---
kind: "section"
citation: "48 C.F.R. § 2816.601"
title: "48"
number: "2816.601"
heading: "Time-and-materials contracts."
url: "https://uscodex.org/cfr/48/2816.601"
---

# §2816.601. Time-and-materials contracts.


The BPC, or designee at a level at or above the chief of the contracting office, is the agency official authorized to approve a determination and finding prescribed in FAR 16.601(d)(1)(ii).


## Notes

### Authority

Authority: 28 U.S.C. 510; 40 U.S.C. 486(c); 28 CFR 0.75(j) and 28 CFR 0.76(j).

### Source

Source: 87 FR 47118, Aug. 2, 2022, unless otherwise noted.
