.C. 301 and 20 U.S.C. 1018a.

### Source

Source: 88 FR 60542, Sept. 1, 2023, unless otherwise noted.
